Loading...
HomeMy WebLinkAboutJQ Construction LLC - CO-01 - 5.18.2026Docusign Envelope ID: 4424E839-B3C5-87D6-8168-57EAB6490C3F CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 1 PROJECT: 1600 BLI< BERTCH AVENUE SANITARY SEWER REPAIR , CONTRACT NO. 1160 Date Prepared: 5/7/2026 AMOUNT: $ 23,020.00 TO: JQ Construction, LLC , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated Emergency Repair. A. Description of change to be made or extra work to be done: 1001 Install new SW-301, 48" Sanitary Manhole. 1002 Excavate existing subgrade. 1003 Furnish and place modified subbase. B. Reason for ordering change or extra work: 1001 Replace existing failing manhole. 1002 Remove existing unsuitable subgrade. 1003 Place and compact new subbase material for new road base. C. Settlement for cost of work to be made as follows: 1001 SW-301, 48" - $13,560 EACH x 1 EACH 1002 Excavation - S80 /CY x 49.5 CY 1003 Modified Subbase - $25 / SY x 220 SY CITY OF WATERLOO BY: "—Signed by: Palo bct,Sun, '-4 KG 59855493r... yo ATTEST: Signed by: relay feta, rrcoocorrocsxo... City Clerk Total Net Increase 05/18/2026 JQ Construction LLC = $13,560.00 = $3,960.00 = $5,500.00 $23,020.00 Date CONTRACTOR BY: f/4/ 05/18/2026 Date PRINTED NAME: Justin Quint TITLE: Owner 5/7/2026 Date APPROVED: 6.702le City Engineer Date