Loading...
HomeMy WebLinkAboutADDENDUM NO. 4 Addendum No. 4 for Contract No. 831 (EDA Award No. .05-79-05007) F.Y. 2013 Storm Water Lift Stations Westfield Avenue, Vinton Street, and Virden Creek City of Waterloo Waterloo, Iowa I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed \\\\\``�a ESSlp `of sfonal..E velepun the laws of the State of Iowa. \��`\QQ�Q•,•+••••,Nqt''�, ur / (d te) =za,+•DANIEL P.+•++-�� Lu • � = Z MILLER m = Printed or typed name Daniel P.Miller j; 14497 ZZ License number: 14467 'per '•.......+'+ \��. My license renewal date is December 31,2013. %ii� rlolw'A11`\`��� Pages or sheets covered by this seal: Addendum No.4 Stanley Consultants INC A Stanley Group Comparry Engineering,Environmental and Construction Services-Woddvvide 00 01 05.doc Stanley GonsUltc nts Nc ADDENDUM NO. 4 APRIL 4, 2013 CONTRACT NO. 831 (EDA AWARD NO. 05-79-05007) F.Y. 2013 STORM WATER LIFT STATIONS WESTFIELD AVENUE, VINTON STREET, AND VIRDEN CREEK CITY OF WATERLOO WATERLOO, IOWA 1. SECTION 31 23 00- EXCAVATION AND FILL Article"2.03 HYDROSEEDING" Delete paragraph D. in its entirety and insert the following in its place: D. Mulch: Hydraulically applied wood cellulose fiber. END OF ADDENDUM NO. 4 1) D. P. Miller Addendum No. 4 Page 1 of 1 ms1222 23209.03.00