Loading...
HomeMy WebLinkAbout360 E RIDGEWAY AVE INVOICE DATE DUE DATE INVOICE# TOTAL DUE #14V411L,' 12/14/2022 01/20/2023 2023-00011100 $80.00Al F4,1 Tm .. Gterloo N° Customer#: 13404 Please Make Check Payable and Remit To: City of Waterloo ATTN: City Clerk/Accounts Receivable 715 Mulberry St 50703 THE OTHER PLACE WATERLOO, IA 360ERIDGEWAZ' AV WATERLOO,IA 50702 Amount Enclosed: DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT ------------------------------------------------- ----------- --------------------------------------------------------------KEEP THIS PORTION FOR YOUR RECORDS COMMERCIAL INSPECTION -360 E RIDGEWAY AVE- 11/29/22 FOR BILLING INQUIRY: (319)291-4323 Total Price Description $70.00 INSPECTION 2,000 $10.00 OCCUPANCY FEE INVOICE# CHARGES BILLING DATE DUE DATE $80.00 CUSTOMER# 12/14/2022 01/20/2023 2023-00011100 13404 Less Prepayment $0.00 Total Due--* $80.00 City of Waterloo 1.....b 0 0 tg �PIERL.0 WATERLOO FIRE RESCUE ,t4„ 4410 INSPECTION REPORT THE OTHER PLACE,360E RIDGEWAYAVE,BLD6 360 E RIDGEWAYAVE,WATERLOO IA 50702 DETAILS Inspection Date:11 /29/2022 ; Inspection Type:Annual Inspection(1Yr ; Inspectio\ Number:7735 Shift: N/A € Station: N/A Unit: N/A Lead Inspector:JEFF SIEBEL Other Inspectors: N/A ! F e:$80.00 STATUS CODE DESCRIPTION 3.The 604.2.5 Exit signs Emergency power shall be provided for exit ug ed ns s requoad ired a e duration of not less than system shall be capable of powering the required FAIL 90 minutes. Inspector:JEFF SIEBEL Comments:repair exit/egress light by west exit door by bar. 609.3.3.2 Grease If during the inspection it is found that hoods,g rease-removal devices,fans,ducts or FAIL accumulation other appurtenances have an accumulation of grease,such components shall be cleaned in accordance with ANSIIIKECA C 10. Inspector:JEFF SIEBEL Comments:remove all excessive grease from appliances, walls,floors.Fire hazardri- . v 6 ems' z- di ti,,,-:'7,Z-ft:,3;,f-_'-"?-7,?-?'V'f'-,'-fWF:::% F,- _ 1 1. :,...-.-f,e;;;;'----- ,,-72,2 r g GENERAL NOTES Printed on 12/01/2022 @ 09:22 Page 1 of 2 JEFF SIEBEL-12/01/2022 @ 09:16 kitchen hood exhaust cleaning due 12/17/22 and fire suppression due 1/15/23 JEFF SIEBEL-12/01/2022 @ 09:21 provide corrections to avoid progressive re-inspection fees beginning at$100.Call cell phone if corrected early. JEFF SIEBEL-12/01/2022 @ 09:12 annual inspection$80 REINSPECTION DATE 01/11/2023 CONTACT SIGNATURE Andy Buelow Signed on: 12/01/2022 @ 09:18Gc 7/) id) INSPECTOR SIGNATURE JEFF SIEBEL Signed on:12/01/2022 @ 09:18 QUESTIONS ABOUT YOUR INSPECTION? JEFF SIEBEL Jeff.Siebel@Waterloo-ia.org 3192301224 Printed on 12/01/2022 @ 09:22 Page 2 of 2