Loading...
HomeMy WebLinkAboutEntrust_Solutions_Group_-_CO_46_-_5.4.2026Docusign Envelope ID: 5D1 B7EDD-4172-823F-8093-2B0752AB15D4 Change Order Request (cl ange Order Type tf elainage to ange Order Name: CITY OF I�A J TERLOO E COMMUNICATIONS Cc- rm.m: Design/Engineering la • y. Jrli+l Yt Will Be Subject 'Co The Withho Contract Sections 6.2(lXil and Iii Change Order Cost: ings and Release Set Forth In The $34,96 L.74 No CR-2026-0046 c onstruction Contractor Name (Ann) ITG ,'quest Date: 4/2/2026 6 roject Manager: Michael Regan PM Broadband Implementation ; cquested By: Client/Owner Client/Owner (Ann) City of Waterloo :+ trust Si O gn ff Clayton Johnston VP of Construction Description of Change (includelocati ill - — The following Change Order has been created to account for additional construction labor and materials associated with the updated design planfor the Backbone site Riverview Recreation Area (TO 09 / LCP 022). Reason for Change — Due to long lead times with underground USAGE permits for levee crossings, the City requested a redesign to avoid a crossing along Mitchell Ave & Riverview Recreational Area Trail to serve the Riverview Rec Area. The new fiber route will be going south on Sheffield Ave to Easton Ave, then going east towards the Waste Management Administration Building and cutting across towards Mitchell Ave near boat dock parking lot, and then north on Mitchell Ave towards the recreation area. 51u.3.' F ti I ;i lif� Specifications Labor & material pricing came from the original BoM pricing approved by Waterloo Fiber and the City of Waterloo associated with Contract # 1088 Docusign Envelope ID: 5D1 B7EDD-4172-823F-8093-2B0752AB15D4 Itemized Breakdown of Work Location Description Quantity Unit Price Amount Work Order # Labor Underground - Buried Labor Directional Bore (0)1", (0) 2-, (1)1.25"-->[LF] 2,172 $ 11.95 $ 25,955.40 Installation, Underground Fiber Cable - Including Slack (Micro fiber nutst be blown in)-->[LFJ 2,572 $ 1.20 $ 3,086.40 Installation, Vault 24' x 36"-->[EAJ 3 $ 210.00 $ 720.00 Splicing Labor Install New Splice Gale & Prep Cable -->[EA] I $ 200.00 $ 200.00 Splicing, Fusion, Single Fiber -a[EA) 2 $ 25.00 $ 50.0D Testing, OTDR, Uni-Directional, Power Meter Testing-->IEAJ 2 $ 1.00 $ 2.00 »•a CR Labor Subtotal $ 30.013.80 Materials Fiber Material 24 CT Micro Fiber Cable -->[FT] 2,572 $ 0,57 $ 1,966.04 Underground Material 1.25" FiDPE Roll Conduit, Orange - SDR 11-->[FTI 2,172 $ 0.48 $ 1,012.56 Vault, 24' x 36'-->[EA] 3 $ 699.76 $ 2,099.28 Closures Material FOSC 450 B Closure -->[EA] 1 $ 282.02 $ 282.02 Splice Tray for B-Gel Closure (SM12) -- [EAJ 1 $ 17.31 $ 17.31 Slack Basket for B-Gel Closure-->[EA1 1 $ 40.73 $ 40.73 ••• CR Materials Subtotal $ 4,947.94 • TOTALCRCOST $ 34,961.74 Docusign Envelope ID: 5D1 B7EDD-4172-823F-8093-2B0752AB15D4 Entrust Sign -Off Print Name / Title: Signature: Date: Clayton Johnston VP of Constructionk cearif., 4/3/202 Contractor Manager (not needed for design change requests) Print Name / Title: Signature: Date: Andrew DeKock Regional Manager[] Client/Owner (Attu) Print Name / Title: Signature: Date: **End** Dave Boesen, Mayor Signed by: Utum- Ibt,Sun, "-393E8397B3D3421... 5/4/2026