Loading...
HomeMy WebLinkAboutMEMO (2) nor4Alpah, CITY OF WATERL • I O WA WATERLOO BUILDING INSPECTIONS DEPARTMENT 715 Mulberry St. • Waterloo. IA 50703 • (319) 291-4319 Fax (319) 291-4262 LOUIS CUTWRIGHT,JR. • Building Official/Maintenance Administrator Mayor TIMOTHY J. HURLEY MEMORANDUM COUNCIL MEMBERS TO: Building and Grounds Committee REGINALD A. John Kincaid, Chairperson SCHMITT Want I FROM: Louis Cutwright, Jr. CAROLYN Building Official/Maintenance Administrator COLE Ward 2 DATE: February 15, 2006 HAROLD GETTY RE: FIVE SULLIVAN BROTHERS/PAINTING AND WALL FINISH Ward 3 CONTRACT/MICHAEL PAINT/CHANGE ORDER#1 JOHN A. KINCAID Ward 4 In September 2005 the Finance Committee approved a $15,270.00 painting RON contract with Michael Paint to refinish many areas of the Five Sullivan Brothers WELPER Convention Center. Rooms 10-13 had many surface problems that needed Ward 5 repairing before painting. The walls around the room partitions had been structurally damaged over the years. These were repaired. The acoustical panels BOB on the wall disintegrated when theywere taken off the wall to recover. We finished GREENWOOD At-Li,-se those two (2) walls by laminating sheet rock to the block walls and covering the rock with the acoustical fabric. ERIC GUNDERSON The above descriptions are two (2) areas that are reflected in the attached Change At-LargeOrder#1 for the project. The total cost of the change order is $7,515.76. Thank you for reviewing this change order and for your approval. ja Attachment WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer