Loading...
HomeMy WebLinkAbout1918 SCHUKEI RD 04 INVOICE DATE DUE DATE INVOICE# TOTAL DUE � 09/19/2023 09/26/2023 2024-00000118 $200.00 fl• 1�•*rs I* • IFF= 0 �4 7tti7N3 Customer#: 7728 Please Make Check Payable and Remit To: City of Waterloo ATTN: City Clerk/Accounts Receivable ALDI'S INC 715 Mulberry St 4201 BAGLEY AV N WATERLOO, IA 50703 FAIRBAULT, MN 55021 Amount Enclosed: DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT KEEP THIS PORTION FOR YOUR RECORDS COMMERCIAL INSPECTION - 1918 SCHUKEI RD -9-7-23 FOR BILLING INQUIRY: (319)291-4323 LDescription I Total Price REINSPECTION 3 $200.00 CUSTOMER# BILLING DATE DUE DATE INVOICE# CHARGES 7728 09/19/2023 09/26/2023 2024-00000118 $200.00 Less Prepayment $0.00 Total Due-* $200.00 City of Waterloo Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of Administrative Services Offset Program if not paid in full within ninety days. �ptERLpO WATERLOO FIRE RESCUE INSPECTION REPORT t � \ ALDI INC 1918 SCHUKEI RD BLDG 1918 SCHUKEI RD WATERLOO U 50702 DETAILS Inspection Date:09/07/2023 Inspection Type:Annual Inspection(1Yr) Inspection Number: 10888 Shift: N/A i Station: N/A Unit: N/A Lead Inspector:JEFF SIEBEL Other Inspectors: N/A STATUS CODE DESCRIPTION FAIL 5.2.1 -Annual sprinkler Sprinklers shall be inspected at least annually by licensed contractor system inspection Inspector:JEFF SIEBEL-Comments:Fire Sprinkler Inspection report from Black Hawk Sprinklers dated 6/20/23 lists deficiencies.Contractor must upload correction online to the compliance engine. Location: Not Provided FAIL 604.4.2-Records Records of the inspection,testing and maintenance of emergency and standby power systems shall include the date of service,name of the servicing technician,a summary of conditions noted and a detailed description of any conditions requiring correction and what corrective action was taken.Such records shall be maintained. Inspector:JEFF SIEBEL-Comments:provide current Central Battery and emergency exit and egress light testing with all discrepancies corrected with signature and date. Location: Not Provided FAIL Chapter 14-Inspection, Fire alarm system tested at least annually by licensed contractor testing,and maintenance Inspector:JEFF SIEBEL-Comments:provide current annual fire alarm inspection report with all discrepancies corrected.Currently 330 days past due.Contractor must upload online to the compliance engine. Location: Not Provided GENERAL NOTES JEFF SIEBEL-09/12/2023 @ 09:57 .However Fire Alarm Inspection Report still not posted online and is 351 days past due. JEFF SIEBEL-09/12/2023 @ 09:57 Re-inspection fee$200 Printed on 09/12/2023 @ 10:00 Page 1 of 2 REINSPECTION DATE 10/12/2023 CONTACT SIGNATURE Sabonis Smith DM 8/23 Signed on:09/12/2023 @ 09:58 INSPECTOR SIGNATURE JEFF SIEBEL Signed on:09/12/2023 @ 09:58 QUESTIONS ABOUT YOUR INSPECTION? JEFF SIEBEL Jeff.Siebel@Waterloo-ia.org 3192301224 Printed on 09/12/2023 @ 10-00 Page 2 of 2