HomeMy WebLinkAboutROBINSON BROS. ENVIRONMENTAL, INC.EXHIBIT "A"
ASBESTOS ABATEMENT
RATH BUILDINGS
1442 SYCAMORE STREET, WATERLOO, IOWA 50703
SIGNATURE PAGE
The undersigned Proposer/Bidder, having examined these documents and having full knowledge of the
condition under which the work described herein must be performed, hereby proposes that they will fulfill the
obligations contained herein in accordance with all instructions, terms, conditions, and specifications set forth;
and that they will furnish all required services and pay all incidental costs in strict conformity with these
documents for the stated process as payment in full.
The City shall award one or more Contracts to the responsible Bidder(s) whose bid, conforming to the
Specifications and without regard to whether the bid is made on a per -Option or a total basis, is most
advantageous to the City of Waterloo, price and other factors considered. The City reserves the right to award a
contract for any single Option, any combination of Options, or all Options together.
OPTION A: asbestos abatement and disposal of the entirety of the former Rath Buildings located at 1442
Sycamore Street:
Our bid, for asbestos abatement and disposal of the entirety of the former Rath Buildings
located at 1442 Sycamore Street is, not to exceed:
Total "lump sum" bid: $ 3,060,000.00
Total in written form: Three Million Sixty Thousand Dollars
OPTION B: asbestos abatement and disposal by area of the former Rath Buildings located at 1442 Sycamore
Street:
Our bid, for asbestos abatement and disposal by area of the former Rath Buildings located
at 1442 Sycamore Street is, not to exceed:
Total "Area 1" bid: $
Total "Area 2" bid: $
Total "Area 3" bid: $
Total for Area 1 in written form:
Total for Area tin written form:
Total for Area 3 in written form:
Submitting Firm: Robinson Brothers Environmental, Inc.
Address: 6116 Darlin Dr
City: Dane State: WI Zip: 53529
Authorized Representative (print) (1 CJA U$ ` �,• 1) IN GC-1)
Authorized Representative Signature 1 iee 1't4.5i Attic/
Date : 7/9/26 Email: ryant@robinsonbros.com
Phone: 608-575-7783 Fax:
Page 1 of 2
EXCEPTIONS/DEVIATIONS to this Request for Bid shall be listed in writing on an attached document
provided by the Bidder. Please be as specific as possible. Please check one:
Our company has no exceptions/deviations.
Our company does have exceptions/deviations which are listed on an attached document.
SUBCONTRACTORS AND SUB -CONTRACTORS to this Request for Bid shall be listed in writing on an
attached document provided by the Bidder. Please be as specific as possible. Please check one:
Our company has no subcontractors or sub -subcontractors.
Our company does have subcontractors or sub -subcontractors which are listed on an attached document.
GENERAL INFORMATION. Freight and/or delivery charges, if any, shall be included in the price.
FIRM PRICING. Offered prices shall remain firm for a minimum of sixty (60) days after the due date of this
solicitation unless indicated otherwise. Accepted prices shall remain firm for the duration of the Contract.
ADDENDA (It is the Bidder's responsibility to check for issuance of any addenda). The authorized
representative herby acknowledges receipt of the following addenda:
Addenda Number 1 Date 6/19/26 Addenda Number 2 Date 6/22/26
Addenda Number 3 Date 7/2/26
n We choose not to bid at this time but would like to be considered for future requests for bid
Page 2 of 2
EXHIBIT "B"
ASBESTOS ABATEMENT
RATH BUILDINGS
1442 SYCAMORE STREET, WATERLOO, IOWA 50703
BID ITEMS AND QUANTITIES - Revised
The Quantities shown below are approximate only but are considered sufficiently adequate for the purpose of
the Project Manual and comparing bids. The Contractor is responsible for verification of all materials and
quantities listed below. No additions to the Contract will be allowed for additional ACMs discovered that amount
to Tess than ten percent (10%) of each material listed below. If additional amounts greater than ten percent
(10%) are identified, Contractor is to stop work and notify the City and/or City's consultant immediately. No
compensation for removal of suspect ACMs without prior authorization by City and/or City's consultant will be
approved. All materials and quantities are subject to revision by the City. The first table is the list of ACM
throughout the entire structure. The second table separates out the ACM by area to assist with bidding Option
B.
ASBESTOS CONTAINING MATERIALS SAMPLE LIST (ENTIRE STRUCTURE)
01001101
Substance
Location
Asbestos Content
Est. Quantity
Pipe Insulation
Basement; 1st Floor; 2nd
Floor; 4th Floor; 5th Floor;
6th Floor; 7th Floor
20% Amosite / 8%
Chrysotile
25% Chrysotile
20% Amosite / 3%
Chrysotile
5% Amosite / 15%
Chrysotile
20% Chrysotile
60% Chrysotile
Basement: 355 LF
1st Floor: 65 LF
2nd Floor: 255 LF
4'h Floor: 655 LF
5th Floor: 665 LF
6th Floor: 910 LF
7h Floor: 295 LF
Total: 3,200 LF
'
Heater Insulation
Basement
30% Chrysotile
25 SF
Felt -Wrapped Pipe
Insulation Tar and
Felt
Roof (& 5th Floor and 7th
Floor)
30% Chrysotile
1,100 LF
Door Caulk
Elevator Doors — All Floors
West Exterior Loading Dock
SW Exterior Loading Dock
5% Chrysotile
10% Chrysotile
1.2% Chrysotile
Elevator: 280 LF
West Loading Dock: 8
LF
SW Loading Dock: 10
LF
Pipe Insulation
Debris / Steamer
Insulation Debris /
Aircell Pipe
Insulation Debris /
Duct Wrap Debris
Basement; 2nd Floor; 5th
Floor; 6th Floor; 7th Floor
10% Amosite
20% Amosite / 8%
Chrysotile
25% Chrysotile
20% Amosite / 3%
Chrysotile
5% Amosite / 15%
Chrysotile
20% Chrysotile
60% Chrysotile
20% Chrysotile
70% Chrysotile
Basement: 600 SF
2nd Floor: 1,500 SF
5th Floor: 2,500 SF
6th Floor: 650 SF
7th Floor: 5,500 SF
Total: 10, 750 SF
Page 1 of 9
Material
Substance
1.ocalien
:As
. Quantity
Transite Wall
Panels
4th Floor; 6th Floor; 7th Floor
15% Chrysotile
4th Floor: 200 SF
6th Floor: 4,300 SF
7thFloor: 1,300 SF
Total: 5,800 SF
Duct Sealant
6th Floor
2% Chrysotile
550 LF
Aircell Pipe
Insulation
Basement; 1st Floor; 2nd
Floor;5th Floor;6th Floor;20%
7thFloor
Chrysotile
70% Chrysotile
Basement: 600 LF
1st Floor: 250 LF
2nd Floor: 40 LF
5th Floor: 540 LF
6thFloor: 200 LF
7th Floor: 55 LF
Total: 1,685 LF
Asphalt Shingles /
Ceiling Covering /
Ceiling Covering
Tar / Cork Tar
Paper
Basement; 1st Floor; 2nd
Floor; 3rdFloor; 4thFloor;
5th Floor; 6th Floor; 7th Floor
15% Chrysotile
10% Chrysotile
5°% Chrysotile
2 /o Chrysotile
°
3. o /o Chrysotile
8% Chrysotile
7 /o Chrysotile
3% Chrysotile
Basement: 35,200 SF
IFloor: 13,850 SF
2nd Floor: 56,225 SF
3rd Floor: 73,950 SF
4th Floor: 38,900 SF
5th Floor: 9,600 SF
6th Floor: 5,830 SF
7th Floor: 3,950 SF
Total: 237,505 SF
Tank Insulation
2nd Floor 30% Chrysotile
100 SF
9" x 9" Green Floor
Tile and Black
Mastic with Pipe
Insulation Debris
2nd Floor
Floor Tile: 5%
Chrysotile
Mastic: 5%
Chrysotile
Pipe Insulation:
20% Amosite / 3%
Chrysotile
4,500 SF
12" x 12" Brown
Floor Tile and Black
Mastic with Pipe
Insulation Debris
2nd Floor
Floor Tile: 2%
Chrysotile
Mastic: 5%
Chrysotile
Pipe Insulation:
20% Amosite / 3%
Chrysotile
100 SF
Corrugated Transite
Panels
Exterior
15% Chrysotile
Northwest Office Roof:
2,700 SF
SW Rail Dock Wall:
300 SF
Old Caulk
Exterior — North Street
Level Windows
15% Chrysotile
30 LF
Roofing Tar
All Roofs
8% Chrysotile
6,000 SF
Roofing Caulk
Roof A
5% Chrysotile
60 LF
Roofing Material
Roof E
10% Chrysotile
12,200 SF
Expansion Joint
Exterior — North Al2
(Behind Vertical Metal
Seams)
3% Chrysotile
400 LF
Chalkboard
6th Floor; 7th Floor 15% Chrysotile
6� Floor: 20 SF
7 Floor: 50 SF
Tar'
Floor — HVAC Crawl
5tWall
Space
10% Chrysotile
750 SF
Page 2 of 9
Material
Substance
Location
Asbestos Content
_
Est. Quantity
Panel Adhesive
Basement; 1st Floor; 2nd
Floor 3rd Floor
'
10% Chrysotile
Basement: 360 SF
15t Floor: 700 SF
2nd Floor: 500 SF
3rd Floor: 10,800 SF
Total: 12,360 SF
Duct Wrap
Basement
80%°Chrysotile
70% Chrysotile
500 LF
Cement Board
1st Floor — North Room,
North Wall — Top Half
20% Chrysotile
750 SF
Cork Insulation Tar
7th Floor — Middle Room,
South Portion Walls; 3rd
Floor —Northeast Room
Ceiling
3% Chrysotile
2% Chrysotile
7th Floor: 4,700 SF
3rd Floor: 17,100 SF
Total: 21,800 SF
Possible Fire Doors
(Assumed)
Throughout
N/A (Assumed)
112 Doors
Elevator Equipment
(Assumed)
Throughout
N/A (Assumed)
7 Elevator
NOTE: IT IS UNDERSTOOD THAT THE QUANTITIES OF ACMS DOCUMENTED WITHIN THIS PROJECT
MANUAL ARE ESTIMATED FOR THE PURPOSE OF THIS BID. ALL QUANTITIES SHALL BE
VERIFIED BY CONTRACTOR PRIOR TO SUBMISSION OF BID.
Robinson Brothers Environmental. Inc.
Bidder Name
Page 3 of 9
ASBESTOS CONTAINING MATERIALS SAMPLE LIST (AREA 1)
Material
Substance
on
Asbestos
Content
Eocene Estimated Quantity
Pipe Insulation
Basement; 2"d
Floor; 5th Floor; 6th
Floor; 7th Floor
20% Amosite /
8% Chrysotile
25% Chrysotile
20% Amosite /
3% Chrysotile
5% Amosite /
15% Chrysotile
20% Chrysotile
60% Chrysotile
Basement: 135 LF
2nd Floor: 10 LF
5th Floor: 665 LF
6th Floor: 465 LF
7th Floor: 140 LF
Total: 1,415 LF
Heater
Insulation
Basement
30% Chrysotile
Basement: 25 SF
Door Caulk
Elevator Doors —
All Floors
5% Chrysotile
Elevator: 280 LF
Pipe Insulation
Debris /
Steamer
Insulation
Debris / Aircell
Pipe Insulation
Debris / Duct
Wrap Debris
Basement 2nd
Floor 5th Floor 6th
Floor 7th Floor
10% Amosite
20% Amosite /
8% Chrysotile
25% Chrysotile
20% Amosite /
3% Chrysotile
5% Amosite /
15% Chrysotile
20% Chrysotile
60% Chrysotile
20% Chrysotile
70% Chrysotile
Basement: 600 SF
2nd Floor: 1,500 SF
5th Floor: 2,500 SF
6th Floor: 570 SF
7th Floor: 5,500 SF
Total: 10,670 SF
Aircell Pipe
Insulation
Basement 1
Floor; 5th Floor; 6th20°%
Floor; 7th Floor
Chrysotile
70 /o Chrysotile
Basement: 600 LF
1st Floor: 100 LF
5th Floor: 440 LF
6th Floor: 200 LF
7th Floor: 55 LF
Total: 1,395 LF
Asphalt
Shingles /
Ceiling
Covering /
Ceiling
Tar /
Cork Tar Paper
Basemnt; 1
FFloor; 2nd loor;
3rdFloor; 4thFloor;
5th Floor; 6th Floor;
7th Floor
15% Chrysotile
10% Chrysotile
5% Chrysotile
2% Chrysotile
3.6% Chrysotile
.6 Chrysotile
8Covering
7% Chrysotile
o
3 /o Chrysotile
Basement: 6,850 SF
1st Floor: 6,770 SF
2nd Floor: 21,005 SF
3rd Floor: 32,280 SF
4 Floor: 33,600 SF
5th Floor: 9,520 SF
6Floor: 4,990 SF
7thFloor: 2,250 SF
Total: 117,265 SF
9" x 9" Green
Floor Tile and
Black Mastic
with Pipe
Insulation
Debris
2nd Floor
Floor Tile: 5%
Chrysotile
Mastic: 5%
Chrysotile
Pipe Insulation:
20% Amosite /
3% Chrysotile
2"d Floor: 4,500 SF
Page 4 of 9
Material
Substance
Location
Asbestos
Content
Eocene Estimated Quantity
12" x 12"
Brown Floor
Tile and Black
Mastic with
Pipe Insulation
Debris
2nd Floor
Floor Tile: 2%
Chrysotile
Mastic: 50/0
Chrysotile
Pipe Insulation:
20% Amosite /
3% Chrysotile
2nd Floor: 100 SF
Old Caulk
Exterior — North
Street Level
Windows
15% Chrysotile
Exterior: 30 LF
Roofing Tar
All Roofs
8% Chrysotile
Roof: 2,000 SF
Chalkboard
7th Floor
15% Chrysotile
7th Floor: 50 SF
Panel Adhesive
1st Floor
10% Chrysotile
1st Floor: 700 SF
Duct WrapBasement
80% Chrysotile
70% Chrysotile
Basement: 500 LF
Cork Insulation
Tar
3rd Floor —
Northeast Room
Ceilino
2% Chrysotile
3rd Floor: 17,100 SF
Possible Fire
Doors
(Assumed)
Throughout
N/A (Assumed)
76 Doors
Elevator
Equipment
(Assumed)
Throughout
N/A (Assumed)
2 Elevator
NOTE: IT IS UNDERSTOOD THAT THE QUANTITIES OF ACMS DOCUMENTED WITHIN THIS PROJECT
MANUAL ARE ESTIMATED FOR THE PURPOSE OF THIS BID. ALL QUANTITIES SHALL BE
VERIFIED BY CONTRACTOR PRIOR TO SUBMISSION OF BID.
Robinson Brothers Environmental. Inc.
Bidder Name
Page 5 of 9
ASBESTOS CONTAINING MATERIALS SAMPLE LIST (AREA 2)
Material
Substance
Lech
ifiSbe ste
t
Conten20%
%Vane EstimatedQuantity
Pipe Insulation
Basement 1st
Floor 2nd Floor;20%
4th Floor 6th Floor
7th Floor
Amosite /
8% Chrysotile
Chrysotile
Amosite /
3% Chrysotile
5% Amosite /
15% Chrysotile
20% Chrysotile
60% Chrysotile
Basement: 45 LF
1st Floor: 65 LF
2"d Floor: 215 LF
4th Floor: 70 LF
6th Floor: 445 LF
7th Floor: 155 LF
Total: 995 LF
Felt -Wrapped
Pipe Insulation
Tar and Felt
Roof (& 5th Floor
and 7th Floor)
30% Chrysotile
Roof; 5th Floor; 7th Floor: 1,100 LF
Pipe Insulation
Debris /
Steamer
Insulation
Debris / Aircell
Pipe Insulation
Debris / Duct
Wrap Debris
6th Floor
10% Amosite
20% Amosite /
8% Chrysotile
25% Chrysotile
20% Amosite /
3% Chrysotile
5% Amosite /
15% Chrysotile
20% Chrysotile
60% Chrysotile
20% Chrysotile
70% Chrysotile
6th Floor: 80 SF
1
Transite Wall
Panels
4th Floor; 6th Floor;
7th Floor
15% Chrysotile
4th Floor: 200 SF
6th Floor: 4,300 SF
7th Floor: 1,300 SF
Total: 5,800 SF
Duct Sealant
6th Floor
2% Chrysotile
6th Floor: 550 LF
Aircell Pipe
Insulation
1st Floor; 2nd Floor;
5th Floor
20% Chrysotile
70% Chrysotile
1st Floor: 150 LF
2nd Floor: 40 LF
5th Floor: 100 LF
Total: 290 LF
Asphalt
Shingles /
Ceiling
Covering /
Ceiling
Covering Tar /
Cork Tar Paper
Basement; 1
d
Floor; 2 Floor;
3rd Floor; 4th Floor;
5th Floor; 6th Floor;
7th Floor
15% Chrysotile
10% Chrysotile
5% Chrysotile
2% Chrysotile
3.6% Ch sotile
.86 Chrysotile
7% Chrysotile
3% Chrysotile
Basement: 1,230 SF
1st Floor: 1,560 SF
2"d Floor: 8,660 SF
3rd Floor: 18,175 SF
4th Floor: 5,300 SF
5th Floor:80 SF
6thFloor:840 SF
7th Floor: 1,700 SF
Total: 37,545 SF
Tank Insulation
2"d Floor
30% Chrysotile
2"d Floor: 100 SF
Roofing Tar
All Roofs
8% Chrysotile
Roof: 2,000 SF
Roofing
Material
Roof E
10% Chrysotile
Roof: 12,200 SF
Chalkboard
6th Floor
15% Chrysotile
6th Floor: 20 SF
Wall Tar
5th Floor — HVAC
Crawl Space
10% Chrysotile
5th Floor: 750 SF
Panel Adhesive
3rd Floor
10% Chrysotile
3'd Floor: 630 SF
Page 6 of 9
Material
Substance
Location
Asbestos
Content
Focelte Esemeed E, l'Iri, _F',
Cork Insulation
Tar
7th Floor —Middle
Room, South
Portion Walls
3% Chrysotile
7th Floor: 4,700 SF
Possible Fire
Doors
(Assumed)
Throughout
N/A (Assumed)
29 Doors
Elevator
Equipment
(Assumed)
Throughout
N/A (Assumed)
4 Elevator
NOTE: IT IS UNDERSTOOD THAT THE QUANTITIES OF ACMS DOCUMENTED WITHIN THIS PROJECT
MANUAL ARE ESTIMATED FOR THE PURPOSE OF THIS BID. ALL QUANTITIES SHALL BE
VERIFIED BY CONTRACTOR PRIOR TO SUBMISSION OF BID.
Robinson Brothers Environmental, Inc.
Bidder Name
Page 7 of 9
ASBESTOS CONTAINING MATERIALS SAMPLE LIST (AREA 3)
Material
Substance
Location
Content
Eocene Eocene Estimated Quantity
Pipe Insulation
Basement; 2nd
Floor; 4th Floor
20% Amosite /
8% Chrysotile
25% Chrysotile
20% Amosite /
3% Chrysotile
5% Amosite /
15% Chrysotile
20% Chrysotile
60% Chrysotile
Basement: 175 LF
2nd Floor: 30 LF
4th Floor: 590 LF
Total: 795 LF
Door Caulk
West Exterior
Loading Dock
SW Exterior
Loading Dock
o
10%
1.2 /o Chrysotile
West Loading Dock: 8 LF
SW Loading Dock: 10 LF
Total: 18 LF
Asphalt
Shingles /
Ceiling
Covering /
Ceiling3rd
Covering Tar /
Cork Tar Paper
Basement 1
Floor 2"d Floor
Floorr4'lear
15°% Chrysotile
10% Chrysotile
5% Chrysotile
2% Chrysotile
3.6% Chrysotile
8% Chrysotile
7% Chrysotile
3% Chrysotile
Basement: 27,120 SF
1st Floor: 5,520 SF
2"d Floor: 26,560 SF
3rd Floor: 23,495 SF
4" Floor: 35,900 Sr
Total: 82,695 SF
Corrugated
Transite Panels
Exterior
15% Chrysotile
Northwest Office Roof: 2,700 SF
SW Rail Dock Wall: 300 SF
Roofing Tar
All Roofs
8% Chrysotile
Roof: 2,000 SF
Roofing Caulk
Roof A
5% Chrysotile
Roof: 60 LF
Expansion Joint
Exterior — North
Al2 (Behind
Vertical Metal
Seams)
3% Chrysotile
Exterior: 400 LF
Panel Adhesive
Basement; 2"d
Floor; 3rdFloor
10% Chrysotile
Basement: 360 SF
2nd Floor: 500 SF
3rd Floor: 10,170 SF
Total: 11,030 SF
Cement Board
1st Floor — North
Room, North Wall
— Top Half
20% Chrysotile
1st Floor: 750 SF
Possible Fire
Doors
(Assumed)
Throughout
N/A (Assumed)
7 Doors
Elevator
Equipment
(Assumed)
Throughout
N/A (Assumed)
1 Elevator
NOTE: IT IS UNDERSTOOD THAT THE QUANTITIES OF ACMS DOCUMENTED WITHIN THIS PROJECT
MANUAL ARE ESTIMATED FOR THE PURPOSE OF THIS BID. ALL QUANTITIES SHALL BE
VERIFIED BY CONTRACTOR PRIOR TO SUBMISSION OF BID.
Robinson Brothers Environmental, Inc.
Bidder Name
Page 8 of 9
In the event of discovery of items or materials exceeding 10% of the approximate quantity or not identified
within the specifications are located during abatement, contractor will be bound to the following pricing:
ITEM
Materialetbstince
Unit
UM Pace
1
Pipe Insulation
LF
$ 32.84
2
Heater Insulation
SF
$ 14.37
3
Felt -Wrapped Pipe Insulation Tar and Felt
LF
$ 100.00
4
Door Caulk
LF
$ 7.66
5
Pipe Insulation Debris / Steamer Insulation Debris / Aircell
Pipe Insulation Debris / Duct Wrap Debris
SF
$ 45.98
6
Transite Wall Panels
SF
$ 4.60
7
Duct Sealant
LF
$ 7.18
8
Aircell Pipe Insulation
LF
$ 25.60
9
Asphalt Shingles / Ceiling Covering / Ceiling Covering Tar /
Cork Tar Paper
SF
$ 7.70
10
Tank Insulation
SF
$ 14.37
11
9" x 9" Green Floor Tile and Black Mastic with Pipe Insulation
Debris
SF
$7.00
12
12" x 12" Brown Floor Tile and Black Mastic with Pipe
Insulation Debris
SF
$ 7.00
13
Corrugated Transite Panels
SF
$ 4.50
14
Old Caulk
LF
$ 9.58
15
Roofing Tar
SF
$ 5.75
16
Roofing Caulk
LF
$ 7.66
17
Roofing Material
SF
$ 6.39
18
Expansion Joint
LF
$ 9.58
19
Chalkboard
SF
$ 6.39
20
Wall Tar
SF
$11.50
21
Panel Adhesive
SF
$ 5.75
22
Duct Wrap
LF
$ 28.74
23
Cement Board
SF
$ 4.60
24
Cork Insulation Tar
SF
$ 7.70
25
Possible Fire Doors (Assumed)
EA
$ 114.80
26
Elevator Equipment (Assumed)
EA
$ 344.85
NOTE: IT IS UNDERSTOOD THAT THE QUANTITIES OF ACMS DOCUMENTED WITHIN THIS PROJECT
MANUAL ARE ESTIMATED FOR THE PURPOSE OF THIS BID. ALL QUANTITIES SHALL BE
VERIFIED BY CONTRACTOR PRIOR TO SUBMISSION OF BID.
Robinson Brothers Environmental, Inc.
Bidder Name
Page 9 of 9
BID BOND
The Hanover Insurance Company
CONTRACTOR:
(Name, legal status and address)
Robinson Brothers Environmental, Inc.
6116 Darlin Drive
Dane, WI 53529
OWNER:
(Name, legal status and address)
City of Waterloo
715 Mulberry Street
Waterloo, IA 50703
BOND AMOUNT: 5% of Bid
PROJECT:
(.Name, location or address, and Project number, if any)
Rath Buildings - Asbestos Abatement
1442 Sycamore St, Waterloo, IA 50703
SURETY:
(Name, legal status and principal place of business)
The Hanover Insurance Company
P.O. Box 580045
Charlotte, NC 28258
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and
Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein.
The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid
documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters
into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in
the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the
Owner, for the faithful performance of such Contract and for the prompt payment of labor and material funushed in the
prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount
specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perfonn the
work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety
hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may
accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate
beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's
consent for an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be
deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any
provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions
conforming to such statutory or other legal requirement shall be deemed incorporated herein, When so furnished, the intent is
that this Bond shall be construed as a statutory bond and not as a common law bond.
The Company executing this bond vouches that this document conforms to American Institute of Architects Document A310, 2010
edition 1
Signed and sealed this 25th day of June
(Witness)
2026
(Witness)
AN
i�
Robinson Brothers EriviranMental Inc % cS=••• ,3"CO
la al)
k�
(Title)
The Hanover Insurance Company
6crretn Jo Ann R Smith
Attorney -In -Fact
(Title)
The Company executing this bond vouches that this document conforms to American Institute of Architects Document A310, 2010
edition 2
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWER OF A i TORNEY
THIS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the
extent herein stated.
KNOW ALL PERSONS BY THESE PRESENTS:
That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing under the
laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws of the State of
Michigan, (hereinafter individually and collectively the "Company") does hereby constitute and appoint,
Beth Fedyn, Roger Taylor, Jo Ann R Smith, Sara Grace Ferraro and/or Samantha Curl
Of Robertson -Ryan and Associates of Waukesha, WI each individually, if there be more than one named, as its true and lawful attorney(s)-in-fact to sign,
execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, any and all surety bonds, recognizances,
undertakings, or other surety obligations. The execution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of these presents,
shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company, in their own proper persons.
Provided however, that this power of attorney limits the acts of those named herein; and they have no authority to bind the Company except in the manner stated
and to the extent of any limitation stated below:
Any such obligations in the United States, not to exceed Ten Million and No/100 ($10,000,000) in any single instance
That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company, and said Resolutions
remain in full force and effect:
RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and empowered to
appoint Attorneys -in -fact of the Company, in its name and as it acts, to execute and acknowledge for and on its behalf as surety, any and all bonds,
recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with power to attach thereto the seal of the
Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly executed and
acknowledged by the regularly elected officers of the Company in their own proper persons.
RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and
executed by the President or Vice President in conjunction with any Vice President of the Company, shall be binding on the Company to the same extent
as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile. (Adopted October 7, 1981 —
The Hanover Insurance Company; Adopted April 14, 1982 — Massachusetts Bay Insurance Company; Adopted September 7, 2001—Citizens Insurance
Company of America and affirmed by each Company on March 24, 2014)
IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY
OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents, this 22nd day of April 2025
The Hanover Insurance Company
Mamachasetb Bay Iwraoce Company
Citizens insurance Compenyef America
4114.
H. Kawieekl, Vice President
STATE OF CONNECTICUT )
COUNTY OF HARTFORD
) ss.
The Hanover insurance Company
hosetes Bay Insurance Company
as insurance Compeey of America
Ian II. Mendota, Vice President
On this 22"d day of April, 2025 before me came the above named Executive Vice President and Vice President of The Hanover Insurance Company,
Massachusetts Bay insurance Company and Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein,
and acknowledged that the seats affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance
Company and Citizens Insurance Company of America. respectively, and that the said corporate seals and their signatures as officers were duly affixed and
subscribed to said instrument by the authority and direction of said Corporations.
KATHLEEN M. SWARD
Notary Pubik
InilfCommentveallit! iiiassachusetts
I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America,
hereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies, and do hereby further certify
that the said Powers of Attorney are still in force and effect.
GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this _25 day of June 2026
CERTIFIED COPY