HomeMy WebLinkAbout3555 UNIVERSITY AVE INVOICE DATE DUE DATE INVOICE# TOTAL DUE
11�14e�. 02/09/2021 03/15/2021 2021-00000209 $80.00
,;;?terlo0 �
Customer#: 13209 Please Make Check Payable and Remit To:
City of Waterloo
A TTN: City Clerk/Accounts Receivable
SPICOLI'S 715 Mulberry St
3555 UNIVERSITY AV WATERLOO, IA 50703
WATERLOO,IA 50701
Amount Enclosed:
DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT
KEEP THIS PORTION FOR YOUR RECORDS
COMMERCIAL INSPECTION-3555 UNIVERSITY AVE- 12-16-20 FOR BILLING INQUIRY: (319)291-4323
L Description
Total Price J
INSPECTION 1 HH
$70.00
OCCUPANCY FEE
$10.00
CUSTOMER# I BILLING DATE DUE DATE INVOICE# CHARGES
13209 02/09/2021 03/15/2021 I 2021-00000209
$80.00
Less Prepayment $0.00
Total Due--> $80.00
City of Waterloo
WATERLOOFIRE RESCUEe
INSPECTION REPORT �;4
SPICOLI'S,MSS UNIVERSITYAVE,BLDG MSS UNIVERSITYAVE,WATERLOO/A S0T01 4400
DETAILS
Inspection Date: 12/16/2020 Inspection Type:Annual Inspection(1Yr) Inspection Number:3254 Shift: N/A Station: N/A
Unit: N/A i Lead Inspector:JEFF SIEBEL Other Inspectors: N/A ; Fee:$80.00
STATUS CODE DESCRIPTION
FAIL 5.2.1 -Annual sprinkler Sprinklers shall be inspected at least annually by licensed contractor
system inspection
Inspector:JEFF SIEBEL-Comments:Provide annual fire sprinkler inspection with all
discrepancies corrected. Contractor must upload online to the compliance engine.
Provide a color-coded map or key to outline exactly which buildings are covered by
each fire sprinkler and fire alarm system. Must be postage and every fire sprinkler
riser room
FAIL 506.2-Key box maintenance The operator of the building shall immediately notify the fire code official and provide
the new key where a lock is changed or rekeyed.The key to such lock shall be secured
in the key box.
Inspector:JEFF SIEBEL-Comments:Supply new key for a new lock on door to be
placed in Knox-box for firefighter access
FAIL 604.2.12-Means of egress Emergency power shall be provided for means of egress illumination in accordance
illumination with Sections 1008.3 and 1104.5.1.
Inspector:JEFF SIEBEL-Comments:Repair egress light south wall.Test and repair
outside exit/egress lights
FAIL 605.1 -Abatement of Identified electrical hazards shall be abated. Identified hazardous electrical conditions
electrical hazards in permanent wiring shall be brought to the attention of the responsible code official.
Electrical wiring,devices,appliances and other equipment that is modified or
damaged and constitutes an electrical shock or fire hazard shall not be used.
Inspector:JEFF SIEBEL-Comments: Properly contain all exposed wiring in approved
junction boxes with listed covers
Printed on 01/05/2021 @ 08:17
Page 1 of 3
STATUS CODE DESCRIPTION
FAIL 703.1 -Maintenance The required fire-resistance rating of fire-resistance-rated construction,including,
but not limited to,walls,firestops,shaft enclosures,partitions,smoke barriers,
floors,fire-resistive coatings and sprayed fire-resistant materials applied to
structural members and fire-resistant joint systems,shall be maintained.Such
elements shall be visually inspected by the owner annually and properly repaired,
restored or replaced where damaged,altered,breached or penetrated. Records of
inspections and repairs shall be maintained.Where concealed,such elements shall
not be required to be visually inspected by the owner unless the concealed space is
accessible by the removal or movement of a panel,access door,ceiling tile or similar
movable entry to the space.Openings made therein for the passage of pipes,
electrical conduit,wires,ducts,air transfer openings and holes made for any reason
shall be protected with approved methods capable of resisting the passage of smoke
and fire.Openings through fire-resistance-rated assemblies shall be protected by
self-or automatic-closing doors of approved construction meeting the fire protection
requirements for the assembly.
Inspector:JEFF SIEBEL-Comments:Replace all missing ceiling tile in order for fire
sprinkler system to function as designed
FAIL 903.3.1 -Standards Sprinkler systems shall be designed and installed in accordance with Section
903.3.1.1,unless otherwise permitted by Sections 903.3.1.2 and 903.3.1.3 and other
chapters of this code,as applicable.
Inspector:JEFF SIEBEL-Comments: Replace all missing ceiling tile or contact
contractor to adjust fire sprinkler coverage without ceiling
FAIL Chapter 14-Inspection, Fire alarm system tested at least annually by licensed contractor
testing,and maintenance
Inspector:JEFF SIEBEL-Comments: Provide annual fire alarm inspection report with
all discrepancies corrected. Contractor must Upload online to the compliance engine
GENERAL NOTES
JEFF SIEBEL-01/05/2021 @ 08:15 Annual fire inspection$80
JEFF SIEBEL-01/05/2021 @ 08:15 Immediately repair ceiling or redesign fire sprinkler system for proper coverage
REINSPECTION DATE
01/18/2021
Printed on 01/05/2021 @ 08:17
Page 2 of 3
CONTACT SIGNATURE
Stephen Jordan e t,
Signed on:01/05/2021 @ 08:13
Ci COP )'\
INSPECTOR SIGNATURE
JEFF SIEBEL
Signed on:01/05/2021 @ 08:13
QUESTIONS ABOUT YOUR INSPECTION?
JEFF SIEBEL
Jeff.Siebel@Waterloo-ia.org
3192301224
Printed on 01/05/2021 @ 08:17
Page 3 of 3