HomeMy WebLinkAboutEntrust_-_PSA_Addendum_No_11_-_Fiber_Backbone_-_4.6.2026Docusign Envelope ID: EB9D3C40-CC9E-8DE9-805D-F9DEA6F7D1DA
ADDENDUM NO. 11
TO THE
EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO IA — PROJECT MANAGEMENT,
CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION AND ENGINEERING SUPPORT
SERVICES 2026
CITY OF WATERLOO, IOWA
DATE: MARCH 23, 2026
The following is a revision to the EN COMMUNICATIONS CONTRACT - CITY OF WATERLOO
IA — PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, CONSTRUCTION
INSPECTION AND ENGINEERING SUPPORT SERVICES 2026:
o Due to concerns with underground debris and waste from the building demolition
near Virden Creek, the City of Waterloo has requested to attach to MidAmerican
Energy poles parallel to the creek versus underground to serve the Virden Creek
Lift Station.
o This Addendum has been created to account for labor towards the Make Ready
Engineering (MRE) services (make ready engineering, pole loading analysis, pole
applications, PE stamps, and pole data collection) for the MidAmerican Energy
pole attachment application. It does not include any construction labor or
material costs associated with an updated BoM.
o The following labor pricing is net new costs to the project:
Service
Description
Quantity
Unit Price
Amount
Make Ready Engineering
Design Tech II
3
$130.00
$390.00
Pole Load Analysis
Design Coordinator
3
$145.00
$435.00
Pole Data Collection
Construction Manager
1
$175.00
$175.00
Pole Data Collection
Construction Inspector
1
$140.00
$140.00
Pole Data Collection
Field Manager
0.5
$200.00
$100.00
PE Stamps
PE Stamps
3
$190.00
$570.00
TOTAL
$1,810.00
Any revisions to any of the Contract Documents made by this Addendum shall be
considered as the same revision to any and all related areas of the Contract Documents not
specifically called out in this Addendum.
a —Signed by:
PM, belt,Swt,
'-393E8397B3D3421...
Dave Boesen
Mayor of Waterloo, Iowa
City of Waterloo
A)..a_ 142.2./Q/L
Karen Rossmeier
Director, Broadband Design
EN Engineering, LLC
Page 1 of 1