HomeMy WebLinkAboutTARGET STORE - 1501 E. SAN MARNAN DRIVE O
W A PF INVOICE DATE DUE DATE INVOICE# TOTAL DUE
�� 08/12/2026 09/16/2026 2027-00000074 $150.00
o
• 'in min III II.n •
O
7>
�s. 7V11
Customer#: 4661 Please Make Check Payable and Remit To:
City of Waterloo
ATTN: City Clerk/Accounts Receivable
TARGET STORE T1792 715 Mulberry St
PO BOX 111 WATERLOO, IA 50703
MINNEAPOLIS,MN 55440
Amount Enclosed:
DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT
KEEP THIS PORTION FOR YOUR RECORDS
COMMERCIAL FIRE INSPECTION- 1501 E. SAN MARNAN DR- FOR BILLING INQUIRY: (319)291-4323
08/11/26
Description Total Price
REINSPECTION 2 $150.00
CUSTOMER# BILLING DATE DUE DATE INVOICE# CHARGES
4661 08/12/2026 09/16/2026 2027-00000074 $150.00
Less Prepayment $0.00
Total Due—* $150.00
City of Waterloo
Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent
late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of
America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of
Administrative Services Offset Program if not paid in full within ninety days.
Waterloo Fire Rescue
az Inspection Report 425 E.3rd Street
Target Super Store-1501 E San Marnan DR,BLDG 1501 E San Marnan Dr,Waterloo
IA 50702
INSPECTION DETAILS
Inspection Date Inspection Type iInspection Number
08/11/2026 Annual Inspection(1Yr) I REINSPECTION 1 \ 22017-R3
Lead Inspector Shift Station Unit
BRAD BALDWIN NIA NIA N/A
Other Inspectors
N/A
SUMMARY OF INSPECTION
� 0 07
Passed codes Failed codes
NEXT STEPS
Please direct questions about your Inspection to: Reinspection Date
BRAD BALDWIN
09/01/2026
brad.baldwin@waterloo-ia.org,3192914319
GENERAL NOTES
BRAD BALDWIN-07/17/2026 @ 10:41
2026-Exit sign&Egress lights
rpm
Alt4
BRAD BALDWIN-07/17/2026 @ 10:41
Withholding re-inspection fee on 6125/26 due to progress made,complete corrections to avoid fees at following 7/17/26 @ 9am inspection.
BRAD BALDWIN-07117/2026 @ 10:41
$610 annual inspection fee
BRAD BALDWIN-07/17/2026 @ 10:41
•Commercial Fire Inspector-brad.baldwin@waterloo-ia.org-Work:319-291-4319(#5)-Cell:319-230-1224
BRAD BALDWIN-07/17/2026 @ 10:41
•Provide corrections to avoid progressive re-inspection fees beginning at$100.Beer/Liquor application will not be signed until violations and hazards
corrected
BRAD BALDWIN-07/17/2026 @ 10:41
•If all corrections are made before the scheduled re-inspection date,you can call to set up an earlier re-inspection.Normal operating hours for
inspections&re-inspections are Monday-Friday,9:00 a.m.-4:00 p.m.*****Re inspection fees may be assessed for subsequent re-inspections.Re-
inspection fees start at$100,then$150,and$200 for all subsequent re-inspections.
BRAD BALDWIN-07/17/2026 @ 10:41
$100 re-inspection fee for failure to complete corrections(life safety violations remaining)on scheduled 7/17126 re-inspection.Complete corrections to
avoid fees at following inspections.
DWIN-08/1112026 @ 13:00
$150 re-inspection tse for failure to complete corrections on 8/11/26.Complete corrections to avoid fees at following inspections.
GENERATED ON 8/11/28, 1:04 PM 1 OF 4
SIGNATURES
Contact signature Inspector signature
No signature sE
Report completed post inspection i13
Kyle(2025)floor manager Date: BRAD BALDWIN 0811112026
CHECKLISTS
Reinspection
Code Description
Fail 102.4-Application of building code.
The design and construction of new structures shall comply Location:Electrical permit(for HVAC)
with the International Building Code,and any alterations, Comments:Contractor(Steve's Electric)shall obtain inspection of
additions,changes in use or changes in structures required work when completed.
by this code,which are within the scope of the International
Building Code,shall be made in accordance therewith.
Fail 102.4-Application of building code.
The design and construction of new structures shall comply Location:HVAC permit
with the International Building Code,and any alterations, Comments:Contractor(Arris Inc)shall obtain inspection of work
additions,changes in use or changes in structures required when completed
by this code,which are within the scope of the International
Building Code,shall be made in accordance therewith.
Fail 5.2.1-Annual sprinkler system inspection
Sprinklers shall be inspected at least annually by licensed Location:Sprinkler system
contractor Comments:Provide annual sprinkler inspection and contractors
report including any deficiencies corrected to Compliance Engine
Additional comments:Deficiencies(see attached)shall be corrected
and contractors repair report uploaded to Compliance Engine
•
m®
Fail 507.5.3-Private fire service mains and water tanks.
Private fire service mains and water tanks shall be Location:Private fire hydrants
periodically inspected,tested and maintained in accordance Comments:Provide annual hydrants inspection and contractors
with NFPA 25 at the following intervals:1.Private fire hydrants report including any deficiencies corrected to Compliance Engine
of all types:Inspection annually and after each operation;
flow test and maintenance annually.2.Fire service main Additional comments:Uploaded report 47 days past due as of 8111126
piping:Inspection of exposed,annually;flow test every 5 on Compliance Engine
years.3.Fire service main piping strainers:Inspection and
maintenance after each use.Records of inspections,testing
and maintenance shall be maintained.
2 OF 4
GENERATED ON 8/11/28, 1:04 PM
Additional Codes
Status Code Description
Fail 606.3.3-Cleaning.
O Hoods,grease-removal devices,fans,ducts and other Location:Kitchen hood exhaust
appurtenances shall be cleaned at intervals as required by Comments:Provide required cleaning and contractor's report
Sections 606.3.3.1 through 606.3.3.3. including deficiencies corrected to be uploaded to Compliance
Engine.Currently past due as of 8110126,
Fail 606.3.3.1 Inspection.
0 Hoods,grease-removal devices,fans,ducts and other Location:Kitchen hood suppression system
appurtenances shall be inspected at intervals specified in Comments:Provide contractors required report including
Table 606.3.3.1 or as approved by the fire code official. deficiencies corrected to be uploaded to Compliance Engine.
Inspections shall be completed by qualified individuals.
Currently past due as of 7/30126.
Fail 907.8.4-Inspection,testing and maintenance.
OThe building owner shall be responsible to maintain the fire Location:Fire alarm
and life safety systems in an operable condition at all times. Comments:Deficiency(see attached)shall be corrected including
Service personnel shall meet the qualification requirements contractor's repair report to be uploaded to Compliance Engine
of NFPA 72 for inspection,testing and maintenance of such documenting repair.
systems.Records of inspection,testing and maintenance
shall be maintained.
GENERATED ON 8/11/26, 1:G4 PM 3 OF 4
Po Statement of Fees
FEE
Invoice Date Inspection Fee Date Paid Amount Paid
NIA $150.00
Invoice Number Check Number Transaction Number
NIA
NIA NIA
40F 4
GENERATED ON 8/11/26, 1:04 PM