Loading...
HomeMy WebLinkAboutMEMO (4) CITY OF WATERLOO , IOWA �"1119. .� WATERLOO BUILDING INSPECTIONS DEPARTMENT -t O4' 715 Mulberry St. • Waterloo, IA 50703 • (319) 291-4319 Fax (319) 291-4262 eri00 LOUIS CUTWRIGHT,JR. • Building Official/Maintenance Administrator Mayor MEMORANDUM TIMOTHY T. HURLEY COUNCIL TO: Interested Vendors MEMBERS FROM: Louis Cutwright, Jr. REGINALD A. Building Official/Maintenance Administrator SCHMITT Ward 1DATE: April 17, 2006 CAROLYN COLE RE: FIVE SULLIVAN BROTHERS CONVENTION CENTER Ward2 MECHANICAL UPGRADE -- PHASE II HAROLD GETTY Ward 3 The City of Waterloo is seeking bids to upgrade the mechanical system at the Five JoHN A Sullivan Brothers Convention Center. Phase I of the project was completed in May KINCAID 2005. Phase II is an extension of the total project. Ward 4 hOELPER GENERAL REQUIREMENTS: Ward 5 1. Bidder shall be responsible for the entire project and will be viewed as the BOB General Contractor. GREENWOODGRE At-Lame 2. Bidder shall be responsible to follow all items set out in Sections 1.2 — 1.5 of E.RIC "Facility Improvement Five Sullivan Brothers Mechanical Upgrade." GUNDERSON At-Large 3. Bidder shall meet qualifications set out in Section 1.6 of the "FIFSBMU". 4. The bidder shall pay particular attention to Section 1.10 Scope. The approved recommendations contained in the original study are the base for the Request for Proposal (R.F.P.). If the bidder alters the original study recommendations in any way, the bidder shall provide their own engineered documented study and recommendations that will produce the same energy use savings or greater. 5. If the bidder chooses to submit a different operating system (i.e., Trane, Siemens, Honeywell), the bidder shall produce complete engineered schematic drawings of the all systems, operation manuals and factory training as outlined in Section 3.2 of the "Facility Improvement" document. WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer MEMO TO INTERESTED VENDORS RE: FIVE SULLIVAN BROTHERS MECHANICAL UPGRADE, PHASE II April 17, 2006 Page 2 BIDDING REQUIREMENTS: 1. Mandatory pre-bid meeting will be on Thursday, May 4, 2006, at 1:00 P.M. at Five Sullivan Brothers Convention Center, seminar room. 2. Bids will be due Monday, May 22, 2006, 3:00 P.M., in the City Clerk's Office, First Floor, City Hall, 715 Mulberry Street, Waterloo, IA 50703. 3. Only sealed bids will be accepted. 4. A five percent (5%) bid bond shall accompany the bid in a separate envelope. 5. The exterior of the bid envelope shall be marked "FACILITY IMPROVEMENT FIVE SULLIVAN BROTHERS CONVENTION CENTER, MECHANICAL UPGRADE." 6. Bids will be opened at the City Council meeting May 22, 2006, at 5:30 P.M. 7. The project will be awarded to the lowest responsible bidder. 8. Award of project will be June 5, 2006. 9. Completion will be on or before September 30, 2006. CONDITIONS: 1. Bidder shall provide a payment/performance bond for the total bid price. 2. Work shall be performed with the least disruption to facility business. 3. Bidder shall coordinate work and work schedule with Dennis Law, Ramada manager, at 319-233-7650. 4. The owner will not accept partial sections as the project is completed.—The owner will accept the complete project as a whole after all requirements, as outlined in the R.F.P., have been met and the system has demonstrated complete function and reliability. MEMO TO INTERESTED VENDORS RE: FIVE SULLIVAN BROTHERS MECHANICAL UPGRADE, PHASE II April 17, 2006 Page 3 5. After manufacturer warranty/guarantee has expired, the bidder shall provide in writing an additional 24-month warranty of labor and material on all equipment installed under this contract. ALTERNATES: Under "General Requirements" item 5 — guidelines for alternate submittal are outlined. PAYMENT: 1. A five percent (5%) retainage will affect all billings. 2. Retainage shall be paid within thirty (30) days after the complete acceptance of the project. Acceptance includes complete coordination with existing system. BID SUBMITTAL SHEET COMPANY: ADDRESS: PHONE: The above-referenced company or corporation has fully read all documents and addendums and respectfully submits the lump sum total of: $ to perform all work outlined in the Request for Proposal (R.F.P.) and related documents. The documents call for a one hundred (100) day completion from the "award" date. There will be a $250.00 per-calendar-day penalty if not completed on time. Signature Printed Name Title