Loading...
HomeMy WebLinkAbout300 W 4TH ST INVOICE DATE DUE DATE INVOICE# TOTAL DUE ����� Nit"% 02/15/2023 03/20/2023 2023-00011146 $80.00 girpire .............. %r1oo �o Customer#: 9011 Please Make Check Payable and Remit To: City of Waterloo A TTN: City Clerk/Accounts Receivable DOUGHY JOEY'S 715 Mulberry St 300 W 4TH ST WATERLOO, IA 50703 WATERLOO, IA 50702 Amount Enclosed: DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT KEEP THIS PORTION FOR YOUR RECORDS COMMERCIAL INSPECTION-300 W 4THST- 1-3-23 FOR BILLING INQUIRY: (319)291-4323 Description i Total Price j INSPECTION 2,000 $70.00 OCCUPANCY FEE $10.00 CUSTOMER# BILLING DATE DUE DATE INVOICE# CH.ARGES 9011 02/15/2023 03/20/2023 2023-00011146 $80.00 Less Prepayment $0.00 Total Due $80.00 City of Waterloo WATERLOO FIRE RESCUE (D INSPECTION REPORT \ ' DOUGHYJOEY'S,300 W 4TH ST,BLDG 300 W 4TH ST,WATERLOO IA 50701 DETAILS Inspection Date:01/03/2023 1 Inspection Type:Annual Inspection(1Yr) 1 Inspection Number:8324 1 Shift: N/A i Station: N/A Unit: N/A j Lead Inspector:JEFF SIEBEL Other Inspectors: N/A 1 Fee:$80.00 STATUS CODE DESCRIPTION FAIL 509.2-Equipment access. Approved access shall be provided and maintained for all fire protection system equipment to permit immediate safe operation and maintenance of such equipment. Storage,trash and other materials or objects shall not be placed or kept in such a manner that would prevent such equipment from being readily accessible. Inspector:JEFF SIEBEL-Comments:Remove obstrucions. Maintain a minimum of 36" clearance to fire alarm panel and fire sprinkler riser at all times. FAIL 704.1 -Maintaining Where required when the building was originally constructed, materials and systems protection. used to protect joints and voids in the following locations shall be maintained.The materials and systems shall be securely attached to or bonded to the adjacent construction,without openings visible through the construction. 1.joints in or between fire-resistance-rated walls,floors or floor/ceiling assemblies and roof or roof/ceiling assemblies.2.Joints in smoke barriers.3.Voids at the intersection of a horizontal floor assembly and an exterior curtain wall.4.Voids at the intersection of a horizontal smoke barrier and an exterior curtain wall.5.Voids at the intersection of a nonfire-resistance-rated floor assembly and an exterior curtain wall.6.Voids at the intersection of a vertical fire barrier and an exterior curtain wall.7.Voids at the intersection of a vertical fire barrier and a nonfire-resistance-rated roof assembly. Unprotected joints and voids do not need to be protected where such joints and voids were not required to be protected when the building was originally constructed.Where the system design number is known,the system shall be inspected to the listing criteria and manufacturer's installation instructions. Inspector:JEFF SIEBEL-Comments:Replace missing ceiling tiles:A.in kitchen by hood. B.Office. GENERAL NOTES JEFF SIEBEL-01/04/2023 @ 08:58 annual inspection$80 REINSPECTION DATE 01/24/2023 Printed on 01/04/2023 @ 09:01 Page 1 of 2 CONTACT SIGNATURE Andrew Howe Signed on:01/04/2023 @ 08:58 INSPECTOR SIGNATURE JEFF SIEBEL Signed on:01/04/2023 @ 08:58 QUESTIONS AIOUT YOUR INSPECTION? JEFF SIEBEL Jeff.Siebel@Waterloo-ia.org 3192301224 Printed on 01/04/2023 @ 09:01 Page 2 of 2