Loading...
HomeMy WebLinkAbout3378 Be it resolved by the City O, it of the City of Waterloo, I � That whereas E. Lecki gton has completed yhe work of con- trusting sidewalkin font of lot? Block 5,. Lots 15, 16, 20, �- 21, Block 4 •,Lots 10, 11 Bl oek 6 1ots land .8 ,dock 3;.=- Ldtt7x B *;Lta , Lt 9 ,10 11, Blk8 ; Lots Sand 4 Blk 7..0 �tav� ► y Lots 111I2. 13,14,15,Bloek 3; Lots i, 5,6,7,$,10 Block 4,; �- �A�\t 1- lr Lots 1,2, Block14. --, the owri- of aI lots move described did; on the loth day of 1p�11, petition for said wo.ft end sib and agreement waiving all 'peli ninary resolutwidus• ,notIds 'er other proceedings regvired .bIt law, peliminary to d in nection with the doing of said work, and agreeing that the c thereof should be asees$ed against the abutting pr-oper ty, a0lr�. quired by lave, and that when Sao assessed the waiver on the sessnent certificates would be signed by them,now therefore, e it resolved by the City Council of the City of Waterloo , Ia. that the work of constructing said sid � 3 in front of said described lots be and the same is hereby, accepted, and that the cost thereof is hereby assessed a gainst the abutting lots as provided by law,and in accordance with the petition waiver and agreement of the owners of said property and as shown by the plat mid schedule of the _C City Ndgineer now on file in the office of the City Clerk, showing the cost and anont to be assessed against each lot or parcel of ground. Be tt further resolved that the Mayor and the City-Gsuneel Clerk be and they are hereby directed to issue sidewalk cert, ,t _ ifieates to the said E. Leckington in accordance with said plat and schedule to pair the cost of said impvovement. t