Loading...
HomeMy WebLinkAboutROBINSON BROS. ENVIRONMENTAL, INC.EXHIBIT "A" ASBESTOS ABATEMENT RATH BUILDINGS 1442 SYCAMORE STREET, WATERLOO, IOWA 50703 SIGNATURE PAGE The undersigned Proposer/Bidder, having examined these documents and having full knowledge of the condition under which the work described herein must be performed, hereby proposes that they will fulfill the obligations contained herein in accordance with all instructions, terms, conditions, and specifications set forth; and that they will furnish all required services and pay all incidental costs in strict conformity with these documents for the stated process as payment in full. The City shall award one or more Contracts to the responsible Bidder(s) whose bid, conforming to the Specifications and without regard to whether the bid is made on a per -Option or a total basis, is most advantageous to the City of Waterloo, price and other factors considered. The City reserves the right to award a contract for any single Option, any combination of Options, or all Options together. OPTION A: asbestos abatement and disposal of the entirety of the former Rath Buildings located at 1442 Sycamore Street: Our bid, for asbestos abatement and disposal of the entirety of the former Rath Buildings located at 1442 Sycamore Street is, not to exceed: Total "lump sum" bid: $ 3,060,000.00 Total in written form: Three Million Sixty Thousand Dollars OPTION B: asbestos abatement and disposal by area of the former Rath Buildings located at 1442 Sycamore Street: Our bid, for asbestos abatement and disposal by area of the former Rath Buildings located at 1442 Sycamore Street is, not to exceed: Total "Area 1" bid: $ Total "Area 2" bid: $ Total "Area 3" bid: $ Total for Area 1 in written form: Total for Area tin written form: Total for Area 3 in written form: Submitting Firm: Robinson Brothers Environmental, Inc. Address: 6116 Darlin Dr City: Dane State: WI Zip: 53529 Authorized Representative (print) (1 CJA U$ ` �,• 1) IN GC-1) Authorized Representative Signature 1 iee 1't4.5i Attic/ Date : 7/9/26 Email: ryant@robinsonbros.com Phone: 608-575-7783 Fax: Page 1 of 2 EXCEPTIONS/DEVIATIONS to this Request for Bid shall be listed in writing on an attached document provided by the Bidder. Please be as specific as possible. Please check one: Our company has no exceptions/deviations. Our company does have exceptions/deviations which are listed on an attached document. SUBCONTRACTORS AND SUB -CONTRACTORS to this Request for Bid shall be listed in writing on an attached document provided by the Bidder. Please be as specific as possible. Please check one: Our company has no subcontractors or sub -subcontractors. Our company does have subcontractors or sub -subcontractors which are listed on an attached document. GENERAL INFORMATION. Freight and/or delivery charges, if any, shall be included in the price. FIRM PRICING. Offered prices shall remain firm for a minimum of sixty (60) days after the due date of this solicitation unless indicated otherwise. Accepted prices shall remain firm for the duration of the Contract. ADDENDA (It is the Bidder's responsibility to check for issuance of any addenda). The authorized representative herby acknowledges receipt of the following addenda: Addenda Number 1 Date 6/19/26 Addenda Number 2 Date 6/22/26 Addenda Number 3 Date 7/2/26 n We choose not to bid at this time but would like to be considered for future requests for bid Page 2 of 2 EXHIBIT "B" ASBESTOS ABATEMENT RATH BUILDINGS 1442 SYCAMORE STREET, WATERLOO, IOWA 50703 BID ITEMS AND QUANTITIES - Revised The Quantities shown below are approximate only but are considered sufficiently adequate for the purpose of the Project Manual and comparing bids. The Contractor is responsible for verification of all materials and quantities listed below. No additions to the Contract will be allowed for additional ACMs discovered that amount to Tess than ten percent (10%) of each material listed below. If additional amounts greater than ten percent (10%) are identified, Contractor is to stop work and notify the City and/or City's consultant immediately. No compensation for removal of suspect ACMs without prior authorization by City and/or City's consultant will be approved. All materials and quantities are subject to revision by the City. The first table is the list of ACM throughout the entire structure. The second table separates out the ACM by area to assist with bidding Option B. ASBESTOS CONTAINING MATERIALS SAMPLE LIST (ENTIRE STRUCTURE) 01001101 Substance Location Asbestos Content Est. Quantity Pipe Insulation Basement; 1st Floor; 2nd Floor; 4th Floor; 5th Floor; 6th Floor; 7th Floor 20% Amosite / 8% Chrysotile 25% Chrysotile 20% Amosite / 3% Chrysotile 5% Amosite / 15% Chrysotile 20% Chrysotile 60% Chrysotile Basement: 355 LF 1st Floor: 65 LF 2nd Floor: 255 LF 4'h Floor: 655 LF 5th Floor: 665 LF 6th Floor: 910 LF 7h Floor: 295 LF Total: 3,200 LF ' Heater Insulation Basement 30% Chrysotile 25 SF Felt -Wrapped Pipe Insulation Tar and Felt Roof (& 5th Floor and 7th Floor) 30% Chrysotile 1,100 LF Door Caulk Elevator Doors — All Floors West Exterior Loading Dock SW Exterior Loading Dock 5% Chrysotile 10% Chrysotile 1.2% Chrysotile Elevator: 280 LF West Loading Dock: 8 LF SW Loading Dock: 10 LF Pipe Insulation Debris / Steamer Insulation Debris / Aircell Pipe Insulation Debris / Duct Wrap Debris Basement; 2nd Floor; 5th Floor; 6th Floor; 7th Floor 10% Amosite 20% Amosite / 8% Chrysotile 25% Chrysotile 20% Amosite / 3% Chrysotile 5% Amosite / 15% Chrysotile 20% Chrysotile 60% Chrysotile 20% Chrysotile 70% Chrysotile Basement: 600 SF 2nd Floor: 1,500 SF 5th Floor: 2,500 SF 6th Floor: 650 SF 7th Floor: 5,500 SF Total: 10, 750 SF Page 1 of 9 Material Substance 1.ocalien :As . Quantity Transite Wall Panels 4th Floor; 6th Floor; 7th Floor 15% Chrysotile 4th Floor: 200 SF 6th Floor: 4,300 SF 7thFloor: 1,300 SF Total: 5,800 SF Duct Sealant 6th Floor 2% Chrysotile 550 LF Aircell Pipe Insulation Basement; 1st Floor; 2nd Floor;5th Floor;6th Floor;20% 7thFloor Chrysotile 70% Chrysotile Basement: 600 LF 1st Floor: 250 LF 2nd Floor: 40 LF 5th Floor: 540 LF 6thFloor: 200 LF 7th Floor: 55 LF Total: 1,685 LF Asphalt Shingles / Ceiling Covering / Ceiling Covering Tar / Cork Tar Paper Basement; 1st Floor; 2nd Floor; 3rdFloor; 4thFloor; 5th Floor; 6th Floor; 7th Floor 15% Chrysotile 10% Chrysotile 5°% Chrysotile 2 /o Chrysotile ° 3. o /o Chrysotile 8% Chrysotile 7 /o Chrysotile 3% Chrysotile Basement: 35,200 SF IFloor: 13,850 SF 2nd Floor: 56,225 SF 3rd Floor: 73,950 SF 4th Floor: 38,900 SF 5th Floor: 9,600 SF 6th Floor: 5,830 SF 7th Floor: 3,950 SF Total: 237,505 SF Tank Insulation 2nd Floor 30% Chrysotile 100 SF 9" x 9" Green Floor Tile and Black Mastic with Pipe Insulation Debris 2nd Floor Floor Tile: 5% Chrysotile Mastic: 5% Chrysotile Pipe Insulation: 20% Amosite / 3% Chrysotile 4,500 SF 12" x 12" Brown Floor Tile and Black Mastic with Pipe Insulation Debris 2nd Floor Floor Tile: 2% Chrysotile Mastic: 5% Chrysotile Pipe Insulation: 20% Amosite / 3% Chrysotile 100 SF Corrugated Transite Panels Exterior 15% Chrysotile Northwest Office Roof: 2,700 SF SW Rail Dock Wall: 300 SF Old Caulk Exterior — North Street Level Windows 15% Chrysotile 30 LF Roofing Tar All Roofs 8% Chrysotile 6,000 SF Roofing Caulk Roof A 5% Chrysotile 60 LF Roofing Material Roof E 10% Chrysotile 12,200 SF Expansion Joint Exterior — North Al2 (Behind Vertical Metal Seams) 3% Chrysotile 400 LF Chalkboard 6th Floor; 7th Floor 15% Chrysotile 6� Floor: 20 SF 7 Floor: 50 SF Tar' Floor — HVAC Crawl 5tWall Space 10% Chrysotile 750 SF Page 2 of 9 Material Substance Location Asbestos Content _ Est. Quantity Panel Adhesive Basement; 1st Floor; 2nd Floor 3rd Floor ' 10% Chrysotile Basement: 360 SF 15t Floor: 700 SF 2nd Floor: 500 SF 3rd Floor: 10,800 SF Total: 12,360 SF Duct Wrap Basement 80%°Chrysotile 70% Chrysotile 500 LF Cement Board 1st Floor — North Room, North Wall — Top Half 20% Chrysotile 750 SF Cork Insulation Tar 7th Floor — Middle Room, South Portion Walls; 3rd Floor —Northeast Room Ceiling 3% Chrysotile 2% Chrysotile 7th Floor: 4,700 SF 3rd Floor: 17,100 SF Total: 21,800 SF Possible Fire Doors (Assumed) Throughout N/A (Assumed) 112 Doors Elevator Equipment (Assumed) Throughout N/A (Assumed) 7 Elevator NOTE: IT IS UNDERSTOOD THAT THE QUANTITIES OF ACMS DOCUMENTED WITHIN THIS PROJECT MANUAL ARE ESTIMATED FOR THE PURPOSE OF THIS BID. ALL QUANTITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO SUBMISSION OF BID. Robinson Brothers Environmental. Inc. Bidder Name Page 3 of 9 ASBESTOS CONTAINING MATERIALS SAMPLE LIST (AREA 1) Material Substance on Asbestos Content Eocene Estimated Quantity Pipe Insulation Basement; 2"d Floor; 5th Floor; 6th Floor; 7th Floor 20% Amosite / 8% Chrysotile 25% Chrysotile 20% Amosite / 3% Chrysotile 5% Amosite / 15% Chrysotile 20% Chrysotile 60% Chrysotile Basement: 135 LF 2nd Floor: 10 LF 5th Floor: 665 LF 6th Floor: 465 LF 7th Floor: 140 LF Total: 1,415 LF Heater Insulation Basement 30% Chrysotile Basement: 25 SF Door Caulk Elevator Doors — All Floors 5% Chrysotile Elevator: 280 LF Pipe Insulation Debris / Steamer Insulation Debris / Aircell Pipe Insulation Debris / Duct Wrap Debris Basement 2nd Floor 5th Floor 6th Floor 7th Floor 10% Amosite 20% Amosite / 8% Chrysotile 25% Chrysotile 20% Amosite / 3% Chrysotile 5% Amosite / 15% Chrysotile 20% Chrysotile 60% Chrysotile 20% Chrysotile 70% Chrysotile Basement: 600 SF 2nd Floor: 1,500 SF 5th Floor: 2,500 SF 6th Floor: 570 SF 7th Floor: 5,500 SF Total: 10,670 SF Aircell Pipe Insulation Basement 1 Floor; 5th Floor; 6th20°% Floor; 7th Floor Chrysotile 70 /o Chrysotile Basement: 600 LF 1st Floor: 100 LF 5th Floor: 440 LF 6th Floor: 200 LF 7th Floor: 55 LF Total: 1,395 LF Asphalt Shingles / Ceiling Covering / Ceiling Tar / Cork Tar Paper Basemnt; 1 FFloor; 2nd loor; 3rdFloor; 4thFloor; 5th Floor; 6th Floor; 7th Floor 15% Chrysotile 10% Chrysotile 5% Chrysotile 2% Chrysotile 3.6% Chrysotile .6 Chrysotile 8Covering 7% Chrysotile o 3 /o Chrysotile Basement: 6,850 SF 1st Floor: 6,770 SF 2nd Floor: 21,005 SF 3rd Floor: 32,280 SF 4 Floor: 33,600 SF 5th Floor: 9,520 SF 6Floor: 4,990 SF 7thFloor: 2,250 SF Total: 117,265 SF 9" x 9" Green Floor Tile and Black Mastic with Pipe Insulation Debris 2nd Floor Floor Tile: 5% Chrysotile Mastic: 5% Chrysotile Pipe Insulation: 20% Amosite / 3% Chrysotile 2"d Floor: 4,500 SF Page 4 of 9 Material Substance Location Asbestos Content Eocene Estimated Quantity 12" x 12" Brown Floor Tile and Black Mastic with Pipe Insulation Debris 2nd Floor Floor Tile: 2% Chrysotile Mastic: 50/0 Chrysotile Pipe Insulation: 20% Amosite / 3% Chrysotile 2nd Floor: 100 SF Old Caulk Exterior — North Street Level Windows 15% Chrysotile Exterior: 30 LF Roofing Tar All Roofs 8% Chrysotile Roof: 2,000 SF Chalkboard 7th Floor 15% Chrysotile 7th Floor: 50 SF Panel Adhesive 1st Floor 10% Chrysotile 1st Floor: 700 SF Duct WrapBasement 80% Chrysotile 70% Chrysotile Basement: 500 LF Cork Insulation Tar 3rd Floor — Northeast Room Ceilino 2% Chrysotile 3rd Floor: 17,100 SF Possible Fire Doors (Assumed) Throughout N/A (Assumed) 76 Doors Elevator Equipment (Assumed) Throughout N/A (Assumed) 2 Elevator NOTE: IT IS UNDERSTOOD THAT THE QUANTITIES OF ACMS DOCUMENTED WITHIN THIS PROJECT MANUAL ARE ESTIMATED FOR THE PURPOSE OF THIS BID. ALL QUANTITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO SUBMISSION OF BID. Robinson Brothers Environmental. Inc. Bidder Name Page 5 of 9 ASBESTOS CONTAINING MATERIALS SAMPLE LIST (AREA 2) Material Substance Lech ifiSbe ste t Conten20% %Vane EstimatedQuantity Pipe Insulation Basement 1st Floor 2nd Floor;20% 4th Floor 6th Floor 7th Floor Amosite / 8% Chrysotile Chrysotile Amosite / 3% Chrysotile 5% Amosite / 15% Chrysotile 20% Chrysotile 60% Chrysotile Basement: 45 LF 1st Floor: 65 LF 2"d Floor: 215 LF 4th Floor: 70 LF 6th Floor: 445 LF 7th Floor: 155 LF Total: 995 LF Felt -Wrapped Pipe Insulation Tar and Felt Roof (& 5th Floor and 7th Floor) 30% Chrysotile Roof; 5th Floor; 7th Floor: 1,100 LF Pipe Insulation Debris / Steamer Insulation Debris / Aircell Pipe Insulation Debris / Duct Wrap Debris 6th Floor 10% Amosite 20% Amosite / 8% Chrysotile 25% Chrysotile 20% Amosite / 3% Chrysotile 5% Amosite / 15% Chrysotile 20% Chrysotile 60% Chrysotile 20% Chrysotile 70% Chrysotile 6th Floor: 80 SF 1 Transite Wall Panels 4th Floor; 6th Floor; 7th Floor 15% Chrysotile 4th Floor: 200 SF 6th Floor: 4,300 SF 7th Floor: 1,300 SF Total: 5,800 SF Duct Sealant 6th Floor 2% Chrysotile 6th Floor: 550 LF Aircell Pipe Insulation 1st Floor; 2nd Floor; 5th Floor 20% Chrysotile 70% Chrysotile 1st Floor: 150 LF 2nd Floor: 40 LF 5th Floor: 100 LF Total: 290 LF Asphalt Shingles / Ceiling Covering / Ceiling Covering Tar / Cork Tar Paper Basement; 1 d Floor; 2 Floor; 3rd Floor; 4th Floor; 5th Floor; 6th Floor; 7th Floor 15% Chrysotile 10% Chrysotile 5% Chrysotile 2% Chrysotile 3.6% Ch sotile .86 Chrysotile 7% Chrysotile 3% Chrysotile Basement: 1,230 SF 1st Floor: 1,560 SF 2"d Floor: 8,660 SF 3rd Floor: 18,175 SF 4th Floor: 5,300 SF 5th Floor:80 SF 6thFloor:840 SF 7th Floor: 1,700 SF Total: 37,545 SF Tank Insulation 2"d Floor 30% Chrysotile 2"d Floor: 100 SF Roofing Tar All Roofs 8% Chrysotile Roof: 2,000 SF Roofing Material Roof E 10% Chrysotile Roof: 12,200 SF Chalkboard 6th Floor 15% Chrysotile 6th Floor: 20 SF Wall Tar 5th Floor — HVAC Crawl Space 10% Chrysotile 5th Floor: 750 SF Panel Adhesive 3rd Floor 10% Chrysotile 3'd Floor: 630 SF Page 6 of 9 Material Substance Location Asbestos Content Focelte Esemeed E, l'Iri, _F', Cork Insulation Tar 7th Floor —Middle Room, South Portion Walls 3% Chrysotile 7th Floor: 4,700 SF Possible Fire Doors (Assumed) Throughout N/A (Assumed) 29 Doors Elevator Equipment (Assumed) Throughout N/A (Assumed) 4 Elevator NOTE: IT IS UNDERSTOOD THAT THE QUANTITIES OF ACMS DOCUMENTED WITHIN THIS PROJECT MANUAL ARE ESTIMATED FOR THE PURPOSE OF THIS BID. ALL QUANTITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO SUBMISSION OF BID. Robinson Brothers Environmental, Inc. Bidder Name Page 7 of 9 ASBESTOS CONTAINING MATERIALS SAMPLE LIST (AREA 3) Material Substance Location Content Eocene Eocene Estimated Quantity Pipe Insulation Basement; 2nd Floor; 4th Floor 20% Amosite / 8% Chrysotile 25% Chrysotile 20% Amosite / 3% Chrysotile 5% Amosite / 15% Chrysotile 20% Chrysotile 60% Chrysotile Basement: 175 LF 2nd Floor: 30 LF 4th Floor: 590 LF Total: 795 LF Door Caulk West Exterior Loading Dock SW Exterior Loading Dock o 10% 1.2 /o Chrysotile West Loading Dock: 8 LF SW Loading Dock: 10 LF Total: 18 LF Asphalt Shingles / Ceiling Covering / Ceiling3rd Covering Tar / Cork Tar Paper Basement 1 Floor 2"d Floor Floorr4'lear 15°% Chrysotile 10% Chrysotile 5% Chrysotile 2% Chrysotile 3.6% Chrysotile 8% Chrysotile 7% Chrysotile 3% Chrysotile Basement: 27,120 SF 1st Floor: 5,520 SF 2"d Floor: 26,560 SF 3rd Floor: 23,495 SF 4" Floor: 35,900 Sr Total: 82,695 SF Corrugated Transite Panels Exterior 15% Chrysotile Northwest Office Roof: 2,700 SF SW Rail Dock Wall: 300 SF Roofing Tar All Roofs 8% Chrysotile Roof: 2,000 SF Roofing Caulk Roof A 5% Chrysotile Roof: 60 LF Expansion Joint Exterior — North Al2 (Behind Vertical Metal Seams) 3% Chrysotile Exterior: 400 LF Panel Adhesive Basement; 2"d Floor; 3rdFloor 10% Chrysotile Basement: 360 SF 2nd Floor: 500 SF 3rd Floor: 10,170 SF Total: 11,030 SF Cement Board 1st Floor — North Room, North Wall — Top Half 20% Chrysotile 1st Floor: 750 SF Possible Fire Doors (Assumed) Throughout N/A (Assumed) 7 Doors Elevator Equipment (Assumed) Throughout N/A (Assumed) 1 Elevator NOTE: IT IS UNDERSTOOD THAT THE QUANTITIES OF ACMS DOCUMENTED WITHIN THIS PROJECT MANUAL ARE ESTIMATED FOR THE PURPOSE OF THIS BID. ALL QUANTITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO SUBMISSION OF BID. Robinson Brothers Environmental, Inc. Bidder Name Page 8 of 9 In the event of discovery of items or materials exceeding 10% of the approximate quantity or not identified within the specifications are located during abatement, contractor will be bound to the following pricing: ITEM Materialetbstince Unit UM Pace 1 Pipe Insulation LF $ 32.84 2 Heater Insulation SF $ 14.37 3 Felt -Wrapped Pipe Insulation Tar and Felt LF $ 100.00 4 Door Caulk LF $ 7.66 5 Pipe Insulation Debris / Steamer Insulation Debris / Aircell Pipe Insulation Debris / Duct Wrap Debris SF $ 45.98 6 Transite Wall Panels SF $ 4.60 7 Duct Sealant LF $ 7.18 8 Aircell Pipe Insulation LF $ 25.60 9 Asphalt Shingles / Ceiling Covering / Ceiling Covering Tar / Cork Tar Paper SF $ 7.70 10 Tank Insulation SF $ 14.37 11 9" x 9" Green Floor Tile and Black Mastic with Pipe Insulation Debris SF $7.00 12 12" x 12" Brown Floor Tile and Black Mastic with Pipe Insulation Debris SF $ 7.00 13 Corrugated Transite Panels SF $ 4.50 14 Old Caulk LF $ 9.58 15 Roofing Tar SF $ 5.75 16 Roofing Caulk LF $ 7.66 17 Roofing Material SF $ 6.39 18 Expansion Joint LF $ 9.58 19 Chalkboard SF $ 6.39 20 Wall Tar SF $11.50 21 Panel Adhesive SF $ 5.75 22 Duct Wrap LF $ 28.74 23 Cement Board SF $ 4.60 24 Cork Insulation Tar SF $ 7.70 25 Possible Fire Doors (Assumed) EA $ 114.80 26 Elevator Equipment (Assumed) EA $ 344.85 NOTE: IT IS UNDERSTOOD THAT THE QUANTITIES OF ACMS DOCUMENTED WITHIN THIS PROJECT MANUAL ARE ESTIMATED FOR THE PURPOSE OF THIS BID. ALL QUANTITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO SUBMISSION OF BID. Robinson Brothers Environmental, Inc. Bidder Name Page 9 of 9 BID BOND The Hanover Insurance Company CONTRACTOR: (Name, legal status and address) Robinson Brothers Environmental, Inc. 6116 Darlin Drive Dane, WI 53529 OWNER: (Name, legal status and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 BOND AMOUNT: 5% of Bid PROJECT: (.Name, location or address, and Project number, if any) Rath Buildings - Asbestos Abatement 1442 Sycamore St, Waterloo, IA 50703 SURETY: (Name, legal status and principal place of business) The Hanover Insurance Company P.O. Box 580045 Charlotte, NC 28258 The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material funushed in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perfonn the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein, When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. The Company executing this bond vouches that this document conforms to American Institute of Architects Document A310, 2010 edition 1 Signed and sealed this 25th day of June (Witness) 2026 (Witness) AN i� Robinson Brothers EriviranMental Inc % cS=••• ,3"CO la al) k� (Title) The Hanover Insurance Company 6crretn Jo Ann R Smith Attorney -In -Fact (Title) The Company executing this bond vouches that this document conforms to American Institute of Architects Document A310, 2010 edition 2 THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWER OF A i TORNEY THIS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. KNOW ALL PERSONS BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing under the laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws of the State of Michigan, (hereinafter individually and collectively the "Company") does hereby constitute and appoint, Beth Fedyn, Roger Taylor, Jo Ann R Smith, Sara Grace Ferraro and/or Samantha Curl Of Robertson -Ryan and Associates of Waukesha, WI each individually, if there be more than one named, as its true and lawful attorney(s)-in-fact to sign, execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, any and all surety bonds, recognizances, undertakings, or other surety obligations. The execution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company, in their own proper persons. Provided however, that this power of attorney limits the acts of those named herein; and they have no authority to bind the Company except in the manner stated and to the extent of any limitation stated below: Any such obligations in the United States, not to exceed Ten Million and No/100 ($10,000,000) in any single instance That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company, and said Resolutions remain in full force and effect: RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and empowered to appoint Attorneys -in -fact of the Company, in its name and as it acts, to execute and acknowledge for and on its behalf as surety, any and all bonds, recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with power to attach thereto the seal of the Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons. RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed by the President or Vice President in conjunction with any Vice President of the Company, shall be binding on the Company to the same extent as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile. (Adopted October 7, 1981 — The Hanover Insurance Company; Adopted April 14, 1982 — Massachusetts Bay Insurance Company; Adopted September 7, 2001—Citizens Insurance Company of America and affirmed by each Company on March 24, 2014) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents, this 22nd day of April 2025 The Hanover Insurance Company Mamachasetb Bay Iwraoce Company Citizens insurance Compenyef America 4114. H. Kawieekl, Vice President STATE OF CONNECTICUT ) COUNTY OF HARTFORD ) ss. The Hanover insurance Company hosetes Bay Insurance Company as insurance Compeey of America Ian II. Mendota, Vice President On this 22"d day of April, 2025 before me came the above named Executive Vice President and Vice President of The Hanover Insurance Company, Massachusetts Bay insurance Company and Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein, and acknowledged that the seats affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America. respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said instrument by the authority and direction of said Corporations. KATHLEEN M. SWARD Notary Pubik InilfCommentveallit! iiiassachusetts I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, hereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies, and do hereby further certify that the said Powers of Attorney are still in force and effect. GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this _25 day of June 2026 CERTIFIED COPY