Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
HAMPTON INN - 2034 LAPORTE ROAD
O W A 7. INVOICE DATE DUE DATE INVOICE# TOTAL DUE A. g a ( 08/12/2026 09/16/2026 2027-00000066 $100.00 u O • ' IlAUit II II • O 3 4.4 7vt., Customer#: 12855 Please Make Check Payable and Remit To: City of Waterloo ATTN: City Clerk/Accounts Receivable HAMPTON INN 715 Mulberry St 2034 LA PORTE RD WATERLOO, IA 50703 WATERLOO, IA 50702 Amount Enclosed: DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT KEEP THIS PORTION FOR YOUR RECORDS COMMERCIAL FIRE INSPECTION-2034 LAPORTE RD-08/10/26 FOR BILLING INQUIRY: (319)291-4323 Description Total Price, REINSPECTION 1 $100.00 CUSTOMER# BILLING DATE DUE DATE INVOICE# CHARGES 12855 08/12/2026 09/16/2026 2027-00000066 $100.00 Less Prepayment $0.00 Total Due -* $100.00 City of Waterloo Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of Administrative Services Offset Program if not paid in full within ninety days. Waterloo Fire Rescue Otki Vkz Inspection Report 425 E.3rd Street Hampton Inn&Suites-2034 La Porte RD,BLDG 2034 La Porte Rd,Waterloo IA 50702 INSPECTION DETAILS Inspection Date Inspection Type cooInspection Number 08/10/2026 Annual Inspection(lYr) REINSPECTIO� �lJ�. 21295-R4 Lead Inspector Shift Station Unit BRAD BALDWIN NIA NIA NIA Other Inspectors NIA SUMMARY OF INSPECTION 0 0 0 2 0 11 Passed codes Resolved violations Failed codes NEXT STEPS Please direct questions about your Inspection to: Reinspection Date BRAD BALDWIN 09/01/2026 brad.baldwin@waterloo-ia.org,3192914319 GENERAL NOTES BRAD BALDWIN-07/10/2026 @ 07:20 2026 Exit sign&egress lights T BRAD BALDWIN-07/10/2026 @ 07:20 Electrical adapters and usage repairs 2026 N JM .was.2026 R nn m,ordo., fiefeted amaavmroo ewi tla k:b«:5 codxa+e eclena nareheen w.mpreed duasT}im a tenet mums aG�ad.pero Rsr6 oast ronWredh mpuna!vpme. •r.eceee antee are nowplaggret directly Into a eesronent wail Wieland neve been .Yady mounted in acmNance with lee ant safety requirements. •M goog town mkraveves one dapped s o;ty inch a permanent wadi aNel and we no ender connected through doter ship,e0teneun cords,or edephem. •AMO$000i atKNda auters haw been installed where necessary to ensure eotupmer0 can be cpmmved°nosey to permanent ouHais. These iente hew boon dolly oddrosot,and ate property to be in mmobonce with the c0naWoo 0000,s Identified awing the prae%w infraction.Please at has to contact nm Wyatt 0Mw soy guastona.or,ogobe any adaabonpi commotion. Ted*you, w;dnae c.n., Gburat Manger BRAD BALDWIN-07/10/2026 @ 07:20 Withholding re-inspection due to progress made on 4/23/26.Complete corrections to avoid possible fees at following inspections BRAD BALDWIN-07110/2026 @ 07:20 GENERATED ON 8/10/28, 8:09 AM 1 OF 6 1 $235 annual inspection fee BRAD BALDWIN-07/10/2026 @ 07:20 Private hydrants due inspected by 7/3/26.Reports including deficiencies corrected shall be uploaded to Compliance Engine. BRAD BALDWIN-07110/2026 @ 07:20 Sprinkler system inspection due 7/3/26.Reports including deficiencies corrected shall be uploaded to Compliance Engine. BRAD BALDWIN-0711012026 @ 07:20 Sprinkler standpipe inspection due 7/3126.Reports including deficiencies corrected shall be uploaded to Compliance Engine. BRAD BALDWIN-07110/2026 @ 07:20 Fire extinguishers due annually serviced in January 2027 BRAD BALDWIN-07110/2026 @ 07:20 •Commercial Fire Inspector-brad.baldwin@waterloo-ia.org-Work:319-291-4319(#5)-Cell:319-230-1224 BRAD BALDWIN-07110/2026 @ 07:20 •Provide corrections to avoid progressive re-inspection fees beginning at$100.Beer/Liquor application will not be signed until violations and hazards corrected BRAD BALDWIN-07110/2026 @ 07:20 •If all corrections are made before the scheduled re-inspection date,you can call to set up an earlier re-inspection.Normal operating hours for inspections&re-inspections are Monday-Friday,9:00 a.m.-4:00 p.m.*****Re inspection fees may be assessed for subsequent re-inspections.Re- inspection fees start at$100,then$150,and$200 for all subsequent re-inspections. BRAD BALDWIN-07/10/2026 @ 07:20 •Request of specific time on scheduled inspection date or change of inspection date shall be made by business representative prior to scheduled inspection date.Failure to request time or change of date will result in failed inspection. BRAD BALDWIN-0711012026©07:20 Withholding re-inspection fee on 719126,complete corrections to avoid fees at following inspections. BRAD BALDWIN-08/10/2026 @ 08:08 $100 re-inspection fee due to life safety violations still remaining on 8/10126.Complete corrections to avoid fees at following inspections. SIGNATURES Contact signature Inspector signature No signature Report completedeelpost stinspection Jami Battochio(2025) Date: BRAD BALDWIN 08110/2026 CHECKLISTS GENERATED ON 8/10/28, 8:09 AM 2 OF 6 Reinspection Status Code Description Fail 102.4-Application of building code. Ox The design and construction of new structures shall comply Location:4th floor housekeeping laundry closet with the International Building Code,and any alterations, Comments:Obtain building permit and Inspection of replacement of additions,changes in use or changes In structures required door.Door has arrived and on-site. by this code,which are within the scope of the International Building Code,shall be made in accordance therewith. Additional comments:Replacement door ordered and currently"in production"per phone call with Nichole on 8/6/26. Fail 102.4-Application of building code. px The design and construction of new structures shall comply Location:1st floor laundry furnace room with the International Building Code,and any alterations, Comments:Obtain building permit and inspection of replacement of additions,changes in use or changes in structures required door.Door has arrived and on-site. by this code,which are within the scope of the International Building Code,shall be made in accordance therewith. Additional comments:Replacement door ordered and currently"in production"per phone call with Nichole on 8/6/26. Fail 102.4-Application of building code. The design and construction of new structures shall comply Location:Room#130 with the International Building Code,and any alterations, Comments:Obtain building permit and inspection of replacement of additions,changes in use or changes in structures required door.Door has arrived and on-site. by this code,which are within the scope of the International Building Code,shall be made in accordance therewith. Additional comments:Replacement door ordered and currently"in production"per phone call with Nichole on 8/6/26. Fail 5.2.1-Annual sprinkler system inspection 0 Sprinklers shall be inspected at least annually by licensed Location:Sprinkler system contractor Comments:Provide annual inspection report with any deficiencies corrected,contractor must upload report to Compliance Engine. Additional comments:Deficiency noted on Compliance Engine requires contractor to upload repair report. Fail 705.2-Inspection and maintenance. Ux Opening protectives in fire-resistance-rated assemblies shall Location:Pantry-Mechanical(Furnace)closet be inspected and maintained in accordance with NFPA 80. Comments:Hotel staff notified inspector of:Door frame missing fire Opening protectives in smoke barriers shall be inspected and rating label.Frame shall be re-certified and labeled or replaced by maintained in accordance with NFPA 80 and NFPA 105. obtaining proper permit and inspection. Openings in smoke partitions shall be inspected and maintained in accordance with NFPA 105.Fire doors and Additional comments:Per phone call with Nichole on 8/6/26:QA1 smoke and draft control doors shall not be blocked, scheduled for 8117/26 to address correction. obstructed,or otherwise made inoperable.Fusible links shall be replaced promptly whenever fused or damaged.Opening protectives and smoke and draft control doors shall not be modified. Fail 705.2-Inspection and maintenance. tJx Opening protectives in fire-resistance-rated assemblies shall Location:1st floor-Mechanical(Furnace)closet near breakfast area be inspected and maintained in accordance with NFPA 80. Comments:Hotel staff notified inspector of:Door frame missing fire Opening protectives in smoke barriers shall be inspected and rating label.Frame shall be re-certified and labeled or replaced by maintained in accordance with NFPA 80 and NFPA 105. obtaining proper permit and inspection. Openings in smoke partitions shall be inspected and maintained in accordance with NFPA 105.Fire doors and Additional comments:Per phone call with Nichole on 8/6126:QA1 smoke and draft control doors shall not be blocked, scheduled for 8/17/26 to address correction. obstructed,or otherwise made inoperable.Fusible links shall be replaced promptly whenever fused or damaged.Opening protectives and smoke and draft control doors shall not be modified. GENERATED ON 8/10/28, 8:09 AM 3 OF 6 Fail 705.2-Inspection and maintenance, Opening protectives in fire-resistance-rated assemblies shall Location:Room 205 be inspected and maintained in accordance with NFPA 80. Comments:Door frame to common hallway missing fire rating label. Opening protectives in smoke barriers shall be inspected and Frame shall be re-certified and labeled or replaced by obtaining maintained in accordance with NFPA 80 and NFPA 105. proper permit and inspection. Openings in smoke partitions shall be inspected and maintained in accordance with NFPA 105.Fire doors and Additional comments:Per phone call with Nichole on 8/6/26:QA1 smoke and draft control doors shall not be blocked, scheduled for 8/17/26 to address correction. obstructed,or otherwise made inoperable.Fusible links shall be replaced promptly whenever fused or damaged.Opening protectives and smoke and draft control doors shall not be modified. Fail 705.2-Inspection and maintenance. Opening protectives in fire-resistance-rated assemblies shall Location:1st floor(east end)electric room be inspected and maintained in accordance with NFPA 80. Comments:Door frame to common hallway missing fire rating label. Opening protectives in smoke barriers shall be inspected and Frame shall be re-certified and labeled or replaced by obtaining maintained in accordance with NFPA 80 and NFPA 105. proper permit and inspection. Openings in smoke partitions shall be inspected and maintained in accordance with NFPA 105.Fire doors and Additional comments:Per phone call with Nichole on 8/6/26:QA1 smoke and draft control doors shall not be blocked, scheduled for 8117126 to address correction. obstructed,or otherwise made inoperable.Fusible links shall be replaced promptly whenever fused or damaged.Opening protectives and smoke and draft control doors shall not be modified. Fail 705.2-Inspection and maintenance. Opening protectives in fire-resistance-rated assemblies shall Location:Room 202 be inspected and maintained in accordance with NFPA 80. Comments:Door frame to common hallway missing fire rating label. Opening protectives in smoke barriers shall be inspected and Frame shall be re-certified and labeled or replaced by obtaining maintained in accordance with NFPA 80 and NFPA 105. proper permit and inspection. Openings in smoke partitions shall be inspected and maintained in accordance with NFPA 105.Fire doors and Additional comments:Per phone call with Nichole on 8/6126:QA1 smoke and draft control doors shall not be blocked, scheduled for 8117/26 to address correction. obstructed,or otherwise made inoperable.Fusible links shall be replaced promptly whenever fused or damaged.Opening protectives and smoke and draft control doors shall not be modified. Fail 705.2-Inspection and maintenance. Opening protectives in fire-resistance-rated assemblies shall Location:2nd floor(west end)laundry room be inspected and maintained in accordance with NFPA 80. Comments:Door frame to common hallway missing fire rating label. Opening protectives in smoke barriers shall be inspected and Frame shall be re-certified and labeled or replaced by obtaining maintained in accordance with NFPA 80 and NFPA 105. proper permit and inspection. Openings in smoke partitions shall be inspected and maintained in accordance with NFPA 105.Fire doors and Additional comments:Per phone call with Nichole on 8/6/26:QA1 smoke and draft control doors shall not be blocked, scheduled for 8/17/26 to address correction. obstructed,or otherwise made inoperable.Fusible links shall be replaced promptly whenever fused or damaged.Opening protectives and smoke and draft control doors shall not be modified. GENERATED ON 8/10/26, 8:09 AM 4 OF 6 Fail 901.4.8-Appearance of equipment. Any device that has the physical appearance of life safety or Location:Room#311 fire protection equipment but that does not perform that life Comments:Repair or replace fire alarm strobe not functioning safety or fire protection function shall be prohibited. properly.Work in progress.Room is to remain vacant till repairs are completed,(see attached agreement). Additional comments:Parts ordered,correction in progress ea WWI. to Hampton Iles Woubo... b I..de.efrlrt.M.dledaomw.MNICO.MOti. Cc Y..amnaJw 71amettehheraw•.4177.07 Chet.✓..xRwtetnrts toil, r hehh7777777.77 teh Gee aaoharnem 7oh wore.Me hen.777771 know ma o.le7 se, W+f and Wow.h.+.grw hl and arm and.out alter you poke trot me sveh her tarsallerrrurn.have awned a INalo of our Are .0 waw�ne tre.,.ho m an an INN enm�h we are be,nnl n:weans ante mown to me aratw red., called Nava Xawx Sonnmer also de was anN ableb leave a rooem,t and Nile rot reserved •call Crh vet.I hill update You when Near from hem teprdiry the uleoatl al spoilt to the room. tlole Carman temeawahcah It GENERATED ON 8/10/28, 8:09 AN 5 OF 6 i '® Statement of Fees FEE Invoice Date Inspection Fee Date Paid Amount Paid N/A $100.00 Invoice Number Check Number Transaction Number N/A NIA N/A GENERATED ON 8/10/26, 8:09 AM 6 OF 6