HomeMy WebLinkAboutTHE SPOT #3 - 117 E SAN MARNAN DRIVE OF W A rF INVOICE DATE DUE DATE INVOICE# TOTAL DUE
.11.e 08/31/2026 10/05/2026 2027-00000107 $150.00
O
41.S 7 v '
Customer#: 24676 Please Make Check Payable and Remit To:
City of Waterloo
ATTN: City Clerk/Accounts Receivable
THE SPOT#3 715 Mulberry St
117 E SAN MARNAN DR WATERLOO, IA 50703
WATERLOO, IA 50702
Amount Enclosed:
DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT
KEEP THIS PORTION FOR YOUR RECORDS
COMMERCIAL FIRE INSPECTION - 117 E SAN MARNAN DR- FOR BILLING INQUIRY: (319)291-4323
08/17/26
Description Total Price
REINSPECTION 2 $150.00
CUSTOMER# BILLING DATE DUE DATE INVOICE# CHARGES
24676 08/31/2026 10/05/2026 2027-00000107 $150.00
Less Prepayment $0.00
Total Due—* $150.00
City of Waterloo
Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent
late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of
America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of
Administrative Services Offset Program if not paid in full within ninety days.
Waterloo Fire Rescue
Inspection Report 425 E.3rd Street
The Spot#3-117 E San Marnan DR,BLDG 117 E San Marnan Dr,Waterloo IA 50702
INSPECTION DETAILS
Inspection Date Inspection Type Inspection Number
08/17/2026 Annual Inspection(1Yr) REINSPECTION I __ 17913-R6
Lead Inspector Shift Station Unit
BRAD BALDWIN N/A N/A N/A
Other Inspectors
N/A
SUMMARY OF INSPECTION
0 0 0 1
Passed codes Failed codes
NEXT STEPS
Please direct questions about your Inspection to: Reinspection Date
BRAD BALDWIN
brad.baldwin@waterloo-ia.org,3192914319 0910812026
GENERAL NOTES
BRAD BALDWIN-08/17/2026 @ 11:12
$150 re-inspection fee for failure to complete corrections on scheduled 8/17/26 inspection.Complete all corrections to avoid fees at following inspections.
BRAD BALDWIN-07/27/2026 @ 08:15
Re-inspection scheduled for 60 days out due to remodel project.Request of earlier inspection will be accepted if all corrections completed at earlier date.
BRAD BALDWIN-07/27/2026 @ 08:15
$100 re-inspection fee,failure to complete corrections on 413/26
BRAD BALDWIN-07/27/2026 @ 08:15
$80 annual inspection fee
BRAD BALDWIN-07/27/2026 @ 08:15
Ceiling tiles noted missing today during active remodel,all ceiling tiles shall be re-installed after project is complete.
BRAD BALDWIN-07127/2026 @ 08:15
•Commercial Fire Inspector-brad.baldwin@waterloo-ia.org-Work:319-291-4319(#5)-Cell:319-230-1224
BRAD BALDWIN-07/27/2026 @ 08:15
•Provide corrections to avoid progressive re-inspection fees beginning at$100.Beer/Liquor application will not be signed until violations and hazards
corrected
BRAD BALDWIN-07/27/2026 @ 08:15
•If all corrections are made before the scheduled re-inspection date,you can call to set up an earlier re-inspection.Normal operating hours for
inspections&re-inspections are Monday-Friday,9:00 a.m.-4:00 p.m.*****Re inspection fees may be assessed for subsequent re-inspections.Re-
inspection fees start at$100,then$150,and$200 for all subsequent re-inspections.
BRAD BALDWIN-07/27/2026 @ 08:15
Staff member removed propane tank from building as directed by inspector today 2/18/26.
GENERATED ON 8/17/26, 11:19 AM 1 OF 3
BRAD BALDWIN-07127/2026 @ 08:15
Withholding re-inspections due to construction project in progress,complete corrections to avoid fees
BRAD BALDWIN-0712712026 @ 08:15
LED lights agreement
,. CITY OF
��t� } WATERLOOrut o ma.nsuwrwa�arn v
Pe
�/ Building Permitting
&Inspections
Purpose of agreement,Outline requirements regarding the installation and use of
specific lighting systems at"me Spot 413"to comply with electrical and Fire safety
tales enfprced by the City of Wetedao Bulling Inspections Department and
Waterloo Fire Inspections,
AgseemeM:Lighting shorttins be connected or energized.All non-compliant Or
improperly listed electrical equipment shall not be wired,powered,or made
operatonal unless approved by City Electrical Inspector or Fire Inspector.
Requaements for 111.11800n Approval'
• Provide documentation that lighting is:
Listed bye rueanallyreccogmzed testing laboratory and installed per Me
listing
Approved for commence'use and compliant with City Building.
Electrrc,and Fire codes.
Fnfertement:Seth lighting found connected and operational without approaiate
acme,al wilt be subject to inspection and possiele citation.
•As a representative of"The Spot e3"at 117E San Marmon,I agree with the
requirements above and will maintain lighting disconnected or remove
lighting from use.
Sign Mere:
Date: 'Oa/
SIGNATURES
Contact signature Inspector signature
No steel post
-- —�'
Report completed post inspection
T<
Malik(2025) Date: BRAD BALDWIN 08117/2026
CHECKLISTS
Reinspection
Status Code Description
Fail 102.4-Application of building code.
• The design and construction of new structures shall comply Location:Remodel project
with the International Building Code,and any alterations, Comments:All necessary permits shall be obtained including
additions,changes in use or changes in structures required inspections completed for active remodel project.
by this code,which are within the scope of the International
Building Code,shall be made in accordance therewith. Additional comments:Final building inspection shall be requested
and passed to complete fire inspection.Contact Brian Wirtz at 319-
291-4319 for Building Inspection
GENERATED ON 8/17/26, 11:19 AM 2 OF 3
'® Statement of Fees
FEE
Invoice Date Inspection Fee Date Paid Amount Paid
NIA $150.00
Invoice Number Check Number Transaction Number
NIA NIA NIA
GENERATED ON 8/17/26, 11:19 AM 3 OF 3