HomeMy WebLinkAbout3533 W AIRLINE HWY F W A T INVOICE DATE DUE DATE INVOICE# TOTAL DUE
{ 07/20/2023 08/25/2023 2024-00000056 $80.00
v 9 /0O
Customer#: 4987 Please Make Check Payable and Remit To:
City of Waterloo
ATTN: City Clerk/Accounts Receivable
CEDAR FALLS CONSTRUCTION 715 Mulberry St
3533 W AIRLINE HWY WATERLOO, IA 50703
WATERLOO, IA 50703
Amount Enclosed:
DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT
KEEP THIS PORTION FOR YOUR RECORDS
COMMERCIAL INSPECTION- 3533 W AIRLINE HWY - 7-19-23 FOR BILLING INQUIRY: (319)291-4323
Description Total Price j
INSPECTION 2,000 $70.00
OCCUPANCY FEE $10.00
CUSTOMER# BILLING DATE DUE DATE INVOICE# CHARGES
4987 07/20/2023 08/25/2023 2024-00000056 $80.00
Less Prepayment $0.00
Total Due -* $80.00
City of Waterloo
Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent
late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of
America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of
Administrative Services Offset Program if not paid in full within ninety days.
‘;\
0\ c61
WATERLOO FIRE RESCUE 44PSERto0
INSPECTION REPORT �y ,/'
SERVICE SIGNING/CEDAR FALLS CONSTRUCTION,3533 W AIRLINE HWY,BLDG 3533 W
AIRLINE HWY,WATERLOO IA 50703 42%0
DETAILS
Inspection Date:07/19/2023 Inspection Type:Annual Inspection(1Yr) I Inspection Number:204 j Shift: N/A I Station: N/A
Unit: N/A Lead Inspector:JEREMIAH VANDYKE Other Inspectors: N/A I Fee:$80.00
STATUS CODE DESCRIPTION
FAIL 1203.2.6-Exit signs. Emergency power shall be provided for exit signs as required in Section 1013.6.3.The
system shall be capable of powering the required load for a duration of not less than
90 minutes.
Inspector:JEREMIAH VANDYKE-Comments:2 Exit signs tested and failed,need
repaired or replaced.
Location:Old Shop
FAIL 5.2.1 -Annual sprinkler Sprinklers shall be inspected at least annually by licensed contractor
system inspection
Inspector:JEREMIAH VANDYKE-Comments:Sprinkler system is to be inspected
annually by licensed contractor.Reports for Sprinkler system inspection,5 year
inspection,and private hydrant report needs to be uploaded to Compliance Engine
by Licensed contractor.Contact sprinkler contractor to set up inspections.
Location: Private Hydrant and Sprinkler system.
FAIL Chapter 14-Inspection, Fire alarm system tested at least annually by licensed contractor
testing,and maintenance
Inspector:JEREMIAH VANDYKE-Comments: Fire alarm needs to be inspected
annually by licensed contractor and inspection report is to be uploaded to
Compliance engine website by fire alarm contractor.
Location: Fire Alarm
GENERAL NOTES
JEREMIAH VANDYKE-07/19/2023 @ 15:21 Fire extinguisher serviced/compliant by Superior Fire in February 2023.
JEREMIAH VANDYKE-07/19/2023 @ 15:37 Contact Black Hawk County Dispatch of any changes for emergency 24 hour contacts in
the event of an emergency at that address.Phone#319-291-2515.
Printed on 07/19/2023 @ 15:39
Page 1 of 2
GENERAL NOTES
JEREMIAH VANDYKE-07/19/2023 @ 15:37 Re-inspection dates are automatically generated 30 days out from the initial
inspection. Normal operating hours for inspections&re-inspections are Monday-
Friday,8:00 a.m.-5:00 p.m.If the automatically generated re-inspection date lands on
a weekend,the re-inspection will typically be performed the following Monday or
Tuesday.If all corrections are made before the 30 days,you can call to set up an earlier
re-inspection.
JEREMIAH VANDYKE-07/19/2023 @ 15:37 Re inspection fees may be assessed for subsequent re-inspections. Re-inspection fees
start at$100,then$150,and$200 for all subsequent re-inspections.-
JEREMIAH VANDYKE-07/19/2023 @ 15:37 Inspection Fee=$80.00
REINSPECT/ON DATE
08/18/2023
CONTACT SIGNATURE
Pat Burke Reason for not collecting a signature: NA
INSPECTOR SIGNATURE
JEREMIAH VANDYKE
Signed on:07/19/2023 @ 15:38 h /
QUESTIONS ASOUT YOUR INSPECTION?
JEREMIAH VANDYKE
jeremiah.vandyke@waterloo-ia.org
No phone number available
Printed on 07/19/2023 @ 15:39
Page 2 of 2