HomeMy WebLinkAboutADDENDUM NO. 4 Addendum No. 4
for
Contract No. 831
(EDA Award No. .05-79-05007)
F.Y. 2013 Storm Water Lift Stations
Westfield Avenue, Vinton Street, and Virden
Creek
City of Waterloo
Waterloo, Iowa
I hereby certify that this engineering document was prepared by me or
under my direct personal supervision and that I am a duly licensed \\\\\``�a ESSlp
`of sfonal..E velepun the laws of the State of Iowa. \��`\QQ�Q•,•+••••,Nqt''�,
ur / (d te) =za,+•DANIEL P.+•++-��
Lu
• � =
Z MILLER m =
Printed or typed name Daniel P.Miller j; 14497
ZZ
License number: 14467
'per '•.......+'+ \��.
My license renewal date is December 31,2013. %ii� rlolw'A11`\`���
Pages or sheets covered by this seal: Addendum No.4
Stanley Consultants INC
A Stanley Group Comparry
Engineering,Environmental and Construction Services-Woddvvide
00 01 05.doc
Stanley GonsUltc nts Nc
ADDENDUM NO. 4
APRIL 4, 2013
CONTRACT NO. 831
(EDA AWARD NO. 05-79-05007)
F.Y. 2013 STORM WATER LIFT STATIONS
WESTFIELD AVENUE, VINTON STREET, AND VIRDEN CREEK
CITY OF WATERLOO
WATERLOO, IOWA
1. SECTION 31 23 00- EXCAVATION AND FILL
Article"2.03 HYDROSEEDING"
Delete paragraph D. in its entirety and insert the following in its place:
D. Mulch: Hydraulically applied wood cellulose fiber.
END OF ADDENDUM NO. 4
1) D. P. Miller
Addendum No. 4
Page 1 of 1
ms1222 23209.03.00