Loading...
HomeMy WebLinkAboutPROJECT SECS } AECOMr y FY 2019 University Avenue Reconstruction — Phase 2 From Midway Drive to Greenhill Road City of Waterloo, Iowa City Contract No. 934 AECOM#60528991 Prepared For. City of Waterloo 715 Mulberry Street Waterloo, Iowa 50703 I _ Prepared By: AECOM 501 Sycamore Street, Suite 222 P.O. Box 1497 Waterloo, Iowa 50704-1497 February 2019 FY 2019 UNIVERSITY AVENUE RECONSTRUCTION — PHASE 2 FROM MIDWAY DRIVE TO GREENHILL ROAD CITY OF WATERLOO, IOWA City Contract No. 934 Prepared For: City of Waterloo, Iowa Prepared By: AECOM February 2019 -- „„s§tlj l lltjllft I hereby certify that this engineering document was prepared by me or ESSt `' my directpersonal supervision and that I am a dulylicensed under p o � Professional Engineer under the laws of the state of Iowa. MICHELLE M. G� SWEENEY .#1 r : 20830 : % f �� `S14? February 6, 2019 MICHELLE M. SWEENEY, PE Date towp '. License No. 20830 Ff(llit t1ti 1111111i11t& My license renewal date is December 31, 2019. Pages or sheets covered by this seal: FY 2019 UNIVERSITY AVENUE RECONSTRUCTION - PHASE 2 FROM MIDWAY DRIVE TO GREENHILL ROAD CITY OF WATERLOO, IOWA CONTRACT NO. 934 CONTRACT DOCUMENTS TABLE OF CONTENTS Page 1. NOTICE TO BIDDERS NB1-4 2. NOTICE OF PUBLIC HEARING NPH-1-2 3. INSTRUCTIONS TO BIDDERS IB-1-10 4. FORM OF BID OR PROPOSAL FB-1-10 5. SALES TAX EXEMPTION INFORMATION FORM STE-1 6. FORM OF BID BOND BB-1 7. NON-COLLUSION AFFIDAVITS NCA-1-2 8. EQUAL OPPORTUNITY CLAUSE EOC-1-2 9. TITLE VI CIVIL RIGHTS TVI-1 10. BIDDER'S STATUS FORM BSF-1-2 11. AFFIRMATIVE ACTION PROGRAM 1-8 10. POTENTIAL ITEMS OF WORK FOR MBE/WBE PARTICIPATION M-1 SUBCONTRACTOR'S BID REQUEST FORM M-5 LETTER FORM FOR SUBCONTRACTOR QUOTES M-6 MBE/WBE SCOPE LETTER M-7 MBE AND/OR WBE PREBID CONTACT INFORMATION FORM M-8-9 11. WATERLOO/CEDAR FALLS MINORITY AND WOMEN BUSINESSES ENTERPRISE CONSTRUCTION AND MAINTENANCE CONTRACTOR'S GUIDE 1-4 12. STATEMENT OF BIDDER'S QUALIFICATIONS SBQ-1-2 13. GENERAL SPECIAL PROVISIONS GSP-1-4 14. SPECIAL PROVISIONS SP-1-13 The 2019 edition of the "URBAN STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS MANUAL" (SUDAS) shall apply to the construction of this project. The Standard Specifications are amended by the project specifications. TECHNICALS: 100 TRAFFIC SIGNALIZATION SPECIFICATIONS 100-1 - 32 200 REHABILITATION OF EXISTING MANHOLES 200-1 -2 300 HIGH DENSITY POLYETHYLENE (HDPE) PIPE 300-1 -4 400 COLORED AND STAMPED CONCRETE 400-1 - 5 500 SITE FURNISHING 500-1 - 5 600 PLANTINGS 600-1 - 15 TABLE OF CONTENTS TOC-1 of 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 15. GENERAL SPECIFICATIONS FOR CONSTRUCTION GSC-1-13 16. SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION SGS-1 17. FORM OF CONTRACT C-1-4 -- 18. FORM OF PERFORMANCE BOND PFB-1-2 19. FORM OF PAYMENT BOND PB-1-2 APPENDIX 1. CHANGE ORDER FORM 2. ROAD PLANS TABLE OF CONTENTS TOC-2 of 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa NOTICE TO BIDDERS For the Taking of Construction Bids for the FY 2019 UNIVERSITY AVENUE RECONSTRUCTION - PHASE 2 FROM MIDWAY DRIVE TO GREENHILL ROAD In the City of Waterloo, Iowa CONTRACT NO. 934 RECEIVING OF BIDS Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her office in the City Hall of the said City on the 14th day of March, 2019 until 1:00 p.m. for the reconstruction of the FY 2019 UNIVERSITY AVENUE RECONSTRUCTION - PHASE 2, City Contract No. 934, as described in detail in the plans and specifications now on file in the Office of the City Clerk. OPENING OF BIDS All proposals received will be opened in the First Floor Conference Room at City Hall, in the City of Waterloo, Iowa, on the 14th day of March, 2019, at 1:00 p.m., and the proposals will be acted upon at such later time and place as may then be fixed by the City Council. PUBLIC HEARING The Council of said City will conduct a public hearing on the proposed plans, specifications, form of contract, and estimate of cost for the construction of the above-described improvement project at 5:30 p.m. on March 18, 2019, said hearing to be held in the Harold E. Getty Council Chambers in City Hall in said City. SCOPE OF WORK The project consists of the reconstruction of the existing University Avenue 6-lane facility with a new 4- lane roadway. The project includes installation of sidewalks, shared use paths, and reconstruction of the existing storm sewer, water main, and traffic signals. BEGINNING AND COMPLETION DATES The work under the proposed contract shall be commenced within ten (10) working days after receipt of "Notice to Proceed." Stages 1-4 shall be completed on or before November 15, 2019, and Stages 5-6 shall be completed on or before November 20, 2020. The completion date will be administered based on 120 working days for Stages 1-4 and 120 working days for Stages 5-6. Winter Work, as defined by IDOT Standard Specifications, will be allowed; but working days will not be charged for work completed from November 16, 2019, to April 1, 2020. METHOD OF PAYMENT TO CONTRACTOR The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-five percent (95%) of the work as it is completed and materials delivered and work approved. Final payment will be made thirty-one (31) days after completion of the work and acceptance by the Council. Before final payment is made, vouchers showing that all subcontractors and workmen and all persons furnishing materials have been fully paid for such materials and labor will be required unless the City is satisfied that material, men and laborers have been paid. NOTICE TO BIDDERS NTB-1 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa The Contractor is hereby notified that if the City does not have cash on hand to pay monthly pay estimates, according to Chapter 384.57 of the Code of Iowa, payment may be made by anticipatory — warrants issued bearing a rate of interest not exceeding that permitted by Chapter 74A, Code of Iowa. PLANS AND SPECIFICATIONS Complete digital Plans and Specifications are available at www.questcdn.com. You may download the digital documents free of charge from Questcdn by inputting Questcdn Project #6092788 on the website's Project Search page. Please contact Questcdn.com at 952-233-1632 or info@questcdn.com for assistance in free membership registration, downloading and working with this digital project information. Complete digital Plans and Specifications are also available at AECOM by calling 319-232-6531 or emailing Michelle Sweeney, Project Manager, at michelle.sweeneyaecom.com. Optional paper copies of the Plans and Specifications are available from AECOM, 501 Sycamore Street, Suite 222, Waterloo, Iowa, upon receipt of a $150.00 deposit (CHECK ONLY). Deposits are fully refundable if the plans and specifications are returned in usable condition (i.e., generally free of highlights, ink markings, tears, stickers, water stains and soiling) to the Waterloo AECOM office listed above by the end of the 14th consecutive day after the project has been awarded. No deposits will be refunded for any requests or plans received after the 14th consecutive day, which includes plans returned via mail service. Plan holders are responsible for ascertaining when the project has been awarded. If the plan holder is the prime contractor, or a subcontractor or supplier of the prime contractor that has been awarded the project, Plans and Specifications do not need to be returned to receive the deposit. The prime contractor must submit a list of his subcontractors and suppliers for the City and consulting engineer to verify eligibility for the refundable deposit. Please DO NOT obtain Bid Documents from any source other than Questcdn.com or through the AECOM — Waterloo office as listed above. Obtaining documents through any other source could prevent Bidder from being included on the official AECOM Plan Holders List which, in turn, may cause the Bidder to not receive addenda or other time-sensitive/ bid-critical documents. The City has the right to reject any bids that do not have current bidding documents included in the proposal. Upon award of project, the prime contractor, subcontractors and suppliers shall be supplied with the needed number of plans and specifications at no additional cost. CONTRACT AWARD A contract will be awarded to the qualified bidder submitting the lowest bid. The City reserves the right to reject any or all bids, re-advertise for new bids, and to waive informalities in the bids submitted that might be in the best interest of the City. Bids may be held by the City of Waterloo, Iowa, for a period not to exceed thirty (30) days from the day of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract. — By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa and preference will be given to local domestic labor in the construction of the improvement. PROPOSALS SUBMITTED The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly write or type the unit bid price and the bid item extension (Unit Price x Estimated Qty) in numerals on the blanks provided. Should there be any discrepancy between the unit bid price and extension, the City of Waterloo shall consider the unit bid price as being the valid unit bid price. NOTICE TO BIDDERS NTB-2 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa The bidder has the option to submit a computer-generated spreadsheet in lieu of the portion of the Form of Bid or Proposal, which includes the Bid Item Number, Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price and Total Bid. The computer-generated spreadsheet shall include all of the information listed in that portion of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor submitting the bid. For the bidders who submit a computer-generated spreadsheet, the TOTAL BID (with alternates, if applicable) shall also be indicated in the space(s) provided on the Form of Bid or Proposal. BID SECURITY REQUIRED All bids must be accompanied in a separate envelope by a certified or cashier's check drawn on an Iowa bank, or a bank chartered under the laws of the United States, a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, or bid bond, (on the form furnished by the City) payable to the City of Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, which certified check, certified share draft or bid bond will be held as security that the Bidder will enter into a Contract for the construction of the work and will furnish the required bonds, and in case the successful Bidder shall fail or refuse to enter into the Contract and furnish the required bonds, his bid security may be retained by said City as agreed upon liquidated damages. If bid bond is used, it must be signed by both the Bidder and the surety or surety's agent. Signature of surety's agent must be supported by accompanying Power of Attorney. PERFORMANCE & PAYMENT BONDS The successful bidder will be required to furnish a "Performance Bond" and a "Payment Bond" within ten (10) days after forms are presented to him in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City from claims of any kind caused by the operations of the contractor. MAINTENANCE BOND Before the Contractor shall be entitled to receive final payment for work done under this contract, it shall execute and file a bond in the penal sum of not less than 100% of the total amount of the contract, same 10. to be known as "Maintenance Bond," and which bond must be approved by the City Council, and which bond is in addition to the bond given by the Contractor to guarantee the completion of the work. CONTRACT COMPLIANCE PROGRAM /SUBCONTRACTING The program proposes numerical projections regarding utilization of Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors and suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa. A goal of at least ten percent (10%) for MBE participation on all City funded construction projects that are estimated at $50,000.00 or more. A goal of at least two percent (2%) for WBE participation on all City funded construction projects that are estimated at $50,000.00 or more. Any project funded in part or in total with federal funds shall follow the respective agencies contract compliance program and goals. The Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance MBE/WBE goals. The MBE/WBE subcontractors, suppliers or vendors must provide the Prime Contractor a reasonably competitive price for the service being rendered or the Contractor is not required to accept their bid. LIQUIDATED DAMAGES Time is an essential element of this contract. It is important that the work be diligently pursued to completion. If the work is not completed within the specified contract period, plus authorized extensions, NOTICE TO BIDDERS NTB-3 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa the contractor shall pay to the City Liquidated Damages in the amount of one thousand dollars($1,000.00) per day, for each day, as further described herein, in excess of the authorized time. Days beyond the specified completion date for which Liquidated Damages will be charged will be working days that the contractor does, or could have worked, from Monday through Saturday. Sundays will be counted only if work is performed. Partial working days will be considered as a full working day. Days not chargeable for Liquidated Damages will include rain days, Sunday if no work is done, and legal holidays. Working days will cease to be charged when only punch list items remain to be completed. Punch list items do not include contract bid items or approved change/extra work orders. When the Contractor believes the project to be substantially completed, a written notice stating the same — shall be submitted to the Engineer and a request made for a Punch List. If the work under the Contract extends beyond the normal construction season for such work the Contractor shall submit to the Engineer in writing a request that working days counted toward the project be suspended until work is resumed the following construction season. This amount is not construed as a penalty. These damages are for the cost to the City of providing the required additional inspection, engineering and contract administration. .. PRE-CONSTRUCTION CONFERENCE Before the work is commenced on this contract, a conference shall be held for the purpose of discussing the contract. The conference shall be attended by the prime contractor, subcontractors and City Officials. BIDDER STATUS Attention of bidders is called to compliance with the provisions of the Resident Bidder/Non-Resident Bidder requirements. Each bidder submitting a bid shall execute and include with the bid, a Bidder Status Form in the form herein provided. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. SALES TAX EXEMPTION CERTIFICATES Contractors and approved subcontractors will be provided a Sales Tax Exemption Certification to purchase building materials or supplies in the performance of construction contracts let by the City of Waterloo. Posted pursuant to the provisions of Chapter 26 of the City Code of Iowa. CITY OF WATERLOO, IOWA NOTICE TO BIDDERS NTB-4 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 7. BID SECURITY REQUIRED .. All bids must be accompanied in a separate envelope by a certified or cashier's check drawn on an Iowa bank, or a bank chartered under the laws of the United States, a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, or bid bond (on the form furnished by the City) payable to the City of Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, which certified check, certified share draft or bid bond will be held as security that the Bidder will enter into a Contract for the construction of the work and will furnish the required bonds, and in case the successful Bidder shall fail or refuse to enter into the Contract and furnish the required bond, his bid security may be retained by said City as agreed upon liquidated damages. If bid bond is used, it must be signed by both the bidder and the surety or surety's agent. Signature of surety's agent must be supported by accompanying Power of Attorney. 8. COLLUSIVE AGREEMENTS a. Each bidder submitting a bid shall execute and include with the bid, a Non-Collusion Affidavit in the form herein provided, to the effect that they have not colluded with any other person, firm, or corporation in regard to any bid submitted. b. Each bidder submitting a bid shall have each proposed subcontractor, if any, execute and submit to the City Contract Compliance Officer by 5:00 P.M. the business day following the day bids on this project are due, a Non-Collusion Affidavit in the form herein provided, to the effect that he has not colluded with any other person, firm, or corporation in regard to any bid submitted. Before executing any subcontract, the successful bidder shall submit the name of any proposed subcontractor for approval by the City. 9. MINORITY AND/OR WOMEN BUSINESS ENTERPRISE SUBCONTRACTORS a. CITY OF WATERLOO AND/OR WOMEN BUSINESS ENTERPRISE PRE-BID CONTACT INFORMATION FORM The City of Waterloo Minority and/or Women Business Enterprise Pre-Bid Contact Information Form shall be submitted with the Form of Bid or Proposal. Failure to do so shall be grounds for the bid being rejected if subcontracting is proposed by the prime contractor. 10. MBE/WBE CONTRACT COMPLIANCE PROGRAM PURPOSE -- The purpose of the Contract Compliance Program (hereinafter called Program) is to act as an impetus for increasing the participation of minority and women disadvantaged business enterprise (MBE/WBE) in City awarded construction contracts. The Program does not propose to eliminate any bona fide contractor or subcontractor from bidding on City contracts, but it will hopefully serve as a needed stimulus to help local MBE/WBE's grow and eventually become mainstream contractors and subcontractors. This Contract Compliance Program does not propose to include any set-aside or quotas, but only flexible goals where "good-faith efforts" are required by the contractor to use MBE/WBE subcontractors. INSTRUCTIONS TO BIDDERS IB-3 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa This Program shall not eliminate the need for contractors to continue their "good-faith efforts" in using MBE/WBE subcontractors on City contracts estimated at less than $50,000. The City of Waterloo will make every effort to reduce in-house construction and maintenance work that would be more cost effectively performed by the private sector and, thus, would allow additional bidding opportunities for MBE/WBE firms. The City Contract Compliance Officer shall be advised of all City of Waterloo awarded construction contracts. DEFINITIONS Goals: A flexible numerically expressed objective which contractors are required to make "good- faith efforts." The key to the requirement is to make documented efforts. Goals are neither set-a-sides nor a device to achieve proportional representation or equal results. Numerical goals do not create set-a-sides for specific groups, nor are they designed to achieve proportional representation or equal results. Rather, the goal-setting process in affirmative action planning is used to target and measure the effectiveness of affirmative action efforts to eradicate and prevent discrimination. Quota: A flat numerical requirement that the contractor is required to meet in order to obtain the benefit or be in compliance. The numerical goal component of affirmative action programs is not designed to be, nor may it properly or lawfully be interpreted as, permitting unlawful preferential treatment and quotas with respect to persons of any race, color, religion, sex, or national origin. The regulations at 41 CFR 60-2.12(a), 60-2.15 and 60-2.30, specifically prohibit discrimination and the use of goals as quotas. (U.S. Department of Labor) Set-Aside: An arrangement in which a particular contract is reserved for competition solely among minority and women business enterprises. Contractor. As used in this document means contractor, subcontractor, supplier, vendor, and professional service provider. Minority Business Enterprise (MBE) _ Any business, which is at least 51%, owned by one or more minorities and whose management and daily business operations are controlled by one or more such individuals and is on the current State Unified Certification List, or were listed on the City of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002 -- Women Business Enterprise (WBE): Any business which is at least 51% owned by one or more women and whose management and daily business operations are controlled by one or more such individuals and is on the current State Unified Certification List, or were listed on the City of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002 Minority: Any person or persons who are considered as socially and economically disadvantaged because of their identity as a group member without regard to their individual qualities. The groups include: Black American, Hispanic American, Native Americans, Eskimos, Aleuts, and Asian-Pacific Americans. 13 C.F.R. 124-1.1(c)(3)(ii)(1983). INSTRUCTIONS TO BIDDERS IB-4 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa Lowest Responsible Bidder: Bidder who has offered the lowest bid and who has exhibited skill relative to the type of work bid on, judgment, financial responsibility, and evidence of working with the Affirmative Action Employment Program and the Contract Compliance Program. Broker: One buying or selling for others on commission or other fee basis without maintaining a warehouse or other similar inventory storage facility. Mayor's Advisory Committee: Mayor's Advisory Committee for Minority, Female, and Disadvantaged Business Enterprise. Good Faith Efforts: The successful bidder shall be selected on the basis of having submitted the lowest responsible bid. The obligation of the bidder is to make good faith efforts. The bidder can demonstrate that it has done so by the following: 1. The Prime Contractor met the project goal - No Action necessary 2. If the Prime Contractor failed to meet the goal, they must submit documentation of good faith efforts. CONTRACT COMPLIANCE PROGRAM SUBCONTRACTING The program proposes numerical projections or goals regarding utilization of Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) as subcontractors in the performance of contracts awarded by the City of Waterloo, Iowa. A goal of at least 10% for MBE participation on all City funded construction projects that are estimated at $50,000 or more and projects under $50,000 where applicable at the Contract Compliance Officer's discretion. There is at least 2% WBE goal on City funded projects. Any project which is funded solely or in part with Federal funds shall follow the respective agencies contract compliance program and goals. Any project which is funded solely or in part with State funds shall follow the respective agencies contract compliance program and goals. The City of Waterloo Contract Compliance Program is for City awarded construction contracts only. The prime contractor shall make "good-faith efforts" to meet the Contract Compliance MBE/WBE goals. The MBE/WBE subcontracts must provide the prime contractor a reasonably competitive price for the service being rendered or the contractor is not required to accept the bid. Administrative Reconsideration: As part of this reconsideration, the bidder will have the opportunity to provide written documentation or arguments concerning the issue of whether they made adequate good faith efforts to meet the goals. The bidder will have the opportunity to meet in person with the City of Waterloo's Administrative Reconsideration Committee to discuss the issue of whether they made adequate good faith efforts. The Administrative Reconsideration Committee will forward a written decision on reconsideration to the Mayor and City Council, explaining the basis for finding that the bidder did or did not meet the goal or make adequate good faith efforts to do so. Documentation required will include but is not limited to the following: * Making portions of the work available for MBE/WBE subcontracting INSTRUCTIONS TO BIDDERS IB-5 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa * Evidence of negotiating with MBE/WBE firms * MBE/WBE quotes obtained and non-MBE/WBE quotes used * Reasons agreements were not reached * Follow-up after initial solicitations * Efforts to assist in obtaining equipment, supplies and materials (at competitive prices), bonding, lines of credit, insurance, etc. * Evidence of past compliance or non-compliance by same contractor The Contract Compliance Officer will determine the weight to be given to each item listed above (supported by appropriate documentation) based on overall program goals. RESPONSIBILITIES 1. City of Waterloo A. The City Contract Compliance Officer has the responsibility to assure the City's compliance with Federal, State and Municipal regulations. B. The City Contract Compliance Officer is responsible for maintaining a current directory of certified firms. Certification of MBE/WBE/DBE contractors is through the Iowa Department of Transportation and its Unified Certification Program. Only firms certified based on guidelines prescribed in 49 CFR Part 26 and provisions of this agreement, shall be recognized as certified by the City of Waterloo. C. The City Contract Compliance Officer is responsible for making available a list of future project information notices to MBE/WBE firms. D. The City Contract Compliance Officer shall send notices to appropriate MBE/WBE firms in the directory of each bid solicitation with opening date. E. The City Contract Compliance Officer will receive MBE/WBE Letter(s) of Intent to Bid and within two (2) business days forward the complete list of MBE/WBE bidders who submitted a Letter of Intent to Bid to prime contractors. ll. Prime Contractors In order to be in compliance with the guidelines of this program, the prime contractor must show good-faith efforts in following the MBE/WBE Contract Compliance Program. Good-faith efforts include, but are not limited to, the following: A. Prime contractors shall send solicitation letters (Form CCO-3) to appropriate MBE/WBE (those certified in directory prepared by City Contract Compliance Officer) at least seven (7) working days prior to bid date. Letters should identify specific items to be subcontracted. A minimum of three (3) disadvantaged business contacts must be made and documented, if there are at least three disadvantaged businesses offering services in the area to be subcontracted (See City of Waterloo MBE/WBE Certification List). If less than three (3) are offering the services to be subcontracted, then a contact is required for any that are listed as providing that service. If the Prime Contractor submits a MBE/WBE contact not on the City's MBE/WBE list, attach a copy of the MBE/WBE/DBE Certifications from another government agency. B. If a prime contract bidder is unable to identify MBE/WBE firms to perform portions of the work, the City Contract Compliance Officer should be contacted for assistance immediately. C. Prime contract bidders may solicit MBE/WBE proposals by telephone or personal _ interviews, but all such contacts shall be confirmed by Certified Mail, or subcontract bid request forms (Form CCO-2). INSTRUCTIONS TO BIDDERS IB-6 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa D. If any MBE/WBE business submitting bids is not selected for subcontract award, documentation must accompany the "MBE/WBE Business Enterprise Pre-Bid Contact Information Form" (Form CCO-4 and CCO-4A) on why the MBE/WBE was not selected. These reasons could include: a. Not low bid. Copies of the competing bids may be required for verification. b. MBE/WBE did not bid, withdrew bid or non-responsive. c. Documentation of other business-related reason for not selecting the .. MBE/WBE business for a subcontract. d. Prime contractor self performs work. e. Any other reason relied on by prime. The Contract Compliance Officer will determine the weight to be given to each item listed above (supported by appropriate documentation) based on overall program goals. lll. MBE/WBE Firms A. MBE/WBE firms shall be certified by the Iowa Department of Transportation as owners and controllers of their respective businesses, or were listed on the City of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002. B. MBE/WBE firms must perform the work on the project; they cannot act as a broker by subcontracting the work out to others. C. Each MBE/WBE firm planning to submit quotes on construction projects with goals, shall submit a Letter of Intent to Bid (Form CCO-5) to the City Contract Compliance Officer seven (7) working days prior to bid opening, listing specific items which the MBE/WBE firm is interested in bidding. If sufficient Letters of Intent to Bid are not received by the City Contract Compliance Officer seven (7) working days prior to bid opening, goals on subject project will be reduced accordingly. Agreements between the bidder/proposer and a MBE/WBE in which the MBE/WBE promises not to provide subcontracting quotations to other bidders/proposers are prohibited. NON-COMPLIANCE OF CONTRACTORS A. Noncompliance exists when the contractor's actions are not consistent with the requirements of the Contract Compliance Program in the areas of employment and subcontracting. B. A bidder's failure to show good-faith efforts to meet project goals or a failure to -- use certified MBE/WBE firms may be grounds for finding its bid not responsible. C. The Contract Compliance Officer shall submit to City Council his/her recommendation on any non-compliant contract in writing. NOTICE TO PROCEED Notice to proceed on any project with goals will not be issued until City Contract Compliance Officer determines the lowest responsible bidder has used good-faith efforts to comply with this Compliance Program and the bid was responsive. CONCLUSION This program repeals or revises all sections of previous Waterloo Contract Compliance Programs. INSTRUCTIONS TO BIDDERS IB-7 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 11. EMPLOYMENT AND BUSINESS OPPORTUNITY To the greatest extent feasible, suppliers, subcontractors, and low income workers owning businesses or living in the Waterloo area must be given priority in supplying materials, bidding for subcontract work, or applying for employment by the contractor on this project. Opportunities for training and for employment arising in connection with this project shall, to the greatest extent feasible, be made available to lower income persons residing in the project area. The contract area is the City of Waterloo. The City of Waterloo will require the contractor to document his efforts in securing lower income workers living in the project area and in purchasing supplies from, and awarding subcontracts to, businesses owned by persons residing in the project area. -- 12. STATEMENT OF BIDDER'S QUALIFICATIONS Each bidder shall, upon request of the City of Waterloo, Iowa, submit on the form furnished for that purpose (a copy of which is included in the contract documents), a statement of bidder's qualifications, his experience record in constructing the type of improvements embraced, and his organization and equipment available for the work contemplated; and, when specifically requested, a detailed financial statement. The City of Waterloo, Iowa, shall have the right to take such steps as it deems necessary to determine the ability of the bidder to perform his obligations under the contract, and the bidder shall furnish the City of Waterloo, Iowa, all such information and data for this purpose as it may request. The right is reserved to reject any bid where an investigation of the available evidence or information does not satisfy the City of Waterloo, Iowa, that the bidder is qualified to carry out properly the terms of the contract. 13. AWARD OF CONTRACT a. Award of contract will be made to that responsive and responsible bidder whose bid, conforming to the Specifications, is most advantageous to the City of Waterloo; price and other factors considered. The intention is to award the contract at the time of opening bids, but the right is reserved to postpone such action for a reasonable time, not exceeding thirty (30) days. b. The City Council may, when in its interest, reject any or all bids or waive any informality in bids received. c. The bidder shall submit bids on all the items listed in the proposal and shall state the unit bid price in words in the blank spaces provided beneath the item description. Should there be any discrepancy between the unit bid price in words and listed numeral unit bid price, the City of Waterloo shall consider the unit bid price in words as being the valid unit bid price. A computer-generated spreadsheet as herein provided shall also be acceptable. Proposals requiring mathematical computations to determine unit prices or totals will be rejected. A contract will be awarded to the qualified bidder submitting the lowest total bid as indicated in the NOTICE TO BIDDERS. d. When a contract for a public improvement is to be awarded to the lowest responsive and responsible bidder, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance _ of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the INSTRUCTIONS TO BIDDERS IB-8 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. 14. EXECUTION OF AGREEMENT, BONDS, AND CERTIFICATE OF INSURANCE a. Subsequent to the award and within ten (10) days after the prescribed forms are presented for signature, the successful bidder shall execute and deliver to the City of Waterloo, Iowa, an agreement in the form included in the contract documents in such number of copies as the City of Waterloo, Iowa, may require. ..r b. Having satisfied all conditions of award as set forth elsewhere in these documents, the successful bidder shall, within the period specified in paragraph "a" above, furnish a surety bond and a payment bond in a penal sum not less than the amount of the contract as awarded, as security for the faithful performance of the contract and terms and conditions therein contained and shall guarantee the prompt payment of all persons, firms, or corporations to whom the contractor may become legally indebted for labor, materials, tools, equipment, or services of any nature including utility and transportation services, employed or used by him in performing the work. The bonds shall protect and save harmless the City from claims and damages of any kind caused by the operations of the contractor and shall also guarantee the maintenance of the contract improvements for the period stated in the Notice of Hearing from and after completion of said improvements and their acceptance by the City. Such bonds shall be in the same form as that included in the contract documents and shall bear the same date as, or a date subsequent to that of the agreement. The current Power of Attorney for the person who signs for any surety company shall be attached to such bonds. c. The successful bidder shall, within the period specified in paragraph "a" above, furnish a certificate of insurance for approval in amounts of not less than the amounts specified in the General Specifications for Construction, Section F. No. 4 "Liability Insurance," Pages 11 of 13 Pages. The certificate of insurance shall be furnished in such number of copies as the City of Waterloo may require. The City of Waterloo shall be named as an "Additional Insured." The contractor shall similarly submit his subcontractor's certificates of insurance in the amounts for approval before each commences work. The contractor shall carry or require that there be Worker's Compensation Insurance for all their -- employees and those subcontractors engaged in work at the site, in accordance with State Worker's Compensation Laws. d. The failure of the successful bidder to execute such agreement and to supply the required bond or bonds within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the City of Waterloo, Iowa, may grant, based upon reasons determined sufficient by the City of Waterloo, Iowa, may either award the -- contract to the next lowest bidder or re-advertise for bids, and may charge against the bidder the difference between the amount of the bid and the amount for which a contract for the work is subsequently executed, irrespective of whether the amount thus due exceeds the amount of the bid guaranty. If a more favorable bid is received by re- - advertising, the defaulting bidder shall have no claim against the City of Waterloo, Iowa, for a refund. INSTRUCTIONS TO BIDDERS IB-9 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 15. BIDDER STATUS _ a. Attention of bidders is called to the requirement of complying with the provisions of the Resident Bidder/Non-Resident Bidder requirement. b. Each bidder submitting a bid shall execute and include with the bid, a Bidder Status Form in the form herein provided. c. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. INSTRUCTIONS TO BIDDERS IB-10 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa FORM OF BID OR PROPOSAL FY 2019 UNIVERSITY AVENUE RECONSTRUCTION - PHASE 2 CONTRACT NO. 934 CITY OF WATERLOO, IOWA Honorable Mayor and City Council Waterloo, Iowa Gentlemen: 1. The undersigned, being a Corporation existing under the laws of the State of , a Partnership consisting of the following partners: , — having familiarized (himself) (themselves) (itself) with the existing conditions on the project area affecting the cost of the work, and with all the contract documents listed in the Table of Contents and Addenda (if any), as prepared by the City Engineer of the City of Waterloo now on file in the office of — the City Clerk, City Hall, Waterloo, Iowa, hereby proposes to furnish all supervision, technical personnel, labor, materials, machinery, tools, appurtenances, equipment, and services, including utility and transportation services required to construct and complete this FY 2019 UNIVERSITY AVENUE RECONSTRUCTION — PHASE 2, Contract No. 934, all in accordance with the above- - listed documents and for the unit prices for work in place for the following items and quantities: FY 2019 UNIVERSITY AVENUE RECONSTRUCTION-PHASE 2 CITY CONTRACT NO. 934 ITEM ITEM CODE ITEM UNIT EST. UNIT BID TOTAL BID NO. QTY. PRICE PRICE 1 2010 CLEARING AND GRUBBING UNIT 77 $ $ 2 2010 ON-SITE TOPSOIL CY 3259 $ $ 3 2010 TOPSOIL, CONTRACTOR FURNISH CY 1545 $ $ EXCAVATION, CLASS 10, ROADWAY 4 2010 AND BORROW CY 5319 $ $ ✓ 5 2010 EXCAVATION, CLASS 10,WASTE CY 16808 $ $ 6 2010 EXCAVATION, CLASS 13 CY 200 $ $ — 7 2010 SUBGRADE PREPARATION, 12 IN. SY 39743.1 $ $ 8 2010 SUBGRADE TREATMENT, GEOGRID SY 2150 $ $ 9 2010 SUBBASE, MODIFIED CY 14107.2 $ $ 10 2010 REMOVALS,STRUCTURES EACH 9 $ $ REPLACEMENT OF UNSUITABLE — 11 3010 BACKFILL MATERIAL CY 1000 $ $ STORM SEWER,TRENCHED, HDPE, 12 4020 4IN. LF 28.7 $ $ STORM SEWER,TRENCHED, HDPE, 13 4020 81N. LF 77.5 $ $ STORM SEWER,TRENCHED, RCP, 14 4020 CLASS III, 15 IN. LF 3548 $ $ STORM SEWER,TRENCHED, RCP, 15 4020 CLASS III, 18 IN. LF 1294.7 $ $ FORM OF BID FB-1 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa ITEM ITEM CODE ITEM UNIT EST. UNIT BID TOTAL BID _ NO. QTY. PRICE PRICE STORM SEWER,TRENCHED, RCP, 16 4020 CLASS III, 24 IN. LF 216.3 $ $ - STORM SEWER,TRENCHED, RCP, 17 4020 CLASS III, 30 IN. LF 886.1 $ $ REMOVAL OF STORM SEWER, RCP, - 18 4020 LESS THAN 36 IN. LF 5069 $ $ STORM SEWER ABANDONMENT, 19 4020 PLUG AND FILL, LESS THAN 36 IN. LF 113 $ $ _ 20 4040 SUBDRAIN,TYPE S, 6 IN. LF 8363.8 $ $ SUBDRAIN OUTLETS AND CONNECTIONS, EXISTING 21 4040 SUBDRAIN, 6 IN. EACH 23 $ $ SUBDRAIN OUTLETS AND 22 4040 CONNECTIONS, PER PLAN, 6 IN. EACH 77 $ $ WATER MAIN,TRENCHED, DUCTILE IRON PIPE (DIP),4 IN, NITRILE 23 5010 GASKETS LF 4 $ $ WATER MAIN,TRENCHED, DUCTILE IRON PIPE (DIP), 6 IN, NITRILE 24 5010 GASKETS LF 189.7 $ $ _ WATER MAIN,TRENCHED, DUCTILE IRON PIPE (DIP), 8 IN, NITRILE 25 5010 GASKETS LF 162.9 $ $ WATER MAIN,TRENCHED, DUCTILE IRON PIPE (DIP), 12 IN, NITRILE 26 5010 GASKETS LF 4420 $ $ WATER MAIN, DIRECT BURIED, DUCTILE IRON PIPE (DIP), 6 IN, NITRILE GASKETS, INTEGRAL _„ RESTRAINED JOINTS WITH CASING 27 5010 PIPE LF 204.1 $ $ WATER MAIN, DIRECT BURIED, - DUCTILE IRON PIPE (DIP), 8 IN, NITRILE GASKETS, INTEGRAL RESTRAINED JOINTS WITH CASING ,_ 28 5010 PIPE LF 144.8 $ $ WATER MAIN, DIRECT BURIED, DUCTILE IRON PIPE (DIP), 12 IN, NITRILE GASKETS, INTEGRAL RESTRAINED JOINTS WITH CASING 29 5010 PIPE LF 124.2 $ $ ,_ WATER MAIN,TRENCHLESS, DUCTILE IRON PIPE(DIP),6 IN, NITRILE GASKETS, INTEGRAL RESTRAINED 30 5010 JOINTS WITH CASING PIPE LF 199.2 $ $ FORM OF BID FB-2 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa ITEM ITEM CODE ITEM UNIT EST. UNIT BID TOTAL BID NO. QTY. PRICE PRICE WATER MAIN,TRENCH LESS, DUCTILE IRON PIPE (DIP),8 IN, NITRILE GASKETS, INTEGRAL -- RESTRAINED JOINTS WITH CASING 31 5010 PIPE LF 221.9 $ $ WATER MAIN,TRENCH LESS, - DUCTILE IRON PIPE (DIP), 12 IN, NITRILE GASKETS, INTEGRAL RESTRAINED JOINTS WITH CASING - 32 5010 PIPE LF 135.8 $ $ FITTINGS BY COUNT, DUCTILE 33 5010 IRON,4 IN, MJ CAP EACH 1 $ $ - FITTINGS BY COUNT, DUCTILE 34 5010 IRON,4 IN, 11 1/4° ELBOW EACH 1 $ $ FITTINGS BY COUNT, DUCTILE - 35 5010 IRON, 6 IN, MJ CAP EACH 9 $ $ FITTINGS BY COUNT, DUCTILE 36 5010 IRON, 6 IN,90° ELBOW EACH 2 $ $ FITTINGS BY COUNT, DUCTILE 37 5010 IRON, 6 IN, 22 1/2° ELBOW EACH 3 $ $ FITTINGS BY COUNT, DUCTILE 38 5010 IRON, 6 IN, 11 1/4° ELBOW EACH 1 $ $ FITTINGS BY COUNT, DUCTILE 39 5010 IRON, 6 IN,TEE EACH 1 $ $ - FITTINGS BY COUNT, DUCTILE 40 5010 IRON, 6 IN, LOCKING TEE EACH 2 $ _$ FITTINGS BY COUNT, DUCTILE - 41 5010 IRON, 6 IN X 2 IN, REDUCER EACH 1 $ $ FITTINGS BY COUNT, DUCTILE 42 5010 IRON, 8 IN, MJ CAP EACH 7 $ $ FITTINGS BY COUNT, DUCTILE 43 5010 IRON, 8 IN,90° ELBOW EACH 1 $ $ FITTINGS BY COUNT, DUCTILE 44 5010 IRON, 8 IN, 22 1/2° ELBOW EACH 3 $ $ FITTINGS BY COUNT, DUCTILE -. 45 5010 IRON, 8 IN, 11 1/4° ELBOW EACH 1 $ $ FITTINGS BY COUNT, DUCTILE 46 5010 IRON, 8 IN,TEE EACH 1 $ $ FITTINGS BY COUNT, DUCTILE - 47 5010 IRON,8 IN, LOCKING TEE EACH 1 $ $ FITTINGS BY COUNT, DUCTILE 48 5010 IRON, 8 IN X 6 IN,TEE EACH 2 $ $ - FITTINGS BY COUNT, DUCTILE 49 5010 IRON, 8 IN X 4 IN, REDUCER EACH 1 $ $ —. FORM OF BID FB-3 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 1 ITEM EST. UNIT BID TOTAL BID ITEM CODE ITEM UNIT NO. QTY. PRICE PRICE - FITTINGS BY COUNT, DUCTILE 50 5010 IRON, 8 IN X 6 IN, REDUCER EACH 1 $ $ - FITTINGS BY COUNT, DUCTILE 51 5010 IRON, 12 IN, MJ CAP EACH 1 $ $ FITTINGS BY COUNT, DUCTILE 52 5010 IRON, 12 IN, 90° ELBOW EACH 4 $ $ FITTINGS BY COUNT, DUCTILE 53 5010 IRON, 12 IN,45° ELBOW EACH 9 $ $ _ FITTINGS BY COUNT, DUCTILE 54 5010 IRON, 12 IN, 22 1/2° ELBOW EACH 6 $ $ FITTINGS BY COUNT, DUCTILE 55 5010 IRON, 12 IN, 11 1/4° ELBOW EACH 1 $ $ FITTINGS BY COUNT, DUCTILE 56 5010 IRON, 12 IN,TEE EACH 3 $ $ FITTINGS BY COUNT, DUCTILE 57 5010 IRON, 12 IN, LOCKING TEE EACH 1 $ $ FITTINGS BY COUNT, DUCTILE - 58 5010 IRON, 12 IN X 6 IN,TEE EACH 3 $ $ FITTINGS BY COUNT, DUCTILE 59 5010 IRON, 12 IN X 8 IN,TEE EACH 1 $ $ _ FITTINGS BY COUNT, DUCTILE 60 5010 IRON, 12 IN X 6 IN, LOCKING TEE EACH 5 $ $ FITTINGS BY COUNT, DUCTILE 61 5010 IRON, 12 IN X 8 IN, LOCKING TEE EACH 6 $ $ FITTINGS BY COUNT, DUCTILE 62 5010 IRON, 12 IN X 6 IN, REDUCER EACH 2 $ $ FITTINGS BY COUNT, DUCTILE 63 5010 IRON, 12 IN X 8 IN, REDUCER EACH 1 $ $ FITTINGS BY COUNT, DUCTILE --- IRON, 12 IN X 6 IN,TAPPING 64 5010 SLEEVE EACH 1 $ $ FITTINGS BY COUNT, DUCTILE ,.,. 65 5010 IRON,4 IN, RJ LONG SLEEVE EACH 1 $ $ FITTINGS BY COUNT, DUCTILE 66 5010 IRON, 6 IN, RJ LONG SLEEVE EACH 7 $ $ - FITTINGS BY COUNT, DUCTILE 67 5010 IRON, 8 IN, RJ LONG SLEEVE EACH 5 $ $ FITTINGS BY COUNT, DUCTILE - 68 5010 IRON, 12 IN, RJ LONG SLEEVE EACH 2 $ $ WATER SERVICE STUB, COPPER, 3/4 69 5010 IN LF 28.6 $ $ ...-- WATER SERVICE STUB, COPPER, 1 70 5010 IN LF 63.2 $ $ WATER SERVICE STUB, COPPER, 1 -- 71 5010 1/4 IN LF 23.2 $ $ FORM OF BID FB-4 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa ITEM ITEM CODE ITEM UNIT EST. UNIT BID TOTAL BID NO. QTY. PRICE PRICE 117 7040 FULL DEPTH PATCHES, PCC SY 58.4 $ $ 118 7040 REMOVAL OF PAVEMENT SY 45061.9 $ $ - 119 7040 CURB AND GUTTER REMOVAL LF 35 $ $ 120 7040 SAWCUT FOR REMOVALS LF 5331.6 $ $ 121 8010 TRAFFIC SIGNAL EACH 3 $ $ 122 8010 TRAFFIC SIGNAL REMOVAL EACH 3 $ $ - 123 8010 TEMPORARY TRAFFIC SIGNAL EACH 3 $ $ 124 8030 TRAFFIC CONTROL LS 1 $ $ - 125 2523 LIGHT POLES EACH 51 $ $ 126 2523 ELECTRICAL CIRCUITS LF 12395 $ , $ 127 8010 HANDHOLES AND JUNCTION BOXES EACH 22 $ $ 128 2523 CONTROL CABINET EACH 1 $ $ 129 2528 FLAGGER EACH 20 $ $ PAINTED PAVEMENT MARKINGS, 130 8020 SOLVENT WATERBORNE STA 312.03 $ $ WET, RETROREFLECTIVE - 131 8020 REMOVABLE TAPE MARKINGS STA 336.48 $ $ 132 8020 PAVEMENT MARKINGS REMOVED STA 53.11 $ $ - PAINTED SYMBOLS AND LEGENDS, 133 8020 SOLVENT WATERBORNE EACH 4 $ $ REMOVAL OF CONCRETE 134 2401 FOOTINGS OF LIGHT POLES EACH 26 $ $ REMOVAL OF STEEL BEAM 135 2505 GUARDRAIL LF 126 $ $ - 136 2518 SAFETY CLOSURE EACH 61 $ $ 137 2524 REMOVE AND REINSTALL SIGN EACH 3 $ $ REMOVAL OF TYPE A SIGN - 138 2524 ASSEMBLY EACH 32 $ $ REMOVAL OF TYPE B SIGN TRUSS 139 2524 AND FOUNDATION EACH 4 $ $ - PERFORATED SQUARE STEEL TUBE 140 2524 POSTS LF 559 $ $ PERFORATED SQUARE STEEL TUBE - POST ANCHOR, BREAK-AWAY SOIL 141 2524 INSTALLATION EACH 56 $ $ - 142 2524 TYPE A SIGNS,SHEET ALUMINUM SF 468 $ $ FORM OF BID FB-7 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa ITEM EST. UNIT BID TOTAL BID ITEM CODE ITEM UNIT NO. QTY. PRICE PRICE ' 143 2524 TYPE B SIGNS, SHEET ALUMINUM SF 77 $ $ TEMPORARY BUSINESS ACCESS 144 2524 SIGNS EACH 43 $ $ TEMPORARY BARRIER RAIL, 145 2528 CONCRETE LF 1290 $ $ --- TEMPORARY FLOODLIGHTING 146 2528 LUMINAIRE EACH 13 $ $ TEMPORARY LANE SEPARATION - 147 2528 SYSTEM LF 3296 $ $ PORTABLE DYNAMIC MESSAGE 148 2528 SIGN CDAY 120 $ $ - 149 9010 TEMPORARY SEEDING ACRE 4.5 $ $ 150 9040 SWPPP MANAGEMENT LS 1 $ $ SEEDING, FERTILIZING,AND - MULCHING FOR HYDRAULIC 151 9010 SEEDING ACRE 4.5 $ $ PERIMETER AND SLOPE SEDIMENT - 152 9040 CONTROL DEVICE LF 2275 $ $ REMOVAL OF PERIMETER AND 153 9040 SLOPE SEDIMENT CONTROL DEVICE LF 2275 $ $ - SILT FENCE OR SILT FENCE DITCH 154 9040 CHECK INSTALLATION LF 2731.3 $ $ MAINTENANCE OF SILT FENCE OR - 155 9040 SILT FENCE DITCH CHECK LF 273.1 $ $ REMOVAL OF SILT FENCE OR SILT 156 9040 FENCE DITCH CHECK LF 2731.3 $ $ ROLLED EROSION CONTROL 157 9040 PRODUCT,TYPE II SQ 103 $ $ 158 2601 MOWING ACRE 4.7 $ $ TEMPORARY INTAKE OR MANHOLE 159 9040 COVER ASSEMBLY EACH 6 $ $ MAINTENANCE OF TEMPORARY R INTAKE OR MANHOLE COVER 160 9040 ASSEMBLY EACH 6 $ $ REMOVAL OF TEMPORARY INTAKE 161 9040 OR MANHOLE COVER ASSEMBLY EACH 6 $ $ OPEN-THROAT CURB INTAKE 162 9040 SEDIMENT FILTER LF 450 $ $ MAINTENANCE OF OPEN-THROAT 163 9040 CURB INTAKE SEDIMENT FILTER EACH 45 $ $ REMOVAL OF OPEN-THROAT CURB 164 9040 INTAKE SEDIMENT FILTER EACH 45 $ $ GRATE INTAKE SEDIMENT FILTER 165 9040 BAG EACH 5 $ $ - FORM OF BID FB-8 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa ITEM ITEM CODE ITEM UNIT EST. UNIT BID TOTAL BID NO. QTY. PRICE PRICE — MAINTENANCE OF GRATE INTAKE 166 9040 SEDIMENT FILTER BAG EACH 5 $ $ REMOVAL OF GRATE INTAKE — 167 9040 SEDIMENT FILTER BAG EACH 5 $ $ 168 9060 CHAIN LINK FENCE, 72 IN. LF 57.5 $ $ 169 9060 REMOVAL OF FENCE LF 57.5 $ $ 170 9070 MODULAR BLOCK RETAINING WALL SF 252 $ $ 171 11020 MOBILIZATION LS 1 $ $ — 172 11030 RELOCATION OF MAILBOXES LS 1 $ $ 173 11050 CONCRETE WASHOUT LS 1 $ $ TECHNICAL — 174 400 LANDSCAPING LS 1 $ $ 175 9010 WATERING MGAL 11.76 $ $ 176 9040 IN-LINE FLOCCULANT SOCK EACH 50 $ $ i 177 9040 DEWATERING BAGS EACH 75 $ $ TOTAL BID AMOUNT $ 2. It is understood that the quantities set forth are approximate only and subject to variation and that the unit bid price for the work done shall govern in the actual payment to Contractor. 3. In submitting this bid, the bidder understands that the right is reserved by the City of Waterloo, Iowa, to reject any or all bids. If written notice of the acceptance of this bid is mailed, telegraphed, or delivered to the undersigned within thirty(30)days after the opening thereof, or at any time thereafter before this bid is withdrawn, the undersigned agrees to execute and deliver an agreement in the prescribed form and furnish the required bond and certificate of the insurance within ten (10) days after the agreement is presented to him for signature, and start work within ten (10) days after — "Notice to Proceed" is issued. 4. Security in the sum of _ Dollars ($ ) in the form of , is submitted herewith in accordance with the INSTRUCTIONS TO BIDDERS. 5. Attached hereto is a Non-Collusion Affidavit of Prime Contractor. — 6. Attached hereto is a Bidders Status Form. _ 7. The bidder is prepared to submit a financial and experience statement upon request. 8. The Prime Contractor and Subcontractor(s), which have performed an aggregate of $10,000.00 in work for the City in the current calendar year, are prepared to submit an AAP or Update and an — EOC, within ten (10) days of notification that the bid submitted is lowest and acceptable. 9. The bidder has received the following Addendum or Addenda: — Addendum No. Date — FORM OF BID FB-9 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 10. The bidder shall list the MBE/WBE subcontractor(s), amount of subcontracts and bid items on the City of Waterloo Minority and/or Women Business Pre-bid Contact Information Form submitted with this Form of Bid or Proposal. The apparent low Bidder shall submit a list of all other Subcontractor(s) to be used on this Project to the City of Waterloo by 5:00 p.m. the business day following the day Bids on this Project are due along with the Non-Collusion Affidavits of All Subcontractor(s). The Contractor shall submit information on subcontractors on "SUBCONTRACTOR REQUEST AND APPROVAL" Form to be provided by City prior to approval of contract. The subcontractors listed on this proposal and/or submitted to the Contract Compliance Officer cannot be changed except for the following reasons: 1) The City of Waterloo does not approve the subcontractors. 2) The subcontractors submit in writing that they cannot fulfill their subcontracts. 11. The bidder has filled in all blanks on this proposal. Those blanks not applicable are marked "none" or"NA". 12. The bidder has attached all applicable forms. 13. The Owner reserves the right to select alternates, delete line items, and/or to reduce quantities prior to the award of a contract due to budgetary limitations. (Name of Bidder) (Date) BY: Title Official Address: (Including Zip Code): I.R.S. No. FORM OF BID FB-10 of 10 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa INFORMATION NEEDED FOR IOWA CONSTRUCTION SALES TAX EXEMPTION CERTIFICATE CONTRACTOR NAME: ADDRESS: (Check One) PRIME SUBCONTRACTOR FEDERAL ID#: PROJECT NAME: PROJECT CONTRACT NO.: DESCRIPTION OF WORK: ❑ Brickwork ❑ Landscaping ❑ Carpentry ❑ Painting ❑ Concrete ❑ Paving -- ❑ Drywall-Plaster-Insulation ❑ Plumbing ❑ Electrical ❑ Roofing-Siding-Sheet Metal ❑ Excavation/Grading ❑ Windows ❑ Flooring ❑ Wrecking-Demolition -- ❑ Heavy Construction ❑ Other (Please specify) ❑ Heating-Ventilating-Air Cond SALES TAX EXEMPTION CERT STE-1 of 1 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, as Principal, and as Surety are held and firmly bound unto the CITY OF WATERLOO , Iowa, hereinafter called "OWNER." In the penal sum Dollars ($ ) lawful money of the United States, for the payment of which sum will and truly be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. The condition of this obligation is such that whereas the Principal has submitted the accompanying bid dated the day of , 20_, for NOW, THEREFORE, (a) If said Bid shall be rejected, or in the alternate, (b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form specified and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid, Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. By virtue of statutory authority, the full amount of this bid bond shall be forfeited to the Owner in liquidation of damages sustained in the event that the Principal fails to execute the contract and provide -- the bond as provided in the specifications or by law. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the Owner may accept such Bid or execute such contract; and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and seals, and such of them as are corporations, have caused their corporate seals to be hereto affixed and these pres- ents to be signed by their proper officers this day of , A.D. 201 (Seal) Principal By (Title) (Seal) Witness Surety By Witness Attorney-in-fact — BID BOND BB-1 OF 1 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY NON-COLLUSION AFFIDAVIT OF PRIME BIDDER State of )ss County of , being first duly sworn, deposes and says that: -- 1. He is (Owner, Partner, Officer, Representative, or Agent) , of , the Bidder that has submitted the attached Bid; 2. He is fully informed respecting the preparation and contents of the attached Bid and of all —` pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost element of the bid price or the bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Waterloo, Iowa, or any person interested in the Proposed Contract; and 5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant. (Signed) Title Subscribed and sworn to before me this day of 20 — Title My commission expires r NON-COLLUSION AFFIDAVITS NCA-1 of 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract Nol.934 Waterloo,Iowa NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR State of ) ss:County of , being first duly sworn, deposes and says that: — 1. He is (Owner, Partner, Officer, Representative, or Agent) , of hereinafter referred to as the"Subcontractor;" — 2. He is fully informed respecting the preparation and contents of the subcontractor's proposal submitted by the subcontractor to , contract pertaining to the project in (City or County and State) 3. Such subcontractor's proposal is genuine and is not a collusive or sham proposal; 4. Neither the subcontractor nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affiant, has in any way colluded, conspired, connived, or agreed, directly or indirectly, with any other bidder, firm or person to submit a collusive or sham proposal in connection with such contract or to refrain from submitting a proposal in connection with such contract, or has in any manner, directly or indirectly, sought by unlawful agreement or connivance with any other bidder, firm or person to fix the price or prices in said subcontractor's proposal, or to fix any overhead, profit or cost element of the price of prices in said subcontractor's proposal, or to secure through collusion, conspiracy, connivance or unlawful agreement any advantage against the City of Waterloo, Iowa, or any person interested in the proposed contract; and 5. The price or prices quoted in the subcontractor's proposal are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant. (Signed) Title Subscribed and sworn to before me this day of , 201 Title My commission expires NON-COLLUSION AFFIDAVITS NCA-2 of 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract Nol.934 Waterloo,Iowa EQUAL OPPORTUNITY CLAUSE (As provided in Executive Order No. 11246) All contractors, subcontractors, vendors and suppliers of goods and services doing business with the City and value of said business equals or exceeds ten thousand dollars ($10,000.00) annually agree as follows: 1. The contractors, subcontractor, vendor and supplier of goods and services will not discriminate against any employee or applicant for employment because of race, color, creed, sex, national origin, economic status, age, mental or physical handicap, political opinions or affiliations. The contractor, subcontractor, vendor and supplier will develop an Affirmative Action program to — ensure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, sex, national origin, religion, economic status, age, mental or physical disability, political opinions or affiliations. Such actions shall include but not be limited to the following: a. Employment b. Upgrading c. Demotion or Transfer d. Recruitment and Advertising e. Layoff or Termination f. Rates of Pay or Other Forms of Compensation g. Selection for Training Including Apprenticeship 2. The contractor, subcontractor, vendor and supplier of goods and services will, in all solicitations or advertisements for employees, state that all qualified applicants will receive consideration for employment without regard to race, creed, color, sex, national origin, religion, economic status, age, mental or physical disabilities, political opinion or affiliations. 3. The contractor, subcontractor, vendor and supplier or his/her collective bargaining representative will send to each labor union or representative of workers which he/she has a collective bargaining agreement or other contract or understanding, a notice advising said labor union or workers' representative of the contractor's commitment under this section. 4. The contractor, subcontractor, vendor and supplier of goods and services will comply with all published rules, regulations, directives, and order of the City of Waterloo Affirmative Action Program Contract Compliance Provisions. 5. The contractor, subcontractor, vendor and supplier of goods and services will furnish and file —' compliance reports within such time and upon such forms as provided by the Affirmative Action Officer. Said forms will elicit information as to the policies, procedures, patterns, and practices of each subcontractor as well as the contractor himself/herself and said contractor, subcontractor, vendor and supplier will permit access to his/her employment books, records and accounts to the City's Affirmative Action Officer, for the purpose of investigation to ascertain compliance with this contract and with rules and regulations of the City's Affirmative Action Program—Contract Compliance Provisions relative to Resolution No. 24664. 6. In the event of the contractor's non-compliance with the non-discrimination clauses of this contract or with any of such rules, regulations and orders, this contract may be canceled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further contracts in accordance with procedures authorized by the City Council. 7. The contractor, subcontractor, vendor and supplier of goods and services will include, or incorporate by reference, the provisions of the non-discrimination clause in every contract, EQUAL OPPORTUNITY CLAUSE EOC-1 of 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa subcontract or purchase order unless exempted by the rules, regulations or orders of the City's Affirmative Action Program, and will provide in every subcontract, or purchase order that said provisions will be binding upon each contractor, subcontractor, or supplier. 8. We, the undersigned, recognize that we are morally and legally committed to non-discrimination in employment. Any person who applies for employment with our company will not be discriminated against because of race, creed, color, sex, national origin, economic status, age, mental or physical disabilities. (Signed) (Appropriate Official) _ (Title) (Date) EQUAL OPPORTUNITY CLAUSE EOC-2 of 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa TITLE VI CIVIL RIGHTS During the performance of this contract, the contractor (for itself), its assignees, and successors in interest(hereinafter referred to as the"contractor") agrees as follows: 1. Compliance with Regulations: The contractor shall comply with the Regulations relative to non- discrimination in Federally assisted programs of the DOT Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract. 2. Nondiscrimination: The contractor, with regard to the work performed by it during the contract, _ shall not discriminate on the grounds of race, color, national origin, sex, age, or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations. 3. Solicitations for Subcontracts, Including Procurement of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to non-discrimination on the grounds of race, color, national origin, sex, age, or disability. 4. Information and Reports: The contractor shall provide all information and reports required by the Regulations or directives issued pursuant there to, and shall allow access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Contracting Authority, the Iowa DOT, or FHWA to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information the contractor shall so certify to the Contracting Authority, the Iowa DOT, or the FHWA as appropriate, and shall set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of the contractor's noncompliance with the nondiscrimination provisions of this contract, the Contracting Authority, the Iowa DOT, or the FHWA shall impose such contract sanctions as they may determine to be appropriate, including, but not limited to: a. Withholding of payments to the contractor under the contract until the contractor complies, and/or b. Cancellation, termination, or suspension of the contract, in whole or in part. 6. Incorporation of Provisions: The contractor shall include the provisions of paragraphs (1) through (6) in every subcontract, including procurement of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement as the Contracting Authority, the Iowa DOT, or the FHWA may direct as a means of enforcing such provisions including sanctions for non-compliance: Provided, however, that, in the event of a contractor becomes involved in, or it threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request the Contracting Authority or the Iowa DOT to enter into such litigation to protect the interests of the Contracting Authority or the Iowa DOT; and, in addition, the contractor may request the United States to enter into such litigation to protect the interest of the United States. TITLE VI CIVIL RIGHTS TVI-1 of 1 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY Bidder Status Form _To be completed by all bidders Part A Please answer"Yes" or"No"for each of the following: ❑ Yes ❑ No My company is authorized to transact business in Iowa. (To help you determine if your company is authorized, please review the worksheet on the next page). • Yes ❑ No My company has an office to transact business in Iowa. ❑ Yes ❑ No My company's office in Iowa is suitable for more than receiving mail, telephone calls, and e-mail. -1 Yes ❑ No My company has been conducting business in Iowa for at least 3 years prior to the first request for bids on this project. ❑ Yes ❑ No My company is not a subsidiary of another business entity or my company is a subsidiary of another business entity that would qualify as a resident bidder in Iowa. If you answered "Yes" for each question above, your company qualifies as a resident bidder. Please complete Parts B and D of this form. If you answered "No" to one or more questions above, your company is a nonresident bidder. Please complete Parts C and D of this form. -'To be completed by resident bidders Part B My company has maintained offices in Iowa during the past 3 years at the following addresses: Dates: / / to / / Address: City, State, Zip: Dates: / / to / / Address: City, State, Zip: Dates: / / to / / Address: You may attach additional sheet(s) if needed. City, State, Zip: To be completed by non-resident bidders Part C 1. Name of home state or foreign country reported to the Iowa Secretary of State: 2. Does your company's home state or foreign country offer preferences to resident bidders, resident labor ❑ Yes ❑ No _ force preferences or any other type of preference to bidders or laborers? 3. If you answered "Yes" to question 2, identify each preference offered by your company's home state or foreign country and the appropriate legal citation. You may attach additional sheet(s) if needed. —To be completed by all bidders Part D I certify that the statements made on this document are true and complete to the best of my knowledge and I know that my failure to provide accurate and truthful information may be a reason to reject my bid. Firm Name: — Signature: Date: You must submit the completed form to the governmental body requesting bids per 875 Iowa Administrative Code Chapter 156.This form has been approved by the Iowa Labor Commissioner. 309-6001 (09-15) BSF-1 Worksheet: Authorization to Transact Business This worksheet may be used to help complete Part A of the Resident Bidder Status form. If at least one of the following describes your business, you are authorized to transact business in Iowa. ❑ Yes ❑ No My business is currently registered as a contractor with the Iowa Division of Labor. ❑ Yes ❑ No My business is a sole proprietorship and I am an Iowa resident for Iowa income tax purposes. ❑ Yes ❑ No My business is a general partnership or joint venture. More than 50 percent of the general partners or joint venture parties are residents of Iowa for Iowa income tax purposes. ❑ Yes ❑ No My business is an active corporation with the Iowa Secretary of State and has paid all fees required by the Secretary of State, has filed its most recent biennial report, and has not filed articles of dissolution. ❑ Yes ❑ No My business is a corporation whose articles of incorporation are filed in a state other than Iowa, — the corporation has received a certificate of authority from the Iowa secretary of state, has filed its most recent biennial report with the secretary of state, and has neither received a certificate of withdrawal from the secretary of state nor had its authority revoked. ❑ Yes ❑ No My business is a limited liability partnership which has filed a statement of qualification in this state and the statement has not been canceled. ❑ Yes ❑ No My business is a limited liability partnership which has filed a statement of qualification in a state other than Iowa, has filed a statement of foreign qualification in Iowa and a statement of cancellation has not been filed. ❑ Yes ❑ No My business is a limited partnership or limited liability limited partnership which has filed a certificate of limited partnership in this state, and has not filed a statement of termination. -- ❑ Yes ❑ No My business is a limited partnership or a limited liability limited partnership whose certificate of limited partnership is filed in a state other than Iowa, the limited partnership or limited liability — limited partnership has received notification from the Iowa secretary of state that the application for certificate of authority has been approved and no notice of cancellation has been filed by the limited partnership or the limited liability limited partnership. _ ❑ Yes ❑ No My business is a limited liability company whose certificate of organization is filed in Iowa and has not filed a statement of termination. ❑ Yes ❑ No My business is a limited liability company whose certificate of organization is filed in a state other than Iowa, has received a certificate of authority to transact business in Iowa and the certificate has not been revoked or canceled. — 309-6001 (09-15) BSF-2 Revised February 2003 CONTRACTOR'S OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Check box that applies to party completing program: ( ) General Contractor ( ) Subcontractor I. Section A to be completed by GENERAL CONTRACTORS only: A. Name of Company Address of Company Zip Telephone Number( ) Federal ID Number(if no Federal ID Number, Owner/President's Social Security Number) Name of Equal Employment Officer Name of Project Project Contract Number Estimated Construction Work Dates / Start Finish Section B to be completed by SUBCONTRACTORS only: B. Name of General or Prime Contractor Name of Subcontractor Subcontractor's Address Zip Subcontractor's Telephone Number( Subcontractor's Federal ID Number(if no Federal ID Number Owner/President's Social Security Number) Name of Equal Employment Officer C. Remainder of program to be completed by party completing program, either Prime or Subcontractor. 1. The Owners and/or Principals of your company: -1 - Ethnic Name Address Position Sex Origin 2. Other Areas of Interest: If your company has branches or subsidiaries, or if your company is a branch or — subsidiary of a parent organization, give the following information: Type of Name Address Affiliation Degree II. EMPLOYER'S POLICY (Please read carefully.) A. We, the undersigned, recognize that we are morally and legally committed to nondiscrimination in employment. Any person who applies for employment with our company will not be discriminated against because of race, color, creed, sex, national origin, economic status, age, mental or physical handicap. B. The employment policies and practices of the undersigned are to recruit and hire employees without discrimination, and to treat them equally with respect to compensation and opportunities for advancement, including training, upgrading, promotion, and transfer. However, we realize the inequities associated with employment training, upgrading, contracting and subcontracting for minorities and women and we will direct ._.. our efforts to correcting any deficiencies to the maximum extent possible. The same will be required of our SUBCONTRACTORS and suppliers. C. We submit this program to assure compliance with Executive Order 11246, as amended, — and other subsequent orders that may pertain to equal employment opportunity and merit employment policies, fully realizing that our qualification and/or merit system should be evaluated and revised, if necessary. D. We agree to put forth the maximum effort to achieve full employment and utilization of capabilities and productivity of all our citizens without regard to race, creed, color, sex, national origin, economic status, age, and mental or physical handicap. E. will give training (Name of Company) and employment opportunities to local residents of Waterloo, Iowa, to the greatest extent feasible. _2 - III. AFFIRMATIVE ACTION A. recognizes that the (Name of Company) effective application of a policy of merit employment involves more than just a policy statement, and (Name of Company) will, therefore, re-evaluate our Affirmative Action Program to ensure that equal employment opportunities are available on the basis of individual merit, and to actively encourage minorities, women and local residents to seek employment with our company on this basis. B. will undertake the (Name of Company) following six (6) steps to improve our Affirmative Action Program: 1. Minority Recruitment and Employment; 2. Local Recruitment and Employment; 3. Disabled Veteran and Vietnam Era Veteran Recruitment and Employment; 4. Handicapped Recruitment and Employment; 5. Female Recruitment and Employment; and 6. Training, Upgrading and Promotional Opportunities. C. will take (Name of Company) whatever steps are necessary to ensure that our total work force has adequate minority, female, and local representation. We will utilize the following methods in our recruitment attempts: 1. Local advertising media (newspapers, radio, TV); 2. Community organizations (churches, clubs, schools); 3. Public and private institutions in the area (UNI, Hawkeye Community College); 4. Job Service of Iowa; and 5. Other. D. will seek qualified minority, female, (Name of Company) and local group applicants for all job categories and will make asserted efforts to increase minority, female and group representation in occupations at the higher levels or skill and responsibility. E. All sources of employment used shall be aware that we are an Equal Employment Opportunity Employer. Labor organizations representing our employees will be notified of our Equal Employment Opportunity Policy and Affirmative Action Program. F. Training, upgrading, promotion and transfer activities at all levels will be monitored to ensure that full consideration has been given to qualified minority, female, and local group employees. G. will encourage other (Name of Company) companies with whom we are associated and/or do business, to do the same and we will assist them in their efforts. -3 - H. has taken the following (Name of Company) Affirmative Action to ensure that minority, female, local contractors and/or suppliers were provided opportunities to negotiate and/or bid on this project: (if none, write "NONE") 1. 2. As a result of the above efforts, we have involved minority, female, and local contractors and/or suppliers in the following areas of subcontracting: (if none, write "NONE") 1. 2. J. will require approved (Name of Company) Affirmative Action Programs from all nonexempt contractors who propose to work on this project and will take whatever steps are necessary to ensure that non-minority contractors have adequate representation of minority, female and local persons in their total work force. K. In further accordance with rules and guidelines issued pursuant to Executive Order 11246 as amended, we establish the goals for our company, based on parity percentages supplied by the City, and we realize these goals will be reviewed on an annual basis. L. will keep records of (Name of Company) specific actions relative to recruitment, employment, training, upgrading and promotion and will provide the City of Waterloo with any information relative to same, including activities of our SUBCONTRACTORS and suppliers as necessary or when requested. ._.. M. Parity figures for companies located in Waterloo are as follows: Minority Parity = .08 (8%) — N. Affirmative Action (Name of Company) — Employment Goals: The definition of Affirmative Action Goals is as follows: "Goals may not be rigid and inflexible quotas which must be met, but must be targets, reasonably attainable by means — of applying every good faith effort to make all aspects of the entire Affirmative Action Program work." For the year 20_, please submit percentage targets for employing minorities and women. If you already have reached your target for hiring minorities and women, please submit that percentage. *Goals for Minorities: Goals for Women: *Your affirmative action goals should be between 1% and 10% or more for minorities and 1% and 5% or more for women. -4 - Please be advised that the goals or targets are purely your estimation of how many women and minorities your company can reasonably expect to hire in 201_. Note, that none of the goals are rigid or inflexible. They are targets that your company calculates as reasonably attainable. This will help the City in its monitoring procedures as required by City of Waterloo Resolution No. 1984-142(4). CONTRACTOR'S TOTAL WORK FORCE (WATERLOO) HOURLY NAME AND ADDRESS JOB CATEGORY RACE SEX WAGE is INDICATE: DISABLED VETERAN: DV VIETNAM ERA VETERAN: W HANDICAPPED: H -5 - We hereby certify that we are in compliance with all City and Federal Affirmative Action Regulations and agree to accept all liability for failure to comply. Respectfully submitted, — By: Company Executive Date — By: Equal Employment Opportunity Officer Date City of Waterloo Affirmative Action Officer Approved _ Disapproved Reason: By: Date: -6 - DESCRIPTION OF JOB CATEGORIES 1. Officials/Manager: Occupations in which employees set broad policies, exercise overall responsibility for execution of all policies, or direct individual departments or special phases of the agency's operations or provide specialized consultation on a regional, district or area basis. Includes: department heads, bureau chiefs, division chiefs, directors, deputy directors, controllers, examiners, wardens, superintendents, unit supervisors, sheriffs, police and fire chiefs and inspectors and kindred workers. 2. Professionals: Occupations which require specialized and theoretical knowledge which is usually required through college training or thorough work experience and other training which provides comparable knowledge. Includes: personnel and labor relations workers, social workers, doctors, psychologists, registered nurses, economists, dietitians, lawyers, system analysts, accountants, engineers, employment and vocational rehabilitation counselors, teachers or instructors, police and fire captains and lieutenants and kindred workers. 3. Technicians: Occupations which require a combination of basic scientific or technical knowledge and manual skill which can be obtained through specialized post-secondary school education and through equivalent on-the-job training. Includes: computer programmers and operations, draftsmen, surveyors, licensed practical nurses, photographs, radio operators, technical illustrators, police and fire sergeants and kindred workers. 4. Office/Clerical: Workers are responsible for internal and external communication, recording and retrieval of data and/or information and other paper work required in an office. Includes: bookkeepers, messengers, office machine operators, clerk-typists, stenographers, court transcribers, hearing reporters, statistical clerks, dispatchers, license distributors, payroll clerks and kindred workers. 5. Skilled Craft Workers: Workers perform jobs which require special manual skill and a thorough and comprehensive knowledge of the processes involved in the work which is acquired through on-the-job training programs. Includes: Mechanics and repairman, electricians, heavy equipment operators, stationary engineers, skilled machine occupations, carpenters, compositors and typesetters and kindred workers. 6. Sales Workers: Occupations engaging wholly and primarily in direct selling. Includes: advertising agents and salesman, insurance agents and brokers, real estate agents and brokers, stock and bond salesmen, demonstrators, salesmen and sales clerks, grocery clerks and cashier checkers, and kindred workers. 7. Operatives (semi-skilled): Workers who operate machine or processing equipment or perform other factory-type duties of intermediate skill level which can be mastered in a few weeks and require only limited training. Includes: apprentices (auto mechanics), plumbers, building trades, metal working trades, bricklayers, carpenters, electricians, machinists, mechanics, printing trades, etc., operatives, attendants (auto service and parking), plasterers, chauffeurs, deliverymen and furnacemen, heaters (metal), laundry and dry cleaning operatives, milliners, mine operatives and laborers, motormen, oilers and greasers, (except auto painters), (except construction and maintenance), photographic process workers, stationary fireman, truck and tractor drivers, weavers, (textile), welders and flame cutters and kindred workers. 8. Laborers (unskilled): Workers in manual occupations which generally require no special training. Perform elementary duties that may be learned in few days and require the application of little or no independent judgment. Includes: garage laborers, car washers and greasers, gardeners (except farm) and groundskeepers, longshoremen, and stevedores, lumbermen, raftsmen and woodchoppers, laborers performing lifing, digging, mixing, loading and pulling operations and kindred workers. -7 - 9. Apprentices: Persons employed in a program including work training and related instruction to learn a trade or craft which is traditionally an apprenticeship, regardless of whether the program is registered with a Federal or State agency. 10. Trainees (on-the-job): Production. persons in formal training for craftsmen when not trained under apprentice programs--operative laborer, and service occupations. 11. White Collar: Persons engaged in formal training for clerical, managerial, professional, technical, sales, office and clerical occupations. -s - ITEMS OF POTENTIAL MBE/WBE PARTICIPATION NOTICE TO PROSPECTIVE BIDDERS: The following items from the FY 2019 UNIVERSITY AVENUE RECONSTRUCTION — PHASE 2, Contract No. 934, have a potential for MBE/WBE Participation. This listing, however, is not intended to be all encompassing or to preclude MBE/WBE Contractors from bidding on any items of the Proposal as a Subcontractor or the entire Proposal as a Prime Contractor. ITEM NO. SPEC SECTION ITEM 12 4020 STORM SEWER,TRENCHED, HDPE, 4 IN. 13 4020 STORM SEWER,TRENCHED, HDPE, 8 IN. 14 4020 STORM SEWER,TRENCHED, RCP, CLASS III, 15 IN. 15 4020 STORM SEWER,TRENCHED, RCP, CLASS III, 18 IN. 16 4020 STORM SEWER,TRENCHED, RCP, CLASS III, 24 IN. 17 4020 STORM SEWER,TRENCHED, RCP, CLASS III, 30 IN. 18 4020 REMOVAL OF STORM SEWER, RCP, LESS THAN 36 IN. 19 4020 STORM SEWER ABANDONMENT, PLUG AND FILL, LESS THAN 36 IN. 20 4040 SUBDRAIN,TYPE S, 6 IN. 21 4040 SUBDRAIN OUTLETS AND CONNECTIONS, EXISTING SUBDRAIN, 6 IN. 22 4040 SUBDRAIN OUTLETS AND CONNECTIONS, PER PLAN, 6 IN. 23 5010 WATER MAIN,TRENCHED, DUCTILE IRON PIPE (DIP),4 IN, NITRILE GASKETS 24 5010 WATER MAIN,TRENCHED, DUCTILE IRON PIPE (DIP), 6 IN, NITRILE GASKETS 25 5010 WATER MAIN,TRENCHED, DUCTILE IRON PIPE (DIP), 8 IN, NITRILE GASKETS 26 5010 WATER MAIN,TRENCHED, DUCTILE IRON PIPE (DIP), 12 IN, NITRILE GASKETS 27 5010 WATER MAIN, DIRECT BURIED, DUCTILE IRON PIPE (DIP), 6 IN, NITRILE GASKETS, INTEGRAL RESTRAINED JOINTS WITH CASING PIPE 28 5010 WATER MAIN, DIRECT BURIED, DUCTILE IRON PIPE (DIP), 8 IN, NITRILE GASKETS, INTEGRAL RESTRAINED JOINTS WITH CASING PIPE 29 5010 WATER MAIN, DIRECT BURIED, DUCTILE IRON PIPE (DIP), 12 IN, NITRILE GASKETS, INTEGRAL RESTRAINED JOINTS WITH CASING PIPE 30 5010 WATER MAIN,TRENCHLESS, DUCTILE IRON PIPE (DIP), 6 IN, NITRILE GASKETS, INTEGRAL RESTRAINED JOINTS WITH CASING PIPE 31 5010 WATER MAIN,TRENCHLESS, DUCTILE IRON PIPE (DIP), 8 IN, NITRILE GASKETS, INTEGRAL RESTRAINED JOINTS WITH CASING PIPE 32 5010 WATER MAIN,TRENCHLESS, DUCTILE IRON PIPE (DIP), 12 IN, NITRILE GASKETS, INTEGRAL RESTRAINED JOINTS WITH CASING PIPE 33 5010 FITTINGS BY COUNT, DUCTILE IRON,4 IN, MJ CAP 34 5010 FITTINGS BY COUNT, DUCTILE IRON,4 IN, 11 1/4° ELBOW 35 5010 FITTINGS BY COUNT, DUCTILE IRON, 6 IN, MJ CAP 36 5010 FITTINGS BY COUNT, DUCTILE IRON, 6 IN, 90° ELBOW 37 5010 FITTINGS BY COUNT, DUCTILE IRON, 6 IN, 22 1/2° ELBOW 38 5010 FITTINGS BY COUNT, DUCTILE IRON, 6 IN, 11 1/4° ELBOW 39 5010 FITTINGS BY COUNT, DUCTILE IRON, 6 IN,TEE 40 5010 FITTINGS BY COUNT, DUCTILE IRON, 6 IN, LOCKING TEE MBE/WBE PARTICIPATION M-1 of 9 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa ITEM NO. SPEC SECTION ITEM 41 5010 FITTINGS BY COUNT, DUCTILE IRON, 6 IN X 2 IN, REDUCER 42 5010 FITTINGS BY COUNT, DUCTILE IRON, 8 IN, MJ CAP 43 5010 FITTINGS BY COUNT, DUCTILE IRON, 8 IN,90° ELBOW 44 5010 FITTINGS BY COUNT, DUCTILE IRON, 8 IN, 22 1/2° ELBOW 45 5010 FITTINGS BY COUNT, DUCTILE IRON, 8 IN, 11 1/4° ELBOW 46 5010 FITTINGS BY COUNT, DUCTILE IRON, 8 IN,TEE 47 5010 FITTINGS BY COUNT, DUCTILE IRON, 8 IN, LOCKING TEE 48 5010 FITTINGS BY COUNT, DUCTILE IRON, 8 IN X 6 IN,TEE 49 5010 FITTINGS BY COUNT, DUCTILE IRON,8 IN X 4 IN, REDUCER 50 5010 FITTINGS BY COUNT, DUCTILE IRON, 8 IN X 6 IN, REDUCER 51 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN, MJ CAP 52 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN,90° ELBOW 53 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN,45° ELBOW 54 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN, 22 1/2° ELBOW 55 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN, 11 1/4° ELBOW 56 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN,TEE 57 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN, LOCKING TEE 58 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN X 6 IN,TEE 59 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN X 8 IN,TEE 60 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN X 6 IN, LOCKING TEE 61 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN X 8 IN, LOCKING TEE 62 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN X 6 IN, REDUCER 63 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN X 8 IN, REDUCER 64 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN X 6 IN,TAPPING SLEEVE 65 5010 FITTINGS BY COUNT, DUCTILE IRON,4 IN, RI LONG SLEEVE 66 5010 FITTINGS BY COUNT, DUCTILE IRON, 6 IN, RI LONG SLEEVE 67 5010 FITTINGS BY COUNT, DUCTILE IRON,8 IN, RJ LONG SLEEVE 68 5010 FITTINGS BY COUNT, DUCTILE IRON, 12 IN, RI LONG SLEEVE 69 5010 WATER SERVICE STUB, COPPER, 3/4 IN 70 5010 WATER SERVICE STUB, COPPER, 1 IN 71 5010 WATER SERVICE STUB, COPPER, 1 1/4 IN 72 5010 WATER SERVICE STUB, COPPER, 2 IN 73 5010 WATER SERVICE STUB,TRENCHED, COPPER, 3/4 IN, WITH INTEGRAL RESTRAINED JOINT CASING PIPE 74 5010 WATER SERVICE STUB,TRENCHED, COPPER, 1 IN,WITH INTEGRAL RESTRAINED JOINT CASING PIPE 75 5010 WATER SERVICE STUB,TRENCHED, COPPER, 1 1/4 IN,WITH INTEGRAL RESTRAINED JOINT CASING PIPE 76 5010 WATER SERVICE STUB,TRENCHLESS, COPPER, 1 IN,WITH INTEGRAL RESTRAINED JOINT CASING PIPE 77 5010 WATER SERVICE STUB,TRENCHLESS, COPPER, 1 1/4 IN, WITH INTEGRAL MBE/WBE PARTICIPATION M-2 of 9 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa ITEM NO. SPEC SECTION ITEM RESTRAINED JOINT CASING PIPE 78 5010 WATER SERVICE STUB,TRENCHLESS, COPPER, 2 IN,WITH INTEGRAL RESTRAINED JOINT CASING PIPE 79 5020 VALVE, GATE, DIP,4 IN 80 5020 VALVE, GATE, DIP, 6 IN 81 5020 VALVE, GATE, DIP,8 IN 82 5020 VALVE, GATE, DIP, 12 IN 83 5020 FIRE HYDRANT 84 5020 FIRE HYDRANT ASSEMBLY REMOVAL 85 6010 MANHOLE,SW-401,48 IN. 86 6010 MANHOLE,SW-401, 60 IN. 87 6010 MANHOLE,SW-402,4 X 4 88 6010 INTAKE, SW-501 89 6010 INTAKE, SW-507 90 6010 INTAKE, SW-508 91 6010 INTAKE, SW-509 92 6010 INTAKE, SW-510 93 2435 INTAKE, SW-545 94 6010 CONNECTION TO EXISTING MANHOLE OR INTAKE 95 6010 MANHOLE OR INTAKE ADJUSTMENT, MINOR 96 6010 MANHOLE OR INTAKE ADJUSTMENT, MAJOR 97 6010 REMOVALS, MANHOLE OR INTAKE 98 6020 SANITARY SEWER SPOT REPAIR, BY COUNT 99 6020 SANITARY SEWER SPOT REPAIR, BY LINEAR FOOT 102 2304 TEMPORARY PAVEMENT 103 7010 CURB AND GUTTER, SLOPED,VAR., 6 IN. 104 7010 CURB AND GUTTER, STANDARD,VAR., 6 IN. 105 7010 CONCRETE MEDIAN 107 7020 HMA PAVEMENT, STANDARD, 8 IN. 109 7030 SHARED USE PATHS, PCC, 6 IN. 110 7030 PCC SIDEWALK, PCC,4 IN. 113 7030 DETECTABLE WARNINGS, CAST IRON 114 7030 DRIVEWAYS, PCC, 6 IN. 115 7040 FULL DEPTH PATCHES,COMPOSITE 116 7040 FULL DEPTH PATCHES, HMA 117 7040 FULL DEPTH PATCHES, PCC 118 7040 REMOVAL OF PAVEMENT 119 7040 CURB AND GUTTER REMOVAL 120 7040 SAWCUT FOR REMOVALS 159 9040 TEMPORARY INTAKE OR MANHOLE COVER ASSEMBLY MBE/WBE PARTICIPATION M-3 of 9 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa ITEM NO. SPEC SECTION ITEM 160 9040 MAINTENANCE OF TEMPORARY INTAKE OR MANHOLE COVER ASSEMBLY 161 9040 REMOVAL OF TEMPORARY INTAKE OR MANHOLE COVER ASSEMBLY 162 9040 OPEN-THROAT CURB INTAKE SEDIMENT FILTER 163 9040 MAINTENANCE OF OPEN-THROAT CURB INTAKE SEDIMENT FILTER 164 9040 REMOVAL OF OPEN-THROAT CURB INTAKE SEDIMENT FILTER 165 9040 GRATE INTAKE SEDIMENT FILTER BAG 166 9040 MAINTENANCE OF GRATE INTAKE SEDIMENT FILTER BAG 167 9040 REMOVAL OF GRATE INTAKE SEDIMENT FILTER BAG 176 9040 IN-LINE FLOCCULANT SOCK 177 9040 DEWATERING BAGS MBE/WBE GOALS FOR THIS PROJECT IMPORTANT: Prime Contract Bidders should be aware that ten percent (10%) MBE goal and a two percent (2%)WBE goal is attached to this project. "Certified Return Receipt" letters are no longer needed with the bid showing proof of contacting MBE or WBE Subcontractors, but the Pre-Bid Contact Information Form must be filled out completely. City of Waterloo Contract Compliance Officer: Contract Compliance Officer Community Development Board Carnegie Annex, Suite 202 620 Mulberry Street Waterloo, IA 50703 Phone: (319)291-4429 MBE/WBE PARTICIPATION M-4 of 9 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa SUBCONTRACTOR'S BID REQUEST FORM PRIME BIDDER'S LETTERHEAD Contract No.: Letting Date: I, (subcontractor's name), hereby attest that I have been solicited for a bid on (project name) in the area of(description of work and bid item no.). (Prime contractor) has informed me that if I am interested in bidding, a subcontracting bid proposal must be submitted to the company office by(date)and (time). Subcontractor's Company Name Date Subcontractor's Signature Date Prime Bidder's Signature MBEIWBE PARTICIPATION M-5 of 9 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa LETTER TO BE USED WHEN SOLICITING FOR SUBCONTRACTOR QUOTES Subcontractor Company Name Address RE: Contract No.: Dear • (Prime Contractor's Company Name) is presently soliciting for the following work in connection with the above referenced project. (Insert bid Item Nos. and Description of Work) (Prime Contractor's Company Name)is an Equal Opportunity Employer, and all qualified bidders will not be discriminated against due to race, religion, color, sex, or origin. If interested in bidding your proposal must be turned in to this office by and (Date) (Time) Sincerely, (Prime Contractor's Representative) Form CCO-3 (11/28/2001) MBEIWBE PARTICIPATION M-6 of 9 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa LETTER OF INTENT TO BID (MBE/WBE LETTER) According to the Current MBE/WBE Contract Compliance Program - 2002, all MBE/WBE Contractors interested in submitting subcontractor quotes on construction projects with goals, MUST submit a LETTER OF INTENT TO BID to the City of Waterloo Contract Compliance Officer at least seven (7) days prior to bid opening. The LETTER OF INTENT TO BID must list the specific items which the MBE/WBE Contractor is interested in bidding. Letter should include the following: Name of Project: Your Company Name: -- Address: Phone: Date: List of Specific items to be bid: Item No. Description: Item No. Description: Item No. Description: Item No. Description: Item No. Description: (Subcontractor's Company Name and authorized signature) Return this LETTER OF INTENT TO BID to: $ Contract Compliance Officer Community Development Board 620 Mulberry St. Carnegie Annex, Suite 202 Waterloo, IA 50703 Phone: (319)291-4429 Form CCO-5 (06-20-2002) MBEIWBE PARTICIPATION M-7 of 9 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY CERTIFIED MBE / WBE CONTRACTORS CITY OF WATERLOO, IOWA at\ r 1R 440.11Siii �cerlo0 s CONTRACT COMPLIANCE OFFICE Community Development Board Carnegie Annex, Suite 202 620 Mulberry Street Waterloo,Iowa 50703 City WEB Site: www.ci.waterloo.ia.us Contract Compliance WEB Site for listing updates: http://www.cityofwaterlooiowa.com/contractcompliance Contact: Rudy Jones, Community Development Director Email: rudy.iones(a,waterloo-ia.org Phone: (319) 291-4429 Fax: (319) 291-4431 MBE/WBE Certified Contractors List Page 1 of 4 CERTIFIED MBE CONTRACTORS CARTER ELECTRIC 725 Adams Street Waterloo, IA 50703 Phone: (319)232-9808 Pager: (319)235-4021 Contact: Derrick Carter Specializing in: ELECTRICAL CONTRACTOR CULPEPPER ELECTRIC 1731 Cottage Grove Avenue Waterloo, IA 50707 Phone: (319)235-0885 Fax: (319)236-8177 Contact: Martin Culpepper Certified: City of Waterloo Certified MBE,Licensed Electrician Specializing in: ELECTRICAL CONTRACTOR DANIELS HOME IMPROVEMENT 339 Albany Street Waterloo, IA 50703 Phone: (319) 961-1659 Contact: Sammy Daniels Specializing in: ALL TYPES OF CONCRETE FLATWORK, POURED WALLS ALL TYPES, FOOTINGS, LIGHT DEMOLITION D.C. CORPORATION 426 Beech Street Waterloo, IA 50703 Phone: (319)493-2542 FAX: (319)236-0515 Contact: Terry Phillips Certified: City of Waterloo Certified MBE, Iowa DOT, TSB Certified Specializing in: COMMERCIAL AND RESIDENTIAL DEMOLITION, CONCRETE PAVING, DRIVEWAYS, TRUCKING (ALL TYPES), GENERAL CONSTRUCTION '- MBE/WBE Certified Contractors List Page 2 of 4 art GREER'S WORKS 2003 Plainview Street Waterloo,IA 50703 Phone: (319)233-4701 Contact: Willie Greer Specializing in: DRIVEWAYS, SIDEWALKS, CARPENTRY ROOFING, GENERAL CONSTRUCTION OLD GREER'S WORKS 2309 Springview Street Waterloo, IA 50707 1-' Phone: (319)233-2150 Contact: David L. Greer, Sr. Specializing in: ROOFING& GENERAL CONSTRUCTION QUICK CONSTRUCTION 217 Bates Street Waterloo, IA 50703 Phone: (319)215-4166 Contact: Leroy Harrington Specializing in: ALL TYPES OF CONCRETE FLATWORK AND GENERAL CONSTRUCTION D & D CONSTRUCTION 1124 West Donald Street Waterloo, IA 50703 Phone: (319) 961-4208 Contact: Darrell E. Caldwell, Sr. oit S ecializin in:Specializing ROOFING AND GENERAL CONSTRUCTION E. CASTRO ROOFING 702 Riehl Street Waterloo, IA 50701 Phone: (319)215-5683 Contact: Emillio Castro Specializing in: ost ROOFING, SIDING, GENERAL CONSTRUCTION MBE/WBE Certified Contractors List Page 3 of 4 CERTIFIED WBE CONTRACTORS ATLAS PAINTING, INC.* 911 Sycamore Street P.O. BOX 65 Waterloo,IA 50704 Phone: (319) 232-9164 Specializing in:COMMERCIAL AND INDUSTRIAL PAINTING WATCO CONSTRUCTION, INC.* 2920 Texas Street Waterloo,IA 50702 Phone: (319) 233-7481 Certified: City of Waterloo WBE Contact: Patricia J. Kimball Specializing in:STORM SEWER, INLETS, DRAIN TILE, WATER MAIN, SANITARY SEWER, INTAKE STRUCTURES PETERMAN & HAES CARPET ONE* 4003 University Waterloo, IA 50701 Phone: (319)233-6131 Fax: (319)233-6133 Certified: City of Waterloo WBE — Email: JR11486(ai)cfu.net Contact: Carol Reese Specializing in: — FLOOR COVERING *DENOTES WOMEN BUSINESS ENTERPRISE L MBE/WBE Certified Contractors List Page 4 of 4 4� STATEMENT OF BIDDER'S QUALIFICATIONS (To be submitted by the Bidder only upon the specific request of the City of Waterloo, Iowa.) All questions must be answered and the date given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of bidder. 2. Permanent main office address. 3. When organized. — 4. If a corporation, when incorporated. 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion.) 7. General character of work performed by your company. 8. Have you ever failed to complete any work awarded to you? If so, where and why? 9. Have you ever defaulted on a contract? If so, where and why? 10. List the more important projects recently completed by your company, stating the approximate cost for each, and the month and year completed. 11. List your major equipment available for this contract. 12. Experience in construction work similar in importance to this project. 13. Background and experience of the principal members of your organization, including the officers. 14. Credit available: $ 15. Give bank reference: 16. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the City of Waterloo, Iowa? 17. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the City of Waterloo, Iowa, in verification of the recitals comprising this Statement of Bidder's Qualifications. STATEMENT OF BIDDER'S QUALIFICATIONS SBQ-1 OF 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa Dated at , this day of , 201 . (Name of Bidder) By: Title: State of ) ss: County of , being duly sworn deposes and says that he is of (Name of Organization) and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of , 201_ Notary Public My commission expires STATEMENT OF BIDDERS QUALIFICATIONS SBQ-2 OF 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa _ GENERAL SPECIAL PROVISIONS 1. SCOPE OF WORK The work covered by this contract consists of furnishing all labor, equipment, and materials and performing all operations, in connection with the FY 2019 UNIVERSITY AVENUE RECONSTRUCTION — PHASE 2, Contract No. 934, as shown on the contract drawings and in accordance with these specifications. The contract drawings, which accompany and form a part of this contract and specifications are dated February 6, 2019. They have the general title of FY 2019 UNIVERSITY AVENUE RECONSTRUCTION - - PHASE 2, Contract No. 934. The drawings are numbered and separately entitled as follows: SHEET# PLAN SHEET DESCRIPTION A Sheet Title Sheets B Sheets Typical Cross Sections and Details C Sheets Quantities and General Information D Sheets Mainline Plan and Profile Sheets E Sheets Side Road Plan and Profile Sheets EC Sheets Erosion Control Sheets G Sheets Survey Sheets H Sheets Right-of-Way Sheets I Sheets Landscaping Sheets J Sheets Traffic Control and Staging Sheets K Sheets Interchange Sheets -- L Sheets Geometric, Staking and Jointing M Sheets Storm Sewer Sheets M100 Sheets Water Main Sheets N Sheets Traffic Signal Sheets N100 Sheets Pavement Markings and Signage Sheets P Sheets Lighting Sheets R Sheets Removals Sheets .�. S Sheets Sidewalk Sheets T Sheets Earthwork Quantities Sheets U Sheets 500 Series, Mod. Stds. and Details Sheets W Sheets Mainline Cross Sections Sheets X Sheets Side Road Cross Section Sheets Y Sheets Ramp Cross Sections Sheets The standard specifications of the City of Waterloo are to be used along with the special provisions described herein and shall be considered as part of the contract documents. 2. CONFLICTING SPECIFICATIONS All requirements of other specifications contained in the contract documents which conflict with the provisions of the special provisions will be considered void. 3. DUMPING AREAS Excess material resulting from construction operations shall be hauled to the County Landfill or other area secured by the Contractor and approved by the City Engineer. Rubble, rubbish, trees, brush, and other unsuitable backfill material, as designated by the City Engineer, shall be hauled to the County Landfill. All Landfill charges are to be considered incidental to the contract and are the responsibility of the Contractor. GENERAL SPECIAL PROVISIONS GSP-1 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 4. CONSTRUCTION DAMAGE The Contractor shall exercise care during construction operations to ensure the safety and protection to existing features located near or within the limits of construction. Damage caused by negligence or poor workmanship, as determined by the Engineer, shall be considered the Contractor's responsibility. 5. REMOVED MATERIALS — All materials removed as part of this Contract shall remain the property of the City unless the City determines that the materials are not salvageable and the City does not want to retain ownership of the materials. Materials designated in the field by the Engineer as nonsalvageable shall be hauled and disposed of by the Contractor at no cost to the City. All other materials shall be transported to locations as directed by the Engineer. No separate measurement or payment will be made for hauling or disposing of removed materials and it shall be considered incidental to applicable items. -- 6. OVERHAUL Overhaul will not be paid for "surplus material" obtained from any of the items of construction under this — contract. The cost of overhaul will be considered as incidental to the items to which it applies. 7. MAILBOXES The Contractor shall notify the United States Postal Department of mailboxes, which interfere with any part of the work before removing them, and the Contractor will relocate them as required by the Postmaster. 8. PAY ITEMS All pay items are listed in the proposal and shall include the purchase of all materials, delivery of these — materials, and furnishing all labor, plant and miscellaneous work needed to make the item complete. All such cost shall be incidental to the proposed item to which it applies and shall not be considered for separate payment. — 9. BREAKDOWN OF LUMP SUM CONTRACT PRICE ITEMS The Contractor shall, immediately upon execution and delivery of the contract, before the first estimate for _. payment is made, deliver to the City Engineer a detailed estimate giving a complete breakdown of the lump sum contract prices. The submitted breakdown shall be approved by the City Engineer prior to any payment of any lump sum price item. _ 10. PERMISSION TO HAUL OVER STREETS, RAILROADS AND HIGHWAYS The Contractor will be required to secure, from the proper authorities, permission or permit which may be required to haul over streets, highways, railroads or private property, and any hauling operations of the Contractor shall be subject to the requirements of such permits, permission, and to all applicable regulations, laws, and ordinances governing hauling and movement of equipment over streets, railroads, highways and private property. Any costs or inconvenience caused by obtaining any necessary permits or — permission shall be considered completely covered by the price bid for the items in the proposal. 11. CONSTRUCTION SCHEDULING — The City Engineer shall approve Contractor's work schedule prior to starting. All revisions shall also be approved. The City Engineer may change the schedule to accommodate changing construction conditions. The Contractor shall coordinate the work under this contract with contractors performing work under other contracts which may be performed concurrently. The Contractor shall be responsible to notify the Police, Fire, Street and Engineering Departments of the closing and opening of streets. GENERAL SPECIAL PROVISIONS GSP-2 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa The Contractor shall commence work within ten (10) days after receipt of the "Notice to Proceed" and diligently execute the work of the contract to completion. Stages 1-4 shall be completed on or before November 15, 2019, and Stages 5-6 shall be completed on or before November 20, 2020. The completion date will be administered based on 120 working days for Stages 1-4 and 120 working days for Stages 5-6. Winter Work, as defined by IDOT Standard Specifications, will be allowed, but working days will not be charged for work completed from November 16, 2019, to April 1, 2020. 12. PRE-CONSTRUCTION CONFERENCE Before any work is started, the Contractor shall arrange with the City Engineer to hold a pre-construction conference to discuss problems and schedules of contracts. 13. UNDERGROUND UTILITIES It is the responsibility of the Contractor to obtain the location of gas lines, water lines, electric, telephone, and cable television cables or wires from the various utility companies and the City electrician before starting any excavation. The Contractor shall be responsible for any damage to any underground utilities. The Contractor shall expose those utilities indicated on the plans so that elevations may be determined before beginning construction. This work shall be considered incidental to other items of work. If the Contractor believes that additional costs have been incurred due to a utility being improperly located, the resolution of the additional costs incurred shall be made between the Contractor and the respective utility company. 15. TRAFFIC CONTROL DURING CONSTRUCTION The Contractor shall, at his own expense and without further or other order, provide, erect and maintain, at all times during the progress and suspension of the work and until completion and final acceptance thereof, suitable and requisite barricades, signs or other adequate protection, as required by the latest edition of Part VI of the "Manual on Uniform Traffic Control Devices" and shall provide, keep and maintain such barricades, signs, etc., as may be required or as may be ordered by the Engineer, to ensure the safety of the public as well as those engaged on the work. All barricading plans shall be reviewed by the Engineer. The Contractor shall determine, provide and obtain approval from the City Engineer on all detour locations for all street closings, barricades and posting prior to construction. These shall meet requirements of the City Police Traffic Department. The Contractor shall notify the City Engineer's Office and the Police, Fire and Street Departments when the street is closed for construction. All barricading shall be in accordance with the latest edition of Part VI of the "Manual on Uniform Traffic Control Devices." 16. GRADES, LINES, LEVELS AND SURVEYS All necessary grades, lines, levels and surveys shall be maintained by the Contractor. �— The Contractor shall verify all grades, lines, levels and dimensions as sown on the drawings, and he shall report any errors or inconsistencies in the same to the City Engineer before commencing work. 17. SAFETY OF WORKERS AND PUBLIC The Contractor shall, at all times, take necessary precautions to protect the life and health of all persons employed on this project and the public. He shall provide necessary safety devices and safeguards in accordance with latest and best accident prevention practices. All such protection shall be furnished to employees without cost. No direct measurement of payment shall be made for this protection, but shall be considered incidental to other items of work. The public shall be kept outside of any work area. GENERAL SPECIAL PROVISIONS GSP-3 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 18. CONSTRUCTION EQUIPMENT FOR PORTLAND CEMENT CONCRETE PAVEMENT Section IX "Construction Equipment" of the "Specifications for Concrete Paving, Widening, and Curb and — Gutter" of the Standard Specifications for Municipal Public Works Construction, City of Waterloo, Iowa, shall be amended as follows: Iowa Department of Transportation standard specification Section 2301.07 Construction Equipment For — Portland Cement Concrete Pavement shall apply with the following exception to Section 2301.07.A.7.b Finishing Machine: The first sentence shall read as "A finishing machine will be required on all uniform width slabs ten (10) feet or more in width upon which a continuous line of forms more than one hundred fifty(150) feet in length may be set, except for intersections or otherwise approved by the Engineer." 19. WORKING ON SATURDAYS, SUNDAYS AND LEGAL HOLIDAYS The Contractor shall notify the Engineer in writing forty-eight (48) hours in advance if work on Saturday is planned. By noon the Friday before the planned Saturday work, the Contractor shall confirm the Saturday work schedule with the project inspector. _ Work on Sunday requires prior approval of the Engineer in accordance with the Waterloo Standard Specifications. The Contractor shall not work the following days in 2019 and 2020 due to City holidays: 2019 2020 • May 27, 2019 • January 1, 2020 • July 4, 2019 • January 20, 2020 • September 2, 2019 • May 25, 2020 • November 28-29, 2019 • July 3, 2020 • December 24-25, 2019 • September 7, 2020 GENERAL SPECIAL PROVISIONS GSP-4 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa SPECIAL PROVISIONS CONCRETE AND ASPHALT PAVEMENTS; DRIVEWAYS AND SIDEWALKS 1. PAVEMENT MATERIAL A. PORTLAND CEMENT CONCRETE SUDAS Division 7, Section 7010 shall apply with the following revisions: -- 1) City of Waterloo "Standard Specifications for Municipal Public Works Construction" General Specifications for Construction shall be used in lieu of "General Provisions &Covenants" Division I. 2) 1.08.A.3: Linseed Oil application will be measured by SY and paid by separate bid items. 3) Section 7040 - 1.08.H.3 & 1.3: Sawing for pavement removal will be measured and paid by linear foot. Re-sawing, required due to negligence of the contractor, shall not be paid by the City. All PC concrete removed from this project shall be disposed of at approved recycle or rubble disposal sites. All of the asphalt removed from this project is to be the property of the contractor. When existing paving brick, railroad ties and rails are encountered, these shall also be removed and disposed of as a part of the Pavement Removal bid item. -- Before leaving the project for the day, the Contractor shall shape the subgrade to drain. 4) 2.01.L.2: Flexible foam expansion joint material, one-half (1/2) inch thick and meeting the requirements of Iowa DOT Specification Section 4136, may be used as joint material provided that the material is placed in such a manner that the expansion joint material in the finished joint is smooth (i.e. not wavy). 5) 3.01.C.1 b: Short distance for hand methods is considered as 200 feet or less. 6) 3.02.F: Use of paving machine required on all sections 200 feet or more. 7) 3.02.H.5: Surface treatment shall be burlap bag treatment only. 8) 3.02.K: All joints shall be sealed as per Standard Road Plan PV-101, Details A, B & C. 9) 3.03.B: Hand finish methods may be used for curb and gutter sections 200' or less. 10) Linseed Oil Surface Treatment of PCC Paving and Curb and Gutter This item shall consist of the curing of concrete and protecting the entire finished concrete surface of the pavement and curbs from the de-icing agents used during cold weather by applying a linseed oil solution. The linseed oil solution application is required only on paving placed after August 31. SPECIAL PROVISIONS SP-1 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa A curing compound/linseed oil combination product shall be used. Material shall conform to W.R. MEADOWS LIN-SEALTM WHITE Curing and Anti-Spalling Compound or engineer approved equivalent. Linseed oil treatment shall be paid at the unit price per square yard. B. HOT MIX ASPHALT: -- SUDAS Division 7, Section 7020 shall apply with the following revisions: 1) City of Waterloo "Standard Specifications for Municipal Public Works Construction" General Specifications for Construction shall be used in lieu of "General Provisions & Covenants" Division I. 2) Specific References to Base Widening do not apply to Full Depth Construction on this project. 3) 1.05.B: Allowable percentage of RAP in the mix will be as shown in IDOT I.M. 510, Appendix C. If the contractor wishes to use RAP in the production of HMA, the contractor will provide to the City documentation showing that the RAP is either Unclassified or Classified. Documentation will meet the requirements of IDOT section 2303, IM 505 and IM 510. The City will not do gradation or extraction tests on the RAP to determine the amount of asphalt binder present in the RAP. The contractor can have the samples sent to an independent lab or send the samples to the IDOT for extraction and gradation tests. Contractor tests results on the RAP to determine Classified status will not be accepted. The contractor and the City will work together to take samples. All test results will be provided to the City. If documentation can't be provided, the RAP will be treated as unclassified. RAP to be used in the production of HMA will be included in the JMF. The contractor will take the RAP into account during the mix design as described in IDOT Section 2303 and IM 505. If the contractor wishes to use RAP in the HMA mixture, the contractor will provide documentation for the status of the RAP to be used. 4) 1.05.C: Any HMA removed shall be property of the Contractor. 5) 1.08.J: Sawing for pavement removal will be measured and paid by linear foot. Resawing, due to negligence of contractor, shall not be paid by the City. All of the asphalt removed from this project is to be the property of the Contractor.When existing paving brick is encountered, they shall be taken to the City's storage yard off of Falls Avenue (south of Falls Avenue, east of Black Hawk Creek, north of University Avenue). The bricks shall be removed in such a way as to minimize damage (no milling) and kept reasonably free of soil or other materials. If railroad ties and rails are encountered, these shall also be removed and disposed of as a part of the Concrete Pavement Removal item. SPECIAL PROVISIONS SP-2 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa Before leaving the project for the day, the Contractor shall shape the subgrade to drain. 6) 2.02: Use of warm mix asphalt (WMA) is not allowed. 7) 2.03.B: No recycled asphalt shingles (RAS)will be allowed. 8) 3.01.C: Tack coat will be required per lift in this section. 9) 3.06.A: The City may conduct the tests, hire an independent testing laboratory, or use the Contractor's test results. Density for all streets will be a minimum of 94%. 10) 3.06.A.2: The City will not prepare the mix designs. The Contractor will have mix designs approved by the IDOT or independent lab. Any HMA produced prior to submittal of JMF's and material certifications will not be paid for. 11) 3.06.A.3.b.1: Binder will be accepted based on suppliers shipment certification. 12) 3.06.A.3.b.6: No split samples for agency correlation are required. 13) 3.06.B.4: Will be modified as follows: u- For base, intermediate and surface lifts, any mix on any street per stage per day, over 700 feet in length or over 2400 SY in area will require QMA. For base intermediate and surface lifts over 100 ton per street per stage per day will require a hot box sample and gradation, unless otherwise waived by the Engineer. 14) 3.02.D. Maximum compacted thickness of any lift will be three (3) inches. 15) 3.02.D.6 Multiple lifts of asphalt will not be allowed on the same street on the same day until existing HMA has reached an ambient temperature with its surroundings prior to the placement of the next layer of HMA. The Engineer may waive this requirement. 16) Separate payment for asphalt binder will not be made. 17) PWL will not be used to determine pay adjustments. 2. DETECTABLE WARNING SURFACES AND SIDEWALK CONSTRUCTION Detectable warnings shall be placed at all new or reconstructed sidewalk accessibility ramps and placed in accordance with the design plans for that particular style of ramp. All detectable warning surfaces placed shall consist of truncated domes aligned in a square grid pattern, manufactured in accordance with the current ADA detectable warning regulations, and be installed per the manufacturer's specifications. Detectable warning surfaces shall extend for the full width of the sidewalk ramp, but not including the flare at the curb. The detectable warning surfaces shall be cast iron and without color. Approved Vendors: Cast Iron • MetaDome, LLC— MetaCast • EJ Group, Inc. — Detectable Warning Plates • Neenah Foundry Company SPECIAL PROVISIONS SP-3 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa Details are included in the plans indicating the estimated limits of sidewalk removal and replacement to meet ADA requirements. All excavation required construct/reconstruct sidewalk ramps and adjacent sidewalk is considered incidental to applicable items. Sidewalk curb sections will be required along sidewalks where the grade between the sidewalk and property line is impractical to grade. The contractor will build the sidewalk and the curb section together, pinning the curb on after the sidewalk is completed will not be allowed. The contractor will install curb on top of the sidewalk, along the length of sidewalk shown in the plans or as directed in the field by the engineer. The sidewalk will taper from nothing to a maximum of eight inches high. Anything over this height will require a separate retaining wall to be built and paid under a different bid item. Payment per linear foot will be full compensation for all labor, materials and equipment required to construct the curb section on the sidewalk. EARTHWORK, SUBGRADE AND SUBBASE 3. EXCAVATION (STREETS) — Work under this item shall consist of removal and disposal of existing subgrade to accommodate the proposed paving section, and Modified Subbase. It also includes additional excavation, commonly referred to as Subgrade Repair, which is determined to be necessary based on field conditions and at the direction of the Engineer, and grading of the parking between the curb and sidewalk (where noted). This project includes estimated excavation quantities for the placement of four(4), six (6) or twelve (12) inches of modified subbase as listed in the plans. However, due — to the probable variability of the subgrade the City reserves the right to increase or decrease the total thickness of the rock base layer and the corresponding quantity of "Excavation" based on field conditions. A decision will be made in the field by the Engineer regarding total excavation — required. Excavation, which is required up to three (3) feet behind the curb, and grading of the parking (if required), is included in the estimated quantities (C.Y.) in the street quantity breakdown in the plans. Additional volume has been included for intersection returns. Plan quantity will be used for pay quantity unless adjusted from the estimated quantity due to field conditions and the decision of the Engineer. — The Contractor's equipment used shall include an appropriately sized track dozer for excavation and grading operations. 4. GEOGRID A geogrid is being considered for possible use in situations requiring subgrade repair. The extent of its use is unknown. An evaluation of subgrade conditions and estimated costs will determine when it is to be used. There were no known locations for use of a geogrid at the time of design, but shall be used as _ directed in the field by the Engineer. Geogrid used shall be Tensar BX4100 Geogrid or approved equal. Payment shall be made on a square-yard basis. Area considered for payment shall be based on the area of subgrade covered, at the direction of the Engineer, and shall not include double payment for overlapped areas. — SPECIAL PROVISIONS SP-4 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 5. MODIFIED SUBBASE -- Unless adjusted in the field by the Engineer, the thickness of modified subbase shall be placed as shown on the typical cross section with a tolerance of zero feet less than specified thickness and 0.05 feet greater. Modified subbase shall be placed in uniform lifts of not more than 8 inches in thickness. A clean aggregate interface shall be maintained between the subbase material and the porous backfill of all longitudinal or transverse subdrains. Equipment used shall conform with IDOT Article 2001.05, Paragraphs B, C, D, or F except rollers shall have a minimum compaction effort of 300 pounds per inch (5.25 kg/mm) width. The Modified subbase material shall conform to — Section 2115 of the IDOT Standard Specifications (Gradation No. 14 of Section 4109). Crushed concrete or composite pavement shall be allowed and the crushing operation will be considered incidental to the bid item. Modified subbase material shall be paid for per square yard of material placed. If the Contractor places additional width from that specified in the typical section or additional material than that approved by the Engineer in the field, it shall be at the contractor's expense. All modified subbase shall be compacted with a minimum of six roller passes. While using the modified subbase as a work platform, the Contractor shall keep modified subbase material at the specified minimum thickness and cross section. 6. TOPSOIL PLACEMENT Eight (8) inches of topsoil shall be placed at locations disturbed by excavation or grading _ operations as directed in the field by the Engineer. The Contractor may use existing topsoil to restore the disturbed areas if it is of an acceptable quality. Additional topsoil that is required to complete the work, but is not available on the job, shall be furnished by the Contractor. The topsoil shall be free of deleterious materials such as rocks, bricks, stones, roots, or other debris. The topsoil shall be compacted, shaped and raked to provide a suitable seed bed as directed by the Engineer. All topsoil material must be approved by the Engineer prior to its placement. Measurement of topsoil areas shall be actual area disturbed due to construction of the FY 2019 UNIVERSITY AVENUE RECONSTRUCTION - PHASE 2, City Contract No. 934 project. Payment will be made on a cubic yard basis. SEWERS AND STRUCTURES 7. REMOVAL OF EXISTING STORM SEWER, LESS THAN 36" DIAMETER There are some locations where existing mainline storm sewer is to be removed. This item does not include inlet runs. Payment will be made at the unit price per lineal foot and includes, but is not limited to, removal, disposal and capping of pipe, if necessary. 8. REMOVAL OF EXISTING STORM SEWER, GREATER THAN 36" DIAMETER There are some locations where existing mainline storm sewer is to be removed. This item does not include inlet runs. Payment will be made at the unit price per lineal foot and includes, but is not limited to, removal, disposal and capping of pipe, if necessary. 9. REMOVE EXISTING STRUCTURE Work under this item shall consist of the removal and disposal of existing structures at locations shown on the plans and/or as directed in the field by the Engineer. This item will also include backfilling the hole left by the removed structure (when applicable). Backfill material shall be incidental and shall be approved by the Engineer. SPECIAL PROVISIONS SP-5 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 10. REMOVALS, MANHOLE OR INTAKE — Work under this item shall consist of the removal and disposal of existing manholes, inlets, inlet runs, etc., at locations shown on the plans and/or as directed in the field by the Engineer. This item will also include backfilling the hole left by the removed structure (when applicable). Backfill -- material shall be incidental and shall be approved by the Engineer. Compaction shall be according to the requirement of"MECHANICALLY COMPACTED BACKFILL." Old castings that are not to be reused shall be delivered to the City Waste Management Yard. The Contractor shall be responsible for protecting existing castings from theft or damage whether to be reused in this project or to be delivered to the City Waste Management Yard. If theft or damage of castings should occur, the castings shall be replaced at Contractor expense. 11. PLUGGING ABANDONED PIPES/UTILITIES If existing abandoned pipes or utilities are found during excavation, capping of these pipes or — utilities shall be considered incidental to applicable items, unless otherwise approved by the Engineer. 12. STORM SEWER INLETS AND MANHOLES Unit bid prices for inlets and manholes shall include excavation, furnishing all labor and materials, backfilling and all other work necessary to complete the structure as detailed on the plans or in the specifications. The Contractor shall be responsible for replacement and for the cost of any casting, which is damaged due to his operations or handling. Each rodent guard shall be a complete assembly as shown on the detail. Modified guards are not acceptable. The subdrain outlet/rodent guards shall be paid on a per each basis. Contractor shall also construct a P.C.C. — boxout/special shaping at each inlet, which are considered incidental to the inlet bid price. Inlets may be backfilled four days after being poured with C-4 mix and after two (2) days with M-4 mix. The forms may be removed after 12 hours. Woo Boxouts shall be left 1/2" ± 1/4" lower than adjacent paving. Except for the porous backfill at the lower 12", the backfill placed shall be Granular Subbase. If the contractor constructs inlets prior to street closure and pavement removal, the location of the inlet(s) shall be located in the field by construction staking based on the information in the project plans. 13. MANHOLE ADJUSTMENT, MINOR& MAJOR This bid item involves removing and replacing concrete boxouts, castings, chimney seals, and .._ adjustment rings. The Contractor shall remove the existing boxout and casting from the structure, remove the concrete from the casting, reset the casting to the proper elevation according to the standard detail included in the plans. Any damages to the casting or structure caused by the Contractor's operations will be the Contractor's responsibility. The Contractor shall be responsible for protecting existing castings from theft or damage whether to be reused in this project or to be delivered to the City Waste _ Management Yard. If theft or damage of castings should occur, the castings shall be replaced at Contractor expense. 14. EXCAVATION CLASS 13 Excavation, Class 13, is an estimated quantity on this project. Excavation, Class 13, will be paid by the cubic yard for the actual measured volume of rubble or debris found. _. SPECIAL PROVISIONS SP-6 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa SUBDRAINAGE 15. SUBDRAINS SUDAS Division 4, Section 4040 applies with following revisions: City of Waterloo "Standard Specifications for Municipal Public Works Construction" General Specifications for Construction shall be used in lieu of "General Provisions & Covenants" Division I. A. Use 6"Type S Subdrain. 16. SUBDRAIN OUTLETS AND CONNECTIONS This work shall include the tapping of new drain tile pipe into existing manholes, inlets or pipe, existing subdrain, including the concrete collar and fillet modification as necessary and directed in the field by the Engineer. If an existing service tap is found, connection to this tap will be considered incidental to the subdrain bid item. A subdrain outlet shall be constructed. All payments for above said work shall be made under Bid Items for "SUBDRAIN OUTLETS AND CONNECTIONS". CONSTRUCTION SEQUENCING AND STAGING _ 17. ACCESS TO PROPERTIES The intent of construction staging is to maintain access to businesses, schools, churches, apartments, etc. Other staging proposals submitted by the Contractor will be considered as long as adequate access is maintained. Those streets with staging indicated on the plans shall be constructed so that not more than one stage is closed at a time (unless otherwise noted). The stage closed for construction shall be completed prior to the subsequent stage being closed. The staging for this project shall be as shown in the J-Sheets. PAYMENT, LIQUIDATED DAMAGES AND PENALTIES 18. TRAFFIC CONTROL The Engineer, or authorized representative, shall periodically review traffic control that has been put in place by the Contractor. If traffic control devices are found to be without proper maintenance, penalties shall be assessed. Improper maintenance shall include, but not be limited to, the following situations: A. Less than 100 percent of lights in working order. B. Any barricade or sign moved or tipped over. C. Fencing not supported in a vertical position. D. Fencing not placed around excavations when workers/equipment are not working at the location. E. Lack of proper barricades or signage. Each incident is treated as a separate citation on an individual basis. It is not intended that minor deficiencies be price adjusted if corrected the day notification is given. In addition to a price adjustment, the Engineer may suspend work for irresponsible and/or repeated failure to construct the project using proper traffic control procedures. SPECIAL PROVISIONS SP-7 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa Penalties: 1st Offense Written warning given by City. 2nd Offense $ 100 3rd Offense $ 250 4th Offense $ 500 5th Offense $1,000 — 6th Offense Engineer's discretion (amount or more equal or greater than $1,000) 19. LIQUIDATED DAMAGES Time is an essential element of this contract. It is important that the work be diligently pursued to completion. If the work is not completed within the specified contract period, plus authorized — extensions, the Contractor shall pay to the City Liquidated Damages in the amount of $1,000.00 per day, for each day, as further described herein, in excess of the authorized time. Days beyond the specified completion date for which Liquidated Damages will be charged will be working days that the Contractor does, or could have worked from Monday through Saturday. Sundays will be counted only if work is performed. Days not chargeable for Liquidated Damages will include rain days, Sundays if no work is done, and legal holidays. — Working days will cease to be charged when only punch list items remain to be completed. Punch list items do not include contract bid items or approved change/extra work orders. — When the Contractor believes the project to be substantially completed, a written notice stating the same shall be submitted to the Engineer and a request made for a Punch List. If the work under the Contract extends beyond the normal construction season for such work, the Contractor — shall submit to the Engineer in writing a request that working days counted toward the project be suspended until work is resumed the following construction season. This amount is not construed as a penalty. These damages are for the cost to the City of providing the required additional inspection, engineering and contract administration. MISCELLANEOUS ••- 20. CONCRETE CLEAN-UP AND WASHOUT Runoff from concrete cleanup is a caustic pollutant that can harm wildlife and vegetation. DO NOT clean tools, equipment, and concrete trucks into or allow wastes to enter into the streets, ditches, storm drains or waterways. In Waterloo, failure to follow proper concrete clean-up procedures is a violation of the City's Code of Ordinances and is considered a municipal infraction, punishable by fines. The current City of Waterloo schedule of fines is: 1st offense $200 fine and court costs 2nd offense $500 fine and court costs - 3rd and subsequent offense $750 fine and court costs All concrete wastes shall be deposited into pre-approved waste receptacles. Waste receptacles may be installed on select City properties to provide a central location and minimize costs. The locations selected to host the waste receptacles shall be approved by the City Engineer prior to installation. Upon completion of construction, the location of the waste receptacles shall be returned to pre-construction condition. — Earthen pits are not an acceptable waste receptacle. SPECIAL PROVISIONS SP-8 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 21. HAUL ROUTES Haul routes to and from the project site shall be submitted for review by the Engineer. In general, the Contractor shall request haul routes over the main streets in the area, staying on streets within the project as much as possible and should not include truck-embargoed streets. 22. WATER ON GRADE After paving has been removed on a street, and during the course of the project, the prime contractor shall be responsible to pump out any water that has accumulated on the grade at intersections or other low spots. This shall be completed within twenty-four (24) hours of the source (rain, main break, etc.) of water being terminated. This work shall be considered incidental to applicable items. 23. WIDENING OF EXISTING DRIVEWAYS The Contractor will be paid for replacing existing driveways at their existing widths. If any property owner desires to widen a driveway, it shall first be approved by the Engineer. The property owner shall be responsible to make arrangements privately with his own contractor for payment of driveway widening approved by the Engineer. The City will not pay for the widening -- of any driveway, except at specific locations shown on the plans or as directed by the Engineer. 24. QUANTITY ADJUSTMENTS The following Bid Items are exempted from consideration under the provisions of Section B. "Scope of Work," Paragraph 7 of the "General Specifications for Construction" concerning the variance of the "As-Built" quantity of the listed item by more than twenty (20%) percent from the estimated quantity specified in the contract: ITEM NO. SPEC ITEM SECTION 1 2010 CLEARING AND GRUBBING 4 2010 EXCAVATION, CLASS 10, ROADWAY AND BORROW 5 2010 EXCAVATION, CLASS 10, WASTE 6 2010 EXCAVATION, CLASS 13 7 2010 SUBGRADE PREPARATION, 12 IN. 8 2010 SUBGRADE TREATMENT, GEOGRID 9 2010 SUBBASE, MODIFIED 11 3010 REPLACEMENT OF UNSUITABLE BACKFILL MATERIAL 102 2304 TEMPORARY PAVEMENT -- 106 7010 LINSEED OIL SURFACE TREATMENT OF PCC PAVING AND CURB AND GUTTER 115 7040 FULL DEPTH PATCHES, COMPOSITE 116 7040 FULL DEPTH PATCHES, HMA 117 7040 FULL DEPTH PATCHES, PCC 120 7040 SAWCUT FOR REMOVALS 129 2528 FLAGGER 130 8020 PAINTED PAVEMENT MARKINGS, SOLVENT WATERBORNE SPECIAL PROVISIONS SP-9 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa ITEM NO. SPEC ITEM SECTION 131 8020 WET, RETROREFLECTIVE REMOVABLE TAPE MARKINGS 132 8020 PAVEMENT MARKINGS REMOVED 144 2524 TEMPORARY BUSINESS ACCESS SIGNS 145 2528 TEMPORARY BARRIER RAIL, CONCRETE 146 2528 TEMPORARY FLOODLIGHTING LUMINAIRE 147 2528 TEMPORARY LANE SEPARATION SYSTEM 148 2528 PORTABLE DYNAMIC MESSAGE SIGN 149 9010 TEMPORARY SEEDING 151 9010 SEEDING, FERTILIZING, AND MULCHING FOR HYDRAULIC SEEDING 154 9040 SILT FENCE OR SILT FENCE DITCH CHECK INSTALLATION 155 9040 MAINTENANCE OF SILT FENCE OR SILT FENCE DITCH CHECK 156 9040 REMOVAL OF SILT FENCE OR SILT FENCE DITCH CHECK 157 9040 ROLLED EROSION CONTROL PRODUCT, TYPE II 158 2601 MOWING 159 9040 TEMPORARY INTAKE OR MANHOLE COVER ASSEMBLY — 176 9040 IN-LINE FLOCCULANT SOCK 177 9040 DEWATERING BAGS 25. PERCENT OF CONTRACT TO BE PERFORMED BY PRIME CONTRACTOR The Prime Contractor shall be required to perform at least 30 percent of the total contract amount of this project not including specialty items which are Traffic Signalization and Landscaping. Purchasing of materials for subcontractors will not be an acceptable method for the prime contractor to meet the 30 percent requirement. 26. INFORMATIONAL SIGNS RELATING TO CONSTRUCTION Portable Dynamic Message Signs Contractor shall use a Portable Dynamic Message Sign (PDMS) to inform the public a minimum of five (5) days prior to a major change in traffic patterns on University Avenue. Advanced information signs shall be placed at the east and west limits of FY 2019 UNIVERSITY AVENUE RECONSTRUCTION - PHASE 2, City Contract No. 934 project. Locations of PDMS will be determined by the Engineer in the field. SPECIAL PROVISIONS SP-10 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa This partnership will be multi-lateral in makeup, and participation will be totally voluntary. Any cost associated with effectuating this partnering will be agreed to by all parties and will be shared -- equally by the participating parties. The establishment of a partnership charter on this project will not change the legal relationship of the parties to the contract nor relieve the parties from any of the terms of the contract. 28. PAVEMENT MARKING This work involves placing temporary and permanent pavement markings and symbols in accordance with IDOT Section 2527. All permanent paint used on this project shall be waterborne paint and shall have reflectorizing spheres meeting Section 4184 of the IDOT Standard Specifications. The Contractor shall clean the pavement prior to placement of the pavement markings and symbols. The Contractor shall work with the City to determine exact placement of all markings and symbols in the field. Payment for temporary and permanent pavement markings shall be on a station basis. Payment shall be full compensation for all equipment, labor, materials and cleaning of the pavement needed to place all symbols in this project. See plan sheet for a tabulation of the pavement markings. 29. MODULAR BLOCK RETAINING WALL This work involves constructing the modular block retaining wall per SUDAS 9070. Retaining wall shall be 8" Classic 8 — DOT modular block manufactured by Rochester Concrete Products. Color shall be Sandstone. Structural design and installation details shall be in accordance with the block manufacturer's specifications. Item includes subdrain, backfill, stabilization material, cap block, pins and all other materials to install in accordance with block manufacturer's specification. If necessary to meet the manufacturers' requirements, the Contractor shall provide the structural design and details signed and sealed by a Structural Engineer licensed in the State of Iowa. The cap shall be glued on to permanently adhere to the top of the wall. 30. HYDRO-SEEDING (HYDRAULIC SEEDING) (TYPE 1 AND TYPE 4) Use standard urban mix; including grade preparation, in areas directed by the Engineer. Contractor shall be paid per acres of completed area. SUDAS Standard Specifications, Division 9 — Site work and Landscaping, Section 9010 — seeding shall apply. 31. STORM WATER POLLUTION PREVENTION PLAN Storm water pollution prevention has become an important issue on construction projects. Therefore, the City is requiring that the storm sewer system on this project be protected in order to reduce and minimize the impact of sediment-laden runoff flowing into the storm sewer system. Detail sheets are included in the plans with representation of various structures and the proposed protection to be provided. A tabulation is also included in the plans indicating the estimated number of structures (existing and new)to be protected. SPECIAL PROVISIONS SP-11 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa Structures that are unlikely to receive storm water during the construction process are not included in the tabulation. Protection will be placed at those locations directed by the Engineer or his representative. Payment for protecting the structures will be made on a per each basis and includes all labor and materials needed to do so during the course of the project. After construction, protection at the inlets shall be left in place until vegetation has been re-established, or the City authorizes removal of the protection. No separate payment will be made for protection of open ends of storm sewer pipe, but _. this will be considered incidental to applicable items. The materials shall be removed in such a manner as to present further contamination of the storm _ sewer system and subsequent impairment of downstream receiving waters of the sewer. 32. INTAKE, SW—545 This work shall be in accordance with Section 2435 of the IDOT Standard Specifications. Payment for this bid item shall be on per each basis per IDOT Specifications. 33. TEMPORARY PAVEMENT This work shall be in accordance with Section 2304 of the IDOT Standard Specifications. Payment for this bid item shall be on per square yard basis per IDOT Specifications. 34. ELECTRICAL CIRCUITS This work shall be in accordance with Section 2523 of the IDOT Standard Specifications. Payment for this bid item shall be per lineal foot basis per IDOT Specifications. 35. CONTROL CABINET This work shall be in accordance with Section 2523 of the IDOT Standard Specifications. Payment for this bid item shall be on per each basis per IDOT Specifications. 36. FLAGGER This work shall be in accordance with Section 2528 of the IDOT Standard Specifications. Payment for this bid item shall be on per each basis per IDOT Specifications. 37. REMOVAL OF CONCRETE FOOTINGS OF LIGHT POLES This work shall be in accordance with Section 2401 of the IDOT Standard Specifications. Payment for this bid item shall be on per each basis per IDOT Specifications. 38. REMOVAL OF STEEL BEAM GUARDRAIL This work for these bid items shall be in accordance with Section 2505 of the IDOT Standard Specifications. Payment for REMOVAL OF STEEL BEAM GUARDRAIL bid item shall be per lineal foot basis per IDOT Specifications. 39. SAFETY CLOSURE This work shall be in accordance with Section 2518 of the IDOT Standard Specifications. Payment for this bid item shall be on per each basis per IDOT Specifications. — SPECIAL PROVISIONS SP-12 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 40. REMOVE AND REINSTALL SIGN AS PER PLAN; REMOVAL OF TYPE A SIGN ASSEMBLY; PERFORATED SQUARE STEEL TUBE POSTS; PERFORATED SQUARE STEEL TUBE POST ANCHOR, BREAK-AWAY SOIL; TYPE A SIGNS, SHEET ALUMINUM; TEMPORARY BUSINESS ACCESS SIGNS This work shall be in accordance with Section 2524 of the IDOT Standard Specifications. Payment for REMOVE AND REINSTALL SIGN AS PER PLAN, REMOVAL OF TYPE A SIGN ASSEMBLY; PERFORATED SQUARE STEEL TUBE POST ANCHOR, BREAK-AWAY SOIL, and TEMPORARY BUSINESS ACCESS SIGNS bid items shall be on per each basis per IDOT Specifications. Payment for PERFORATED SQUARE STEEL TUBE POSTS bid item shall be per lineal foot basis per IDOT Specifications. Payment for TYPE A SIGNS, SHEET ALUMINUM bid item shall be per square foot basis per IDOT Specifications. 41. TEMPORARY BARRIER RAIL, CONCRETE; TEMPORARY FLOODLIGHTING LUMINAIRE; TEMPORARY LANE SEPARATION SYSTEM; PORTABLE DYNAMIC MESSAGE SIGN This work shall be in accordance with Section 2528 of the IDOT Standard Specifications. Payment for TEMPORARY FLOODLIGHTING LUMINAIRE bid item shall be on per each basis per IDOT Specifications. Payment for TEMPORARY BARRIER RAIL, CONCRETE and TEMPORARY LANE SEPARATION SYSTEM bid item shall be per lineal foot basis per IDOT Specifications. Payment for PORTABLE DYNAMIC MESSAGE SIGN bid item shall be per calendar day basis per IDOT Specifications. 42. MOWING This work shall be in accordance with Section 2601 of the IDOT Standard Specifications. Payment for this bid item shall be on per acre basis per IDOT Specifications. 43. LIGHT POLES This work shall be in accordance with Section 2523 of the IDOT Standard Specifi'.,ations. Payment for this bid item shall be on per each basis per IDOT Specifications. SPECIAL PROVISIONS SP-13 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY „� SECTION 100 TRAFFIC SIGNALIZATION SPECIFICATIONS TABLE OF CONTENTS A. GENERAL 1 B. MATERIALS AND CONSTRUCTION 2 1. Solid State ATC (NEMA)Actuated Traffic Signal Controller 2 2. Controller Cabinet 4 3. Auxiliary Splice Cabinet 7 4. Loop Detector Amplifiers 7 5. Traffic Signal Uninterrupted Power Supply 7 6. Vehicular Signal Heads 11 7. Pedestrian Signal Heads 12 8. Backplates 12 9. Foundations 12 10. Traffic Signal Pedestal Poles 14 11. Galvanized Steel Traffic Signal Supports and Light Poles 14 12. Galvanized Powder Top Coat 15 13. Electrical 16 14. Bonding and Grounding 17 15. Cables and Wires 18 16. Handholes 18 17. Conduit 19 18. Fiber Optics Cable 21 19. Mounting Hardware 23 20. Accessible Pedestrian Signals 23 21. Signal Service Meter Bypass Socket 25 22. Power Disconnect 25 23. Emergency Vehicle Pre-Emption (EVP) System 25 24. Traffic Monitoring Camera 26 25. Traffic Detection Camera 26 26. Wireless Communications 27 27. Inductive Detector Loops 27 28. Luminaires 29 29. Reflectorized Street Name Signs 30 C. SALVAGED MATERIALS 31 D. TRAFFIC CONTROL 32 E. METHOD OF MEASUREMENT AND BASIS OF PAYMENT 32 TRAFFIC SIGNALIZATION i FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa CITY OF WATERLOO TRAFFIC SIGNALIZATION SPECIFICATIONS A. GENERAL 1. Scope These Specifications cover the work described in the contract documents. It covers furnishing all labor, equipment and materials, and performing all required operations to complete the work as per contract documents and to provide a completely operational and working signal system. Unless otherwise modified by these Signalization Specifications, and Special Provisions if any, all work including equipment, material and installation, shall be in accordance with the appropriate Iowa DOT standard and supplemental specifications. Where reference is made to the codes, standard specifications, supplemental specifications, the safety orders, the general orders, the standards, laws, and ordinances, it shall mean the version of the reference that is in effect on the bid advertising date. 2. Definitions 1) Terms used in this document shall have the meanings defined below: • Specifications means this document titled, "CITY OF WATERLOO TRAFFIC SIGNALIZATION SPECIFICATIONS" • Iowa DOT means the Iowa Department of Transportation. • City means City of Waterloo, Iowa, or its representatives. • WTOD means City of Waterloo Traffic Operations Department. • Punch List means a list of items that need to be corrected by the Contractor on the project before the final acceptance can be made. • Response Time means the elapsed time from when the Contractor is given a notice to take certain actions to the time the Contractor actually starts the action. • Contractor means the Contractor and/or Contractors representatives and sub- contractors. • LED means light emitting diode. • IP means Internet Protocol. • APS means Accessible Pedestrian Signals. • Contract Documents means the collection of all the documents prepared for and used in the course of advertising and awarding the contract such as Plans, Specifications, Special Provisions, Form of Contract, Form of Bid, and all other forms and documents. 3. Related Specifications and Standards The Contractor shall comply with all of the standards listed below unless otherwise modified by contract documents or Special Provisions: • ANSI (American National Standards Institute) Standards. • ASTM (American Society for Testing Materials) Standards. • EIA(Electronics Industries Associations) Standards • Iowa DOT Standard Specifications for Highway and Bridge Construction, and All Current Supplemental Specifications, in Particular Sections 2402, 2403, 2404, and 2405. 2408, 2423, 4187, and Division 26. • IMSA(International Municipal Signal Association) Standards. TRAFFIC SIGNALIZATION 100-1 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa • ITE (Institute of Transportation Engineers) Standards. • MUTCD - Iowa Manual on Uniform Traffic Control Devices. • National Electrical Code. • National Electrical Safety Code. • NEMA(National Electrical Manufacturers Association) Standards. • Specifications of the Underwriters Laboratories, Inc. • TIA(Telecommunications Industries Association) Standards. • TIA/EIA(Telecommunications Industry Association/Electronic Industries Alliance) 568 • NTCIP (The National Transportation Communications for Intelligent Transportation System Protocol). • All pertinent local, state and federal laws and regulations covering installation, material, design, construction, and operation. The Contractor shall notify WTOD in writing of any discrepancy or ambiguity as to the intent or meaning of the Contract Documents or Signalization Specification before starting to work on that area. WTOD will supply the Contractor in writing with the intent. The decision of WTOD shall be final and conclusive. B. MATERIALS AND CONSTRUCTION The contract work shall comply with the applicable requirements of the Iowa DOT's Standard Specifications for Highway and Bridge Construction and current supplements, in particular the following parts: Section 2423: Support Structures for Highway Signs, Luminaires, and Traffic Signals Section 2525: Traffic Signalization Section 4189: Traffic Signal Equipment Division 26: Roadside Development(2601 to 2612) Materials shall be of new stock unless the plans provide for the relocation or the use of materials furnished by others. New materials shall be the products of approved suppliers and manufacturers, approved by the Engineer. Miscellaneous electrical equipment and materials shall be UL approved. 1. Solid State ATC (NEMA)Actuated Traffic Signal Controller FOR INFORMATION ONLY. City will supply controller to contractor for installation. Contractor to supply cabinet, all associated cabinet equipment and footing. The controller shall be fully compatible with Waterloo's Intellight traffic adaptive system MaxAdapt and shall function in traffic adaptive mode. Unless otherwise specified elsewhere in the contract — documents controller shall meet the requirements below. All electronic components, workmanship, and functionality of the traffic signal controller shall conform to the applicable standards for TS-2 Type 1 traffic signal controllers mandated by the National Electrical Manufacturers Association's (NEMA) current edition NEMA Standards Publication TS2-2003 v02.06 for Traffic Controller Assemblies with National Transportation Communications for ITS Protocol (NTCIP) Requirements. Controller engine board and operating Mow system shall support open architecture and be compliant with current ITE, AASHTO, and NEMA Standard Publication for Advanced Transportation Controllers(ATC)5201. All major components shall meet the environmental, design, and operating standards outlined in —' NEMA Standards Publication TS2-2003 v02.06, Section 2. TRAFFIC SIGNALIZATION 100-2 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa Direct human interface shall be through menus or graphics user interface. Engine Board and CPU shall be compliant with the ATC 5201 Standard and shall meet the following minimum specifications: Processor: 32-bit; 750 MIPs at 400 MHz; Memory: 1 MB SRAM; 64 MB SDRAM; 64 MB DRAM On-board 5-Pin USB Motherboard Connector No batteries or moving parts such as fans or memory storage devices with rotating parts on the controller unit Display a 16 line x 40 character LCD All keypads to be mounted on the controller front panel and are to be weather resistant and backlit Readily be installed and operate in TS-2 Type 1 traffic signal control cabinets. Each local controller shall have a USB slot for copying controller data for either backup or for transferring to another controller. The Traffic Signal Controller shall use a Linux operating system (0/S) with kernel version 3.14 or later and shall include standard POSIX libraries for application support including real-time extensions of POSIX 1003.1 b. To facilitate application level access to the ATC hardware, a Board Support Package (BSP) shall be provided by the controller manufacturer for access to hardware-specific drivers. The operating system shall include enabled support for cgroups (control groups) for the purpose of limiting, accounting for, and isolating resource usage (CPU, Memory, etc.) of all running processes to ensure the reliability and stability of the traffic signal control application. The Linux operating system shall include an application programming interface in compliance with the ITE, AASHTO, and NEMA Application Programming Interface (API) Standard for the ATC v2.0. In addition to the front panel screen, the traffic signal controller shall have an on-board web server which hosts a graphical user interface for monitoring and configuring the intersection control software. The web server interface shall provide access from any internet enabled device with a web browser. No additional or proprietary software shall be needed to use the graphical user interface. In addition to standard operations specified in the NEMA TS-2 for NTCIP v02.06 Standard, the intersection control software shall have a logic processor where the user can develop advanced logic statements and operations to be used as custom solutions or for feature development. In addition to standard Boolean logic, the user shall be able to specify conditions using all input and output functions including but not limited to phase indications and intervals, detector calls, preempt status, interval/service times, and greater than/less than relationships. For example, the processor shall provide a way for the user to program the following condition in the controller front panel: "Call preempt 5 if phase 2 is green for more than 25 seconds. Also send a message to the downstream controller to start preempt 2 in 15 seconds if the coordinator is currently in transition." One copy of a Microsoft Windows® based traffic signal controller emulation software package shall be supplied. This program would allow the user to program a traffic signal controller on a TRAFFIC SIGNALIZATION 100-3 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa Windows based computer, and shall be compatible with the latest version of the Windows operating system. The program supplied shall be the same version as the firmware version supplied with the controller. This program would allow the user to program a complete traffic signal controller and can be saved on a USB memory drive for transfer to a controller. This program shall be updated and supplied to the City at the same time as the Linux firmware for the — controller and shall be supplied no charge for any updates. The Contractor shall provide all NTCIP Management Information Base (MIBs) files associated with the controller software including manufacturer specific and extended objects. There shall be no limitations on the re-distribution and re-use of the MIBs associated with the controller software. The vendor's current software development tool kit including tool-chain and other necessary Linux — Libraries for the ATC engine board shall be publicly available for the lifetime of the product. Once standard ATC API Software has been developed per the ATC API 2.06a specification and released by the ITE, AASHTO, and NEMA Joint Committee on ATCs, the new industry standard _ API and toolkit should be provided on all engine boards provided with no extra cost. The controller shall be compatible with City's existing MaxView Advanced Traffic management System including full communications and monitoring capabilities. 2. Controller Cabinet The controller cabinet shall be a fully operational and functional NEMA TS2 Type 1 cabinet that is fiber optics ready and NTCIP ready and shall meet or exceed all the requirements of the Specifications. The controller cabinet shall include everything for TS2 operations, such as bus interface units (BIU), power supplies, MMU, necessary 2-channel detector cards, and all other necessary components. Cabinet shall come with mounted 110 V power strip with at least four — outlets and mounted 100/10 hardened managed Ethernet switch with at least 7 outlets. All external communications to the cabinet's components shall be through the Ethernet switch. Controller cabinet design may be affected by battery backup system. — Fiber Optic Patch Panel shall not block access to internal components of the control cabinet. All conduit openings in the controller cabinet shall be sealed with a sealing compound. This compound shall be a readily workable soft plastic, except those provided for drains. It shall be workable at temperatures as low as 30 degrees F, and shall not melt or run at temperatures as high as 300 degrees Fahrenheit. Controller cabinets shall be dust proof, weatherproof and made from high-grade aluminum to furnish housing for the control equipment and terminal facilities. Anchor bolts shall be included. A gasket panel police door shall be provided with police lock, two keys, flash switch and signal -- shutdown switch. A 15 AMP GFCI duplex receptacle and lamp base with on-off toggle switch shall be provided. Outlet and lamp shall be fused ahead of the cabinet circuit breaker. The detector rack(s) shall be capable of 8-phase operation plus four pre-emption channels. The 12- bay load switch shall be provided and loaded appropriately. Maintenance Switches. Inside the cabinet shall include properly rated and of good quality Stop Time Control, Timer Power, Flash, and Detector Test Switches. The stop time control switch will be a three-position switch labeled MANUAL-OFF-NORMAL. The center off position will allow the controller to cycle normally during flash. The flash switch shall let the controller continue to operate within the cabinet for field evaluation of the controller. TRAFFIC SIGNALIZATION 100-4 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa The lowest field connection shall be at least three (3) inches from the bottom of the cabinet. The anchor bolts shall be secured with nuts which will not have more than three full threads exposed or interfere with field connections. The field terminals shall attach to the controller cabinet with color coded Y, R, G and B electrical spring wire connectors. Connectors shall be designed flexible and durable with an outer insulator providing a compact, fully insulated connection without cutting or abrading wires. The four spring connectors shall have a corrosion resistant steel inner shell to strengthen them while permitting spring expansion and contraction due to temperature changes. The connector shall have a deep, flared skirt to protect against shorts and shiners. The connector shall have a flexible base to allow the connector to bend with wires. The field terminals shall connect to the controller cabinet with standard screws. Lug terminals will not be accepted. No hardware or terminal facilities shall be attached to the cabinet door, excluding an intersection call/display panels and test switches as required. Two hard copies and an electronic cabinet electrical prints shall be provided for each cabinet. Electronic copyin PDF is preferred. Where the cabinet seats on the concrete base, the bottom edge of the cabinet shall be waterproofed. Appropriate silicone sealing caulk shall be applied to the mating surface of concrete at a minimum bead diameter of 1/2 inch to 3/4 inch before installing the cabinet so that when the cabinet is being installed, securing anchor bolts provide for even and uniform spreading — of the sealing material. The underside of the cabinet flange shall be free from any foreign objects, washers, spacers, etc., before caulking procedure. All cabinet and police door locks shall use a standard key and standard skeleton key. The police panel flash switch shall be wired such that when it is switched to"flash"the controller will return to its initialization point and remain there until turned off flash. All load switches shall conform to the triple-circuit solid-state type load switch as specified in the NEMA standard "TS2-6.2 Three-Circuit Solid State Load Switches". Load switches shall have LED input and output indications. LED indications shall be provided to reflect the DC driver state for red, yellow and green. The closing or opening of signal circuits shall be positive without objectionable dark intervals, flickering of lights or conflicting signal indications. All internal components shall be accessible without encapsulation. — Power supply loads shall be metered. Each circuit shall be a 10 ampere rated driver, LED lamp load at 120 VAC. Provide an AC power surge protective device (SPD) on the load side of the cabinet circuit breaker. The SPD shall be a UL 1449 3rd (or latest revision) Edition Recognized device that is rated for a maximum operating current of 15A or greater. The SPD must be equipped with a maximum continuous operating voltage (MCOV) of 150V, L-N, L-G, & N-G modes of protection, voltage protection rating (VPR) of 700V or less, nominal discharge current rating (In) of 20kA, a short circuit current rating (SCCR) of at least 50kA, visual indication (LED) of operational status, and Form C dry contacts. Provide modular type surge protective devices comprised of a silicon breakover device for all loop detector signal inputs. The device shall be rated for a nominal voltage of 75VDC, and equipped with a minimum surge current rating of 250A. TRAFFIC SIGNALIZATION 100-5 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa Provide surge protective devices comprised of metal oxide varistors (MOV) for all load relay outputs. The SPDs shall be rated for a nominal voltage of 120VAC, equipped with a surge current rating of 39kA. Provide modular type surge protective devices comprised of three-stage hybrid technology protection consisting of gas discharge tubes (GDT), silicon avalanche diodes (SAD) and positive temperature coefficients (PTC) for all low voltage communication inputs. The SPDs shall be UL 497E Listed and equipped with a surge current rating of 10kA Provide surge protective devices comprised of gas discharge tubes (GDT) for all 120VAC interconnect signal lines. The SPDs shall be equipped with a surge current rating of 10kA. Provide modular type surge protective devices comprised of three-stage hybrid technology protection consisting of metal oxide varistors (MOV), silicon avalanche diodes (SAD) and series inductor for all low voltage (DC Power) input circuits. The SPDs shall be UL 497B Listed, _ equipped with a surge current rating of 10kA, and a continuous current rating of 5A. Provide surge protective devices consisting of gas discharge tubes (GDT), silicon avalanche diodes(SAD) and positive temperature coefficients(PTC) on all coax video cables. The SPD shall be equipped with s surge current rating of 20kA, and an isolated ground. Isolation transformer to allow operation with a single point short between loop and ground. The MSD harness wiring shall all be terminated on a separate dedicated termination panel. All incoming service voltage connections (including breakers) shall have clear plastic protective shielding covers. Unless otherwise shown on the plans, the supplier shall install one 20 AMP breaker, 1-pole for traffic signals, one 30 AMP, 2-pole breaker for lighting, one 60 AMP, 2-pole breaker for main conductors inside each cabinet. The controller cabinet shall have installed a disconnect panel box, which will shut power off to all circuits inside the cabinet. The disconnect panel box shall be wired as shown on the plans. The cabinet shall come with an installed disconnect breaker panel and shall be connect as per the traffic signal schematic on the project plans. Disconnect breaker panels shall be G.E. model _ TL412C metal 4 circuit(9 inch by 7 1/2 inch by 3 inch), Square D model 1-Q06-12L100S metal 6 circuit(13 inch by 9 inch by 4 inch), Cutler Hammer BR48L1258P (13 inch by 11 inch by 3.5 inch) or approved equal. Installation inside traffic control cabinet shall also meet the following requirements: • Street Lighting Equipment. Electric contactors shall be installed in an auxiliary box or behind a transparent protective cover to prevent personnel from coming into contact with live parts. Contactors shall be mounted away from the door where they are protected against rain and snow fall. • Wall Mounted Fiber Termination Center. The fiber jumpers connected to the termination center shall be mounted so that they do not contact the cabinet door when the door is closed. • Detector Rack. The components installed in the detector rack should be easily and readily accessible. Nothing should be mounted directly in front of the detector rack. Changing rack components should not require moving or un-mounting other equipment. TRAFFIC SIGNALIZATION 100-6 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa • Programming. All components shall be programmed in order to produce a fully functional traffic control system. Programming, as a minimum and where applicable shall include signal controller timing, coordination, detection cameras, loop amplifier extension times, emergency vehicle preemption, and network connection. 3. Auxiliary Splice Cabinet--NOT INCLUDED IN THIS PROJECT If the plans call for auxiliary fiber optic splice cabinet it shall be large enough to store and protect fiber optic connections and splices and provide strain relief where needed. It shall come with a pad lock and be installed above the existing signal control cabinets. It shall come fully equipped with all the parts such as panels, connector panels, splice trays, mounting brackets, etc. for installation of a fully functional fiber optic connection. 4. Loop Detector Amplifiers All loop detector amplifiers shall be two (2)-channel card rack-mounted. The card rack will include — an appropriate power supply. Acceptable amplifiers can be any of IDC, Sarasota, EDI, or Reno brands. The detector card rack shall also accommodate video detection cards when necessary. Detectors shall have the capability of operating in "pulse" or "presence" mode, "delay" timing on each channel, adjustable in one (1) second increments or less, and "extension" timing on each channel, adjustable in 0.5-second increments or less. 5. Traffic Signal Uninterrupted Power Supply SERVICE ENCLOSURE: • Service enclosure shall meet Electric Utility Service Equipment Requirements Committee(EUSERC) requirements. • Service enclosure shall be fabricated from minimum %8" aluminum. • Interior of service enclosure shall be fabricated from minimum 14 gauge cold rolled steel & painted white. • Service enclosure shall be anodized aluminum. • Service enclosure shall have continuous welded seams. • Service enclosure shall have full length deadfront with stainless steel hinge. • Service enclosure shall be in accordance with UL 508A standards for industrial control panels and labeled for service entrance equipment. • Service enclosure shall have pull section with removable step. • Service enclosure shall have fully framed side hinged outer door with swaged close tolerance sides for flush fit with top drip lip & closed cell neoprene flange compressed gaskets. • Service enclosure shall have hinged deadfront with 1/4 turn latch & knurled knobs. • Deadfront door shall be hinged on the same side as exterior door & open a minimum of 100°. • Removable backpan shall be mounted on 4 welded %4" studs. • All circuit breakers shall be mounted in a vertical position, handle up for"On" handle down for"Off'. • Circuit breakers shall be of cable-in cable-out type. • Service enclosure shall consist of absolutely no "Bolt-On" or"Plug-In" circuit breakers. TRAFFIC SIGNALIZATION 100-7 FY 2019 University Avenue Reconstructon-Phase 2 '— AECOM#60528991-Ph2 Waterloo,Iowa • Service enclosure shall be completely prewired in the factory. • Wiring should be to NEMA IIB standards showing external connections & external equipment. • All bussing shall be UL approved copper THHN cable bussing, fully rated. — • The function of all circuit breakers, switches & other components as required shall be identified by laminated engraved plastic nameplates with minimum 1/4" letters fastened with minimum of two#4-40 stainless steel machine screws. • Wiring schematics will be Computer Aided Drafting & include all external equipment & connections per NEMA IIB. • As Built factory drawings shall be laminated and affixed to the inside of the outer door. • Manufacturers will be required to furnish independent laboratory certification of metal preparation &finish &to confirm that the overall product meets these specifications. If this agency wishes to witness this testing, all costs to be paid by contractor. Traffic Signal Battery Backup System Specifications — ENCLOSURE SPECIFICATIONS: Aluminum weatherproof enclosure shall house BBS and batteries. Enclosure shall be TIG welded construction with welding materials specifically designed for the material to be welded. Enclosure shall have fully framed side hinged outer doors with swaged close tolerance sides for flush fit with drip lip and closed cell neoprene flange compressed gaskets. Front door shall incorporate a full-length piano hinge, Type II keyed lock, pad-lockable draw latch (center area — on door-latch side), and a pad lockable welded-in place vandal-proof tab, rated at 2000 lbs. There shall be no exposed nut, bolts, screws, rivets or other fasteners on the exterior of the enclosure. Maximum cabinet dimensions 46" H x 20" W x 10.25" D. Weight 300 lbs with batteries. BBS shall be mounted in an interior tilt out housing with 800 lb rated stops. Battery — connectors shall be Anderson Connectors with silver plated contacts. Batteries shall be installed in fixed position framed shelves for seismic safety and be readily accessible for maintenance. Batteries shall be mounted allowing airflow front and back. Enclosure can include two transfer bypass switches, one for BBS bypass the second for auxiliary generator (optional). All switches must be panel mounted on interior dead front panel board. UV resistant plastic laminated nameplates shall identify all controls and major components. A plastic covered wiring diagram will be attached to the inside of the front door. All components shall be factory wired and conform to required NEMA, NEC, and UL standards. A chassis ground point shall be provided. Panel shall be UL 508 Industrial Control Panel rated and must meet the following specifications. — BBS PANEL MINIMUM FEATURES: • Typical run time is (6) six to (12)twelve hours full operation, based on the actual load. — • BBS bypass and BBS isolation switch. • Deadfront safety panel board with all switches and plugs pre-wired with phenolic nameplates. — • All nameplates shall be phenolic engraved type. • All wire terminating lugs shall be full wrap around type. • All batteries shall be captive spaced from external captive sides in earthquake proof — shelving. • Cabinet ventilation shall be by (qty. 2) 4" x %4" louvers top and bottom with encapsulated bug screens, cleanable filters and a 100cfm fan to completely exchange air 25 time minimum per minute. — • All DC terminals and connections shall incorporate safety covers such that the safety covers are in place for every normal maintenance mode. TRAFFIC SIGNALIZATION 100-8 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa • Event Counters &Total Run Time Counter. BBS UNIT MINIMUM SPECIFICATIONS: BBS unit shall provide a true sine-wave output with minimum 2000 Volt-Amp continuous capacity. BBS must provide for utility service isolation when in operation. The minimum rating for wattage output will be 1200 watts. The BBS shall be capable of running an intersection with LED lights (for Run Time consult manufacturer). The unit shall operate off-line, with transfer time of 2-4 ms or less, with battery condition indicator, with automatic test provisions, and with -- hot-swappable batteries (all batteries in system). BBS will automatically recharge batteries from full discharge to 90% capacity within 8 hours. BBS will provide on-line operation for a minimum input of 90 to 150 VAC, provide full load output of 120VAC — 10% / +4% at 60 Hz +/- 0.05% over a temperature range of-37° C (-34.6° F) (optional adder) to +74° C (165.2° F) and conform to and be based on a UL Approved Design. For safety and maintenance the inverter shall not exceed 40 pounds. The BBS unit will be delivered with maintenance manuals. BBS UNIT MINIMUM FEATURES: • 2KVA 1200 Watts, with quick make/break connectors and plugs. (Systems requiring hard wiring termination to/from the inverter are unacceptable). • Surge energy - Per IEEE 62.41 (formerly IEEE 587) • Common mode clamping 0 ns < 5ns typical UL 1449 • Conditioned power—Computer quality • Transient lighting protection — Per IEEE 62.41 (formerly IEEE 587) • Transfer to battery time—2-4 ms • Retransfer to utility—2-4 ms • Each battery shall be 24 volts @ 18 AH with heavy duty Anderson plugs connections to the BBS for greater system reliability and ease of maintenance. Series wiring is unacceptable. • Fan cooling shall be fused for locked rotor current. • Cooling air shall be ducted to cool the front and back of each battery with air space on all four sides and top of battery. • Inverter covers shall be 60% open on both sides to diminish the environmental effects of extreme temperatures. • Includes USB & RS232, DB9 Computer Interface Ports. • Low voltage safety design at 24V DC. (Higher voltage DC systems are unacceptable). BBS COMMUNICATIONS MODULE: All inverter connections shall be made without the use of tools. This includes: NC-Input, NC- Output, Normally-Open, and Normally-Closed programmable contacts. Smart Slot Relay I/O Module; Input#1 Turn the BBS on. Input#2 Turn the BBS off. Input#3 Start the BBS self-test. Input#4 Shut down the BBS (when on battery). Output#1 The BBS is on-battery (during a power failure, self-test or run time calibration). Output#2 BBS has a low battery— Programmable. Output#3 The protected load is not receiving power from the BBS. Output#4 Replace the BBS batteries. Output#5 The BBS is overloaded. Output#6 Any BBS fault or self-test failure. TRAFFIC SIGNALIZATION 100-9 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa BATTERIES: Batteries shall be maintenance-free, type AGMNRLA (Absorbed Glass Mat/Valve Regulated Lead Acid) or Gel Cell. Batteries shall be independently pre-wired and individually fused. Batteries shall be furnished with heavy-duty 50 amp rated silver-plated Anderson Connectors. 100 Amp internal fuse by Battery supplier. Batteries shall be lightweight for personnel safety and protection plus ease of installation and maintenance. Batteries shall not exceed a weight of over 27.64 lbs. ENCLOSURE TEMPERATURE COMPENSATION: Operating temperature shall be a minimum -37° C (-34.6° F) to +74° C (165.2° F). POWER SYSTEM ANALYZER AND CONFLICT RESOLUTION MODULE: The inverter should incorporate an integrated power system analyzer and conflict resolution system. The analyzer should evaluate and make limited adjustments to the incoming utility power and automatically transfer load to the battery back-up power if utility power is lost. When utility power becomes available, the BBS should analyze the power to verify stability and return to normal operation. The system should provide automatic BBS failure detection and automatically isolate the failed BBS and lock the unit on to utility power. Once the failure has been corrected, the system should return to normal operation. TRIPLE BYPASS SYSTEM FOR OFFLINE BBS: 1. Power Analyzer with Conflict Monitor Isolation and Transfer Module. 2. PCM — Power Conflict Monitor. The PCM is a totally redundant failsafe system. It monitors load bus power available continuously. If load bus power fails for 5ms the PCM will transfer and isolate the BBS and guarantee that commercial power will be locked on. 3. Timer— Redundant 5 ms delay and hard transfer to utility power. 4. The outboard Transfer Switch shall not interrupt the normal controller function. Transfer time shall be 2ms. 5. Onboard I/O module will execute lockout of battery backup system upon detection of any inverter BBS fault. If BBS resets itself, it will automatically be available for backup. 6. ON Inverter to timed relay for Full Time control of Output, 0 to 10 hours. BATTERY CHARGER: Shall charge from shut off discharge to 90% fully charged in less than 8 hours. The battery — charger shall utilize Advanced Battery Management to extend battery life. HOT-SWAPPABLE BATTERY REPLACEMENT: The unit shall be capable of user friendly battery replacement without interrupting signal operation. WARRANTY: Manufacturers shall provide a two (2) year factory-replacement parts warranty on the BBS. Batteries shall be warranted for full replacement for two (2) years. The warranty shall be included in the total bid price of the BBS. TRAFFIC SIGNALIZATION 100-10 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa 6. Vehicular Signal Heads Signal head doors should open so the light assembly can be changed without removing the door or loosening the head. Signal indications shall be 12 inches in diameter and sectional in construction requiring one section for each light indication. All traffic signal light sources shall be LED. LED and LED assemblies shall meet all pertinent NEMA, IEEE, and ITE standards. Signal head lenses can be made of glass or ultraviolet (UV) stabilized synthetic materials. Non-polycarbonate synthetic lenses shall meet the ITE color standards and 3 1/2-foot drop test. Lenses shall be capable of withstanding ultraviolet exposure from direct sunlight for a minimum period of 36 months without exhibiting evidence of deterioration. Lenses may be tinted or may use transparent film or materials with similar characteristics to enhance "ON/OFF" contrasts. If a polymeric lens is used, a surface coating or chemical surface treatment shall be used to provide front surface abrasion resistance. The housing for the individual sections shall be made of UV stabilized polycarbonate or a die- cast aluminum. The top and bottom of each section shall have an integral locking ring with separations to permit rotation of the signal head in 5 degree or smaller increments. Openings in the top and bottom of the signal shall accommodate standard 1 1/2-inch bracket arms. All joints between sections shall be waterproof. Locknuts or other means approved by the engineer shall hold the section firmly together. Each section shall be complete with a one (1) piece, hinged door with watertight gaskets and two (2) stainless steel locking devices. The hinged pins shall be designed so that the doors may be easily removed and reinstalled without use of special tools. One section of a three or more section assembly shall be equipped with terminal block for termination of field wiring. The lamp socket shall be equipped with color-coded wire, red, yellow, or green, depending upon the lens color of the section. The socket wires shall be a minimum of 26 inches long, composed of wire with insulation designated to withstand 105 degrees C. The wiring leads shall be terminated with spade lugs for ease of connection to terminal block. The socket shall be equipped with a gasket to insure a dust-tight fit. A coupling washer assembly comprised of two (2) washers, three (3) cadmium-plated bolts, nuts and lock washers shall lock the individual sections together. The hole in the coupling -- washer assembly shall be large enough to accommodate three 3/4-inch cables. Certification: The City shall be furnished with a certification from the manufacturer of the signal head that the equipment furnished under the contract documents complies with all provisions of these Specifications. If there are any items which do not comply with the contract documents, a list of those exceptions must be detailed on the certification. All screws, latching bolts and hinge pins shall be according to manufacturers' recommendations. One section of the three section signal shall be equipped with a six- position terminal block for termination of field wiring. Each five-indication signal shall be equipped with an eight-position terminal block. TRAFFIC SIGNALIZATION 100-11 FY 2019 University Avenue Reconstructon-Phase 2 -- AECOM#60528991-Ph2 Waterloo,Iowa All surfaces of metal signal housing doors and visor shall be oven baked, black, enamel, ^, except the doors and visors shall be flat black. During the course of construction and until the new signals are placed in operation, signal faces shall be covered or turned away from approaching traffic. When ready for operation, they shall be securely fastened in position facing toward approaching traffic. All traffic signal displays shall be installed as indicated on the plans and aligned and leveled per MUTCD on all axes. All optically programmable signal heads shall be properly programmed to limit their field of view as directed by the Engineer. Three-section overhead displays located on mast arms should have the red indication above the mast arm and five-section displays shall have two sections above the mast arm Visors: Each lens shall have an aluminum or UV stabilized polycarbonate cut-off tunnel visor not less than 8 inches in length and designed to shield each lens. Visors shall have a minimum thickness of 0.05 inch and be painted flat black. 7. Pedestrian Signal Heads Signal head doors should open so the light assembly can be changed without removing the door or loosening the head. All pedestrian signal heads shall include all the necessary fittings and adjustable cable tie type brackets and shall use LED. The pedestrian signal shall be 16 inches, with a universal don't walk "HAND" symbol indication and a universal walk"MAN"symbol indication in one section head, and countdown timers. Other properties shall be the same as defined for vehicular traffic signal heads defined earlier. 8. Backplates Backplates shall be UV stabilized polycarbonate or aluminum and louvered. Backplates shall be 5-inch border in size and shall be at least 0.05 inch thick. A 1-inch radius shall be provided on all corners. Each backplate shall be furnished with all the necessary mounting hardware for attachment according to manufacturers' instructions. The size of each backplate shall be suitable for mounting on three-section and five-section, 12- inch signal heads, including space for plumbizers, when called for. All mounting hardware shall be rustproof and corrosion resistant. 9. Foundations A screw-in metal foundation can be used in lieu of a concrete base for pedestal installations. If -- used, it shall conform to manufacturer's specification for use as traffic signal pedestal pole as per plans. The concrete bases shall conform to the dimensions shown on the plans. The bottom of all foundations shall rest securely on firm undisturbed ground. Forms shall be used for the above ground portion of all foundations. Whenever the excavation for a foundation is irregular in shape, forms shall be used to provide the proper dimensions of the foundations below grade. The material for the forms shall be of sufficient thickness to prevent warping or other deflections from the specified pattern. The forms shall be leveled and a means shall be provided for holding them rigidly in place while the concrete is being deposited. _ TRAFFIC SIGNALIZATION 100-12 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa The Contractor shall be responsible for the proper elevation, offset and level of each foundation. Where the foundation cannot be constructed as shown on the plans because of an obstruction, the Contractor shall relocate the foundation or use other effective methods of supporting the pole after securing the Engineer's approval. Anchor bolts and reinforcement shall be held rigidly in-place before the concrete is poured. Anchor bolts shall be held in-place by means of a template constructed to space the anchor bolts uniformly in accordance with the pattern shown on the plans, and not to protrude excessively after installation of equipment. Two conduit inlets shall be installed as a minimum per foundation. Inlets not used shall be capped below grade. A ground rod shall be placed external to each foundation. All ground rods shall be a minimum of 5/8-inch in diameter, 8-foot long copper clad and shall be external to the concrete foundation, driven 4 inches below ground surface. Anchor bolts, conduits and reinforcement shall be held rigidly in place before the concrete is poured. The center of the template and the center of the concrete base shall coincide unless otherwise directed by the Engineer. High-frequency vibrator shall consolidate concrete after it is placed in the form. The top of the base shall be rounded with an edger having a radius of 1/2 inch. The exposed surface of the base shall have a rubbed surface finish. Should the Contractor find that it is necessary to alter or reconfigure any portion of the installation or there would be a conflict with the design versus the site grade, ditches, utilities, etc., or the elevation appears to be too high or too low, the City shall be notified in writing of the portions that are in conflict. Immediate response will be given by the City or its representative to avoid delays. After the foundation or base has been poured, no modification of any sort shall be made. If any part of the foundation or base is installed in an incorrect manner, as determined by the Engineer, the entire foundation or base shall be removed and the Contractor shall install a new -- foundation or base at no extra cost to the City. Prior to installing the structures, the anchor bolts shall be covered in such a manner as to protect them against damage and to protect the public from possible injury. The foundation must be given seven days to cure before the structures are erected. New bases shall be constructed and finished to the dimensions shown on the plans. Concrete shall be as specified in paragraph 2403.03 of the Iowa DOT Standard Specifications for Class C, Mix No. C-4, air-entrained P.C. concrete, and shall be placed in accordance with Section 2403 of the Iowa DOT Standard Specifications. Reinforcement shall be in accordance with Iowa DOT Specification Section 2404 of the Standard Specifications. The top of the signal base shall be at a minimum of 2 inches and a maximum of 3 inches above the finished grade. Whenever excavation is made across parkways, driveways or sodded areas, the sod, topsoil, crushed stone or gravel shall be replaced or restored as nearly as possible to its original grade and the grade involved shall be left in a neat and presentable condition. Concrete sidewalks, pavements, base courses and bituminous surfaces shall be replaced with -- new materials. The backfill shall be mechanically compacted in 6-inch layers to a density equal to that of the surrounding material. TRAFFIC SIGNALIZATION 100-13 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa 10. Signal Pedestal Poles -- All traffic signal pedestals shall be Sch 80 galvanized steel or Sch 80 spun aluminum and shall be in conformance with Iowa DOT Specification 2525 of the Standard Specifications. The length of the pedestal, from the bottom of the base to the top of the shaft, shall be 10 feet, unless otherwise specified on the plans. For galvanized poles, the pedestal shaft shall be fabricated of tubing with a wall thickness of at least 1/8 inch. It shall have a satin brush or spun finish. The top of the shaft shall have an outer diameter to receive a pole-top mounting bracket of a traffic signal or a pedestal-mounted traffic signal controller. All hardware shall be of hot dipped galvanized steel in accordance with the latest revision of ASTM A123. The pedestal base shall be cast-aluminum, breakaway, with a handhole. The size of the handhole shall be at least 4 inches by 6 inches and equipped with a cover, which can be securely fastened to the shaft with the use of simple tools. The surface of the base shall be prepared for painting in accordance with the manufacturer's recommendations and coated to match the pedestals. Bases shall have a minimum weight of 20 pounds, and shall have a 4-bolt pattern uniformly spaced on a 13 3/4-inch diameter bolt circle. Anchor Bolts. Galvanized, hot rolled steel anchor bolts, sizes as determined by the pole manufacturer, shall be supplied, complete with all the hardware required for installation. The anchor bolts shall have a right angle bend at the bottom end and threaded at the top end. 11. Galvanized Steel Traffic Signal Supports and Light Poles The signal mast arms, support poles and light poles shall be continuous steel poles of the _ anchor base type as shown on the plans. The pole shall be fabricated from low carbon (maximum carbon 0.30 percent) steel of U.S. Standard Gauge and shall be manufactured from steel sheet with one continuous welded vertical seam. After manufactured, they shall have minimum yield strength of 48,000 psi. The base shall be of heavy cast or rolled steel attached to the lower end of the shaft by a continuous weld on both the inside and outside of the shaft. The diameter of the bolt circle shall be as specified by _. the manufacturer. It is permissible to fabricate poles and mast arms by welding two sections together by vendor only. Welding and fabrication shall conform to the Structural Welding Code AWS, as modified by AASHTO Standard Specifications for Welding of Structural Steel Highway Bridges and the current Iowa DOT Supplemental Specifications for Structural Steel. The pole shall be designed to support the traffic signals, lights and/or signs with the clearance as shown on the plans. Where called for on the plans, the poles shall be designed to assume high-rise design luminaire arms for streetlights. The luminaire riser may be manufactured and designed a separate add-on piece. The pole shall be equipped with an approximately minimum 2-foot by 1-foot 10-inch transformer base or as specified on the plans. -- Securing of the cover of the shaft shall be possible with the use of simple tools. The mast arms and poles shall be equipped with all necessary hardware, shims, and anchor bolts to provide a complete installation without additional parts. TRAFFIC SIGNALIZATION 100-14 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa In addition to what is shown on the plans, all signal poles and mast arms shall be designed to carry a 5-section traffic signal head and a 24 inch by 36 inch sign at the end of each mast arm. All hardware shall be of hot dipped galvanized steel in accordance with the latest revision of ASTM A123. All mast arms and support poles shall be galvanized steel and shall be in conformance with Iowa DOT Specification 2525 of the Standard Specifications. All luminaire extensions shall provide for 40-foot mounting height and 12-foot overhang, unless otherwise specified on the plans. All signal supports shall contain the anchor bolts. The anchor bolts shall be constructed from A36 steel with minimum yield strength of 50,000 psi. The anchor bolts shall be hot dipped galvanized for a minimum of 12 inches on the threaded end and shall be threaded a minimum of 6 inches at one end and have a 4-inch long, 90-degree bend at the other end. Certification: The fabricator shall certify that the mast arms are capable of withstanding winds of at least 100 mph without failure; that only certified welding operators in accordance with AWS D1.1-75 or latest revisions were used; and that only electrodes as modified by the current version of AASHTO Standard Specifications for Welding of Structural Steel for Highway Bridges were used. Pole Erection: All poles are to be erected vertically with the mast arm at a right angle to the centerline of the street, unless otherwise specified, and securely bolted to the cast-in-place concrete foundations at the locations indicated on the plans. Leveling shall be accomplished by the use of nuts on each anchor bolt. One nut shall be placed on each anchor bolt and the pole placed in position on these nuts. The top nuts shall then be placed loosely and the pole adjusted to the vertical position by adjusting both the upper and lower nuts and final tightening of top nut to expose a maximum of three full threads. All threaded pedestal poles shall be drilled and tapped and a % inch diameter X % inch long galvanized or stainless steel bolt shall be installed through the base and the pole to prevent turning of the pole. The Location of All Signal Standards: The locations of all signal standards shown on the plans are subject to adjustment depending on the actual locations of existing underground utilities and overhead utilities. Actual locations of standards will be selected at the time of construction upon location of existing utilities. 12. Galvanized Finish Both liquid finish or powder top coat galvanization are acceptable. ` All light poles, light pole mast arms, light pole bases, signal poles, pedestal poles, push button posts and signal pole mast arms shall come with a 5-year warranty against fading, cracking, peeling and corrosion. They shall be finished using an electrostatically applied liquid finish consisting of an organic, zinc-rich, moisture cure urethane primer and high quality fast-cure polyurea topcoat (MillerBond or similar) or using a galvanized-powder topcoat finishing system, in accordance with the following: MATERIALS: Surface Preparations. Prior to being incorporated into an assembled product, steel plates 3/4 inch or more in thickness shall be blast cleaned to remove rolled-in mill scale, impurities and non- metallic foreign materials. After assembly, all weld flux shall be mechanically removed. The iron or _. steel product shall be prepared for zinc coating in accordance with ASTM 232. i TRAFFIC SIGNALIZATION 100-15 AECOM#60528991-Ph2 FY 2019 University Avenue Reconstruct -Phase 2 Waterloo,Iowa Zinc Coating. The product shall be hot-dip galvanized to the requirements of ASTM A123 (fabricated products). The entire product shall be totally immersed, with no part of it protruding out of the zinc (no double dipping). This is to limit a risk of trapped contaminates containing chlorides and reduce the risk of bare spots. Maximum aluminum content of the bath shall be 0.01 %. Flux ash shall be skimmed from the bath surface prior to immersion and extraction of the product to assure a debris-free zinc coating. Exterior Coating. All galvanized exterior surfaces shall be coated with a Urethane or Triglycidyl Isocyanurate (TGIC) Polyester Powder to a minimum film thickness of 2.0 mils. Prior to application, the surfaces to be powder coated shall be mechanically etched by brush blasting (Ref. Society for Protective Coatings [SSPCj SP-7) and the zinc-coated substrate preheated to 450°F for a minimum of 1 hour in a gas-fired convection oven by heating the zinc-coated substrate to a minimum of 350°F and a maximum of 400°F. The thermosetting powder resin shall provide both intercoat as well as substrate fusion adhesion that meets 5A or 5B classifications of ASTM D3359. Color shall be a semi-gloss black elected from the manufacturer's standard color table, and shall be readily matchable for future repair. CONSTRUCTION: Packaging. Prior to shipment, all items shall be protected to prevent damage during shipment and handling at project site. Field Repair Procedures. Where factory applied coatings have become damaged or abraded due to handling, transport, installation, welding or other circumstances, they shall be repaired in accordance with manufacturer's recommendations. All damaged areas shall be thoroughly wire brushed. All dirt, oil, grease or other contaminants shall be removed in accordance with SSPC- SP1 and SP5. Touch-up paint shall be supplied by the galvanizer or steel fabricator and shall be identical in color and composition to that used in the plant. Touch-up paint shall be applied to all prepared surfaces to a dry film thickness of at least 4.0 mils. 13. Electrical Weather proof connectors shall be used. All termination shall offer a secure connection and be secure to the cable conductors. It shall not pull off of the cable when gently tugged. The connection shall not rely on tape to secure it to the cable jacket to prevent it from coming apart. The correct tools shall be used to crimp the terminal connections. Using the wrong size of crimping die which produces a weak, non-uniform crimp which produces a short term installation is not acceptable. Service Installation. (Traffic Signal and Lighting): The Contractor shall supply and install a 2- inch SCH 80 PVC conduit to the source of power either to the transformer or up the power pole with a weather head connector as required by the power company supplied by the Contractor. The size of the service conductors shall be 3/c No. 3 AWG stranded conductor. The Contractor will be responsible for coordination of this work with the power company and for payment of connection fees, if any. The address of the source of power will be provided at the time of construction. Pole: There shall be one (1) conductor for each optical unit or set of optical units operating identically through the same cycle and one (1) conductor for common return. Each overhead red, yellow, green signal head shall be wired with a separate cable from a splice in the pole base according to the conductor combination specified on the plans. TRAFFIC SIGNALIZATION 100-16 FY 2019 University Avenue Reconstructon-Phase 2 Waterloo,Iowa AECOM#60528991-Ph2 An electrical splice in each wire servicing traffic signal heads on a pole shall be made in the handhole compartment of that pole. All wiring, except loop and magnetic detector wire, shall be one continuous length of cable from the splice in the handhole compartment of the signal pole to the terminal compartment in the controller cabinet. Splices for detectors will be permitted between the detector wire and the detector lead-in cable only at the first handhole provided adjacent to the detector and will be done by City personnel. All splices in the handhole compartment of a signal pole shall be made using gel filled twist wire connectors. Signal cable splices shall be made using gel-filled wire nuts. Cable connections in signal heads and controller cabinets shall be made at the terminal blocks with a mechanical attachment device attached to each wire end by terminal connectors specified elsewhere in this Special Provision. Slack for each cable shall be provided by a 4-foot length in each handhole and a 2-foot length in each signal and controller base (measured from the handhole compartment to the end of the cable). In those handholes where detector splices are made, a 4-foot length of cable slack shall be provided in both the loop wire and the shielded lead-in cable. Cables shall be pulled through conduit by means of a cable grip designed to provide a firm hold upon the exterior covering of the cable or cables, with a minimum of dragging on the ground or pavement. This shall be accomplished by means of reels mounted on jacks or rollers and other suitable devices. A suitable wire lubricant shall be used to reduce friction and strain on wires or cables. Service cable runs shall be continuous from the power line located on the service pole to the meter located on the controller cabinet or from the meter located on the service pole to the terminal compartment in the controller, whichever is applicable. The service riser shall be topped by standard weather head or otherwise replaced with "U" Guard. Clearances to the overhead utilities shall be specified by the serving utility. The power company will furnish the electrical meter. The Contractor shall supply the service cabinet. All work shall be in accordance with Iowa DOT Specification 2525 of the Standard Specifications and the MUTCD. A uniform systematic color code shall be used. All wiring shall comply with the National Electrical Code and City Ordinance, and shall be subject to the inspection of WTOD. All wire shall be plainly marked on the outside of the sheath with the manufacturer's name and identification of the type of the cable. 14. Bonding and Grounding Metal conduit, service equipment, anchor bolts, metal poles, pedestals, controller cabinets, and all other electrical equipment shall be made mechanically and electrically secure to from a continuous system, and shall be effectively grounded. The grounding conductor shall be a No. 6 AWG stranded green copper wire. Grounding bar shall be accomplished by bonding the grounding circuits to copper clad metal, driven electrodes. All electrodes shall be as a minimum, 5/8 inches in diameter and 8-foot long copper clad. The electrodes shall be driven vertically until the top of the rod is a minimum of 4 inches below grade. Bonding to the ground rod shall be made by means of suitable screw type positive ground rod clamps. Grounding to waterlines will not be permitted. TRAFFIC SIGNALIZATION 100-17 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa Bonding of standards and pedestals shall be by means of a bonding strap attached to an anchor bolt or to 1 3/16-inch, or longer, brass or bronze bolt installed in the pole base. The service meter and socket shall be bonded to a ground electrode by use of a ground clamp and a No. 6 AWG copper wire and shall be by means of cadmium plated grounding bushing and bonding jumpers. Where there is a change at a pull box or manhole for non-metallic conduit to metallic conduit, the grounding wire in the non-metallic conduit shall be bonded to the metallic conduit. —' Existing ungrounded metal poles shall be grounded by means of a driven ground rod. 15. Cables and Wires The number of conductors and size of all traffic signal cable shall be as specified on the plans. All wire shall be plainly marked on the outside of the sheath with the manufacturer's name and identification of the type of the cable. Service Conductors: Power cable shall be a 600-volt, stranded, insulated, single conductor, No. 3 AWG (black and white) unless otherwise stated in the plans. Ground wire shall be No. 6 AWG green stranded copper wire. Signal Pole Base to Signal Pole Base: This shall be composed of either 5-conductor No. 16 AWG or 12-conductor No. 16 AWG cable IMSA Spec 20-1 Signal Cable — PE insulations, PE Jacket or otherwise specified on project plans. The color code should be NEMA K-1 method 1 with 600 volts rating. The signal cable conductors shall pedestal mounted) and mast arms to signal heads shall be No. 16 AWG cable (the number of conductors shall be specified on plans) and composed of stranded wire. Luminaire Conductors: Conductors shall consist of type THWN, 600 volt, and single conductor copper stranded wires, which run continuously between poles. Conductors shall meet the requirements of section 4185.12 of the Iowa DOT Standards Specifications and shall be of the size and number shown on the plans. Detector Lead-In Cable: Detector lead-in cable shall be No. 16 AWG, meeting the requirements of IMSA Specification 50-2 or latest revision thereof. Tracer Wire: Tracer wire shall be a #10 AWG wire single conductor, stranded copper, Type —' THWN, with UL approval and orange jacket. Provide in conduit runs that contain fiber optic cable, but the conduit does not contain built-in tracer wire. Tracer wire shall be electrically continuous. Splices are permitted in hand-holes and pull-boxes provided the connection of 2 or more wires is made using a gel-filled wire connector. An additional 10' long "tail" shall be bonded to the tracer to be used for locating purposes. 16. Handholes Unless otherwise indicated on the plans, handholes shall be constructed as per these Specifications. Except for fiber optics handholes, the Contractor may furnish a poured-in-place concrete handhole, with cast iron ring and cover, or a pre-cast concrete handhole, with cast iron ring _ and cover, or a fiberglass handhole. Concrete pipe (referred to as Traffic Handhole), meeting AASHTO Specification designation M86 for non-reinforced or M170 Class III for reinforced, of suitable length and diameter, and provided with cable hooks made with a minimum 1/4-inch diameter steel material. Cast iron ring and cover may be rated light duty for non-traffic areas (155 pound minimum). Fiber optics handholes shall be as per plans. TRAFFIC SIGNALIZATION 100-18 FY 2019 University Avenue Reconstructor-Phase 2 Waterloo,Iowa AECOM#60528991-Ph2 Handholes on fill rural cross sections shall have a drain and drain pipe. A crushed stone sump with a minimum depth of 18 inches shall be provided beneath all handholes. The cover shall have the name "TRAFFIC" in 2-inch letters cast into the lid. The handhole shall be large enough to house loops in fiber optics cable as per manufacturer's recommendation for minimum diameter of the fiber optics cable loop. Frames and covers for handholes shall be cast iron and conform to the dimensions shown on the plans. The top of the handhole shall be set flush with the sidewalk or driveway surface. When constructed in an earth shoulder away from the pavement edge, the top surface of the handhole shall be approximately 1 inch above the surface of the ground or as indicated on plans. The ends of the conduit leading into the handhole shall extend a minimum of 1 inch and not more than 2 inches beyond the inside wall. All conduits in the handhole shall slope inward in a manner so as to provide drainage of water or condensation. Each handhole shall contain a minimum of two cable hooks. The hooks shall be permanently fastened to the inside wall near the top of the handhole. When precast concrete sections are used for handholes, the conduit entrances shall be neatly grouted between the conduit and the precast concrete. The handhole ring shall fit snugly inside the precast concrete section. Grouting shall be done immediately after conduits are placed into the handhole to prevent washing in of debris. After installation of handhole and before acceptance by the City, all foreign debris, including but not limited to dirt, leaves, grout, concrete, cans and glass, shall be removed. All loop detector lead-in conductors shall be placed into a handhole prior to winter shut down. 17. Conduit All conduits, except fiber optic conduits, shall be Schedule 80 Poly Vinyl Chloride (PVC) when placed under paved surfaces and SCH 40 elsewhere. The number and size of conduit shall be as specified on the plans. PVC conduits shall be rigid polyvinyl chloride meeting the requirements of NEMA TC-2, Type 2, and applicable UL standards. All conduits, except fiber optic conduits, buried in open trenches shall be placed a minimum of 18 inches deep and shall extend a minimum of 3 feet 6 inches from the back of curb unless otherwise directed by the Engineer. Open trench methods of placing conduit will be permitted except where the conduit is to be placed under existing pavement. Conduit in pavement areas shall be placed to a minimum depth of 24 inches below the finished pavement surface or as directed by the Engineer. Fiber optic conduits shall be installed at least 42 inches below grade. The backfill materials from the placement of conduit in open trenches shall be deposited in the trench in layers not to exceed 6 inches in depth and each layer shall be thoroughly compacted before the next layer is placed. All cinders, broken concrete, or other hard abrasive materials shall be moved and shall not be used in the backfill material. All surplus material shall be removed from the public right-of-way and properly disposed TRAFFIC SIGNALIZATION 100-19 FY 2019 University Avenue Reconstructor-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa Whenever excavation is made across parkways, driveways or sodded areas, the sod, topsoil, crushed stone or gravel shall be replaced or restored as nearly as possible to its original grade and the grade involved shall be left in a neat and presentable condition. Concrete sidewalks, pavements, base courses and bituminous surfaces shall be replaced with new materials. Underground conduits shall be laid at a distance of at least 6 inches from any water line or other utility line. When the plans require the conduit be placed without disturbing the existing pavement, the term "pushed" is used. Pushed conduit shall be placed by jacking, pushing, boring or any _. other means necessary to place the conduit without cutting or removing pavement. The size of a bored hole shall not exceed the outside diameter of the conduit, which is to be placed. Tunneling under the pavement or water jetting will not be permitted. Pits for boring shall not . be closer than 2 feet to the back of curb unless otherwise directed by the Engineer. Conduits shall be Sch 80 PVC unless otherwise shown on the plans. When it is impractical to push the conduit under pavement due to unanticipated obstructions, the Contractor may, with the Engineer's permission, cut the existing pavement. Where conduit is to be placed by trenching methods under existing asphaltic pavement, an 8- inch wide by 18-inch deep trench shall be opened along neat lines. The trench shall be backfilled with crushed stone, acceptable to the Engineer, filled with Class M high-early strength concrete to within 4 inches of the surface level. The concrete shall be allowed to set for a minimum of 48 hours without being exposed to traffic. The final 4 inches of backfill shall s- be a hot bituminous concrete plant mix acceptable to the Engineer. A polyethylene pull rope shall be installed in all conduits, which is identified on the plans for future use. At least 2 feet of pull rope shall be doubled back into the conduit at each termination. Conduit shall be laid to drain and 1-inch drains with crushed stone sumps shall be installed as shown on the plans and at all low points. The backfill shall be mechanically compacted in 6-inch layers to a density equal to that of the surrounding material. Conduit shall be connected to existing and new light bases and junction boxes. All required fittings shall be furnished and installed by the Contractor to provide a continuous, enclosed conduit system between poles. Conduit under pavement and driveways shall be rigid steel conduit or PVC Schedule 80, Type 2, in accordance with Iowa DOT Specification Section 4185.10 of the Standard Specifications. All trenches shall be backfilled with material containing no broken pieces of concrete or asphalt, stone, brick, wood or other unsuitable material including nested clods. All conductors and wiring shall be furnished as new material and installed by the Contractor and shall conform to Iowa DOT Specification 2525 of the Standard Specifications. Conduit not under pavement or driveways shall be Schedule 40 PVC. All unused conduits, whether for future use or for later use in the project, shall be capped. All conduits shall be sloped to drain toward the nearest handhole, and if this should prove to be impractical, then a conduit drain shall be provided with crushed stone drainage sumps at all low points, as detailed in the plans for traffic signal bases. A permeable membrane to keep sand from washing back into the conduit shall be installed at the conduit drain. TRAFFIC SIGNALIZATION 100-20 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa Fiber optics conduit shall be high-density polyethylene (HDPE) with minimum wall thickness of 0.07 inch and shall consist of a shell or sleeve tube, over-sheathing at least 4 inner -- tubes. Inner tubes shall be rated for direct burial and shall have a minimum OD/ID of 16/13. Inner tubes shall be ridged longitudinally inside and shall have a smooth surface outside. The inside surface of the inner tubes shall have a low friction permanent lining to reduce friction during cable placement. The conduit shall come with preinstalled sleeved copper tracer wire of minimum size AWG#20. The whole outer tube and inner tubes package shall be rated for direct bury and shall be suitable for boring under existing pavement. — 18. Fiber Optics Cable For the University Avenue Reconstruction — Phase 2 Project, all interconnection and monitoring shall be completed using newly constructed fiber optic cable as shown in the plans. All fiber optic cable shall be placed in HDPE conduit in accordance with Section 17. All other necessary equipment, including patch cords, termination panels and all other equipment, tools and labor necessary to complete the network connections shall be included in the contractor's bid for Traffic Signalization. All 12 strands shall be terminated inside the controller cabinet. Unless otherwise mentioned on the prior in these specifications or plans, the traffic fiber optics control communications and interconnect cable shall have the following minimum properties. Fiber optics cable shall be small diameter high fiber-density micro cable suitable to be deployed by blowing into small duct sizes. Micro cable fibers shall be blown through conduits and shall not be pulled to cause stresses higher than manufacturer specified tensile strength for that micro fiber. A 72 Stranded Single Mode Loose Tube Cable Meet Pertinent ANSI, EIA, and TIA Specifications for the Usage, Installation, and Location Type Required by This Project Typical Core Diameter 8.3 um± 1.0 urn Cladding Diameter 125.0 um± 1.0 urn Core Concentricity± 1 Percent Attenuation Uniformity No point Discontinuity Greater Than 0.1 um at Either 1310 nm or 1550 nm "-" Max Attenuation 0.40 dB/Mile The coating shall be a dual layer UV cured acrylate applied by the fiber manufacturer. The coating shall be mechanically or chemically strippable without damage to the fiber. The central member of the cable shall be a glass reinforced plastic rod designed to prevent the buckling of the cable. The cable core interstices shall be filled with water blocking tape to prevent water infiltration. Dielectric fillers may be included in the cable core where needed to lend symmetry to the cable — cross-section. Buffer tubes shall be of dual layer construction with the inner layer made of polycarbonate and the outer layer made of polyester. Each buffer tube shall be water-blocked with a water-swellable yarn or tape. Buffer tubes shall be stranded around the central member using reverse oscillation, or"SZ", stranding process. The buffer tubes shall meet TIA/EIA-598A, "Color Coding of Fiber Optic Cables". The fiber cable shall include loose tubes with 12 fibers in each tube. TRAFFIC SIGNALIZATION 100-21 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa The cable tensile strength shall be provided by a high tensile strength aramid yarn and/or fiber glass. All dielectric cables, without armoring, shall be sheathed with medium density polyethylene. The minimum nominal jacket thickness shall be 0.055 inch. Jacketing material shall be applied directly over the tensile strength members and flooding compound. The jacket or sheath shall be marked with the manufacturer's name and the words "Optical Cable," the year of manufacture, and sequential feet marks. The markings shall be repeated every 2 feet. The actual length of the cable shall be within the range plus 1 percent of the length marked. The marking shall be in a contrasting color to the cable jacket. Additionally, the jacket marking shall have a durable weatherproof label which shows the actual attenuation of each fiber expressed in dB/mile. The cable shall be fabricated to withstand a maximized pulling tension of 600 pounds during installation (short term)and 135 pounds upon installation (long term). The shipping, storing, installing and operating temperature range of the cable shall be-40 degrees F to+158 degrees F. The manufacturer shall test at the 100 percent level all fiber optic cable for the following tests: a) Each fiber proof tested at a minimum load of 350 Mpa. b) Each fiber tested for attenuation and the reading shall be part of cable labeling. The cable shall meet the appropriate standard Fiber Optic Test Procedure for the following measurements: a) Fluid Penetration b) Compound Drip c) Compressive Loading Resistance d) Cyclic Flexing e) Cyclic Impact f) Tensile Loading and Bending The cable ends shall be available for testing. The cable ends must be sealed to prevent moisture impregnation. Fiber Optic Jumpers/Patch Cords: All fibers entering the traffic signal controller cabinet shall be terminated in the fiber optic termination unit within the traffic controller cabinet. Length of patch cord will vary according to distribution unit to traffic signal controller, fiber optic modem, or video modem location within controller cabinet and shall provide for 2 feet of total slack. A sufficient number of patch cords shall be installed to provide a fully-operational communications system. Controller cabinet patch cords shall consist of factory-assembled patch cords, each containing two fibers. Each such fiber shall have a connector with ceramic ferrule on each end. Each patch cord- shall have a dielectric strength member and a durable outer jacket designed to withstand '— handling. Fiber Optic Termination Unit: The unit shall be a rack mount, drawer type enclosure that is dust and moisture repellent. The unit shall provide easy front access with removable rear tray for easy rear access and shall have a maximum dimension of 3.5 inches H by 18.5 inches W by 11.25 inches D. The size of the unit shall be adequate for the number of fibers, proper winding area, and splices. The unit shall provide for cable entry from the side and be capable of accommodating up to 48 connections TRAFFIC SIGNALIZATION 100-22 FY 2019 University Avenue Reconstructor-Phase 2 Waterloo,Iowa AECOM#50528991-Ph2 Connectors: Only connectors of ceramic ferrule and physical contact end finish shall be used to terminate fibers to equipment. ST connectors shall be used for multi-mode fiber. SC connectors shall be used for single mode fiber. Maximum attenuation per connector shall be 0.75 dB. Splices: Fusion splices shall be used for all splices. The fiber cable shall be installed in continuous runs as designated on the plans. Splices shall be allowed only in the splice enclosures and controller cabinets as located on the plans. Maximum attenuation per splice shall be 0.3 dB. -- Fan Out Kits: Fan out kits shall be provided for separation and protection of individual fibers with buffer tubing and jacketing materials suitable for termination of the fiber and fiber optic connector as specified. Splice Enclosure: Continuous fiber cable runs and/or traffic signal controller branch circuit points will be spliced in an outside plant splice enclosure located in handholes as shown on plans. Green buffer tube of"trunk-line"fiber cable shall be spliced with "branch-line' fiber cable leading to traffic signal cabinet. The remaining "trunk-line" fiber cable buffer tubes shall remain in-tact and be"expressed"through the splice enclosure. Enclosure shall accept a minimum of six cables and provide enough trays to splice all fibers and provide means of "expressing" in-tact fiber cable buffer tubes. All fiber cables shall enter the enclosure at one end. Enclosure shall be watertight and re-enterable using gel-compressed cable connections and a re-enterable gasket. Fiber splice loss shall not exceed the limits of TIA/EIA 568. Tuber Color: The green tube shall be extended to the traffic signal cabinet and shall be used exclusively for traffic communications and video monitoring purposes. Orange color tube shall be set aside for other City Entities. Interconnection: All controllers shall be interconnected and connected to Waterloo Traffic Control Center by fiber optic cable. 19. Mounting Hardware Mounting heights for pedestrian heads should meet the minimum mounting height requirements. Pedestrian heads of the same type and size mounted on the same pole should be approximately the same height measured from the bottom of the pedestrian signal head housing to the closest sidewalk elevation. Different size pedestrian signal heads on the same pole should be mounted with their middle point having approximately the same height. All pedestrian and vehicular signals heads shall be provided with adjustable cable brackets for _ mounting, as well as all other hardware necessary to completely mount the signals. All signal heads shall connect to poles and mast arms using adjustable cable tie supported brackets. Brackets shall not be painted unless otherwise shown on the plans. Plumbizers are not acceptable. All openings not used shall be plugged with a metal octagonal signal closure cap. No plastic devices of any type will be allowed. Top and bottom brackets will be required for all pole-mounted signal heads unless otherwise shown in the plans. All mounting brackets shall be stainless steel, not painted. Control cabinet mounting will be on its own concrete base unless otherwise noted on plans. 20. Accessible Pedestrian Signals Push Buttons: Pedestrian pushbutton detectors shall be ADA-compliant and shall have a pressure or piezo-electric activated solid state contact without levers, handles, or toggle switches. TRAFFIC SIGNALIZATION 100-23 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa The contacts shall be entirely insulated from the case and operating button with terminals for making connections. Pedestrian detection shall have audio capability with differing frequencies corresponding to each pedestrian signal indication and audio tactile push buttons. The push button should activate the audible signal only for the crosswalk where the push button is activated. The entire assembly shall be weatherproof, watertight, and freeze-proof and shall be secure against electrical shock and be of such construction as to withstand continuous hard usage. The contact shall be normally open and no current flowing except at the moment of actuation. The push button shall have an LED light and shall flash each time the button is pushed. The push button shall emit an audible sound when the button is pushed and emit an audible sound of different frequency when the button is released. Accessible Pedestrian Signals and Detectors shall be provided at all pedestrian crosswalk locations and shall meet the requirements of the latest version of the Manual on Uniform Traffic Control Devices. Each pedestrian pushbutton shall be provided with the following features: • A Pushbutton locator tone • A Tactile arrow • A Speech walk message for the WALKING PERSON indication indicating the • direction and/or name of the street to be crossed • A Speech pushbutton information message APS shall be provided with the following features: • Both audible and vibro-tactile walk indications • Vibro-tactile walk indications shall be provided by a tactile arrow on the pushbutton that vibrates during the walk interval• An audible walk indication during the walk interval only. The audible walk indication shall be audible from the beginning of the associated crosswalk. The audio volume and direction shall be programmed to be heard as close to the crosswalk it is controlling as possible to avoid confusion with the other nearby crossing. It shall be placed as close to the curb of the corresponding crosswalk as possible. • Automatic volume adjustment in response to ambient traffic sound level shall be provided. All audible walk indications for this project shall be a speech walk message Speech walk messages shall be patterned after the following model: "Franklin. Walk sign is on to cross Franklin Street." Audible detection beacon audio intensity shall be auto adjusted based on ambient noise. Extended pushbutton features are not required for this project Contractor shall submit shop drawings for all accessible pedestrian signals and detector equipment for approval. Additional wiring and equipment required for a complete accessible pedestrian signal and detector installation is not indicated in the plan drawings, but shall be included in the Traffic Signalization _. bid item. TRAFFIC SIGNALIZATION 100-24 FY 2019 University Avenue Reconstructon-Phase 2 Waterloo,Iowa AECOM#60528991-Ph2 21. Signal Service Meter Bypass Socket Service panel cabinets shall be furnished when indicated on the project plans and be installed onto the traffic signal controller cabinet by the Contractor. Meter socket shall be UL and ANSI approved and a stamp showing approvals must be visible on inside of the socket. Meter sockets shall be constructed of steel and finished with light gray coating. The coating shall be electrostatically applied. The meter socket shall be rated for two 100-amp or 200-amp terminals and have a fifth terminal as a neutral. The meter socket shall also operate with a bypass device so that the traffic signal will not power down during installation or removal of the utility meter. The utility company will supply and install the meter once the Contractor notifies them of the traffic signal startup. All units shall be any one Anchor Electric U42552-HO, Landis & GYR, HQ-5U-40405-015, Millbank NU9318-XL, Durham T-H5213-U (HCP), or approved equal. 22. Power Disconnect The cabinet shall come with a properly rated power disconnect. It shall disconnect the power from the utility source to the cabinet so that there are no "hot" circuits or terminals inside the cabinet when servicing it. 23. Emergency Vehicle Pre-Emption (EVP)System Contractor to remove existing EVP system and reinstall on new signal system. Contractor shall supply new wire and mounting brackets for EVP equipment. EVP system shall be fully compatible with City's existing OPTICOM system and shall conform to the plans using Model 764 detectors. EVP Detector and Light Installation: The detectors, indicator lights, wiring and connections shall be installed in accordance with the manufacturer's instructions. In the event at installation a noticeable obstruction is present in line with the detector, the Contractor shall advise the Engineer before installation. The detector and indicator light shall be attached to the traffic signal mast arm to the satisfaction of the Engineer. All hardware shall be tightened securely. The detector and indicator light shall be installed and mounted in such a way so as to insure the watertight integrity of the complete assembly. The detector shall be installed with the drain hole at the bottom. There shall be no detector cable splices from the EVP detector on the traffic signal mast arm to the traffic signal cabinet. The detector cable shall be marked in the traffic signal cabinet as to which street and direction it is associated. All EVP detectors and EVP indicator lights shall be operational when each traffic control signal system is initially turned on. The Contractor shall furnish and install 3/c No. 20 AWG EVP detector cables and 3/c No. 14 cables for the confirmation lights where indicated in the plans. Emergency vehicle pre-emption TRAFFIC SIGNALIZATION 100-25 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa cables (3/c No. 20) shall be installed continuous without splices or terminals from the EVP detector to the traffic signal cabinet. 24. Traffic Monitoring Camera Outdoor monitoring cameras shall be installed with full remote control and monitoring capability activated from Waterloo Traffic Operations Center at 625 Glenwood Street Waterloo, Iowa. Unless stated otherwise on the plans, monitoring system at each intersection shall consist of the following Axis cameras: one Q1645-E MK II camera looking down, four Q1765-LE aimed towards approaches. 25. Traffic Detection Camera Unless stated otherwise on the plans, detection system at each intersection shall consist of four cameras aimed towards each side street approach and major street approach. The cameras shall _ meet the following requirements: The Video Detection System and its components, referred to as the VDS, shall be a complete and working system. Shall be IP compatible (IP addressable and network compatible). Camera shall be mounted according to the manufacturer's recommendations. NEMA compatible output to NEMA TS2 Type 1 controller with signal output for detection as NEMA loop detectors. Settable and definable loop zone detection area up to at least 300 feet measured from the camera mounting location. —' Minimum roadway surface coverage within 15 degree cone of camera vision from camera lens axis measured from the camera mounting. Software and hardware to provide for defining detection area (loops)zones as small as 6 feet by 6 feet or smaller, and defining large detection zonesareas, minimum of five zonesloops per lane, and minimum of four lanes per camera. Detector features shall include count detection, presence and passage detection, speed detection, label displays, data gathering stations, and contrast loss detection. Image shall be able to be calibrated for accurate distances. Fail-safe feature with fixed time, max time, or min time selection. User friendly and easy programming with Windows 10 and Windows 7 interface. The camera assembly, including mountings, shall withstand 90 mph winds. Performing during night hours with no ambient lighting. Shall have heating or features to ascertain full operability in presence of snow and ice. Shall have heating or features to ascertain full operability of snow and ice. Shall not fog. TRAFFIC SIGNALIZATION 100-26 FY 2019 University Avenue Reconstrueton-Phase 2 Waterloo,Iowa AECOM#60528991-Ph2 Shall provide all the software and hardware needed to program and run the video detection system from both the cabinet, and remotely from Waterloo Traffic Operations Center. Communication link will be provided as a different part of the project. VDS system will be connected to an inside cabinet Ethernet switch to establish the VDS link to the Traffic Operations Center. The system shall have a 2 year warranty. Housing shall be maintenance free. Shall not cause adverse electronic effect on the controllers operations. — Shall operate at a mounting height of 20 feet or less, and up to 35 feet or more. Self-diagnostics of power-up and reporting failures. The system shall be capable of recognizing vehicular travel/movement directions. Desirable feature is communications over power line between cabinet and camera. — Remote zooming capability. Operating temperatures—30°F to 140°F Camera and camera assembly shall have features or shall be designed to reduce the need for manual cleaning of the camera or enclosure lens. 26. Wireless Communications-NOT INCLUDED IN THIS PROJECT Wireless technology shall be compatible with Waterloo's existing system. Signal controller and — monitoring cameras shall be connected to VVTOD by wireless communications. The City has a wireless communications backbone with several tower and access point devices. For more information on locations and type of existing devices, contact Mohammad Elahi, City Traffic Engineer, at(319)291-4440. Mean time between failures and warranty: 100,000 hours, 1 year on parts and labor, and manufacturer's warranty, whichever provides for longest combination coverage. The Contractor shall be responsible for designing a fully functional wireless communication system connected to Traffic Operations Center. It shall be the Contractor's responsibility to assure the delivery of a working system, including the use of proper equipment, appropriate installation, acceptable communication, and central location's remote, monitoring, and control capabilities. System shall include antennas, cables,jumpers, pole mounts, protectors, and all items necessary to make a complete working system which shall be in accordance with the wireless and camera manufacturer's recommendations to provide a complete working system suitable for traffic monitoring. 27. Inductive Detector Loops Loops in existing pavements shall be saw-cut. Loops in new pavement shall be prefabricated and buried/embedded. All loops shall be individually placed in pavement and terminated in handholes. Loop Wire. The loop wire shall be 600-volt stranded copper, No. 14 AWG, Type THWN, with UL approval. The loop wire shall be protected by a flexible vinyl plastic tubing of 3/16-inch inner TRAFFIC SIGNALIZATION 100-27 FY 2019 University Avenue Reconstructon-Phase 2 AECOM#60528991-Ph2 Waterloo,Iowa diameter, a minimum of 1/32-inch wall thickness, 1/4-inch outer diameter. The tubing shall also be highly abrasion resistant and have a smooth bore. New Pavement Loop Cable: Shall be prefabricated and designed to be overlaid with hot asphalt or embedded in Portland cement concrete. The loop cable and assembly shall be capable of direct placement under asphalt overlays or concrete pavement without need for additional tubing. Each component of the prefabricated loop assembly, including the loop, the lead-in cable and the splice enclosure, shall be designed to resist moisture penetration and to continue functioning under minor pavement cracking. The cable may be around 0.36 inch O.D. and shall be made with such material as to ensure long, trouble free life. Splices are allowed only inside the handhole. All other connections shall be factory connected and sealed. The Contractor shall obtain Engineer's field verification of all loop locations prior to beginning of construction. If the prefabricated loop detector is destroyed before, during or after the paving operation, it will be replaced with another prefabricated loop detector even if this entails the removing of several panels of concrete. Cost of replacement shall be the responsibility of the faulty party and no cost will be borne by the City. Existing Pavement: Inductive loops consisting of three turns (four turns for back loops) of wire shall be saw cut in the pavement, with the width of cut being 3/8 inch and with a depth of 2 1/2 inches to 2 3/4 inches deep. Sharp (120 degree or less) corners shall be provided with an additional diagonal saw cut as shown in the plans. All saw cuts shall be overlapped sufficiently so that a full 2 1/2 inch to 2 3/4 inch depth of cut results around the entire perimeter of the loop. For each additional turn of wire, 1/4 inch of depth shall be added to the saw cut. Generally, all front loops have three 3 turns and all back loops have four turns of No. 14 AWG wire unless otherwise shown on plans or determined by Engineer during construction of the loop. For curbed streets, the saw cut shall be extended to the gutter line and a hole shall be drilled through the gutter line toward the handhole. No saw cut will be allowed into the curb face. For non-curbed streets, the saw cut shall extend to a hole drilled near the edge of the pavement as shown on the plans. A length of 3/4-inch diameter PVC conduit shall be inserted and sealed into the drilled hole from the outside edge of the pavement. Prior to placement of wire, the saw cut shall be clean and free of water and all foreign materials that may cause premature failure. Loop wire, encased in plastic vinyl tubing, shall be placed in the finished cut. Short pieces of backer rope of 3 to 4 inches shall be used, where necessary, to assure that the loop wire will remain at the bottom of the saw cut and not float up into the sealant. Lead-in wires outside of the loop shall be twisted approximately one turn per foot. All wire installation must be made without damage to the wire or its insulation. All damaged wire shall be replaced. Loop testing completed in accordance with Section 2505.03.F.6 of the Standard Specifications. During saw cut and prefabrication loop testing, the City of Waterloo, the Contractor, and/or Engineer shall be present during all testing procedures. Any loop that tests below the 100 mega ohms value shall be considered to be a faulty loop and shall be replaced. After obtaining satisfactory test results, the loop shall be sealed with Pro-Seal 6006 EX, Ruscoe Q Seal 290S, 3M Detector Loop Sealant 5000 or approved equivalent. If an approved equivalent is used, it must be approved by the City of Waterloo's Traffic Operations Department. The sealer shall be used strictly in accordance with the manufacturer's instructions. If sealant is placed below recommended manufacturer's temperature requirements, i.e., placement during late fall and winter, the loop shall not be accepted until the outside air temperature is at or above the TRAFFIC SIGNALIZATION 100-28 FY 2019 University Avenue Reconstructon-Phase 2 Waterloo,Iowa AECOM#60528991-Ph2 manufacturer's temperature. The sealer shall be poured into the slot to half depth. When both the loop and lead-in slots are half filled, check for air bubbles or material pileup and then proceed to fill the slots to roadway level. Excess sealant shall be removed by means of a"Squeegee." In all cases, there shall be neither a trough nor a mound formed. The sealer, when poured into a saw cut, should completely surround the wire, displace all air therein and completely fill the area of the slot, except for that portion filled with the wire hold down material. Allow sufficient time for the sealer to harden in accordance with manufacturer's instructions before allowing traffic to move over the area. The saw slot filler shall be a two component system, high viscosity liquid or approved equal formulated for use in sealing inductive wire loops and leads embedded in asphalt concrete and Portland cement concrete. The saw slot filler shall be useable on grades of 15 percent or less without excessive flow of material, unless otherwise approved by the Engineer. The Engineer shall approve the sealer. Approval of other sealants shall be based on Specifications and/or test data about their physical properties, performance properties and chemical resistance. The cured sealer shall be unaffected by oils, gasoline, grease, acids and most alkalis. The mixing of components and the filling of the cut shall be in accordance with the directions of the manufacturer. After completion of the sealing, the loop shall be final tested, as described in paragraph above. Completed sealed loop must pass continuity and resistance test prior to being accepted. Loop Splicing: The electrical splice between the loop lead-in cable to the controller and the loop wire shall be soldered using dipped or resin core solder and provided with a watertight protective covering for the spliced wire, the shielding on the loop lead-ins and the end of the tubing containing the loop wires. No torch soldering will be allowed. Remove the insulation from each conductor of a pair of lead-in cable conductors for 1 inch and scrape both copper conductors with knife until bright. Remove the plastic tubing from the loop wires for 1 1/2 inches. Remove the insulation from the loop wires for 1 inch and scrape both copper conductors with knife until bright. Solder the loop wires together where needed for series connection and to the lead-in wires and cover with a wire nut twisted on tightly. Cover the exposed shielding, drain wire and wire nut splices with a fast-drying brush-up type sealant and bonding compound manufactured for this purpose to protect surfaces against moisture, corrosion and other contaminants. The compound shall withstand Iowa's extreme weather conditions. Any unused loop lead-in wire shall have the end of it also covered with the appropriate product designed and manufactured for this purpose. 28. Luminaires Unless otherwise shown or modified on the plans, the luminaires shall meet the requirements listed under this section. Luminaires shall be Acuity Brands ATB2-40BLEDE70-MVOLT-R3-BK or engineer approved -- equivalent meeting the following requirements: • LED 120-277 Multi-Tap • Type III Light Distribution • Photocell Receptacle (Empty) • 100-130 Lumens Per Watt • 3700K-4000K Light Temperature • Lights Shall Not Require Separate Power Supply or Driver • Shall be Finished to Meet Pole Color • Minimum 50,000 Hours at 70% Lumen Maintenance TRAFFIC SIGNALIZATION 100-29 FY 2019 University Avenue Reconstructon-Phase 2 —' AECOM#60528991-Ph2 Waterloo,Iowa Luminaire shall be finished to match color and style of pole. Supplier shall provide a catalog cut sheet of luminaire for review by WTOD prior to acceptance. Luminaires shall be installed for operation on 240-volt AC, single phase, 60 Hz. Each luminaire shall be complete with EEI-NEMA Standard through terminal polarized, twist- lock type photoelectric control receptacle with shorting caps on all luminaires. Photoelectric control for the intersection shall be installed in the controller cabinet. Where a photocell is to be installed, the Contractor shall verify that the luminaire photocell is — operational prior to installation. Individual luminaires shall be provided with molded in-line fuse connector within the mast arm _- pole base and be sized to fit the conductors. Fuses shall be 10-ampere cartridge type. The neutral conductor shall not be fused. Street light connectors shall be used for all luminaire cable connections. Split bolts shall not be used. The photoelectric control turning "ON" and "OFF" roadway luminaires shall be in accordance with the following: • The photoelectric controls shall be of a solid-state crystal sensing type with an inverted turn-on and turn-off design and shall meet the design and quality requirements specified in the current acceptable standards to ANSI C136.10. The device shall have surge protection conforming to the requirements in the current acceptable surge protection ANSI standards. —' • The voltage rating of the control device shall be multi-voltage operating properly over the input voltage range of 105 to 285 volts, 50-60 Hz, alternating current with no change in the turn-on and turn-off foot-candle values, and a maximum total drift of not more than 1 percent over 10 years. • The control device shall have a minimum 30-second time delay to eliminate false operation — due to lightning or stray passing lights, shall provide fail-safe operation (the light supply shall remain "ON" if the control circuit fails), and shall be equipped with an arrester for built-in transient surge protection. — • The "TURN ON" level of the control device shall be 3.0 foot-candles at the appropriate voltage; the"TURN OFF" level of the control device 60 percent of the turn-on value. • An "ON-OFF" switch shall be provided inside each controller cabinet that controls power to all lighting circuits at that intersection. 29. Reflectorized Street Name Signs --NOT INCLUDED IN THIS PROJECT Length and Width: Sign length and width are determined based on the street name, letter size and type. Street name signs mounted overhead shall use 12-inch Upper Case and 9-inch Lower Case lettering. The substrate shall be aluminum, 6061-T6, 0.10-inch minimum thickness or of material specified on the plans. The nameplate shall have a minimum length of 48 inches. The sign length shall be in 6-inch increments. — TRAFFIC SIGNALIZATION 100-30 FY 2019 University Avenue Reconstructon-Phase 2 Waterloo,Iowa AECOM#60528991-Ph2 Un-mounted faces shall be shipped 1/4-inch wider and with 1/4-inch longer than the required width and length. The face shall be registered in the lower right corner with right and bottom border correct (3/4 inch) and the extra 1/4 inch at the top and left edge. Corners of the mounted nameplate shall be rounded (radius of corner must correspond to border radius)or as specified on the plans. Reflective Sheeting: The sign face shall be made from Type III or Type IV prismatic type retro- reflective sheeting. Processing: When screen processing, transparent screen process color shall be coated with a clear finish. Screen processed opaque black color need not be clear coated. All screen processing and clear coating shall be in accordance with the recommendations of the sheeting manufacturer. Sign faces may be produced by direct application of cutout copy onto mechanically applied background in accordance with sheeting manufacturers' recommendations. Application: For mounted signs, reflective sheeting shall be applied to sign blades that have been properly prepared. The sign faces shall be applied using the heat-vacuum process or squeeze roller application in accordance with the recommendations of the sheeting manufacturer. Letter Design: Standard abbreviations for street, avenue, boulevard, etc., shall be used following the street name or number. Legend shall optically be spaced and centered, both horizontally and vertically. The charts for standard alphabets (capital or upper case) for highway signs for letter design and spacing shall be used. Border: The border shall be 3/4-inch wide with 2 1/4-inch radius corners set on a square corner. The dimension between the inside edges of the border vertically and horizontally shall be 16 1/2 — inches wide by 1 1/2 inches shorter than the chosen length of the sign blade. Shop Drawings: Submit a sign layout shop drawing for each different mast arm-mounted street name sign for review and acceptance prior to sign fabrication. C. SALVAGED MATERIALS All existing signal materials and equipment not listed in the Specifications and which are not being incorporated into the final project shall be salvaged by the Contractor and stockpiled on the project site for pick up by WTOD personnel. Such items will remain the property of the City. Contractor may be allowed to deliver the salvaged equipment and materials to the City, but prior authorization and coordination is required. Existing traffic signal equipment and materials to be salvaged include: • Galvanized Poles and mast arms • Signal heads and signs mounted on signal poles or mast arms • Signal controllers and cabinets • Cameras • EVP detectors and indicator lights Among items to be properly disposed of by Contractor shall include: • Traffic signal pole footings—whole or partial—to be removed. • Old Street name signs to be removed. • Painted poles and mast arms TRAFFIC SIGNALIZATION 100-31 FY 2019 University Avenue Reconstructon-Phase 2 — AECOM#60528991-Ph2 Waterloo,Iowa D. TRAFFIC CONTROL It shall be the contractor's full responsibility to set up and maintain traffic control that is in compliance with the MUTCD and Iowa DOT standards. E. METHOD OF MEASUREMENT AND BASIS OF PAYMENT The "Traffic Signalization" work includes all traffic signal system components, interconnection system, luminaire pole extensions and luminaires which are mounted on the traffic signal poles, as detailed on the plans and described in this Specifications, to provide a fully operational system. Unless listed as a separate bid item, no other payment will be made for work covered by the Specifications, but all work will be considered to be included in the lump sum price for "Traffic Signalization." Contractor shall provide a breakdown list price for all items on Lump Sum traffic Signalization bid items immediately after a contract is signed or within a period specified on the plans. Compensation to the Contractor for all work covered by this Specifications shall be made at the Contract Lump Sum price for the signal system installation, complete, in place, and operating. No measurement or payment of individual traffic signal items will be made except for purposes _ of progress payments. The Contract Lump Sum payment shall be full compensation for all items of work and no separate payment for any individual items will be made. TRAFFIC SIGNALIZATION 100-32 FY 2019 University Avenue Reconstructon-Phase 2 Waterloo,Iowa AECOM#60528991-Ph2 SECTION 200 REHABILITATION OF EXISTING MANHOLES PART I GENERAL 200-1-1 GENERAL A. See SUDAS Division 6 unless otherwise noted below. 1. Under SUDAS Division 6 - Structures for Sanitary and Storm Sewers - Section 6020 - Rehabilitation of Existing Manholes, 3.02.B, delete Item No. 11 in its entirety (3.02.B.11). 2. Under SUDAS Division 6 - Structures for Sanitary and Storm Sewers - Section 6020 - Rehabilitation of Existing Manholes, 3.02.B, delete Item No. 13 in its entirety and replace with the following Item No. 13: "3.02.B. 13. Reinstall existing casting unless otherwise noted." B. Manhole Inspections 1. In the presence of the ENGINEER, CONTRACTOR shall inspect all the manholes on the project to determine what measures need to be taken to solve each manholes I & I issues. 2. CONTRACTOR shall locate, open, and inspect the following: a. Casting b. Chimney i. Rings ii. Grout c. Cone Section d. Barrel Sections e. Barrel Section Joints f. Base Section i. Invert ii. Bench iii. Doghouse 3. CITY shall assist with locating manholes not found by the CONTRACTOR 4. CITY shall assist with local residence where the manhole locations are in conflict with personal property. 5. ENGINEER shall provide a spread sheet with manhole numbers and bid items for logging the inspections. 6. EXTRA WORK will include the following: a. Personal Property remove and replace or relocation b. CITY will perform Box Outs of manholes located in the street. C. Internal Chimney Seal—Spray-On Applications 1. Products a. Cretex EasySeal SG b. S.S.I. Flex-Seal Utility Sealant c. Or Equal REHABILITATION OF EXISTING MANHOLES 200-1 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 2. Approved Spray-On products shall take the place of Internal Chimney Seals as determined during manhole inspections 3. Measurement and Payment shall be that of Internal Chimney Seal Bid Item. See Specification Section 01 22 13. 4. Substitutions for Spray-On Internal Chimney Seals shall be approved by the ENGINEER. D. Manhole Lining Admixture —see SUDAS Section 6020— Rehabilitation of Existing Manholes for Cementitious Mortar Liner Specifications. 1. Products a. ConrncShield b. Strong Seal MS-2A c. Or Equal 2. Product Data a. Unit Weight— 125 pcf b. Working Time—40 minutes c. Initial Set Time— 120 minutes d. Final Set Time—240 minutes e. Modulus of Elasticity ASTM C-469 28 day— 1,500,000 psi f. Flexural Strength ASTM C-293 1. 24 hours minimum 400 psi 2. 28 days greater than 1,500 psi g. Compressive Strength ASTM C-882 1. 24 hours—3,000 psi 2. 28 days— 10,000 psi h. Bond Strength ASTM C-882 1. 28 days—greater than 2,000 psi i. Tensile Strength ASTM C-496 greater than 800 psi 3. Installation a. Follow the manufacturer's installation procedure. E. Chemical Grout 11 1. Products a. Avanti AV-100 and Optional Additives b. Or Equal 2. Product Data a. http://www.avantigrout.com/resources/product-information/technical-data-sheets-1 3. Installation a. Follow the manufacturer's installation procedure. *** END OF SECTION * * * REHABILITATION OF EXISTING MANHOLES 200-2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa SECTION 300 HIGH DENSITY POLYETHYLENE (HDPE) PIPE PART I GENERAL 300-1-1 SUBMITTALS A. Product Data: 1. Manufacturing test specification data listing resin type, cell classification, stock density, melt flow, flexural modulus, tensile strength, and coloration. 2. Include test results with shipment of materials, with 2 additional copies of test results furnished to ENGINEER. 3. Pipe Dimensions: a. Average outside diameter. b. Average inside diameter. c. Minimum and average wall thickness. 300-1-2 QUALITY ASSURANCE A. Comply with appropriate codes and standards of following organizations for handling, heat fusion, and underground installation of low pressure polyethylene pipe. 1. American Gas Association (AGA). 2. Plastic Pipe Institute (PPI). 300-1-3 DELIVERY, STORAGE, AND HANDLING A. Pipe Storage: 1. Store or stack pipe to prevent damage from marring, crushing or puncture. Limit maximum stacking height to 6 ft. 2. Store in accordance with manufacturer's recommendations. B. Pipe Handling: 1. Protect pipe from excessive heat or harmful chemicals. PART 2 PRODUCTS 300-2-1 MATERIALS A. Manufacturers: 1. Phillips Driscopipe, Inc., Richardson, Texas. 2. Plexco, Amsted Industries, Franklin Park, Illinois. 3. Poly Pipe Industries, Gainesville, Texas. 4. Or equal. B. Physical Properties of Pipe Resin: 1. Density: ASTM D1505, not less than 0.941 - 0.955 gms/cu cm. '— 2. Melt Flow: ASTM D1238 -Condition E, not greater than 0.15. HIGH DENSITY POLYETHYLENE PIPE 300-1 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 3. Flexural Modulus: ASTM D790, 110,000 to less than 160,000 psi. 4. Tensile Strength at Yield: ASTM D638, 3,000 to less than 3,500 psi. 5. Environmental Stress Crack Resistance (ESCR): ASTM D1693 - Condition C, shall be in excess of 5,000 hrs with zero failures. 6. Hydrostatic Design Basis: ASTM D2837, 1,600 psi at 23❑C. C. High performance, high molecular weight, high density polyethylene pipe(Type 3408 or 4710 resin). D. ASTM D1248 (Type III, Class C, Category 5, P34). E. ASTM D3350, minimum cell classification value 345434C. F. Standard dimension ratio SDR 11. G. Marking: Intervals of 5 ft or less. 1. Manufacturer's name or trademark. 2. Nominal pipe size. 3. Type of plastic pipe (i.e., PE 3408 or 4710) '- 4. Standard dimension ratio SDR 11. 5. ASTM D2513. 6. Extrusion date, period of manufacture or lot, or batch number. _ H. Dimensions: 1. Conform to standard dimensions and tolerances of ASTM D2513. 300-2-2 FITTINGS A. Fittings from polyethylene compound having cell classification equal to or exceeding compound used in pipe to ensure compatibility of polyethylene resins. B. Provide molded fittings rather than factory fabricated fittings in available diameters. C. Be of same manufacture as pipe being provided. ENGINEER may allow substitution for approved material with use of flanged joint sections. D. Flange Joints: 1. 150 lb carbon steel or convoluted epoxy coated ductile iron backup flanges as recommended _ by manufacturer. 2. Cadmium plated carbon steel nuts and bolts. 3. Flanges and bolt patterns consistent with ANSI B16.5, AWWA C207, ASTM A536, and as recommended by manufacturer. E. Fitting dimensions shall conform to standard dimensions and tolerances, ASTM D3261. F. Markings, ea. fitting: 1. Manufacturer's name or trademark. 2. Nominal size. 3. Type of plastic pipe (i.e., PE 3408 or 4710). 4. Standard dimension ratio SDR 11. 5. ASTM D2513. 6. Extrusion date, lot number or batch number. HIGH DENSITY POLYETHYLENE PIPE 300-2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 2.03 SOURCE QUALITY CONTROL -- A. If manufacturer's test data inadequate or unavailable, OWNER reserves right to reject or require additional tests to satisfy material requirements. Costs of these tests shall be borne by CONTRACTOR. PART 3 EXECUTION 300-3-1 INSTALLATION A. Horizontal directional drilling in accordance with SUDAS 3020. B. Heat Fusion of Pipe: 1. Weld in accordance with manufacturer's recommendation for butt fusion methods. Provide qualified fusion operators. 2. Butt fusion equipment for joining procedures shall be capable of meeting conditions recommended by pipe manufacturer including, but not limited to,temperature requirements, alignment, and fusion pressures. 3. For cleaning pipe ends, solutions such as detergents and solvents, when required, shall be used in accordance with manufacturer's recommendations. 4. Do not bend pipe to greater degree than minimum radius recommended by manufacturer for type and grade. 5. Do not subject pipe to strains that will overstress or buckle piping or impose excessive stress on joints. 6. Branch saddle fusions shall be joined in accordance with manufacturer's recommendations and procedures. Branch saddle fusion equipment shall be of size to facilitate saddle fusion within trench. 7. Before butt fusing pipe, inspect each length for presence of dirt, sand, mud, shavings, and other debris or animals. Remove debris from pipe. 8. Cover at end of each working day open ends of fused pipe. Cap to prevent entry by animals or debris. 9. Use compatible fusion techniques when polyethylene of different melt indexes are fused together. Refer to manufacturer's specifications for compatible fusion. D. Flange Ends: 1. Use on flanged pipe connection sections. 2. Connect slip-on carbon steel backup flanges with nuts and bolts. Convoluted ductile iron backup rings may be substituted for joining HDPE pipes per manufacturer's — recommendations. 3. Butt fuse fabricated flange adapters to pipe. 300-3-2 FIELD QUALITY CONTROL A. Pipe may be rejected for failure to conform to Specifications or following. 1. Fractures or cracks passing through pipe wall, except single crack not exceeding 2 in. in length at either end of pipe which could be cut off and discarded. Pipes within one shipment shall be rejected if defects exist in more than 5% of shipment or delivery. 2. Cracks sufficient to impair strength, durability or serviceability of pipe. 3. Defects indicating improper proportioning, mixing, and molding. 4. Damaged ends, where such damage prevents making satisfactory joint. HIGH DENSITY POLYETHYLENE PIPE 300-3 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa B. Acceptance of fittings, stubs or other specially fabricated pipe sections shall be based on visual inspection at Project site and documentation of conformance to these Contract Documents. C. Pipe Testing: SUDAS 5030.3.05. *** END OF SECTION *** HIGH DENSITY POLYETHYLENE PIPE 300-4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa SECTION 400 COLORED AND STAMPED CONCRETE 1. PART 1-GENERAL 1.1 SECTION INCLUDES A. Installation of integrally colored concrete, stamped concrete and concrete finishes. 1.2 DESCRIPTION OF WORK A. The work is furnishing, placing, and installing concrete sidewalk and plaza per S U DAS Standard Specification Division 7 - Streets and Related Work in accordance with the drawings and specifications. 1.3 ACTION SUBMITTALS A. Product Data: Submit manufacturer's product data, storage and handling requirements and recommendations, installation methods and available colors, styles, patterns and textures. B. Samples: Submit manufacturer's samples of materials, finishes, and colors. C. Warranty:Manufacturer's standard warranty. 1.4 QUALITY ASSURANCE A. Perform work in accordance with: ACI 305.1, ACI 306.1,ACI 318. B. Obtain each material from same source and maintain high degree of consistency in workmanship throughout Project. C. Installer Qualifications: Concrete work shall be by firm with 5 years of experience with work of similar scope and quality. D. Integrally Colored Concrete Mock-Up: 1. Provide full-scale mock-up for each Colored Concrete Type. Construct at least one month before start of other concrete work to allow concrete to cure before observation. 2. At location acceptable to Engineer, demonstrate methods used for construction, including forming and finishing conditions required for Project using materials, workmanship, joint treatments, and curing methods to be used throughout Project. 3. Accepted mock-up provides visual standard for work of Section. 4. Remove mock-up when no longer required for comparison with finished work at Substantial Completion and Acceptance. 1.5 DELIVERY, STORAGE AND HANDLING r._ A. Color Additive: Deliver, store, and handle in accordance with manufacturer's instructions. B. Concrete: Schedule delivery to provide consistent mix times from time color additive is placed in mixture until placement of integrally colored concrete. Mix times shall meet manufacturer's written specifications. 1.6 MEASUREMENT AND PAYMENT A. Measurement: Each thickness of PCC Colored Pavement will be measured in square yards at the depth specified. The area of manholes, intakes, or other fixtures in the pavement will not be ducted from the measured pavement area. Acceptable m ock-up areas will be measured for payment. COLORED AND STAMPED CONCRETE 400-1 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa B. Payment: Payment will be at the unit cost per square yard for each thickness off PCC _ Sidewalk. C. Includes: Unit price includes, but is not limited to, minor grade adjustments, excavation, preparation of the subbase, formwork, additional thickness at thickened edges, aggregate base, placement of integrally colored concrete, application of surface sealers and textures, jointing, sampling, testing, and all other incidental items necessary for a complete in place installation. 2. PART 2-PRODUCTS 2.1 CONCRETE MATERIAL A. As per SUDAS Standard Specification Division 7 - Streets and Related Work _ 2.2 COLOR ADDITIVES A. Type: 1. Admixture shall be a colored, water-reducing, admixture containing no calcium chloride with coloring agents that are limeproof and ultra-violet resistant. 2. Colored admixture shall conform to the requirements of ACI 303.11, ASTM C979, ASTM _ C494 and AASHTO MI 94. 3. All colored concrete shall be integral and mixed in a controlled environment. B. Color Additive Delivery: 1. Automated Dispensing: Meter and dispense colors using computer-controlled automated color weighing and dispensing system. 2. Manual Dispensing: Powdered color additives in pre-measured disintegrating bags. C. Decorative Concrete Type A (See plans for locations): 1. Pigment for integrally colored concrete shall be: a. 920 Smoke 1. Provide one 25 lb. bag/two cubic yards of concrete. 2. Manufactured by Solomon Colors, Inc. 4050 Color Plant Road, Springfield, IL 62702. Phone: 1-800-624-0261, www.solomoncolors.com. b. Or Approved Equal D. Decorative Concrete Type B (See plans for locations): 1. Pigment for integrally colored concrete shall be: a. 242 Sahara 1. Provide one 25 lb. bag/two cubic yards of concrete. 2. Manufactured by Solomon Colors, Inc. 4050 Color Plant Road, Springfield, IL 62702. Phone: 1-800-624-0261, www.solomoncolors.com. b. Or Approved Equal COLORED AND STAMPED CONCRETE 400-2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa E. Decorative Concrete Type C (See plans for locations): 1. Pigment for integrally colored concrete shall be: a. 242 Sahara 1. Provide one 25 lb. bag/two cubic yards of concrete. 2. Manufactured by Solomon Colors, Inc. 4050 Color Plant Road, Springfield, IL 62702. Phone: 1-800-624-0261, www.solomoncolors.com. b. Or Approved Equal 2.3 FINISHES A. Decorative Concrete Type A(See plans for locations): 1. Raked, tined surface finish texture over initial broom finish to create a %4" deep reveal at approximately 2" on center utilizing Kraft Tool CC198-1. The intent is that the surface texture should appear to be raked. 2. For direction of raked finish, see plans. B. Decorative Concrete Type B (See plans for locations): 1. Pattern to be Brickform Running Bond Used Brick—Standard 2. Manufacturer: Solomon Colors, Inc. 4050 Color Plant Road, Springfield, IL 62702. Phone: 1-800-624-0261, www.solomoncolors.com. 3. For direction of stamped concrete pattern finish, see plans. C. Decorative Concrete Type C (See plans for locations): 1. Raked, tined surface finish texture over initial broom finish to create a %4' deep reveal at approximately 2" on center utilizing Kraft Tool CC198-1. The intent is that the surface texture should appear to be raked. 2. For direction of raked finish, see plans. 2.4 ACCESSORIES A. Joint Sealants: 1. Provide per SUDAS Standard Specification Division 7—Streets and Related Work. 2. Color: Color selected by Engineer from manufacturer's full range. To match integrally colored concrete. B. Cleaning Agents:Use products known to be compatible with integrally colored concrete. C. Liquid Release Agent: Colorless, scented liquid formulated to break the bond between imprinting tools and surface of color-hardened concrete. Evaporates completely, leaving no residue. D. Waterborne Curing Compound and Sealer: Low VOC waterborne modified acrylic formulation. Complies with ASTM C 309. Suring and Sealing Compound to be of the same manufacturer as the color admixture. E. Solvent-Borne Curing Compound and Sealer: 100 percent methacrylate polymers and UV inhibitors blend. Low VOC waterborne modified acrylic formulation. Complies with ASTM C 309. Suring and Sealing Compound to be of the same manufacturer as the color admixture. F. ADA ramps and tactile warning surfacing treatment, refer to civil S plans. COLORED AND STAMPED CONCRETE 400-3 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 3. PART3—EXECUTION 3.1 EXAMINATION A. Examine areas and conditions, with Installer present, for compliance with requirements for correct and level finished grade, mounting surfaces, installation tolerances, and other conditions affecting performance of the work. B. Do not place integrally colored concrete where standing water is present. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Concrete installation as per SUDAS Standard Specification Division 7-Streets and Related Work. B. Comply with color admixture manufacturer's recommendations and written installation ,F instructions unless more stringent requirements are indicated. C. As indicated on plans for Colored Concrete Type A and Colored Concrete Type C, apply a raked surface finish texture to Colored Concrete Type A and Colored Concrete Type C to create a %"deep reveal at approximately 2"on center. The intent is that the surface texture should appear to be raked. D. As indicated on plans for Colored Concrete Type B, apply brick concrete stamped finish and associated sealants in accordance with manufacturer's specifications. Installer shall take care in determining "stamp" modules to align with jointing and termination of pours. E. Apply curing compound for integral colored concrete according to manufacturer's instructions using manufacturer's recommended application techniques. Apply sealing compound at consistent time for each pour to maintain close color consistency per manufacturer's recommendations. F. Precautions shall be taken in hot weather to prevent plastic cracking resulting from excessively rapid drying at surface as described in CIP 5 Plastic Shrinkage Cracking published by the National Ready Mixed Concrete Association. G. Do not cover concrete with plastic sheeting. H. Concrete scoring joints and expansion joints as indicated on plans. I. All surface gradients shall be per the grading plans, local and national standards and not exceed a 1.75% cross slope. J. All surface gradients for transit shelter pads shall be as per manufacturer's recommendations. Refer to details and manufacturer's installation instructions. 3.3 APPEARANCE TOLERANCES A. Appearance: Minor variations in appearance of integrally colored concrete that are similar to natural variations in color and appearance of uncolored concrete are acceptable. 3.4 CLEANING A. Efflorescence: Remove efflorescence as soon as practical after it appears and as part of final cleaning. B. Use least aggressive cleaning techniques possible. COLORED AND STAMPED CONCRETE 400-4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa C. If proprietary cleaning agents are used, pre-wet surface, test cleaning agent on small, inconspicuous area, and check effects prior to proceeding. Thoroughly rinse surface afterwards with clean water. Follow cleaner manufacturer's instructions. D. Do not use muriatic or hydrochloric acid on integrally colored concrete. ** * END OF SECTION * * * COLORED AND STAMPED CONCRETE 400-5 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY SECTION 500 SITE FURNISHINGS 1. PART I—GENERAL 1.1 SUMMARY A. Section Includes: "' 1. Benches—Types A, B and C. 2. Leaning Rails. 3. Trash Receptacles. 4. Bike Racks. 5. Bus Shelters. 1.2 ACTION SUBMITTALS A. Product Data: Submit manufacturer's product data, storage and handling requirements and recommendations, installation methods and available colors, styles, patterns and textures. -° B. Shop Drawings: Submit manufacturer's shop drawings, including plans and elevations, indicating overall dimensions. C. Samples: Submit manufacturer's samples of materials, finishes, and colors. D. Warranty: Manufacturer's standard warranty. E. Bus Shelter Wind Loading Certification: Contractor shall provide a written, stamped certification by a locally licensed structural engineer that Bus Shelter and related mounting/installation details meets or exceeds all applicable wind loading requirements. 1.3 CLOSEOUT SUBMITTALS A. Maintenance Data: For site furnishings to include in maintenance manuals. 1.4 MAINTENANCE MATERIAL SUBMITTALS A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Trash Receptacle Inner Containers: Two full-size units for each size indicated. 1.5 QUALITY ASSURANCE A. Manufacturer Qualifications: 1. Minimum 15 years of experience in the manufacture of site seating. 1.6 DELIVERY, STORAGE AND HANDLING A. Handle products in accordance with manufacturer's instructions. B. Store products in manufacturer's original packaging until ready for installation. C. Protect products from impacts and abrasion during storage. 1.7 WARRANTY A. Provide manufacturer's standard warranty SITE FURNISHINGS 500-1 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa B. Warranty terms: one year from date of invoice against defects in materials and workmanship. 1.8 MEASUREMENT AND PAYMENT A. Measurement: Site Furnishings will not be measured for payment, but will be considered part of the lump sum landscaping item. B. Payment: Payment will be included as part pf the lump sum price paid for landscaping C. Schedule of Values: Prior to any payment by the City for work completed on this project, the contractor shall complete and forward to City for approval a list of unit costs for each item included in the lump sum price bid for landscaping. D. Includes: Unit price includes, but is not limited to, site furnishing, shipping, hardware for installation, site furnishing installation, and all other incidental items necessary for a complete in place installation. 2. PART 2-PRODUCTS 2.1 BENCHES A. Provide benches based on the product named. 1. Bench Type A:Metro 40 Series—Connect Rail by Landscape Forms a. Style: Sitting Rail: 1. Depth: 7 inches 2. Overall Height: 18 inches 3. Length: 45 inches b. Mounting: Surface Mounted. c. Materials: 1. Seat — Aluminum: Extruded aluminum insert/board is clear anodized (202-R1) and powdercoated. 2. Frame-Cast Aluminum. d. Finish: 1. Pangard II Polyester Powdercoat (proprietary finish). Color: Metallic Titanium e. Manufacturer: Landscape Forms, Inc., 7800 E. Michigan Ave, Kalamazoo, Michigan 49048. Phone: (800) 521-2546. Fax (269) 381-3455. Website _ www.landscapeforms.com 2. Bench Type B: Stay Bench by Landscape Forms a. Style: Backless with 2 dividers. 1. Depth: 19 inches 2. Overall Height: 20 inches 3. Length: 69 inches b. Mounting: Surface Mounted. c. Finish: SITE FURNISHINGS 500-2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa _ 1. Pangand U Polyester Povvderoost (proprietary finish). Color: Metallic Titanium -~ d. Manufacturer: Landscape Forms, Inc., 7800 E. Michigan Ave, Km\amazoo. Michigan 49048. Phone: (800) 521'2548. Fax (269) 381-3455. VVabmha vvxvw]andncapohorms.com -- 3. Bench Type C: FGPBenoh by Landscape Forma _ a. Style: Backed 1. Depth: 28 \nchea 2. Overall Height: 30inohes 3. Length: 7Uinches b. Seating Surface: Jaxah, no finish. C. Mounting: Surface Mounted. ~~ d. Supports Finish: 1. Pangard U Polyester Powdercoad (proprietary finish). Color: Metallic ~~ Titanium e. Manufacturer: Landscape Fonno. Inc., 7800 E. Michigan Ave, Ko|am0000, Michigan 49048. Phone: (800) 521-2546. Fax (269) 381'3455. VVnbnite ^� vvvvw]andscepeforma.uom 3.2 LEANING RAILS ~~ A. Provide leaning rails based on the product named. 1. Leaning Rail:Metro 4O Series-Connect Rail by Landscape Forms �- I. Style: Leaning Rail: 1 Depth: 6.5inohes ~� 2. Overall Height 30inchme 1 Length: 45inches ii Mounting: Surface Mounted. ~~ iii yWe\eho|s: 1. Seat - Extruded aluminum insert/board is clear anodized (202'R1) ~~ ondpowdarcoated. 2. Fname-Cast Aluminum. iv. Finish: 1. Pangand U Polyester Powdencoat (proprietary finish). Color: Metallic Titanium ~� V. Manufacturer: Landscape Forms, Inc., 7808 E. Michigan Ave, Kalamazoo, Michigan 48048. Phone: (800) 521-2548. Fax (260) 381'3455. VVabnita vvvvw]andscapafnrmo.nom ~� 2.3 TRASH RECEPTACLES A. Provide trash receptacles based on the product named -' -- SITE FURNISHINGS 500-3 pYuo1oUniversity Avenue Reconstruction-Phase e AsooM*musuoss1'ph2 City Contract No.o3w Waterloo,Iowa _ 1. Metro 4U Series - Collect Litter Receptacle by Landscape Forms a. Style: Side Opening, capacity: 23 gallons. b. Size: ^~ 1 Depth: 15.Qinches 2� Width: 23.5 inches 3. Height 37.9 inches _~ C. Mounting: Surface Mounted: Shipped with adjustable levelers. Cl. Look: Keyed with 2 brass keys per unit. All Trash Receptacles to be keyed the same and shall also nnah:h key for Phase | Trash Receptacles. ~_ o. Finish: 1. Pangard U Polyester Powdencosd (proprietary finish). Color: Metallic Titanium ~- 2. Polyethylene Color: Black [ Manufacturer: Landscape Forms, Inc., 7800 E. Michigan Ave. Ko|amazuu, Michigan 40048. Phone: (808) 521-2546. Fax (269) 381'3455. VVobsite ~~ wvmv]ondsoopeformn.00m 2.4 BIKE RACKS ,~ A. Provide bike racks based on the product named. 1. Metro 4O Series— Ride bicycle rack by Landscape Forms ~~ a. Size: 1. Depth: 3.3 inches —' 3. Width: 28inches 3, Height: 20inches b. Mounting: Surface Mounted ~~ C. Finish: ' _ 1. Pengard U Polyester Povvderooat (proprietary finish). Color: Metallic Titanium d. Manufacturer: Landscape Forms, Inc., 7800 E. Michigan Ave. Kalamazoo, —~ Michigan 40048. Phone: (800) 521'2546. Fax (260) 381'3455. VVebnite www]andscmpeforme.onm 2.5 BUSSHELTERS ~� A, Provide bus shelters based on the product named. ~~ 1. Metro 48Series Connect2.0 Transit Structure a. Style: 12foot shelter ~- 1. Four (4) Veridical Posts with Tempered Glass Roof Structure: 2 Width/Length: 144inohes 3. Tempered Safety G|moo. Roof Length 16175 inches. Roof Width -- 7575innhes. SITE FURNISHINGS 500-4 pvuo1yUniversity Avenue Reconstruction'p»aoeo AscoM*moouoyy1'p,2 City Contract No.no* Waterloo,Iowa ~~ b. Glass Options: 1. Front Glass: Center Front Glass, Tempered. 2. Rear Glass: All Glass Rear, Tempered. 3. Side Glass: All Glass Sides, Tempered. c. Power Source for Lighting: Hard-wired. d. Finish: Ij 1. Pangard II Polyester Powdercoat (proprietary finish). Color — Metallic Titanium, to match Phase I Bus Shelter color. e. Manufacturer: Landscape Forms, Inc., 7800 E. Michigan Ave, Kalamazoo, Michigan 49048. Phone: (800) 521-2546. Fax (269) 381-3455. Website www.landscapeforms.com r 3. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas and conditions, with Installer present, for compliance with requirements for correct and level finished grade, mounting surfaces, installation tolerances, and other conditions affecting performance of the work. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION, GENERAL A. Comply with manufacturer's written installation instructions unless more stringent requirements are indicated. Complete field assembly of site furnishings where required. B. Unless otherwise indicated, install site furnishings after landscaping and paving have been completed. 3.3 FINISH REQUIREMENTS, GENERAL A. Appearance of Finished Work: Noticeable variations in same piece are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. * * * END OF SECTION * * SITE FURNISHINGS 500-5 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY -~ ~ SECTION �� PLANTS ~ 1' PARTY-GENERAL ~ 1.1 SECTION INCLUDES A. Plant Preparation ~- B. Plant Material C. Planting Preparation D. Planting E. Tree Stabilization F. Landscape Edging ~~ G. Finishing H. Maintenance & Warranty ~� 1.2 ADDITIONAL REQUIREMENTS A. In addition to requirements be|nw, refer toand comply with Iowa Statewide Urban Design ~~ and 3pecificadons (SUDAS) Division S - SitoVVorkand Landsooping, Section SO30 - Plant Material and Planting. ^� 1.3 DEFINITIONS A. Backfill: The earth used to replace or the act of replacing earth in an excavation. ~~ B. Balled and Bur|eppod Stock: Plants dug with firm, natural balls of earth in which they were grown, with a ball size not less than sizes indioated� wrapped with budap. Ued, rigidly nuppoded, and drum laced with twine with the root flare visible at the surface of the ball as recommended by ANSI ZOO.| -- C. Container-Grown Stook: Hea|thy, vigornus, well-rooted plants grown in e oontainer, with a well-established oocd system reaching sides of container and maintaining a firm ball when removed from container. Container shall be rigid enough to hold ball shape and protect ~` root mass during shipping and be sized according to ANSI Z60.1 for type and size of plant required. D. Finish Grade.- Elevation of finished surface of planting soil. Finish Grade mhoU be as -` noted on details and approved by Engineer Owner's Representative. E. Pesticide: A substance or mixture intended for pneventiny, destroying, repeUing, or mitigating a pest. Pesticides include inneoticidea, midoides, herbicides. fungicides, �- rodontinides, and moUusoioidao. They also include substances or mixtures intended for use as a plant regu|abor, defoliant, or desiccant. Some sources danoih/ herbicides separately from pesticides. ~- F. Pests: Living organisms that occur where they are not desired o/ that cause damage to p|ents, anima|n, or people, Rests include insects, mibaa, grubs. mollusks (snails and slugs), rodents (gophera, mo|ea, and mioe), unwanted plants (weeds), fungi, bacteria, and viruses. _ G. Planting Area: Areas to be planted. As shown on drawings in configurations identified. puNra 600-1 pvuo1oUniversity Avenue u � H. Planting Soil: Exsdng, on-site soil; imported soi|� or manufactured soil that has been ~_ modified with soil amendments and fertilizers to produce a soil mixture best for plant growth. | Plant" Plants', Plant Material: These terms refer to vegetation in gono/a|, including trees, � ahrubu, vines, ground covers, ornamental grasses, bu|bs, cormn, tubers, or herbaceous vegetation. J. Root Flare: Also called 'trunk Uava.^ The area at the base of the p|anCo stem or trunk _~ vvhena the stem or trunk broadens to form 000ts� the area of transition between the root system and the stem ortrunk. K, Stem Girdling Roots.- Roots that encircle the stems (hunks) of trees below the soil ~_ surface. L� Subgrade: The surface o/ elevation of subsoil remaining after excavation is nnmp|ete, or the top surface ofa fill orbookfiU before planting soil io placed. ~_ 1.4 COORDINATION A. Coordinate plant installations with seeding and other site work. Plant treea, shrubs, and -- other plants after finish grades are established and accepted before planting turf areas unless otherwise indicated. 1. When planting treeo, shnube, and other plants after planting turf areas, limit traffic to _ newly installed turf and protect turf oveos, and promptly repair damage caused by planting operations. 1.5 PRE-INSTALLATION MEETINGS A. Pre-installation Conference: Conduct conference at Project site as directed by ~ Landscape Architect orEngineer. 1.6 ACTION SUBMITTALS A. Product Data: For each type of product indicated. 1. Plant Materials: Include quantities, sizes, quality, and sources for plant materials. 2. Pesticides and Herbicides: Include product label and manufacturer's application instructions specific to the Project. ~- 3. Metal Landscape Edging: Provide cut sheet and technical installation specifications. B. Qualification Data: For landscape Installer. Include list of similar projects completed by ~~ Installer demonstrating Installer's capabilities and experience. Include project namea, addnansen, and year completed, and include names and addresses of owners' contact persons. C. Product Certificates: For each type of manufactured pnodunt, from nnnnuha(tuoer, and complying with the following: 1. Manufacturer's certified analysis nf standard products. 2. Analysis of other mabaha|o by a recognized laboratory made according to methods established by the Association of Official Analytical Chemists, where applicable. _ ~— pLAwTe eoo'u pvun1s University Avenue Reconstruction-Phase u AsooM#60*28991'phe City Contract No.nx4 Waterloo,Iowa ~— D. Pesticides and Herbicides: Product label and manufacturer's application instructions specific to Project. 1.7 QUALITY ASSURANCE A. Installer Qualifications: A qualified landscape installer whose work has resulted in successful establishment of plants. 1. Professional Membership: Installer shall be a member in good standing of either the National Association of Landscape Professionals or the American Nursery and Landscape Association. 2. Experience: Three years of experience in landscape installation in the project's geographical area (within 200 mile radius). 3. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when work is in progress. 4. Personnel Certifications: Installer's field supervisor shall have certification in one or more of the following categories from the National Association of Landscape Professionals: a. Landscape Industry Certified Technician - Exterior. b. Landscape Industry Certified Horticultural Technician. 5. Pesticide Applicator: State licensed, commercial. B. Provide quality, size, genus, species, and variety of plants indicated, complying with Oa. applicable requirements in ANSI Z60.l. C. Measurements: Measure according to ANSI Z60. I. Do not prune to obtain required sizes. 1. Trees and Shrubs: Measure with branches and trunks or canes in their normal position. Take height measurements from or near the top of the root flare for field- grown stock and container- grown stock. Measure main body of tree or shrub for height and spread; do not measure branches or roots tip to tip. Take caliper measurements 6 inches above the root flare for trees up to 4-inch caliper size, and 12 inches above the root flare for larger sizes. 2. Other Plants: Measure with stems, petioles, and foliage in their normal position. D. Plant Material Observation: Landscape Architect may observe plant material either at place of growth or at site before planting for compliance with requirements for genus, species, variety, cultivar, size, and quality. Landscape Architect may also observe trees and shrubs further for size and condition of balls and root systems, pests, disease symptoms, injuries, and latent defects and may reject unsatisfactory or defective material at any time during progress of work. Remove rejected trees or shrubs immediately from Project site. `' 1. Notify Landscape Architect of sources of planting materials fourteen days in advance of delivery to site. The Landscape Architect will inspect all materials at project site or nursery location if within 30 miles of project site. PLANTS 600-3 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 1.8 DELIVERY, STORAGE, AND HANDLING A. Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of compliance with state and Federal laws if applicable. .. B. Bulk Materials: 1. Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on existing turf areas or plants. 2. Provide erosion-control measures to prevent erosion or displacement of bulk materials; discharge of soil-bearing water runoff; and airborne dust reaching adjacent properties, water conveyance systems, or walkways. 3. Accompany each delivery of bulk materials with appropriate certificates. C. Do not prune trees and shrubs before delivery. Protect bark, branches, and root systems from sunscald, drying, windburn, sweating, whipping, and other handling and tying damage. Do not bend or bind-tie trees or shrubs in such a manner as to destroy their natural shape. Provide protective covering of plants during shipping and delivery. Do not drop plants during delivery and handling. D. Handle planting stock by root ball. E. Apply antidesiccant to trees and shrubs using power spray to provide an adequate film over trunks (before wrapping), branches, stems, twigs, and foliage to protect during digging, handling, and transportation. 1. If deciduous trees or shrubs are moved in full leaf, spray with antidesiccant at nursery before moving and again two weeks after planting. F. Wrap trees and shrubs with burlap fabric over trunks, branches, stems, twigs, and foliage to protect from wind and other damage during digging, handling, and transportation. G. Deliver approved plants after preparations for planting have been completed, and install immediately. If planting is delayed more than six hours after delivery, set plants and trees in their appropriate aspect (sun, filtered sun, or shade), protect from weather and mechanical damage, and keep roots moist. 1. Set balled stock on ground and cover ball with soil, peat moss, sawdust, or other acceptable material. 2. Do not remove container-grown stock from containers before time of planting. 3. Water root systems of plants stored on-site deeply and thoroughly with a fine-mist spray. Water as often as necessary to maintain root systems in a moist, but not overly wet condition. 4. It is the Contractors responsibility to secure all materials from vandalism and theft. 1.9 FIELD CONDITIONS A. Field Measurements: Verify actual grade elevations, service and utility locations and utility easements, and dimensions of plantings and construction contiguous with new plantings by field measurements before proceeding with planting work. PLANTS 600-4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa B. Planting Restrictions: Refer to and comply with Iowa Statewide Urban Design and Specifications (SUDAS) Section 9030 — Plant Material and Planting. C. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit planting to be performed when beneficial and optimum results may be obtained. Apply products during favorable weather conditions according to manufacturer's written instructions and warranty requirements. 1.10 WARRANTY A. Special Warranty: Installer agrees to repair or replace plantings and accessories that fail in materials, workmanship, or growth within specified warranty period. 1. Failures include, but are not limited to,the following: a. Death and unsatisfactory growth except for defects resulting from abuse, lack of adequate maintenance, or neglect by Owner. b. Structural failures including plantings falling or blowing over. c. Faulty performance of tree stabilization. 2. Warranty Periods: From date of Substantial Completion. a. Trees: 24 months. b. All Other Plant Material: 12 months. 3. Include the following remedial actions as a minimum: a. Immediately remove dead plants and replace unless required to plant in the succeeding planting season. b. Replace plants that are more than 25 percent dead or in an unhealthy condition at end of the warranty period. c. A limit of one replacement of each plant is required except for losses or replacements due to failure to comply with requirements. d. Provide extended warranty for period equal to original warranty period, for replaced plant material. Submit plan with locations of replaced plant materials and date of acceptance of replacement to Project Engineer. 1.11 MAINTENANCE SERVICE A. Initial Maintenance Service for Trees: Provide maintenance by skilled employees of landscape Installer. Maintain as required in Part 3. Begin maintenance immediately after plants are installed and continue until plantings are acceptably healthy and well established but for not less than maintenance period below. 1. Maintenance Period: 24 months from date of substantial completion. B. Initial Maintenance Service for all other plants: Provide maintenance by skilled employees of landscape Installer. Maintain as required in Part 3. Begin maintenance immediately after turf and/or plants are installed and continue until turf and/or plantings are acceptably healthy and well established but for not less than maintenance period below. 1. Maintenance Period: 12 months from date of Substantial Completion. PLANTS 600-5 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa C. Continuing Maintenance Proposal: From Installer to Owner, in the form of a standard yearly (or other period) maintenance agreement, starting on date initial maintenance service is concluded. State services, obligations, conditions, and terms for agreement period and for future renewal options. D. Maintenance Personnel Qualifications: A qualified landscape maintenance professional whose work has resulted in successful maintenance of turf and plants. 1. Professional Membership: Landscape maintenance professional shall be a member in good standing of either the National Association of Landscape Professionals or the American Nursery and Landscape Association. 2. Experience: Two years of experience in landscape maintenance in the project's — geographical area (within 200 mile radius). 3. Landscape Maintenance Professional's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when maintenance work is in progress. 4. Personnel Certifications: Landscape Maintenance Professional's field supervisor shall have certification in one or more of the following categories from the National Association of Landscape Professionals: a. Landscape Industry Certified Lawn Care Manager. b. Landscape Industry Certified Lawn Care Technician - National. c. Landscape Industry Certified Lawn Care Technician. 1.12 MEASUREMENT AND PAYMENT A. Measurement and Values: The project is lump sum but contractor is required to submit a schedule of values for specified items within one week of execution of contract. The following items shall be included as items in the schedule of values. _ 1. Plants: Values for plant material shall be established per each plant. Unit value for plant material shall include but not be limited to all materials, utility coordination, planning layout, staking, sub-grade preparation, planting, backfilling, guying, finish grading, mulching, maintenance and identified on the drawings and within this specification. 2. Landscape Edging: Value for landscape edging shall be established based on linear foot measurement, Unit value for landscape edging shall include but not be limited to all material, layout, edging installation, and finishing. 2. PART 2-PRODUCTS 2.1 PLANT MATERIAL A. General: Furnish nursery-grown plants true to genus, species, variety, cultivar, stem form, shearing, and other features indicated in Plant List, Plant Schedule, or Plant Legend indicated on Drawings and complying with ANSI Z60. I; and with healthy root systems developed by transplanting or root pruning. Provide well-shaped, fully branched, healthy, vigorous stock, densely foliated when in leaf and free of disease, pests, eggs, larvae, and defects such as knots, sunscald, injuries, abrasions, and disfigurement. — PLANTS 600-6 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa soil to prevent settling. Scarify sides of planting pit smeared or smoothed during excavation. 2. Excavate approximately two times as wide as ball diameter for balled and burlapped stock. 3. Excavate at minimum of two times the diameter of root spread and deep enough to accommodate vertical roots for bare-root stock. 4. Do not excavate deeper than depth of the root ball, measured from the root flare to the bottom of the rootball. 5. If area under the plant was initially dug too deep, add soil to raise it to the correct — level and thoroughly tamp the added soil to prevent settling. 6. Maintain angles of repose of adjacent materials to ensure stability. Do not excavate subgrades of adjacent paving, structures, hardscapes, or other new or existing improvements. 7. Maintain supervision of excavations during working hours. 8. Keep excavations flagged, covered and fenced with approved safety fencing or otherwise protected overnight as previously approved by Engineer Owner's Representative. 9. If drain tile is indicated on Drawings or required under planting areas, excavate to top of porous backfill over tile. B. Subsoil and topsoil removed from excavations may be used as backfill soil unless otherwise indicated, refer to SUDAS Division 9 — Site Work and Landscaping, Section 9030 — Plant Material and Planting. C. Obstructions: Notify Landscape Architect o r Engineer Owner's Representative if unexpected rock or obstructions detrimental to trees or shrubs are encountered in excavations. 1. Hardpan Layer: Drill 6-inch diameter holes, 24 inches apart each way, into free- draining strata or to a depth of 10 feet, whichever is less, and backfill with free- - draining material. D. Drainage: Notify Landscape Architect or Engineer Owner's Representative if subsoil conditions evidence unexpected water seepage or retention in tree or shrub planting pits. E. Fill excavations with water and allow a maximum of 24 hours for water to percolate away — into subsoil before positioning trees and shrubs. Provide safety fencing at all excavations/planting pits. 3.5 TREE AND SHRUB PLANTING A. Inspection: At time of planting, verify that root flare is visible at top of root ball according to ANSI Z60.1 . If root flare is not visible, remove soil in a level manner from _ the root ball to where the uppermost root emerges from the trunk. After soil removal to expose the root flare, verify that root ball still meets size requirements. B. Roots: Remove stem girdling roots and kinked roots. Remove injured roots by cutting cleanly; do not break. PLANTS 600-11 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa C. Slopes: When planting on slopes, set the plant so the root flare on the uphill side is flush with the surrounding soil on the slope; the edge of the root ball on the downhill side will be above the surrounding soil. Apply enough soil to cover the downhill side of the root ball. D. Set balled and burlapped stock plumb and in center of planting pit or trench with root flare 2 inches above adjacent finish grades. 1. Use planting soil for backfill. E. After placing some backfill around root ball to stabilize plant, carefully cut and remove burlap, rope, and wire baskets from tops of root balls and from sides, but do not remove from under root balls. Remove pallets, if any, before setting. Do not use planting stock if root ball is cracked or broken before or during planting operation. F. Backfill around root ball in layers, tamping to settle soil and eliminate voids and air pockets. When planting pit is approximately one-half filled, water thoroughly before placing remainder of backfill. Repeat watering until no more water is absorbed. G. Place planting tablets in each planting pit when pit is approximately one-half filled; in amounts recommended in soil reports from soil-testing laboratory. Place tablets beside the root ball about 1 inch from root tips; do not place tablets in bottom of the hole. H. Continue backfilling process. Water again after placing and tamping final layer of soil. I. Set container-grown stock plumb and in center of planting pit or trench with root flare 2 inches above adjacent finish grades. 1. Use planting soil for backfill. 2. Carefully remove root ball from container without damaging root ball or plant. 3. Backfill around root ball in layers, tamping to settle soil and eliminate voids and air pockets. When planting pit is approximately one-half filled, water thoroughly before placing remainder of backfill. Repeat watering until no more water is absorbed. 4. Place planting tablets in each planting pit when pit is approximately one-half filled; in amounts recommended in soil reports from soil-testing laboratory. Place tablets beside the root ball about 1 inch from root tips; do not place tablets in bottom of the hole. 5. Continue backfilling process. Water again after placing and tamping final layer of soil. 3.6 TREE AND SHRUB PRUNING A. Remove only dead, dying, or broken branches. Do not prune for shape. B. Prune, thin, and shape trees, shrubs, and vines as directed by Architect. C. Prune, thin, and shape trees according to standard professional horticultural and arboricultural practices. Unless otherwise indicated by owner do not cut tree leaders; remove only injured, dying, or dead branches from trees and shrubs; and prune to retain natural character. D. Do not apply pruning paint to wounds. 3.7 TREE STABILIZATION A. Install trunk stabilization as follows unless otherwise indicated: 1. Upright Staking and Tying: Stake trees of 2-inch through 5-inch caliper. Stake trees of less than 2-inch caliper only as required to prevent wind tip out. Use a PLANTS 600-12 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa minimum of two stakes of length required to penetrate at least 18 inches below bottom of backfilled excavation and to extend at least 72 inches or one-third of trunk height above grade. Set vertical stakes and space to avoid penetrating root balls or root masses. 2. Use two stakes for trees up to 12 feet high and 2-112 inches or less in caliper; three stakes for trees less than 14 feet high and up to 4 inches in caliper. Space stakes equally around trees. 3. Support trees with bands of flexible ties at contact points with tree trunk. Allow enough slack to avoid rigid restraint of tree. _ 4. Support trees with two strands of tie wire, connected to the brass grommets of tree- tie webbing at contact points with tree trunk. Allow enough slack to avoid rigid restraint of tree. B. Guying and Staking: Guying trees more than 14 feet in height and more than 3 inches in caliper unless otherwise indicated. Securely attach no fewer than three guys to stakes 30 inches long, driven to grade. 3.8 HERBACEOUS PLANTING A. Set out and space plants other than trees and shrubs as indicated on Drawings in — even rows. B. Use planting soil for backfill. — C. Dig holes large enough to allow spreading of roots. D. For rooted cutting plants supplied in flats, plant each in a manner that minimally disturbs the root system but to a depth not less than two nodes. E. Work soil around roots to eliminate air pockets and leave a slight saucer indentation around plants to hold water. F. Water thoroughly after planting, taking care not to cover plant crowns with wet soil. G. Protect plants from hot sun and wind; remove protection if plants show evidence of recovery from transplanting shock. 3.9 HERBACEOUS PLANTING A. Landscape edging to be installed between all planted areas and lawn areas within the median. B. Landscape edging shall be installed to be flush with adjacent grades. 3.10 PLANTING AREA MULCHING A. Mulch backfilled surfaces of planting areas and other areas indicated. 1. Trees in Turf Areas: Apply mulch ring of 3-inch average thickness, with 36-inch radius around trunks or stems or as specified in drawings. Do not place mulch within 3 inches of trunks or stems. 3.11 PLANT MAINTENANCE A. Maintain plantings by pruning, cultivating, watering, weeding, fertilizing, mulching, restoring planting saucers, adjusting and repairing tree-stabilization devices, resetting PLANTS 600-13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa to proper grades or vertical position, and performing other operations as required to — establish healthy, viable plantings for the duration of the maintenance periods. B. Fill in, as necessary, soil subsidence that may occur because of settling or other processes. Replace mulch materials damaged or lost in areas of subsidence. C. Apply treatments as required to keep plant materials, planted areas, and soils free of pests and pathogens or disease. Use integrated pest management practices when possible to minimize use of pesticides and reduce hazards. Treatments include physical controls such as hosing off foliage, mechanical controls such as traps, and biological control agents. 3.12 PESTICIDE APPLICATION — A. Apply pesticides and other chemical products and biological control agents according to authorities having jurisdiction and manufacturer's written recommendations, Coordinate applications with Owner's operations and others in proximity to the Work. Notify Owner before each application is performed. B. Pre-Emergent Herbicides (Selective and Nonselective): Apply to tree, shrub, and groundcover areas according to manufacturer's written recommendations. Do not apply to seeded areas. C. Post-Emergent Herbicides (Selective and Nonselective): Apply only as necessary to treat already- germinated weeds and according to manufacturer's written recommendations. 3.13 REPAIR AND REPLACEMENT A. General: Repair or replace existing or new trees and other plants that are damaged by construction operations, in a manner approved by Owner. 1 1. Perform repairs of damaged trunks, branches, and roots within 48 hours. 2. Replace trees and other plants that cannot be repaired and restored to full-growth — status, as determined by Owner. B. Remove and replace trees that are more than 25 percent dead or in an unhealthy condition before the end of the corrections period or are damaged during construction operations that Owner determines are incapable of restoring to normal growth pattern. 1. Provide new trees of same size and species as those being replaced. 3.14 CLEANING AND PROTECTION A. During planting, keep adjacent paving and construction clean and work area in an orderly condition. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas. B. Remove surplus soil and waste material including excess subsoil, unsuitable soil, trash, and debris and legally dispose of them off Owner's property. C. Protect plants from damage due to landscape operations and operations of other contractors and trades. Maintain protection during installation and maintenance periods. Treat, repair, or replace damaged plantings. D. After installation and before Substantial Completion, remove nursery tags, nursery stakes, tie tape, labels, wire, burlap, and other debris from plant material, planting areas, and Project site. PLANTS 600-14 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa arri 3.15 MAINTENANCE SERVICE A. Maintenance Service for Trees: Provide maintenance by skilled employees of landscape Installer. Maintain as required in "Plant Maintenance" Article. Begin maintenance immediately after plants are installed and continue until plantings are acceptably healthy and well established, but for not less than maintenance period below: 1. Maintenance Period: 24 months from date of Substantial Completion. B. Maintenance Service for all Other Plants: Provide maintenance by skilled employees of landscape Installer. Maintain as required in "Plant Maintenance" Article. Begin maintenance immediately after plants are installed and continue until plantings are acceptably healthy and well established, but for not less than maintenance period below: 1. Maintenance Period: 12 months from date of Substantial Completion. * * * END OF SECTION * * * PLANTS 600-15 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY GENERAL SPECIFICATIONS FOR CONSTRUCTION CITY OF WATERLOO, IOWA Department of Engineering SECTION A- Definitions of Terms SECTION B -Scope of work SECTION C -Control of Materials and Work SECTION D - Procedure and Progress SECTION E - Measurements and Payments SECTION F - Legal Relations and Responsibility SECTION A - DEFINITIONS OF TERMS 1. CITY. The City of Waterloo, Iowa, which is the Party of the F rst Part of the accompanying contract, acting through its authorized representative. 2. COUNCIL. The duly elected Council of the City of Waterloo, Iowa. 3. ENGINEER. The City Engineer of Waterloo, Iowa, or his authorized representative. — 4. INSPECTOR. The authorized representative of the Engineer, assigned to the detailed inspection of the work or materials therefor and to such other duties as may be delegated to him in these specifications. 5. CONTRACTOR. The Party of the Second Part in the accompanying contract for the improvement covered by these specifications, or his authorized representative. 6. SUBCONTRACTOR. Any person, firm, or corporation who has, with the approval of the Council, contracted with the Contractor to execute and perform in his stead all or any part of the contract. 7. BIDDER. Any individual, firm, or corporation submitting a proposal for a'I or a part of the work provided for in these specifications. 8. PROPOSAL GUARANTEE. The security designed in the Notice of Bidders or Proposal to be furnished by the bidder as a guarantee of good faith to enter into a contract and furnish an acceptable bond for the work contemplated if it be awarded him. 9. SURETY. The corporate body bound with and for the Contractor fo the acceptable performance of the contract. 10. PROPOSAL. The written Proposal, submitted by the bidder in the prescribed manner — and on the standard form, for the improvements covered by these specifications. 11. SPECIFICATIONS. The documents that set forth the manner in which the proposed work is to be accomplished which have been prepared by the Engineer and approved by the City Council, official copies of which are now on file with the City Clerk. 12. SPECIAL PROVISIONS. Clauses or memoranda not contained herein applying to the contract of which these specifications are a part, which change or supplement these specifications. 13. CONTRACT. The agreement entered into between the City and the Contractor, setting forth the terms under which the work covered by the plans and specifications is to be performed. The contract includes all conditions, definitions, and instructions set forth in the official publications relating to GENERAL SPECS GS-1 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract Na 934 Waterloo,Iowa the work, the official contract and specifications, the Proposal, official plans, and all supplemental agreements entered into by the parties to the contract. 14. NOTICE TO BIDDERS. The notice called attention of bidders to the time and place for receiving bids, containing a brief description of the work, and briefly setting forth the requirements and -- conditions for submission of Proposals. 15. INSTRUCTIONS TO BIDDERS. The clauses setting forth in detail the information relative to the proposed work and requirements for the submission of Proposals. 16. PLANS. The plans for the improvement covered by the specifications and approved by the Council, official copies of which are on file with the City Clerk. — 17. CONTRACT BOND. The bond executed by the Contractor and his surety in favor of the City of Waterloo, Iowa, guaranteeing the complete execution of the contract in accordance with the plans and specifications, the payment of all debts pertaining to the work, and maintenance of the work as provided by law or by the specifications. 18. CONTRACT PERIOD. The period from the specified date for beginning the work to the specified date of completion, both dates inclusive. The contract period may be extended by the Council, as provided in these specifications, in which event the contract period includes the new date of completion. 19. OFFICIAL PUBLICATIONS. The official publications are the formal resolutions and notices relative to the proposed improvement that are required by law to be published in a prescribed manner and that have actually been published in accordance with the statutes relating thereto. Attention is directed to the fact that these official publications are by statute vested with all of the force and effect of contract obligations. 20. A.S.T.M. Abbreviation for American Society for Testing Materials. 21. WORK. The term "Work" of the Contractor and Subcontractor includes labor or materials or both, equipment, transportation, or other facilities necessary to complete the contract. — 22. TIME. All time limits stated in the contract documents are of the essence in the contract. SECTION B -SCOPE OF WORK 1. CORRELATION AND INTENT OF DOCUMENTS. The Contract documents are .. complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the documents is to include all labor, materials, equipment, and transportation necessary for the proper execution of the work. Materials or work described in words which, so applied, have a well-known technical or trade meaning shall be held to refer to such recognized standard. 2. DRAWINGS AND SPECIFICATIONS. Unless otherwise provided in the contract documents, the engineer shall furnish to the Contractor, free of charge, all copies of drawings and specifications reasonably necessary for the execution of the work. The Contractor shall keep one (1) copy of all drawings and specifications on the work available to the Engineer and to his representatives. 3. CONTRACTOR'S UNDERSTANDING. It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the nature, character and location of the work, the conformance to the ground, the character, quality, and quantity of the materials to be encountered, the character of the equipment and facilities needed preliminary to and during the prosecution of the work, GENERAL SPECS GS-2 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa Contractor fail to fulfill the requirements of the specifications and Contract, and to direct the attention of the Contractor to such failure or infringement; but such inspection shall not relieve the Contractor from �- any obligations to furnish acceptable materials or to provide completed construction that is satisfactory in every particular. In case of any dispute arising between the Inspector and the Contractor as to materials furnished or the manner of performing the work, the Inspector shall have the authority to reject materials or suspend the work until the question at issue can be referred to and decided by the Engineer. Inspectors are not authorized to revoke, alter, enlarge, relax, or release any requirements of these specifications. The Inspector shall, in no case, act as foreman or perform other duties for the Contractor, or interfere with the management of the work by the latter. 3. STATUS OF THE ENGINEER. The Engineer shall have general supervision and direction of the work. He has authority to stop the work whenever such stoppage may be necessary to insure the proper execution of the Contract. He shall also have authority to reject any work and/or materials which do not conform to the specifications, to direct the application of forces to any portion of the work as, in his judgment, is required, and to order the force increased or diminished, and to decide questions which arise in the execution of the work. 4. ENGINEER'S DECISIONS. The Engineer shall, within a reasonable time, make decisions on all claims of the Contractor and on all other matters relating to the execution and progress of the work or the interpretation of the contract documents. All such decisions of the Engineer shall be final except as to the element of time and financial consideration involved, which, if no agreement in regard thereto is reached, shall be subject to arbitration. 5. STAKES AND INSTRUCTIONS. The Contractor shall provide reasonable and necessary opportunities and facilities for setting stakes and making measurements. The Contractor shall not furnish stakes or men to set them. He shall not proceed until he has received from the Engineer such stakes and instructions as may be necessary to the progress of the work. The Contractor shall carefully preserve bench marks, reference points, and stakes, and in case of willful or careless destruction, he shall be charged with the resulting extra expense and shall be responsible for any mistakes that may be caused, by their loss or disturbance. 6. SUPERINTENDENCE. The Contractor shall keep on his work during its progress a competent superintendent and any necessary assistants, all satisfactory to the Engineer. The Superintendent shall not be changed except with the consent of the Engineer, unless the Superintendent proves to be unsatisfactory to the Contractor and ceases to be in his employ. The Superintendent shall represent the Contractor in his absence, and all directions given to him shall be as binding as if given to the Contractor. Important decisions shall be confirmed in writing to the Contractor. Other directions shall be so confirmed on written request in each case. The Contractor shall give efficient supervision to the work using his best skill and attention. He shall carefully study and compare all drawings, specifications, and other instructions, and shall report at once to the Engineer any error, inconsistency, or omission which he may discover. 7. REMOVAL OF UNAUTHORIZED WORK. Work done without lines and grade being give, work done beyond lines shown on the plans or as given, except as herein provided, or any extra or additional work done without authority, will be considered as unauthorized and at the expense of the Contractor and will not be paid for under the provisions of the Contract. Work so done may be ordered removed and replaced at the Contractor's expense. 8. REMOVAL OF DEFECTIVE MATERIALS OR WORK. The Contractor shall promptly remove from the premises all materials condemned by the engineer as failing to conform to the Contract; whether incorporated in the work or not, and the Contractor shall promptly replace and re-execute his GENERAL SPECS GS-5 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa own work in accordance with the contract and without expense to the City, and shall bear the expense of making good all work of other Contractors destroyed or damaged by such removal or replacement. If the Contractor does not remove such condemned work and materials within a reasonable time, fixed by written notice, the City may remove them and may store the material at the expense of the -- Contractor. If the Contractor does not pay the expense of such removal within a reasonable time thereafter, the City may, upon ten (10) days' written notice, sell such materials at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs and expense that should have been borne by the Contractor; or, if the net proceeds of such sale are insufficient to pay the expenses of removal, the City may deduct the balance from any amounts due the Contractor. 9. MATERIALS, EQUIPMENT, APPLIANCES, AND FACILITIES. Unless otherwise — stipulated, the Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation, and other facilities necessary for the execution and completion of the work. Materials shall be of the quality specified for each particular part of the work. Whenever, in construction of the work or in the manufacture of any article of appliance necessary for the construction or operation of the work, it is necessary to use any material that is not fully specified in these specifications, it shall be of good quality and shall meet with the approval of the Engineer. Any appliance that is necessary for the construction or operation of the work and is commonly recognized as a part of the work, shall be furnished by the Contractor as part of the work, whether or not it is specifically called for in the plans and specifications, and such appliance shall be of good quality and standard make and shall meet with the approval of the Engineer. 10. MATERIAL SAMPLES. Before the contract is awarded, the bidder may be required to furnish a statement of the origin, composition, and manufacture of any and all materials proposed for use in the performance of the Contract, together with samples of the material. These samples will be considered as representative and typical of the material to be obtained from any particular source. 11. CHARACTER OF WORKMEN AND EQUIPMENT. The Contractor shall employ competent and efficient workmen for every kind of work. Any person employed on the work who shall refuse or neglect to obey the directions of the Engineer or Inspector, or who shall be deemed incompetent or disorderly, or who shall commit trespass upon public or private property in the vicinity of the work, shall be dismissed when the Engineer so orders, and shall not be re-employed unless express permission be given by the Engineer. The Contractor shall, at all times, enforce discipline and good order among his employees. The methods, equipment, and appliances used on the work, and the labor employed, shall be such as will produce a satisfactory quality of work and shall be adequate to complete the contract within the specified time limit. 12. HIRING CITY EMPLOYEES. The Contractor shall not employ and hire any of the City's employees without the permission of the Engineer. 13. LABOR. Local labor shall be given preferences so far as practicable. 14. THE CITY'S RIGHT TO DO WORK. If the Contractor should neglect to prosecute the work properly or fail to perform any provision of this Contract, the City of Waterloo, after three (3) days' written notice to the Contractor may, without prejudice to any other remedy he may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor, provided, however, that the Engineer shall approve both such action and the amount charged to the Contractor. GENERAL SPECS GS-6 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa SECTION D -PROCEDURE AND PROGRESS -- 1. ORDER OF COMPLETION - USE OF COMPLETED PORTIONS. The Contractor shall complete any portion or portions of the work in such order or time as the Engineer may require. The City shall have the right to take possession of and use completed or partially completed portion of the work at any time, but such taking possession and use shall not be deemed an acceptance of work so taken or used, or any part thereof. If such prior use increases the cost of or delays the work, the Contractor shall be entitled to such extra compensation or extension of time, or both, as the Engineer may determine. 2. WEATHER. During stormy or inclement weather, all work shall be suspended, except such as can be done in an acceptable manner. Permission to work during freezing, stormy, or inclement weather shall in no way be construed as a release of the Contractor's responsibility regarding the quality of the finished work at such time. 3. SUNDAYS AND LEGAL HOLIDAYS. Except for such work as may be required to properly maintain or protect completed or partially completed construction or to maintain lights and barricades, no work will be permitted on Sundays or legal holidays without specific permission of the Engineer. 4. DELAYS AND EXTENSION OF TIME. If the Contractor be delayed in the completion of the work by an act of neglect of the City, or its employees; or by any other Contractor employed by the City; or by changes ordered in the work; or by strikes, lockouts, fire, unusual delays in transportation, unavoidable casualties, or any cause beyond the Contractor's control; or by delay authorized by the Engineer pending arbitration; or by any cause which the Engineer shall decide justifies the delay, then the time of completion shall be extended for such reasonable time as the Engineer may decide will compensate for such delay. -- No such extension shall be made for delay occurring more than thirty (30) days before claim therefor is made in writing to the Engineer. In the case of a continuing cause of delay, only one claim is necessary. This article does not exclude the recovery of damages for delay by either party under provisions in the contract documents. 5. TEMPORARY SUSPENSION OF WORK. The Engineer shall have authority to suspend the work, wholly or in part, for such period or periods of time as he may deem necessary, due to unsuitable weather or such other conditions as are considered unfavorable for the suitable prosecution of the work, or for such time as is necessary due to the failure to the Contractor to carry out orders given or to perform any or all provisions of the Contract. 6. NOTICES - HOW SERVED. Any notice to be given by the City to the Contractor under this contract shall be deemed to be served if the same be delivered to the man in charge of any office used by the Contractor or his foreman or agent at or near the work, or deposited in the post office, postpaid, addressed to the Contractor at his last known place of business. 7. PROGRESS OF WORK. The progress of the work shall be such that, at the expiration of one-fourth (1/4) of the contract period, one-eighth (1/8) of the work shall be completed; at the expiration of one-half (1/2) of the contract period, three-eighths (3/8) of the work shall be completed; at the expiration -- of three-fourths (3/4) of the contract period, the work shall be three-fourths (3/4) completed, and the whole work shall be completed at the expiration of the contract period. _ If, at any time the above schedule is not being maintained, the Council may give written notice to the Contractor and his sureties that the specifications are not being complied with. Such notice shall state what action on the part of the Contractor is required to bring the work within the requirements of the specifications. If the Contractor fails, within ten (10) days, to proceed as directed in the said notice, then the Council shall have authority to annul this contract without process or action at law and take over the GENERAL SPECS GS-7 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa prosecution and completion of the work, as provided under the article covering City's right to terminate — contract. 8. CITY'S RIGHT TO TERMINATE CONTRACT. If the Contractor should be adjudged a bankrupt; or if he should make a general assignment for the benefit of this creditor; or if a Receiver should be appointed on account of his insolvency; or if he should persistently or repeatedly refuse or should fail, except in cases for which extension of time is provided, to supply enough skilled workmen or proper materials; or if he should fail to make prompt payment to Subcontractors or for materials or labor; or if he _ should persistently disregard laws, ordinances, or the instructions of the Engineer; or if he should otherwise be guilty of a substantial violation of any provision of the contract, then the City, upon the certificate of the Engineer that sufficient cause exists to justify such action, may, without prejudice to any other rights or remedy, and after giving the Contractor seven (7) days' written notice, terminate the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method he may deem expedient. In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. — If the unpaid balance of the contract price shall exceed the expenses of finishing the work, including compensation for additional managerial and administration services, such excess shall be paid to the Contractor. If such expense shall exceed such unpaid balance, the Contractor shall pay the difference to the City. The expense incurred by the City as herein provided and the damage incurred through the Contractor's default shall be certified by the Engineer. 9. REMOVAL OF EQUIPMENT. In the case of annulment of this contract before — completion, from any cause whatsoever, the Contractor, if notified to do so by the City; shall promptly remove any part or all of his equipment and supplies from the property of the City, failing which, the City shall have the right to remove such equipment and supplies at the expense of the Contractor. SECTION E -MEASUREMENTS AND PAYMENT 1. STANDARD OF MEASUREMENT. All work completed under the contract shall be measured by the Engineer according to the United States standard measures. 2. SCOPE OF PAYMENTS. The Engineer's measurements of quantities shall be the basis for final payment for the work performed under this Contract. After the work is completed, the Engineer will make measurements and computations of the number of units of each of the various items of work completed, and the Contractor will be paid for the actual amount of work performed at the rates specified in his Proposal. Before final settlement is made, the Council may require the Contractor to submit a list of all persons furnishing labor or materials, with evidence that such persons have been paid in full. Payment shall be made in the manner set forth in official publications and Council Proceedings relative thereto. 3. PAYMENT FOR EXTRA WORK. Such extra work as may have been ordered by the Engineer and performed by the Contractor shall be compensated for as provided herein. If work is to be done or materials are to be furnished by the Contractor which cannot properly be classified under unit prices included in the Proposal, the Contractor shall be paid therefor the actual reasonable cost of the labor and materials entering permanently in such work, plus fifteen percent (15%) of the cost thereof. In computing the labor cost on such extra work, the following items shall be included: -- (a) Actual payroll expenditures for labor at the current rate therefor, and cost of materials. (b) Pay of foreman and timekeepers for actual time required on the extra work. (c) Liability insurance, prorated, for the extra work. — GENERAL SPECS GS-8 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa Labor cost items on extra work shall be furnished in duplicate by the Contractor to the Inspector daily. The Inspector shall check the items, and if he finds them to be correct, he shall so certify on the statement of cost, returning one copy to the Contractor and filing one copy with the Engineer. The Engineer shall determine the cost of materials entering into extra work from the materials and receipted freight bills for the same. For any special machine, power tools, or equipment, including fuel and lubricants, but not including small hand tools, which may be deemed necessary or desirable to use, the Contractor shall be allowed a reasonable rental thereon, to be agreed upon in writing by the Engineer before such work is begun, and to which sum no percentage is to be added. The item of cost shall not include repairs or replacement of equipment or overhead expenses of any character. The fifteen percent (15%) allowed is considered to cover the use of hand tools and all overhead expenses except liability insurance. In no case will a claim for extra compensation be allowed unless the work upon which the claim is based has been ordered in writing, except as provided hereinafter. — 4. CLAIMS FOR EXTRA COST. If the Contractor claims that any instructions, by drawings or otherwise, involved extra cost under this contract, he shall give the Engineer written notice thereof within ten (10) days after completion of the work. No such claim shall be valid unless so made. 5. CLAIMS FOR EXTRA COMPENSATION. If the Contractor deems that extra compensation is due him for work and/or materials that he considered is not clearly covered in the items for which he submitted unit prices in his bid and that were not ordered in writing by the Engineer as an extra s heretofore provided, the Contractor shall notify the Engineer, in writing, of his intention to make claim for extra compensation for work and/or material before starting construction. If such written notification is not given or the Engineer is not afforded proper facilities by the Contractor for keeping strict account of actual cost as defined herein, then the Contractor hereby agrees to waive the claim for extra compensation. Such notice to the engineer and the fact that the Engineer has kept account of cost as aforesaid, shall not in any way be construed as proving the validity of the claim, which must be passed upon by the Council. In the event that the Council finds the claim to be just, it shall be allowed and paid for as extra work as provided herein. 6. COMPLETION REPORT AND OBJECTIONS THERETO. Within ten (10) days after the full completion of the work to be done under this contract, the Engineer shall make a written statement of all the work done by the Contractor hereunder, stating the quantity of each item as found by him and including a statement of all credits for extra work and all credits or debits for changes, alterations, omissions, and defects, and shall forthwith deliver a copy of such statement to the Contractor. The Contractor shall compare such statement with his own records and shall then, in writing, either approve such statement or point out any claimed errors or omissions. If any of such claims are found correct, the Engineer shall, within ten (10) days, prepare a new statement, a copy of which shall in like manner be delivered unto the Contractor. The Engineer will not file a formal completion report with the City until the Contractor has approved the same. If the figures of the Engineer and the Contractor cannot be reconciled, or there is a difference of opinion regarding some item or items, then such difference of opinion shall be submitted to arbitration as hereinafter provided, and the decision of the arbitrator or arbitrators shall be final, and the Engineer shall, — within a period of five (5) days, file his completion report. Before action by the City Council upon such completion report, the Contractor shall also file a written statement of any claims he may have against the City, other than those shown by such completion report, growing out of this contract or the work done hereunder. The City shall retain ten percent(10%) of GENERAL SPECS GS-9 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa the amount due the Contractor on the completion report for a period of thirty (30) days. If no claims are filed against the Contractor within thirty (30) days, the final ten percent (10%) shall then be paid to the Contractor. 7. WAIVER. By the execution of this contract, the Contractor agrees that any objections he may have to the statement of the amount of work done hereunder included by the Engineer in this completion report, and any claims of the Contractor against the City growing out of this contract and the work done hereunder which are not stated in writing in the manner and within the time provided in _ Article 6, Section E hereof, shall be waived, and no such claim shall thereafter be asserted against the City. SECTION F -LEGAL RELATIONS AND RESPONSIBILITIES 1. LAWS RELATING TO WORK. The Contractor is presumed to be familiar with all laws, ordinances, and regulations which may, in any manner, affect those engaged or employed upon the work or the materials or equipment used in or upon the work, and shall conduct the work so as not to conflict with such laws, ordinances, and regulations. 2. PROTECTION OF WORK AND PROPERTY. The Contractor for any part of the improvement shall be held responsible for the care of materials and of partially completed and completed work until final acceptance of the same by the Council. He will be required to make good at his own expense any damage which the work may sustain from any cause prior to the filing of the engineer's certificate of completion. He shall take all risk from floods and casualties of every description and make no charge for delay due to such cause. He may, however, be allowed a reasonable extension of time on account of such delays. He shall correct or make good at his own expense all damages to adjacent property due to the acts or negligence of his employees of the prosecution of his work, and save the City harmless therefor. The Contractor shall be held liable and responsible for all damages done to water, sewer, drain, or other underground pipes and structures, and to sidewalks and private property. 3. RESPONSIBILITY FOR ACCIDENTS. The Contractor shall assume full responsibility for all damages sustained by persons or property due to the carrying on of his work until final acceptance thereof, or until released by the Engineer in writing. 4. LIABILITY INSURANCE. The Contractor shall carry liability insurance which shall save the City harmless and protect the public and any person from injury sustained by the reason of the prosecution of the work or the handling or storing of materials therefor, and said Contractor shall also carry liability insurance which shall meet the requirements of the Iowa Worker's Compensation Law. Before work shall be started on this contract, the Contractor shall furnish the City Clerk with proper affidavit or Affidavits executed by representatives of duly qualified insurance companies, evidencing that said insurance company or companies have issued liability insurance policies, effective during the life of the contract, or for a period of a least ten (10) days following the filing of written notice of cancellation, protecting the public and any person from injuries or damages sustained by reason of carrying on the work involved in the Contract. The affidavit shall specifically evidence the following forms — of insurance protection: (a) Public liability insurance covering all operations performed by persons directly employed by the Contractor. (b) Public liability insurance covering all operations performed by any Subcontractor to whom a portion of the work may have been assigned. GENERAL SPECS GS-10 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa (c) Public liability insurance covering all work upon the project performed by any independent Contractor working under the direction of either the principal Contractor or a Subcontractor. (d) Motor vehicle bodily injury liability insurance and property damage liability insurance on all motor vehicles employed on the work, whether owned by the Contractor or by other persons, firms, or corporations. (e) The minimum protection shall be as follows: Comprehensive General Liability Insurance General Aggregate Limit $ 5,000,000.00 Products—Completed Operations Aggregate Limit $ 5,000,000.00 Each Occurrence Limit $ 5 ,000,000.00 Comprehensive Automobile Liability Insurance $ 1,000,000.00 The Contractor shall have the City of Waterloo, Iowa, and AECOM Technical Services, Inc., named as an "Additional Named Insured". A certificate, or a policy if requested, shall be filed with the Owner. — All certificates and/or policies of insurance furnished by the Contractor to be filed with the City Clerk shall include the name and address of the agency issuing the same. It shall also be required that the City Clerk be notified by registered mail of the cancellation or expiration of the above insurance. 5. BARRICADES AND SIGNS. The Contractor shall, at his own expense and without further or other order, provide, erect, and maintain, at all times during the progress and suspension of the work and until completion and final acceptance thereof, suitable and requisite barricades, signs, or other adequate protection, as required by the latest edition of the "Iowa Manual on Uniform Traffic Control Devices for Streets and Highways" and shall provide, keep, and maintain such barricades, signs, etc., as may be required or as may be ordered by the City Engineer, to insure the safety of the public as well as those engaged on the work. All barricading plans shall be approved by the City Engineer. 6. ROYALTIES AND PATENTS. The Contractor shall pay all royalties and license fees. He shall defend all suits or claims for infringement of any patent rights and shall save the City harmless from loss on account thereof, except that the City shall be responsible for all such loss when a particular process or the product of a particular manufacturer is specified. 7. PERMITS AND REGULATIONS. Permits and licenses of a temporary nature for the prosecution of the work shall be secured and paid for by the Contractor. Permits, license, and easements for permanent changes in existing facilities shall be secured and paid for by the City. 8. CLAIMS FOR DAMAGES. Any claim for damages arising under this Contract shall be made in writing to the party liable within a reasonable time of the first observance of such damage and no later than the time of final payment, except as expressly stipulated otherwise in the case of faulty work or materials, and shall be adjusted by agreement or arbitration. The Contractor shall be held for the payment of all just claims against him arising out of the prosecution of this contract, and his bond will not be released until such claims are paid for dismissed. GENERAL SPECS GS-11 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 9. ASSIGNMENT OF CONTRACT. The Contractor shall not sell or assign the contract or sublet any portion of the work provided for therein without the written consent of the City Council. 10. SUBCONTRACTORS. The Contractor shall, as soon as practicable after the signature of the contract, notify the Engineer in writing of the names of the Subcontractors proposed for the work and shall not employ any that the Engineer may, within a reasonable time, object to as incompetent or unfit. The Contractor agrees that he is as fully responsible to the City for the acts and omission of his Subcontractors and of persons either directly or indirectly employed by them as he is for the acts and omissions of persons directly employed by him. Nothing contained in the contract documents shall create any contractual relation between any Subcontractor and the City. 11. ARBITRATION. All questions subject to arbitration under this Contract shall be submitted to arbitration at the choice of either party to the dispute. The Contractor shall not cause a delay of the work during any arbitration proceedings, except by agreement with the Engineer. The demand for arbitration shall be filed in writing with the Engineer, in the case of an appeal from his decision, within ten (10) days of its receipt, and in any other case, within a reasonable time after cause thereof, and in no case later than the time of final payment, except as otherwise expressly stipulated in the contract. If the Engineer fails to make a decision within a reasonable time, an appeal to arbitration may be taken as if his decision had been rendered against the part appealing. No one shall be nominated or act as an arbitrator who is in any way financially interested in the contract or in the business affairs of either the City or the Contractor. The general procedure shall conform to the laws of the State of Iowa. Unless otherwise provided by such laws, the parties may agree upon one arbitrator; otherwise, there shall be three--one named in writing by each party to this contract to the other party, and the third chosen by these two arbitrators, or, if — they fail to select a third within ten (10) days, then he shall be chosen by the Comptroller of the State of Iowa. Should either party refuse or neglect to supply the arbitrators with any papers or information demanded in writing, the arbitrators are empowered by both parties to proceed ex parte. If there be one arbitrator, his decision shall be binding; if three, the decision of any two shall be binding. Such decision shall be a condition precedent to any right of legal action, and, wherever permitted by law, it may be filed in Court to carry it into effect. The arbitrators, if they deem that the case demands it, are authorized to award to the party whose contention is sustained such sums as they shall deem proper for the time, expense, and trouble incident to the appeal, and, if the appeal was taken without reasonable cause, damages for delay, the arbitrators shall fix their own compensation unless otherwise provided by agreement, and shall assess the costs and charges of the arbitration upon either or both parties. The award of the arbitrators must be in writing, and it shall not be open to objections on account of the form of proceeding or the award, unless otherwise provided by the laws of Iowa. In the event of such laws providing on any matter covered by this article otherwise than as hereinbefore specified, the method of procedure throughout and the legal effect of the award shall be wholly in accordance with the laws of the State of Iowa, it being intended hereby to lay down a principle of action to be followed, leaving its local application to be adopted to the legal requirements of the place in which the work is to be done. GENERAL SPECS GS-12 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa 12. PERFORMANCE AND PAYMENT BONDS. The Contractor shall, at the time of execution and delivery of this contract and before the taking effect of same, furnish and deliver to the City — written bonds of indemnity to the amount required by law in form and substance, and with surety thereon satisfactory and acceptable to the City, to insure the faithful performance and payment by the Contractor of all the covenants and agreements on the part of the Contractor contained in this contract. These bonds shall remain in force and effect for the full amount of the Contract. 13. PERSONAL LIABILITY OF PUBLIC OFFICIALS. In carrying out any of the provisions of the Contract or in exercising any power or authority granted him thereby, there shall be no liability upon — the Engineer or his authorized assistants, either personally or as an official of the City, it being understood that in such matters he acts as the agent and representative of the City. 14. JURISDICTION. Any action in Court against the Contractor or sureties on his bond because of damages to property or individuals by said Contractor or his workmen, or because of the violation of any provisions of the specifications, or on account of the failure of said Contractor to comply fully with these provisions, shall be brought in the District Court of the State of Iowa in and for Black Hawk County. 15. TERMINATION OF RESPONSIBILITY. The Contract shall be considered as completed and the Contractor released from further obligations except as to the requirements of his bond, after the work has been completed and finally accepted and final estimates have been allowed and the completion report of the Engineer has been filed and approved by the Council. 16. CITY'S LEGAL RIGHTS. The City shall not be precluded by any measurements, estimate, or certificate made, either before or after the completion and acceptance of the work and payment therefor, from showing the true amount and character of the work performed and materials furnished by the Contractor, or from showing that any such measurement, estimate, or certificate is untrue or incorrectly made, or the work or materials do not, in fact, conform to the Contract. The City shall not be precluded, notwithstanding any such measurements, estimate, or certificate — and payment in accordance therewith, from recovering from the Contractor and his surety such damages as it may sustain by reason of his failure to comply with the terms of the Contract. Neither the acceptance by the City or any of its representatives, nor any payment for or acceptance of the whole or any part of the work, nor any extension of time, nor any possession taken by the City, shall operate as a waiver on any portion of the contract or of any power herein reserved, or any right to damages herein provided. A waiver of any breach of the contract shall not be held to be a waiver of any other or subsequent breach. GENERAL SPECS GS-13 of 13 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION 1. SUBCONTRACTS The contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to require compliance by each subcontractor with the applicable provisions of the contract for the improvements embraced in this contract. 2. REVIEW BY THE CITY OF WATERLOO The City of Waterloo, its authorized representatives and agents, shall at all times have access to and be permitted to observe and review all work, materials, equipment, payrolls, personnel records, employment conditions, material invoices, and other relevant data and records pertaining to this contract, provided, however, that all instructions and approval with respect to the work will be given to the contractor only by the City of Waterloo through its authorized representative or agents. 3. INSPECTION a. The contractor shall furnish promptly all materials reasonably necessary for any tests, which may be required. All tests by the City of Waterloo will be performed in such manner as not to delay the work unnecessarily and will be made in accordance with the provisions of the Technical Specifications. b. Inspection of materials and appurtenances to be incorporated in the improvements embraced in this contract may be made at the place of production, manufacture or shipment, whenever the quantity justifies it, and such inspection and acceptance, unless otherwise stated in the Technical Specifications, shall be final, except as regards (1) latent defects, (2) departures from specific requirements of the contract, (3) damage or loss in transit, or (4) fraud or such gross mistakes as amount to fraud. Subject to the requirements contained in the preceding sentence, the inspection of materials as a whole or in part will be made at the project site. 4. WARRANTY OF TITLE — No material, supplies, or equipment to be installed or furnished under this contract shall be purchased subject to any chattel mortgage or under a conditional sale, lease-purchase or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. The contractor shall warrant good title to all materials, supplies, and equipment installed or incorporated in the work and upon completion of all work, shall deliver the same together with all improvements and appurtenances constructed or placed thereon by him to the City of Waterloo free from any claims, liens, or charges. Neither the contractor nor any person, firm, or — corporation furnishing any material or labor for any work covered by this contract shall have any right to a lien upon any improvement or appurtenance thereon. Nothing contained in this paragraph, however, shall defeat or impair the right of persons furnishing materials or labor to recover under any bond given by the contractor for their protection or any rights under any law permitting such persons to look to funds due the contractor in the hands of the City of Waterloo. The provisions of this paragraph shall be inserted in all subcontracts and material contracts and notice of its provisions shall be given to all persons furnishing materials for the work when no formal contract is entered into for such materials. SUPPLEMENTAL GENERAL SPECIFICATIONS SGS-1 of 1 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY FORM OF CONTRACT CONTRACT FOR THE CONSTRUCTION OF FY 2019 UNIVERSITY AVENUE RECONSTRUCTION - PHASE 2 CITY OF WATERLOO, IOWA CONTRACT NO. 934 This contract made and entered into this day of 20 , by and between the City of Waterloo, Iowa, a Municipal Corporation , (hereinafter referred to as City), and — of (hereinafter referred to as Contractor), WITNESSETH: ` PAR. 1 Contractor agrees to build and construct the FY 2019 UNIVERSITY AVENUE RECONSTRUCTION — PHASE 2, Contract No. 934, and furnish all necessary tools, equipment, materials, and labor necessary to do all the work called for in the plans and specifications in a workmanlike manner and for the prices set forth in Contractor's proposal, which was accepted by the City, and which is understood and agreed to be a part of this contract. PAR. 2 It is understood and agreed that the resolution adopted by the City Council ordering the construction of the improvement, the Notice to Contractors as published, the Instruction to Bidders, the Form of Proposal, the Construction and Maintenance Bonds, the Council Proceedings relating to this matter, and the Plans and Specifications shall all be considered as forming a part of the contract the same as though they were each set out in said contract. PAR. 3 The Contractor agrees to furnish at its own cost and expense, all necessary materials and labor for said work and to construct said improvements in a thorough, substantial, and workmanlike manner, and in strict accordance with the requirements of this contract, and of the plans and specifications made a part hereof by reference, and to the satisfaction and — approval of the City and its engineer. PAR. 4 The Contractor agrees to perform said work and install said improvements on the terms set out in bid or proposal to the City which has been accepted by the City and which is by reference made a part of this contract. PAR. 5 The Contractor agrees to commence said work within ten (10) working days after receipt of "Notice to Proceed." Stages 1-4 shall be completed on or before November 15, 2019, and Stages 5-6 shall be completed on or before November 20, 2020, unless an extension of time is granted in writing by the Council of the City. PAR. 6 Should the Contractor fail to complete said improvements in strict accordance with the terms and conditions of this contract, or the plans and specifications therefor promptly by the date herein specified, the City may pay such additional sums as it may be required to pay by reason of the failure of said contractor and deduct any and all such sums from any amount then due the Contractor. PAR. 7 The Contractor agrees to comply with and obey all ordinances of the City of Waterloo, Iowa, relating to the obstruction of streets and alleys, keeping open passage ways for water, traffic, FORM OF CONTRACT C-1 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa and protecting any excavations in any street or alley, and maintaining proper and sufficient barricades with lights and signals during all hours of darkness, to see that the backfilling is properly done, and agrees to keep the City whole and defend any and all suits that may be brought against the City by reason of any injuries that may be sustained by any person or property allegedly caused by the Contractor, or his agents, while work is done pursuant to this agreement. PAR. 8 The Contractor agrees that in the event a law suit is brought against the City for damages allegedly sustained by reason of any act, omission or negligence of the Contractor or its agents, or on account of any injuries allegedly sustained by reason of any obstruction, hole, depression or barrier placed or dug by the defendant or its agents, in the doing of the work herein contracted for, that it will defend said suit and save the City harmless therein, and in case judgment is rendered against the City, the Contractor agrees to pay the same promptly. The Contractor agrees to carry public liability insurance in a solvent company in a sufficient amount to protect the City and those who use the streets of the City. PAR. 9 The City shall have the right to appoint one or more construction reviewers who shall review the progress of the work in detail; also, to make any test or any material to be used in such work. No material shall be used in any work until the same has first been approved by the construction reviewer. Such construction reviewer shall have full authority to pass judgment upon all materials and upon the manner of doing the work, and their judgment on rejecting any materials, substance, or manner of work shall be final unless it is revoked or modified by the City Engineer. PAR. 10 Any material, which has been rejected by the construction reviewer, shall be at once removed from the line of work and shall not be again taken thereon or placed with the material proposed to be used without the written consent of the City Engineer. PAR. 11 The Contractor shall maintain no cause of action against the City on account of delays and prosecution of work, but if said work is delayed by the City, the Contractor shall have such extra time for completion of the job as was lost by reason of the delay caused by the City. PAR. 12 The Contractor agrees to pay punctually all just claims of labor, material, men, or subcontractors who shall perform labor or furnish materials entering into this improvement. It is agreed that the City need not pay the Contractor until all such claims are paid by the Contractor. It is agreed that the City shall not be liable for said labor, material, or men under this contract. PAR. 13 The Contractor agrees to furnish the City, simultaneously with this contract, a bond on a form to be provided by the City in the amount provided by law as stated in the Notice to Bidders, which shall be for the benefit of the City, and any and all persons injured by the breach of any of the terms of this contract. Said bond shall be filed with the City Clerk and shall be subject to the approval of the City Council, and is by reference made a part of this contract. PAR. 14 The Contractor agrees that should it abandon work under this contract or cease the prosecution thereof for a period of thirty (30) consecutive days without reasonable cause, and should it fail to proceed with said work within ten (10) days after a notice to continue or carry it on has been mailed to it at the address given herein by the City, or after such notice has been served on it, then the City may proceed to complete said work, using any material, tools, or machinery found along said line of work, doing the work either by contract or as it may elect, and the Contractor and the sureties on its bond shall be liable to the City for the costs and expenses so paid out. Said costs shall be retained by the City from any compensation due, or to become due the Contractor, and may be recovered by the City in an action upon Contractor's bond. FORM OF CONTRACT C-2 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa PAR. 15 In consideration of the full compliance on the part of the Contractor with all the provisions, stipulations, and conditions hereof, or contained in the various instruments made a part of this contract by reference, and upon completion and acceptance of said work, the City agrees to pay to the Contractor, in the manner set out in the Notice to Contractors, the amount of money due the Contractor for work performed and accepted, at the unit prices set out in the Contractor's proposal, which has been accepted by the City. PAR. 16 The total amount of the contract, based on the Engineer's estimates of quantities and the Contractor's unit bid prices, and for which 100% surety bond is required, is — $ PAR. 17 After the completion of said work, the Contractor agrees to remove all debris and cleanup said streets, and to save the City harmless from any damage allegedly resulting from a failure to clean up and remove the debris or put the street back in a proper condition for travel. PAR. 18 This contract is not divisible, but in the event of a conflict between this contract and the various instruments incorporated by reference, this contract shall govern. PAR. 19 Before the Contractor shall be entitled to receive final payment for work done under this contract, it shall execute and file a bond in the penal sum of not less than 100% of the total amount of the contract, same to be known as"Maintenance Bond,"and which bond must be approved by the City Council, and which bond is in addition to the bond given by the Contractor to guarantee the completion of the work. PAR. 20 The Contractor shall maintain all work done hereunder in good order for the period of two (2) years from and after the date it is accepted by the Council of the City of Waterloo, Iowa. Said maintenance shall be made without expense to the City or the abutting property. In the event of the failure or default of the Contractor to remedy any or all defects appearing in said work within a period of two (2) years from the date of its acceptance by said Council, and after having been given ten (10) days' notice so to do by registered letter deposited in the United States Post Office in said town, addressed to said contractor at the address herein given, then the City may proceed to remedy such defects. The costs and expenses thereof to be recovered from the Contractor and the sureties on its maintenance bond by an action brought in any court of competent jurisdiction. PAR. 21 The Contractor shall give notice to said City by registered letter directed to the Mayor or City Clerk/Auditor thereof not more than four (4) and not less than three (3) months prior to the expiration of the term during which the Contractor is required to maintain said improvements, in good repair by the terms of its Contract. The liability of the Contractor and of the sureties on its bond for maintenance of the said improvements shall continue until three (3) months after such notice has been given to the City, and, in any event, until two (2) years after the acceptance of the work. FORM OFCONTRACT C-3 of 4 AECOM 991-Ph2 FY 2019 University Avenue Reconstruction-Phase 2 City Contract No.934 Waterloo,Iowa CITY OF WATERLOO, IOWA Mayor City Clerk Contractor BY: Title: Approved by the City Council of the City of Waterloo, Iowa, this day of 20— ATTEST: , City Clerk Waterloo, Iowa FORM OF CONTRACT C-4 of 4 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS: — That we, of (the"Principal"), and of (the"Surety"), are held and firmly bound unto the City of Waterloo, Iowa (the"Obligee"), in the penal sum of Dollars ($ ), lawful money of the United States, for the payment of said sum in connection with a contract(the"Contract")dated on or about for the purpose of reference as though fully set forth herein. . The Contract is incorporated herein by Whenever the Principal shall be and is declared by the Obligee to be in default under the Contract, with the Obligee having performed its obligations in the Contract, then the Surety, acknowledging that time is of the essence, may promptly remedy the default, or shall promptly undertake to: 1. Complete the Contract in accordance with its terms and conditions; or 2. Obtain one or more bids for completing the Contract in accordance with its terms and conditions, and upon determination by the Surety of the lowest responsible bidder, or — negotiated proposal, or, if the Obligee elects, upon determination by the Obligee and the Surety jointly of the lowest responsible bidder, or negotiated proposal, arrange for a contract between such party and the Obligee. The Surety will make available as work progresses — sufficient funds to pay the cost of completion less the balance of the Contract price. The cost of completion includes responsibilities of the Principal for correction of defective work and completion of the Contract, the Obligee's legal and design professional costs resulting directly from the Principal's default, and liquidated damages or actual damages if no — liquidated damages are specified in the Contract. The term "balance of the Contract price" means the total amount payable by the Obligee to the Principal under the Contract and any amendments thereto, less the amount properly paid by the Obligee to the Principal; or 3. Determine the amount for which it is liable to the Obligee and pay the Obligee that amount as soon as practicable. In the event this bond is enforced, Principal and Surety agree to indemnify Obligee and hold Obligee harmless from and against any and all costs of enforcement, including but not limited to reasonable attorneys' fees and expenses. — Every Surety on this bond shall be deemed and held, any contract to the contrary notwithstanding, to consent to each and all of the following matters, without notice: 1. To any extension of time to the Contract in which to perform the Contract. 2. To any change in the plans, specifications, or Contract when such change does not involve an increase of more than twenty percent(20%) of the total Contract price, and shall then be — released only as to such excess increase. 3. That no provision of this bond or of any other contract shall be valid which limits to less than — one (1) year from the time of the acceptance of the work the right to sue on this bond for defect in workmanship or material not discovered or known to the Obligee at the time such work was accepted. PERFORMANCE BOND PFB-1 of 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa If the Principal performs the Contract, then this bond shall be null and void; otherwise it shall remain in full force and effect. In no event shall the Surety's total obligation exceed the penal amount of this bond. Terms used herein shall include, as appropriate, the singular or plural number, or the masculine, feminine or neuter gender. IN WITNESS WHEREOF, the undersigned Principal and Surety have executed this Performance Bond as of_ PRINCIPAL SURETY Name Name -- By: By: Title: Title: [attach Power of Attorney] _ NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is Partnership, all partners should execute BOND. If this project includes Federal(Funds,the following applies to the payment bond: IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located. PERFORMANCE BOND PFB-2 of 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS: that (Name of Contractor) (Address of Contractor) a (Corporation, Partnership or Individual) hereinafter called Principal, and, (Name of Surety) (Address of Surety) hereinafter called Surety, are held and firmly bound unto (Name of Owner) (Address of Owner) hereinafter called OWNER, in the penal sum of Dollars,($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the OWNER, dated the day of , 20 , a copy of which is hereto attached and made a part hereof for the construction of: FY 2019 UNIVERSITY AVENUE RECONSTRUCTION - PHASE 2 CITY OF WATERLOO, IOWA CITY CONTRACT NO. 934 NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the prosecution of the WORK provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such WORK, and all insurance premiums on said WORK, and for all labor, performed in such WORK whether by SUBCONTRACTOR or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise affect its PAYMENT BOND PB-1 of 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa obligation on this BOND, and it does hereby waive notice of any such change, extension of time, — alteration or addition to the terms of the contract or to the WORK or to the SPECIFICATIONS. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. IN WITNESS HEREOF, this instrument is executed in counterparts, each one(number) of which shall be deemed an original, this the day of 20 ATTEST: Principal (Principal) Secretary — (SEAL)) By (s)(Address) (Witness as to Principal) (Address) (Surety) ATTEST: By Attorney-in-Fact Witness as to Surety (Address) (Address) (Address) NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is Partnership, all partners should execute BOND. if this project includes Federal Funds, the following applies to the payment bond:; IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list(Circular 570 as amended) and be authorized to transact business in the State where the project is located. PAYMENT BOND PB-2 of 2 FY 2019 University Avenue Reconstruction-Phase 2 AECOM#60528991-Ph2 City Contract No.934 Waterloo,Iowa APPENDIX 1. CHANGE ORDER FORM CHANGE ORDER NO. - Owner Date Project Owner's Contract No. Contractor - Date of Contract Start $ You are directed to make the following changes in the Contract Documents. Description: Reason for Change Order: CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $ Original Completion Date: Previous C.O.'s(ADD/DEDUCT): $ Previous CO's(ADD/DEDUCT): This C.O. (ADD/DEDUCT): $ This C.O. (ADD/DEDUCT): Contract Price with all REVISED: approved Change Orders: $ Revised Completion Date: It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall _ be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: By: OWNER(Authorized Signature) Date ACCEPTED: By: CONTRACTOR(Authorized Signature) Date AECOM 60528991-Ph2 / — Project Change Number Order No CHANGE ORDER FORM CO-1 AECOM#ORDE 91-Ph2 FY 2019 University Avenue Reconstruction-Phase 2 City Contract No.934 Waterloo,Iowa THIS PAGE LEFT BLANK INTENTIONALLY