HomeMy WebLinkAbout1918 SCHUKEI RD 04 INVOICE DATE DUE DATE INVOICE# TOTAL DUE
� 09/19/2023 09/26/2023 2024-00000118 $200.00
fl• 1�•*rs I*
•
IFF= 0
�4 7tti7N3
Customer#: 7728 Please Make Check Payable and Remit To:
City of Waterloo
ATTN: City Clerk/Accounts Receivable
ALDI'S INC 715 Mulberry St
4201 BAGLEY AV N WATERLOO, IA 50703
FAIRBAULT, MN 55021
Amount Enclosed:
DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT
KEEP THIS PORTION FOR YOUR RECORDS
COMMERCIAL INSPECTION - 1918 SCHUKEI RD -9-7-23 FOR BILLING INQUIRY: (319)291-4323
LDescription I Total Price
REINSPECTION 3 $200.00
CUSTOMER# BILLING DATE DUE DATE INVOICE# CHARGES
7728 09/19/2023 09/26/2023 2024-00000118 $200.00
Less Prepayment $0.00
Total Due-* $200.00
City of Waterloo
Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent
late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of
America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of
Administrative Services Offset Program if not paid in full within ninety days.
�ptERLpO
WATERLOO FIRE RESCUE
INSPECTION REPORT t � \
ALDI INC 1918 SCHUKEI RD BLDG 1918 SCHUKEI RD WATERLOO U 50702
DETAILS
Inspection Date:09/07/2023 Inspection Type:Annual Inspection(1Yr) Inspection Number: 10888 Shift: N/A i Station: N/A
Unit: N/A Lead Inspector:JEFF SIEBEL Other Inspectors: N/A
STATUS CODE DESCRIPTION
FAIL 5.2.1 -Annual sprinkler Sprinklers shall be inspected at least annually by licensed contractor
system inspection
Inspector:JEFF SIEBEL-Comments:Fire Sprinkler Inspection report from Black Hawk
Sprinklers dated 6/20/23 lists deficiencies.Contractor must upload correction online
to the compliance engine.
Location: Not Provided
FAIL 604.4.2-Records Records of the inspection,testing and maintenance of emergency and standby
power systems shall include the date of service,name of the servicing technician,a
summary of conditions noted and a detailed description of any conditions requiring
correction and what corrective action was taken.Such records shall be maintained.
Inspector:JEFF SIEBEL-Comments:provide current Central Battery and emergency
exit and egress light testing with all discrepancies corrected with signature and date.
Location: Not Provided
FAIL Chapter 14-Inspection, Fire alarm system tested at least annually by licensed contractor
testing,and maintenance
Inspector:JEFF SIEBEL-Comments:provide current annual fire alarm inspection
report with all discrepancies corrected.Currently 330 days past due.Contractor must
upload online to the compliance engine.
Location: Not Provided
GENERAL NOTES
JEFF SIEBEL-09/12/2023 @ 09:57 .However Fire Alarm Inspection Report still not posted online and is 351 days past due.
JEFF SIEBEL-09/12/2023 @ 09:57 Re-inspection fee$200
Printed on 09/12/2023 @ 10:00
Page 1 of 2
REINSPECTION DATE
10/12/2023
CONTACT SIGNATURE
Sabonis Smith DM 8/23
Signed on:09/12/2023 @ 09:58
INSPECTOR SIGNATURE
JEFF SIEBEL
Signed on:09/12/2023 @ 09:58
QUESTIONS ABOUT YOUR INSPECTION?
JEFF SIEBEL
Jeff.Siebel@Waterloo-ia.org
3192301224
Printed on 09/12/2023 @ 10-00
Page 2 of 2