Loading...
HomeMy WebLinkAbout515 BROADWAY ST INVOICE DATE DUE DATE INVOICE# TOTAL DUE �i� 11 $80.00 ��,�,��� ,��, 04/26/2023 04/05/2023 2023-00011173 T� 011141 4terloo V Customer#: 20953 Please Make Check Payable and Remit To: City of Waterloo ATTN: City Clerk/Accounts Receivable KWIK STOP#4 715 Mulberry St 515 BROADWAY ST WATERLOO, IA 50703 WATERLOO,IA 50703 Amount Enclosed: DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT KEEP THIS PORTION FOR YOUR RECORDS COMMERCIAL INSPECTION - 515 BROADWAY ST-3-20-23 FOR BILLING INQUIRY: (319)291-4323 L Description 1 Total Price INSPECTION 2,000 $70.00 OCCUPANCY FEE $10.00 CUSTOMER# BILLING DATE DUE DATE INVOICE# CHARGES 20953 04/26/2023 04/05/2023 2023-00011173 $80.00 Less Prepayment $0.00 Total Due $80.00 City of Waterloo P,SER(O WATERLOO FIRE RESCUE ‘ q o , INSPECTION REPORT KWIK STOP 4,515 BROADWAY ST,BLDG 515 BROADWAY ST,WATERLOO IA 50703 4400 DETAILS Inspection Date:03/20/2023 I Inspection Type:Annual Inspection(1Yr) I Inspection Number:7795 I Shift: N/A I Station: N/A Unit: N/A Lead Inspector:JEFF SIEBEL I Other Inspectors: N/A I Fee:$80.00 STATUS CODE DESCRIPTION FAIL 1203.2.6-Exit signs. Emergency power shall be provided for exit signs as required in Section 1013.6.3.The system shall be capable of powering the required load for a duration of not less than 90 minutes. Inspector:JEFF SIEBEL-Comments:repair exit/egress light above main door. GENERAL NOTES JEFF SIEBEL-03/21/2023 @ 09:45 annual inspection$80 JEFF SIEBEL-03/21/2023 @ 09:50 obstructions removed from in front of electrical panel during inspection. JEFF SIEBEL-03/21/2023 @ 09:50 kitchen out of service. REINSPECTION DATE 04/11/2023 CONTACT SIGNATURE Mohammad Sarwat �, (A Signed on:03/21/2023 @ 09:45 VLF/ INSPECTOR SIGNATURE JEFF SIEBEL Signed on:03/21/2023 @ 09:46 //17i Printed on 03/21/2023 @ 09:50 Page 1 of 2 QUESTIONS ABOUT YOUR INSPECTION? JEFF SIEBEL Jeff.Siebel@Waterloo-ia.org 3192301224 Printed on 03/21/2023 @ 09:50 Page 2of2