Loading...
HomeMy WebLinkAboutAment Design - Supplement No. 6 - Cont 843-5/2/2016riease return rms copy m: City Clerk & Finance Dept. 715 Mulberry St. Waterloo, IA 50703 Iowa DOT Project No. STP -U-8155(731)--70-07 Owner Project No. 843 Professional Services Agreement for Kimball Avenue Transportation Improvements Project — from 500 Feet South of Tower Park Dr to Acadia St Supplemental Agreement No. 6 This is an AGREEMENT, made as of the first (1 st) day of March in the year 2016 by and BETWEEN the City of Waterloo, Iowa, identified as the Owner; City of Waterloo, Iowa City Hall 715 Mulberry Street Waterloo, IA 50703 and the Consultant; Ament, Inc. (dba Ament Design) 625 32nd Avenue SW Cedar Rapids, IA 52404 for the following Project: The parties hereto entered into an agreement dated the twenty-fourth (24th) day of September, 2012 for survey, design and preparation of plans, specifications, and estimates for the Kimball Avenue Transportation Improvement Project —from 500 Feet South of Tower Park Drive to Acadia Street in Black Hawk County. The Owner shall proceed with the construction of the proposed improvements identified in the final plans, specifications, and estimates for the improvements, subject to the concurrence and approval of the Iowa Department of Transportation (Iowa DOT) and the Federal Highway Administration (FHWA) (when applicable). The Owner desires to employ the Consultant to provide additional work in connection with the construction of the improvements. The Consultant is willing to perform the construction -relates services in accordance with the terms hereinafter provided and warrants that it is in compliance with Iowa statutes relating to the licensure of professional engineers. Remarkable Service ... Superior Results www.ament.com P:\G00412.10\Word\Agreements\G0041210 Consultant Contract (SA No 6 -Contingency Release and Fixed Fee Increase) (03-01- 2016).doc ATTN: Jeff Bales March 1,2016 Page 2 RE: KimbaIl Avenue Transportatiori Improvements Project - from 500' S of Tower Park Dr to Acadia St State Project No. STP -U-81 55(731 )--70-07 / Waterloo Contract No. 843 Ament Projeot No. G0004.121000/Tasks 004-005 Request for Release of Contingency and lncrease in Fixed Fee ldentified in Supplemental Agreement No. 4 This Agreement authorizes the release of the $65,913 contingency amount that was included in Supplemental Agreement No. 4 and authorizes the use of this contingency amount for 1) additional estimated actual costs that will exceed our initial estimated actual costs, and 2) to inerease the fixed fee amount for Ament Design from $58,433, the amount that was included in Supplemental Agreement No. 4, by $7,060, to a total of $65,493. 1. All terms and conditions of the original consultant agreement and subsequent supplemental agreements shall remain in effect. 2. Actual costs (the amount that will be invoiced) will exceed the estimated actual costs. Therefore, we are requesting a release of contingency. The costs that are causing the overrun are labor and overhead costs for construction -related services that Ament Design staff are providing, including construction administration and construction observation. The reasons for the overrun are: a. the Project schedule has changed - i.e., working days for the Prime Contractor have been increased by extra work order from 240 working days to 270 working days, a 12,5% increase, and b. a substantial change in scope has been made with the provision of additional services requested andfor approved by the City including: 1. facilitation of monthly utility coordination meetings during construction, H. development and distribution of bi-weekly Applications for Payment Estirnates, rather than monthly applications, as originally proposed, and hi. Project re -design, additional design, drafting of revised Project elements, and development of additional Extra Work Orders necessitated by: 1. delays to the Project schedule caused by utility companies, 2. revised Project staging required as a result of these delays, and 3. conflicts with utility company facilities that could not or would not be resolved by the utility companies in a timely rnanner. 3. As a result of the time schedule change and the substantial change in scope, as outlined above, we request that the City approve an increase in the fixed fee amount for providing construction related services. 4. We request that part of the released contingency be directed to the fixed fee increase. The before and after conditions created by these requests are as follows: Construction Phase Services ONLY SurjDlemental Aqreements 4(Rev) & 5 Before After Chanqe Estimated Actual Costs (Ament Design OnIy) Fixed Fee (as a Percent of Labor + Overhead) Contingency $492,970 $58,433 (12%) $65,91 3 $551 823 $65,493 (12%) so $58,853 $7,060 (12%) -$65,91 3 Total Estimated Cost (Ament Design Only) $617,316 $617,316 so P:\G00412.10\Word\,Agreements\00041210 Consultant Contract (SA No 6 - Contingency Release and Fixed Fee Inerease) (03-01- 201 6).doc ATTN: Jeff Bales March 1, 2016 Page 3 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their proper officials thereunto duly authorized as of the dates below indicated. Am�/ent, Inc. -/V' c Date: Michael G. Dryden, P.E. Secretary/Treasurer City of Waterloo, Iowa Quentin M. Hart Mayor Iowa Department of Transportation Accepted for FHWA Authorization' By:y�l� Robert Welper, P.E. Local Systems Engineer District 2 Office Date: _2_6 1 -A-��-avecll ct,F-cevr,c�C, Date: The Iowa DOT is not a party to this Agreement. However, by signing this Agreement, the Iowa DOT is indicating the work proposed under this Agreement is acceptable for FHWA authorization of Federal funds. P:\G00412.10\Word\Agreements\G0041210 Consultant Contract (SA No 6 -Contingency Release and Fixed Fee Increase) (03-01- 2016).doc