HomeMy WebLinkAboutCHANGE OR EXTRA WORKORDER NO.6 CITY OF WATERLOO. IOWA CHANGE or EXTRA WORK ORDER NO. 6 PROJECT: F.Y. 2020 COURTLAND ST,JEFFERSON ST, AND MULBERRY STREET RECONSTRUCTION PROGRAM, CONTRACT NO. 1015 Date Prepared: September 15, 2020 AMOUNT: $10,152.00 INCREASE TO: LODGE CONSTRUCTION, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated April 6, 2020 A, Description of change to be made or extra work to be done: 6001 Remove existing seal coat street for sanitary sewer reconstructicn 6002 Construct Recycled Asphalt Paving, 6 inch B. Reason for ordering change or extra work: 6001 Sanitary sewer reconstruction in the south half of the 300 block of Mobile is added to the Project and removal of seal coat street was not in original bid items. 6002 To replace existing base on seal coat street — south half of 300 block of Mobile Street C. Settlement for cost of work to be made as follows: 6001. Pavement Removal, Seal Coat 564 SY @ $6.00/SY = $3,384.00 6002 Recycled Asphalt Paving, 6 inches 564 SY © S12.00/SY = S 6,768.00 TOTAL INCREASE _ $10,152.00 LODGE CONSTRUCTION, INC. CONTRACTOR BY: Date TITLE: 4.,;, ,1,1 APPROVED: ,/ CITY ENGINEE't` DATE' Change Order No. 6 Contract No. 1015 Page 1/1