Loading...
HomeMy WebLinkAboutInternational Paper Company - Easement Agreement - 5.18.2026Preparer: Austin J. McMahon, Lange & McMahon, PLC, 222 PS' St. E., Independence, IA 50644 (319) 334-4488 Return To: International Paper Company, Attn: Real Estate Director, 6400 Poplar Avenue, Memphis, TN 38197 EASEMENT AGREEMENT This Easement Agreement (the "Agreement") is entered into as of 1",?1J71c, by and between the City of Waterloo, Iowa ("Grantor") and International aper Company ("Grantee"). 1. Grant of Easements. In consideration of the mutual promises and covenants contained herein, and for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, Grantor does hereby grant and convey unto Grantee, its employees, contractors, and agents, and Grantee does hereby accept, an easement (the "Easement") in, upon, over, across, and beneath the real estate (the "Easement Premises") depicted and described in the Plat of Railroad Easement attached hereto as Exhibit A. In connection with activities for construction, repair, maintenance, and removal of the rail bed and rail spur facilities (collectively, the "Rail Facilities"), Grantor does further grant to Grantee, its employees, contractors and agents, a temporary easement in, upon, over, across, and beneath such areas of Grantor's property as adjoin the Easement Premises and as may be reasonably necessary for such activities (the "Temporary Easement Premises"). Grantee shall submit proposed plans or drawings setting forth the Rail Facilities to the Grantor, and upon Grantor's approval, said plans or drawings shall be designated as and become Exhibit B to this Agreement. 2. Purpose. The Easement Premises is intended for use as a railroad spur and railroad crossing. The Easement Premises shall not be used for any other purpose without the prior written consent of Grantor. It is the intention of the parties that Grantee shall assume all responsibility for the construction, repair, maintenance, operation, and removal of the Rail Facilities in connection with the Easements granted hereunder, and that Grantor shall have no liability relating to the Rail Facilities or the Easements. 3. Grantor Duties. Grantor shall deliver possession of the Easement Premises to Grantee, "as is, where is", without any representation or warranty as to the condition of the Easement Premises or the suitability of same for the Rail Facilities or any related purposes. Grantor shall have no duty to prepare the Easement Premises in any way for Grantee's use. Following transfer of possession of the Easement Premises, Grantor shall have no further duty or obligation with respect to the Easement Premises. 4. Easement Conditions. Grantee agrees that its acceptance of the Easement and the Easement Premises is subject to each and all of the following terms, conditions, covenants, and restrictions, which are covenants running with the land: a. Grantee will construct, maintain, repair, operate and remove the Rail Facilities on the Easement Premises in accordance with all federal, state and local laws and regulations, and a standard of reasonable care. Grantee acknowledges and agrees that its rights of use with respect to the Easement Premises and the Temporary Easement Premises are not exclusive. b. Grantor is under no obligation whatsoever to maintain the Easement Premises or the Temporary Easement Premises in any particular state or condition. c. Grantee shall solely bear all responsibility, cost, and expense for design, construction, repair, maintenance, operation, removal, and any other work relating in any way to the Easement, the Easement Premises, and the Rail Facilities, including but not limited to special snow -removal requirements for operation of the Rail Facilities and maintenance of insurance covering the Rail Facilities and related improvements on the Easement Premises and any activities of Grantee, the railroad, or the employees, contractors or agents of either of them. Notwithstanding the foregoing, the design of all improvements is subject to advance review and approval of Grantor, which shall not be unreasonably withheld, conditioned or delayed. Responses from Grantor for any such design elements shall be given within fifteen (15) days of receipt. Upon removal of the Rail Facilities and related improvements, Grantee shall restore the condition of the Easement Premises to its original condition, and Grantee shall provide Grantor with plans and other relevant documents or information reasonably requested by Grantor regarding said restoration. d. Grantee shall not knowingly cause or permit any Hazardous Substance (defined below) to be brought upon, kept, or used in or about the Easement Premises or the Temporary Easement Premises in violation of applicable law by its employees, contractors, or agents. If Grantee breaches such obligation, or if contamination of the Easement Premises from Hazardous Substances is caused or contributed to by the acts or omissions of Grantee, its officers, directors, employees, contractors, or agents (a "Breaching Party") or otherwise occurs for which the Breaching Party is legally liable, then the Grantee shall indemnify, 2 defend, and hold Grantor harmless as provided in paragraph 4(e) below. Without limiting the foregoing, if the presence of any Hazardous Substance caused or permitted by the Breaching Party results in any contamination of the Easement Premises or the Temporary Easement Premises, Grantee shall promptly notify Grantor of such contamination and shall, at its sole expense, take all actions as are necessary to return the contaminated area to the condition existing prior to the introduction of any such Hazardous Substance; provided that Grantee shall first obtain Grantor's approval of any such action. For purposes of this Agreement, "Hazardous Substances" means any hazardous, toxic, dangerous or extremely dangerous substance, material or waste, which is or becomes regulated by the United States government, the State of Iowa, or any local governmental entity, and shall include, without limitation, any flammables, explosives, radioactive materials, hazardous materials, hazardous waste, hazardous or toxic substances or related materials defined in the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended, the Hazardous Materials Transportation Act, as amended, the Resource Conservation Recovery Act, as amended, and/or the regulations promulgated pursuant thereto. e. Grantee shall defend, indemnify and hold Grantor harmless from and against any and all claims, demands, causes of action, costs, expenses or liabilities of any type or nature whatsoever, including but not limited to reasonable attorneys' fees and expenses, (each of the foregoing is a "Claim") arising from or in connection with the Rail Facilities, Grantee's use or occupation of the Easement Premises or the Temporary Easement Premises, or the activities of Grantee, its directors, officers, shareholders, employees, contractors or agents, in, upon or about the Easement Premises or the Temporary Easement Premises. Grantee further agrees to reimburse Grantor for any costs or expenses, including but not limited to court costs and reasonable attorneys' fees, which Grantor may incur in reviewing, investigating, handling, responding to, or litigating any Claim. 5. Term of Easement; Termination. The Easement shall commence on the date of this Agreement and shall continue in force and effect for so long as the Rail Facilities are in use. For its term, the Easement shall run with the land for the benefit of Grantee, its successors in interest and future owners of its real property abutting the Easement Premises. If Grantee abandons the Rail Facilities or fails to use them for a period of twelve (12) months or more, then, at Grantor's option, Grantor may terminate this Agreement and thereby terminate the Easement and all of Grantee's related rights of use in and to the Easement Premises and the Temporary Easement Premises. Abandonment shall be presumed if Grantee has not filed with the office of the City Engineer a notice of continued use within sixty (60) days after Grantor's written request for same. Grantee's continued use shall be established upon filing of such notice, without regard to whether Grantee has in fact continued to use the Rail Facilities. Grantor shall deliver to Grantee a written notice of Grantor's intent to terminate this Agreement and permit Grantee a period of sixty (60) days from the date of delivery of the notice in which to provide written notice to Grantor of non -abandonment, and absent such action by Grantee, Grantor may file in the public land records of Black Hawk County, Iowa, a notice of termination hereof. Following 3 termination, Grantor may remove the Rail Facilities and retain or dispose of same without incurring any liability to Grantee for damages, compensation, or otherwise. 6. Notices. Any notices hereunder shall be in writing and shall be delivered via certified mail, postage prepaid, and addressed as follows, unless a party later provides notice of an address change in the manner set forth in this Section: If to Grantor: City of Waterloo, Iowa Attn: City Engineer 715 Mulberry Street Waterloo, IA 50703 With a copy to: City of Waterloo, Iowa Attn: City Attorney 715 Mulberry Street Waterloo, IA 50703 If to Grantee: International Paper Company Attn: Real Estate Director 6400 Poplar Avenue Memphis, TN 38197 With a copy to: International Paper Company Attn: Holly Holt, Legal Department 6400 Poplar Avenue Memphis, TN 38197 Notice shall be deemed given on the date of mailing if done by certified mail, or otherwise on the date actual notice is received. Nothing contained herein shall prevent other forms of notice if actually received by the addressee. 7. Survival. The indemnity provisions of this Agreement shall survive the termination of this Agreement. 8. Miscellaneous Provisions. This Agreement is binding upon and shall inure to the benefit of the parties and their respective successors, assigns, and future property owners. This Agreement is the entire agreement between the parties pertaining to the subject matter hereof and supersedes all prior understandings or agreements relating to the subject matter hereof, whether oral or written, and this Agreement may not be modified except by the mutual written agreement of both parties. Time is of the essence. This Agreement may be executed in counterparts, each of which shall be an original and all of which shall constitute one and the same instrument. 4 IN WITNESS WHEREOF, the parties have executed this Easement Agreement by their duly authorized representatives as of the date first set forth above. INTERNATIONAL PAPER COMPANY Name: WNi1 M&I L 1 I Title: INitclor, GL(34.9 Cskcse St rvtt(JaS CITY OF WATERLOO, IOWA By: David Boesen, Mayor Attest: Kelley Felc , City Clerk STATE OF 7;:ine�$e(' ) ) ss. e I %y COUNTY ) This record was acknowledged before me on 6, 1 I ( l)Z t, , by \Ai att ly i'll io -y 1 1/ as D'.eci ; ly,1, 4,( k'J G4. vrc.e S of International Paper Company. STATE OF IOWA ) ) ss. BLACK HAWK COUNTY ) This record was acknowledged before me on and Kelley Felchle, as Mayor and City Clerk, respectively, P"tLEANN M EVEN ° COMMISSION NO. 731693 'W *" MY C M ISS ON EXP$S 5 q c, by David Boesen e City of Waterloo, Iowa. i;Bc^•t:; `, .J. Ni.,..,.',:' Ul,.A.� Index Legend Location Description: Requestor: Proprietor: Surveyor: Lots 13 and 14 & Tract "K" Midport America Park Plat No.2 Waterloo, Iowa City of Waterloo City of Waterloo Surveyor Company: Return To: William W. Castle City of Waterloo Engineering Department 715 Mulberry Street, Waterloo, IA 50703 715 Mulberry St, Waterloo, IA 50703 291-4312 Exhibit "A" Plat of Railroad Easement Lots 13 and 14 and Tract "K'; Midport America Park Plat Nc.2 City of Waterloo, Black Hawk County, Iowa Railroad Easement Description: An easement for the construction, operation, and maintenance of a private railroad line over, under, upon, and across those portions of Lots 13 and 14 and Tract "K" of Midport America Park Plat No.2, City of W 3terloo, Black Hawk County, State of Iowa, described as follows: Beginning at the Southwest corner of Lot 14; thence North 89°12'25" West along the Southern most line of Tract "K", 100.15 feet to the VIest line of Tract "K", said line also being the East line of Parcel "K" of the Southeast Quarter of Section 5, Township 89 North, Range 13 West; thence North 06°51'18" East along the common line 145.90 feet to the Southeast corner of a 15-foot Airport Fence Maintenance Easement; thence South 83°20'12" East 1,418.60 feet to a point on the South line of Lot 13 that is 216 feet west of the Southeastern most corner of Lot 13; thence North 89°12'25" West along the South lines of Lots 13 and 14 1,326.42 feet to the Pcint of Beginning containing 103,486 square feet (2.376 acres). The South lines of Lots 13 and 14, Midport America Park Plat No.2 is assumed to bear North 89°12'25" West for this survey. `p oocao°o C9 t 0 i O o WILLIAM 06 rn W 6c. us oO CASTLE o rn 0j019715 o0 °; tt� '0000CD°* thz. /OWis I hereby certify that this surveying document was prepared and the related survey work was performed by me or under my direct personal supervision and that I am a duly licensed Land Syrveyor u/tder the laws of the State of Iowa. I/7.( J?p,z4, William W. Castle, PLS Date License Number 19715 My License Renewal Date is December 31, 2025. Pages or sheets covered by this seal : Survey Notes: 1. The Bearings shown on this survey are derived from GPS observations using the Iowa State Plane Coordinate System, North Zone, NAD 83 (2011). 2. All dimensions are in US Survev feet and decimals thereof. 3. Easement area: 406,620 square feet (9.33 acres) City of Waterloo Engineering Department 715 Mulberry Street, Waterloo, Iowa 50703 Phone: (319) 291-4312 Fax: (319) 291-4262 Drawn By: WWC Scale: Field Work Date: Date Drawn:1-20-2026 Sheet No. 1 of 2 ZJo Z 'oN }aayS 9Z0Z-OZ-6:unneJQ o e4 :oleo ) JoM mold ,00Z = „6 :oleos OMM :, unneJG 11 0 z Exhibit "A" Continued V / AeM 1044 w o!14nd 43PIM algeuen pie/twos podgy y O J Ex. Platted 30' Easement Z9Z19-66Z (6t.£) :xed Z1-£17-66Z (66£) :euogd £0L09 eMoJ 'oo!Jaaep 'leans LJJagjn j S6L luewpedea 6uuaaui6up oolaa1eM 4o M „LO,LSo00 N x(91..0S£),60'oS£ II II —J Z ON le/d „wed eouawb'll/od %(,96'b£L),t,9'b£L N 00 Z L-1 &aw ior• rn a Z1,£b-1,6Z (61-£) COLDS VI '00IJ0;BM';S /wa9.nW 91L 'Sid 'ause0 welll'M o; wn;aa Exhibit "B" `--2-vmon co 0 0 11 1 ,1 F- w Z Q 0 avow 3303A31 onialaodaro II II II II II II 1- a z CD 8 �_ 9z. V'- 'ZjU U1¢ UNUWU.....„sm¢0 O0WUZ V 2.,Qgm S!= WOZVT 2Y 0 W y 00 O U O 2 Z,, y O U 0 v, K m�g¢oN oz �o �mn N 2 m 0 U, D U 0 a2?C-2z o ozo Cmm wy+�c,V-SW�ZO"4? yU¢ Ogg na�yz: gad Y mOLLj,2hUy 0 atiQ aRZjw¢�» z,,¢ zmo aya,dY,,Zzw,,,.„,,„ y YUy¢� ;,-%! 2 Z oa�Z, ok_, y4a=�m a U¢UO1-UF-UyU OI�0U�2 0 N W < y W CONTROL POINT LIST W o U U U U U U U U U 2 W m m m.0m m m W 2 mv`tirn US o C v N , n 2 '000.10 2222222 m Q • 0 U^cc U Q N W Ocey CO • 20 U W , 2 LLI? h cgs 0 0 U 0 22 2¢ 0, 2> AIM 13 8 l i WATERLOO- 100 200 EET m co co co co co coo co on to co v co co v E L DIV I PROJECT BLACKHAWK CTION W 1 1 (i�ZiZlIU TiT� o `Z� a VIv ajo pp d 01H71H01'ON 1SIX3 6'999 t 8l1S007L31VM0{'09Z&V j? 1 : 0 C I SCALE IN FE I.. 71 o J--L- TRACKAGE TO SERVE: OFHCE OF DESIGN P4S,HE 7171 TRACK "A' PLAN AND PROFILE " o I o I P.'a 01HH1H00U0i °NP/0 1 i !Z(y6731 S049973 LZY99 o 8IISOO1d31VMf;'08Zd#d .v. mat 0000+0 Ns Jd r 0000HJ k 0000+0IAd EIS- + ` ''------ %M o yr o rr ON CN PROPERTY TO ED 8Y CN FORCES. NTRACTOR TO COMPLETE: BBALLASTPLACEMENT, SUPPLY GRANITE BALLAST AND ONE. WM a 1.. EAZ4 Zz 3N1Wry �t w w 1 I1Nl.dNb18E69+/ a 0lZd n t 6919! w2 I I a r 99L 13 lc c Ev91 .V.*119061 +Z 906E+Z 0: 1 Oaw ri 1 . V. Mi( SL'68 c,- /RACKWORK BE COMPLET INDUSTRY CO GRADING, SU AND STOCKPI (. 9109 si V. *II 19 ZE+E,. U szss 1d 1 r I U 1 " 1 I u Z6198 al r 9Z98 EXISTING FIBER OPTIC CABLE HORIZONTAL AND VERTICAL LOCATION TO BE FIELD VERIFIED PROTECTION TO BE DETERMINED RAIL WEIGHT, COMP BARS, INSULATED JOINTS SIGNALS ETC. I vs g,a�m Y 1 I 0089873 I '.. i3 ,1 I< I� w 08R' TRACK CONSTRUCTION BY CN FORCES 0009+601d 808980. 73 r. OSED DITCH GRADE I 80B9Bo I a ' I11 I1' ��" r 13 I i 1 ti{ •t,. 4£Z9+9 I ; W m c.> n 0000+91Ad 8089813 r '. H go L E98 + In 1 t 1 I t' 1 1 RI Q U O1H)�H 3L/ Odd00NVIS ii ! W o 000.0 lAci _ o0 I i 80 B98 �, V. ' 1C66+9:xski � 1 E. I "1w w W o ZL 66+9 *IS Id I 1 J EXISTING GRADE ro a a� i 1 �, ,r i r 1 +00 7+OC SCRIPT. Qr i I .3. Mil 98 EE+i r I x 1 I sE1/; 09 as o a �89B 111 z r o L. 1 998 co o PROPOSED C/L TRK A" 4,812 TOTAL LENGHT 3,874' 1158 TRACK CONSTRUCTION 'ROPOSED CA. TRK 'B" ?,083' TOTAL LENGHT 85.311511 TRACKCONSTRUCT,0, { EXISTING GROUT 1 g 1 g T / o 0 90'999 j9'098 °a; 0 o i.s 1 aoas°999 ' lz I� co J 13 8 . o o I o �ese R: I I ' 10-d 133HS 33S ' U I Iy 14727 Marl( PO Box 137 Markel, Mu Eked l3ne:9: Corpor. R( 8089E 6 ^:-� E0-d133HS33S z' co co 9- co � co co co 0 m to 4) o m 99 o m 9 C) 41 L' o o 0 in m f'�o o N. Lo co o m La o m m m w`r x z g z� O ��ti y.6C U CI All .. ZO-d133HS 33S ®®® i3 Stz a o ¢ 3 + Au o Exhibit EXISTING 6"8 8"STEEL MID AMERICAN GAS MAINS 15+14 & 15+34 TO BE LOWERED TO A MINIMUM DEPTH OF 10' BELOW BASE OF RAIL TOP OF PIPE=857.5, A MINIMUM DISTANCE OF 30' FROM CENTERLINE OF TRACK WATERLOO ) 100 :ALE IN FEET OFFICE OF DESIGN & PLAN AND PROFILE I I I S{ ti ZO-d133 33S 80 B98 0 3E TO SERVE: I I j E'999 +60 z F , 1 J I v I I MID AMERICAN GAS OBE LOWERED TO O'BELOW BASE OFRAIL MINIMUM DISTANCE OF 30' TRACK 0 v. a 13 I I I o ' 90 B98 �e v n o u I t71 I N 2 mi Ia I EXISTING 6" 8 8" STEEL MAINS 15+14 & 15+34 T A MINIMUM DEPTH OF 1 TOP OF PIPE=857.5, A FROM CENTERLINE OF 4 PROPOSED T/R p1 O 0 I Ti I I 80 898o Z'S98 1 I z `r 1 I l Pa 0 1 _ i a 1 g._ 01 _I 1 t- _1_1 , I EXISTING GRADE s I N ,i , W wI ml O 0 m o ry 1691 �� 9 ��,Na 2I YD 131 oI ' ^'� i POSED 12"PVC SANITARY SEWER 16+91.31 ENCASED /N 140' 18"SM00THWALL STEEL PIPE, T/0/CASING PIPE 847.57 01 """I PROPOSED SUBGI PROPOSED DITCH GI PROPOSED 12'PVC SANITARY SEWER 16+1 ENCASED IN 140' 18" SMOOTH V STEEL PIPE, T/0/CASING PIPE 84 1146.90' N 06°51'18" E VATERLOO SUB iLJII II I I MI1II BO B98 0 o a i I I a �I I WMUIIIUI ' l'L98 rn owYy �oWF�otl a 0o w Jr 8 CN MAINL I 80898 II 9'998 N I I II 8 I 80899 8 I I I I .OS q"998 0 R N 1 1 99 �I. CI f ICV I OI 1 L99 N a ,SED C/L TRK A" TOTAL LENGHT CONSTRUCTION 'OSED 04 TRK "B" 33' TOTAL LENGHT K CONSTRUCTION 111 1 80898 0 L ../ Nw 1, 731' CLEAF • TRACKS A"8 "B' 70'EACI- Sl @ 80 898 0 - o<I I— p fX 9'L88 VN �mou raoS 1 <g< .EMIZIDS,B{I 80 d133HS 33S W 1 ir J V Z aV 80d133 S33S ' 080'B9B N CC Q WV W Zf w t. co co co co o co Lc)` Q WL1.1 >