Loading...
HomeMy WebLinkAboutEntrust_Solutions_Group_-_CO_47_-_5.4.2026Docusign Envelope ID: 5D1 B7EDD-4172-823F-8093-2B0752AB15D4 Change Order Request • ange Order Type I' etainage ange Order Name: CITY OF lAz t TERLOO E COMMUNICATIONS Design/Engineering _ . Will Be Subject To The Withholdings and Release Set Forth In The Contract Sections 6.2(f)(i) and (ii) No CR-2026-0047 Change Order Cost: $73,885.18 nstruction Contractor Name (Attn) ITG Request Date: 4411111 4/2/2026 i,", . raject Manager: Michael Regan PM Broadband Implementation Requested By: Client/Owner 1 e Iient/Owner (Mtn) City of Waterloo/Waterloo Fiber Entrust Sign -Off Clayton Johnston VP of Construction Description of -Change (include luea _ t The following Change Order has been created to account for additional constntction labor and materials associated with the updated design plan for the levee crossing along Katoski Dr between Black Hawk Rd and Huntington Rd (TO 16 / LCP 050). Reason for Change The MidAmerican Energy pole attachment application for an aerial levee crossing along Black Hawk Road was denied due to capacity issues. The City has requested to change the design, go overhead and attach to MidAmerican Energy poles for one (1) aerial levee crossing along Katoski Drive between Black Hawk Road and Huntington Road. 4+ °iial Submittals/Specification I.YWaterloo Labor & material pricing came from the original BoM pricing approved by Waterloo Fiber and the City of associated with Contract # 1088 Docusign Envelope ID: 5D1 B7EDD-4172-823F-8093-2B0752AB15D4 Itemized Breakdown of Work Loratian- Work Order # Description • Quantity'- I6Iro4 3'I+i, ' mount , labor Underground - Buried Labor Directional Bore (Or, (0) 2', (0) 1.25" -->[LFJ 2,63i $ 11.95 $ 31,440.43 Remove existing cable - i.e. coax/twisted pair in street light conduits to replace with fiber-->[LF] 2,269 $ 135 $ 3,063.15 Installation, Underground Fiber Cable - Including Slack (Regular Loose Tube Fiber) -a [LF] 361 $ 1.20 $ 457.20 Installation, Underground Fiber Cable - Including Slack (Micro fiber must be blown in)-->ILF] 7,853 $ 120 $ 9,423.60 Installation, Vault 24" x 36'-->[EAJ 4 $ 240.00 $ 960.00 Sawcut, Remove and Replace Asphalt 6' Thick-->[SgrFt] 5 $ 28.00 $ 140.00 Sawcut, Remove and Replace Concrete 6" Thick-->[SgrFt] 5 $ 32.00 $ 160.00 Aerial-Strand/Lash Labor Bond Strand/Guy to pole ground + materials -->[EA] • 3 $ 250.00 $ 750.00 Install Strand-->[FTi 381 $ 1.80 $ 685.80 Install Snow Shoes-->[F.A] 2 $ 160.00 $ 320.00 Install / Lash Aerial Cable-->[FTJ 381 $ 2.34 $ 891.54 Install Pole Risers-->[EAJ 2 $ 368.00 $ 616.00 Install Down Guy & Anchors-->[EAJ 2 $ 385.00 $ 770.00 Pole Transfer / Make Ready (Straight Through) -->[EA] 1 $ 193.00 $ 193.00 Pole Transfer / Make Ready (Double Dead-end)-->[EAj 2 $ 461.00 $ 922.00 Splicing Labor Install New Splice Case & Prep Cable -->[EA] 3 $ 200.00 $ 600.00 Re-enter splice closure-->[EAJ 20 $ 180.00 $ 3,600.00 Splicing, Fusion, Single Fiber -->[EA] 138 $ 23.00 $ 4,700.00 Splicing, Mau Fusion, 12 Fiber Ribbon -->[RIBBON] 94 $ 1.00 $ 94.00 s r * CR Labor Subtotal $ 59,786.74 Materials Fiber Material 48 CT Fiber Cable -AFT] 681 $ 6.48 $ 326.88 48 CT Micro Fiber Cable-->[FTJ 6,592 $ 0.90 $ 5,932.80 144 CT Micro Fiber Cable-->[FF] 1,261 $ 2.06 $ 2,597.66 Underground Material 1" HDPE Roll Conduit, Orange - SDR 11-->[FT] 2,631 $ 0.31 $ 999.78 Vault, 24' x 36'-->[EA] 4 $ 699.76 $ 2,799.04 Closures Material FOSC 450 B Closure -->[EA] 3 $ 282.02 $ 846.06 Splice Tray for B-Gel Closure (SM12)-->[EA] 3 $ 17.31 $ 51.93 Slack Basket for B-Gel Closure -->[EA] 3 $ 40.73 $ 122.19 Aerial Material Snow Shoes -->[EA] 2 $ 45.00 $ 90.00 U Guard-->[POLEI 2 $ 12.00 $ 24.00 Anchors -->[EA] 2 $ 125.00 $ 250.00 Guy Marker - Yellow plastic cover for visibility of down guy-->[EAJ 2 $ 10.00 $ 20.00 Aerial-Strand/Lash Material 6M Strand -->[FT] 881 $ 0.10 $ 38.10 ass C:RT9aleri3lsSubtota1 $ 14,098A4 sss TOTALCRCOST JIMMIE 73,885.18 Docusign Envelope ID: 5D1 B7EDD-4172-823F-8093-2B0752AB15D4 Entrust Sign -Off Print Name / Title: Signature: Date: Clayton Johnston VP of Construction J1i �ZGrCAi1i 4/3/20 5 Contractor Manager (not needed for design change requests) Print Narne / Title: Signature: Date: Andrew DeKock Regional Managers Client/Owner (Attn) Print Name / Title: Signature: Date: **End** ve Boe en, Mayor gned by: NA, Ixoc sun, 39JE 3y(B3U3421... 5/4/2026