Loading...
HomeMy WebLinkAbout2026-423-08.03.2026.docDocusign Envelope ID: B5D0EEFF-A50D-8372-8193-585B17102E38 Prepared by LeAnn M. Even, Deputy City Clerk, City of Waterloo, 715 Mulberry Street, Waterloo, IA 50703, (319) 291-4323. RESOLUTION NO. 2026-423 RESOLUTION CONFIRMING APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, ETC., AND AUTHORIZING TO PROCEED IN CONJUNCTION WITH THE FY 2027 SIDEWALK INFILL, SIDEWALK RAMP AND TRAIL REPAIR PROGRAM - ZONE 5B, CONTRACT NO. 1157. WHEREAS, the City Council of the City of Waterloo, Iowa, has determined that the FY 2027 Sidewalk Infill, Sidewalk Ramp and Trail Repair Program — Zone 5B, Contract No. 1157, is necessary and in the public interest; and WHEREAS, the City Council has reviewed the proposed plans, specifications, form of contract, and related documents for said project; and WHEREAS, the City Council desires to confirm approval of the plans, specifications, form of contract, and related documents, and authorize the project to proceed in accordance with applicable bidding and contracting requirements. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA, 1. That the plans, specifications, form of contract, and estimate of cost for the FY 2027 Sidewalk Infill, Sidewalk Ramp and Trail Repair Program — Zone 5B, Contract No. 1157, are hereby confirmed and approved. 2. That the Engineering Department are authorized to proceed with the project in accordance with said plans, specifications, and form of contract. PASSED AND ADOPTED this 3rd day of August 2026. Signed by: 393E8397B3D3421... David Boesen, Mayor ATTEST: ,(—Signed by: LeAnn j ven, Deputy City Clerk SEAL