Loading...
HomeMy WebLinkAboutMEMO (3) f� 1Fr41 CITY , IOWA � �... .... II WATERLOO BUILDING INSPECTIONS DEPARTMENT S� 715 Mulberry St. • Waterloo, IA 50703 • (319) 291-4319 Fax (319) 291-4262 VQ ND LOUIS CUTWRIGHT,JR. • Building Official/Maintenance Administrator MEMORANDUM Mayor TIMOTHY J. TO: Building & Grounds Committee HURLEY John Kincaid, Chairperson COUNCIL FROM: Louis Cutwright, Jr. MEMBERS Building Official/Maintenance Administrator REGINALD A. DATE: October 6, 2006 SCHMITT Ward 7 RE: FIVE SULLIVAN BROTHERS CONVENTION CENTER CAROLYN EQUIPMENT UPGRADE, CHANGE ORDER NO. 1 COLE Ward 2 The scope of work as outlined in the bid document as prepared by Gilmor and HAROLD Doyle for Phase II of the Five Sullivan Brothers Convention Center mechanical GETTY Ward 3 equipment upgrade is about ninety (90) percent complete. However, during the process of replacing the new listed equipment, additional valves have shown JOHN A. themselves to be in a failed or near-failed condition. KINCAID Ward 4 Johnson Controls has submitted Change Order No. 1 for the replacement of all RON additional defective valves and the rectifying of several air handler conditions that WELPER were not spelled out in the document prepared by Gilmor and Doyle (i.e., air handler ward expansion joints, air handler door problems, etc.). The total cost of the additional BOB work, labor and material will be $104,890. Do not have heart failure! There are GREENWOOD four (4) items in the document that need immediate attention before we get into the At-Large heating season. Hot water pumps 1, 2 and 3 and heat exchanger butterfly isolation ERIC valves and triple-duty valves that are leaking internally need replacing. GUNDERSON At-Large I recommend a change order for $30,650 to be issued to Johnson Controls for these repairs. The additional valve replacements are on the chilled-water side of the system. My staff will work with those valves through the winter months so that by the next cooling season, the complete system will be automated and operational. I'm requesting authorization to send to Council Change Order No. 1 from JCI in the amount of$30,650 for the selected items as outlined in the Johnson Controls document dated October 3, 2006. Thank you for considering this request. Attachment WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer