Loading...
HomeMy WebLinkAboutADDENDUM 1 ��� CITY OF WATERLOO , IOWA i4 WATERLOO LEISURE SERVICES COMMISSION sr 1101 Campbell Avenue • Waterloo,IA 50701 • (319)291-4370 Fax(319)291-4297 PAUL HUTING • Leisure Services Director ferloo August 13, 2013 Mayor BUCK CLARK COUNCIL MEMBERS RE: WATERLOO LEISURE SERVICES FY2014 SULLIVAN PARK BASKETBALL PROPOSAL DAVID ADDENDUM 1 JONES Ward I Waterloo Leisure Services recently sent you a bid request for modifications CAROLYN and updates to Sullivan Park basketball courts located near corner of East 4th COLE and Adams St. Under the SPECIFICATIONS section there is a change in Ward 2 information being provided. We are notifying you of this Addendum to that section. The additional information is the removal of density tests/core HAROLD sampling. GETTY Ward 3 Remove following paragraph in Specifications Section from bid packet: QUENTIN M. HART Density Tests on Asphalt Concrete in Place: Ward 4 The Contractor shall provide density testing on the asphalt concrete by RON core sample from project per S.U.D.A.S. Section 7020, 3.06. The WELPER contractor will cut cores and test per IDOT and SUDAS specifications. Ward 5 BOB Leisure Services is no longer requiring density testing or core sampling. GREENWOOD At-Large If you have any questions, please contact our office at 291-4370. STEVE SCHMITT Thank You. At-Large Travis Nichols Facilities/Project Manager CITY WEBSITE:www.cityofwaterlooiowa.com WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer F.Y. 2014 2672 & 2736 Logan Avenue Sanitary Services Addendum No. One (1) August 13, 2013 Contract No. 861 Page 1 of 1 City of Waterloo Engineering Department 715 Mulberry Street Waterloo, IA 52703 To: Bidding Document Holders of Record The information contained in this Addendum modifies, supplements or replaces information contained in the Project Manual and on the Drawings and is hereby made a part of the Contract Documents. This addendum contains one (1) page. Please acknowledge receipt of this addendum on Form of Bid Page 2 prior to submittal of your bid as well as signing and faxing the Faxed Addendum Receipt. If you have any questions, please call our office. PROJECT MANUAL ITEM 1. Tree and Stump removal required for the construction of the services shall be incidental to the project and paid as part of Mobilization. 2. PVC pipe shall be used for Sanitary Sewer Service. References of RCP shall be changed to PVC SDR 23.5. References to RCP include, but are not limited to: a. "Notice of Public Hearing" section, page 2 within Scope of Work. b. "Form of Bid or Proposal" section, page 1 within the bid items tabulation. c. "Items of Potential MBE/WBE Participation" section, page 1 within descriptions. d. "Special Provisions" section, pages 2-4 within item 4 and 5 descriptions. PVC Sanitary Sewer Service shall comply with SUDAS Sanitary Sewer Service specifications, section 4010, 2.04 C. End of Addendum No. One (1) TEMPLATES/ENGINEERING/ADDENDUM TO CONST CONTRACT