Change Order Request
(cl ange Order Type
tf elainage
to ange Order Name:
CITY OF
I�A J TERLOO
E COMMUNICATIONS
Cc- rm.m:
Design/Engineering
la • y. Jrli+l Yt
Will Be Subject 'Co The Withho
Contract Sections 6.2(lXil and Iii
Change Order Cost:
ings and Release Set Forth In The
$34,96 L.74
No
CR-2026-0046
c onstruction Contractor Name (Ann) ITG
,'quest Date:
4/2/2026
6 roject Manager: Michael Regan
PM Broadband Implementation
; cquested By:
Client/Owner
Client/Owner (Ann) City of Waterloo
:+ trust Si O
gn ff
Clayton Johnston
VP of Construction
Description of Change (includelocati ill
- —
The following Change Order has been created to account for additional construction labor and materials
associated with the updated design planfor the Backbone site Riverview Recreation Area (TO 09 / LCP 022).
Reason for Change
—
Due to long lead times with underground USAGE permits for levee crossings, the City requested a redesign to
avoid a crossing along Mitchell Ave & Riverview Recreational Area Trail to serve the Riverview Rec Area. The
new fiber route will be going south on Sheffield Ave to Easton Ave, then going east towards the Waste
Management Administration Building and cutting across towards Mitchell Ave near boat dock parking lot,
and then north on Mitchell Ave towards the recreation area.
51u.3.' F ti I ;i lif� Specifications
Labor & material pricing came from the original BoM pricing approved by Waterloo Fiber and the City of
Waterloo associated with Contract # 1088
Docusign Envelope ID: 5D1 B7EDD-4172-823F-8093-2B0752AB15D4
Itemized Breakdown of Work
Location
Description Quantity Unit Price Amount
Work Order #
Labor
Underground - Buried Labor
Directional Bore (0)1", (0) 2-, (1)1.25"-->[LF]
2,172
$ 11.95
$ 25,955.40
Installation, Underground Fiber Cable - Including Slack (Micro fiber
nutst be blown in)-->[LFJ
2,572
$ 1.20
$ 3,086.40
Installation, Vault 24' x 36"-->[EAJ
3
$ 210.00
$ 720.00
Splicing Labor
Install New Splice Gale & Prep Cable -->[EA]
I
$ 200.00
$ 200.00
Splicing, Fusion, Single Fiber -a[EA)
2
$ 25.00
$ 50.0D
Testing, OTDR, Uni-Directional, Power Meter Testing-->IEAJ
2
$ 1.00
$ 2.00
»•a
CR Labor Subtotal
$ 30.013.80
Materials
Fiber Material
24 CT Micro Fiber Cable -->[FT]
2,572
$ 0,57 $ 1,966.04
Underground Material 1.25" FiDPE Roll Conduit, Orange - SDR 11-->[FTI
2,172
$ 0.48 $ 1,012.56
Vault, 24' x 36'-->[EA]
3
$ 699.76 $ 2,099.28
Closures Material FOSC 450 B Closure -->[EA]
1
$ 282.02 $ 282.02
Splice Tray for B-Gel Closure (SM12) -- [EAJ
1
$ 17.31 $ 17.31
Slack Basket for B-Gel Closure-->[EA1
1
$ 40.73 $ 40.73
••• CR Materials Subtotal $ 4,947.94
• TOTALCRCOST $ 34,961.74
Docusign Envelope ID: 5D1 B7EDD-4172-823F-8093-2B0752AB15D4
Entrust Sign -Off
Print Name / Title:
Signature:
Date:
Clayton Johnston
VP of Constructionk
cearif.,
4/3/202
Contractor Manager (not needed for design change requests)
Print Name / Title:
Signature:
Date:
Andrew DeKock
Regional Manager[]
Client/Owner (Attu)
Print Name / Title:
Signature:
Date:
**End**
Dave Boesen, Mayor
Signed by:
Utum- Ibt,Sun,
"-393E8397B3D3421...
5/4/2026