Loading...
HomeMy WebLinkAboutEntrust_-_PSA_Addendum_No_11_-_Fiber_Backbone_-_4.6.2026Docusign Envelope ID: EB9D3C40-CC9E-8DE9-805D-F9DEA6F7D1DA ADDENDUM NO. 11 TO THE EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA — PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION AND ENGINEERING SUPPORT SERVICES 2026 CITY OF WATERLOO, IOWA DATE: MARCH 23, 2026 The following is a revision to the EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA — PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION AND ENGINEERING SUPPORT SERVICES 2026: o Due to concerns with underground debris and waste from the building demolition near Virden Creek, the City of Waterloo has requested to attach to MidAmerican Energy poles parallel to the creek versus underground to serve the Virden Creek Lift Station. o This Addendum has been created to account for labor towards the Make Ready Engineering (MRE) services (make ready engineering, pole loading analysis, pole applications, PE stamps, and pole data collection) for the MidAmerican Energy pole attachment application. It does not include any construction labor or material costs associated with an updated BoM. o The following labor pricing is net new costs to the project: Service Description Quantity Unit Price Amount Make Ready Engineering Design Tech II 3 $130.00 $390.00 Pole Load Analysis Design Coordinator 3 $145.00 $435.00 Pole Data Collection Construction Manager 1 $175.00 $175.00 Pole Data Collection Construction Inspector 1 $140.00 $140.00 Pole Data Collection Field Manager 0.5 $200.00 $100.00 PE Stamps PE Stamps 3 $190.00 $570.00 TOTAL $1,810.00 Any revisions to any of the Contract Documents made by this Addendum shall be considered as the same revision to any and all related areas of the Contract Documents not specifically called out in this Addendum. a —Signed by: PM, belt,Swt, '-393E8397B3D3421... Dave Boesen Mayor of Waterloo, Iowa City of Waterloo A)..a_ 142.2./Q/L Karen Rossmeier Director, Broadband Design EN Engineering, LLC Page 1 of 1