MEMORANDUM
COUNCIL
MEMBERS
TO: Building and Grounds Committee
REGINALD A. John Kincaid, Chairperson
SCHMITT
Want I
FROM: Louis Cutwright, Jr.
CAROLYN Building Official/Maintenance Administrator
COLE
Ward 2 DATE: February 15, 2006
HAROLD
GETTY RE: FIVE SULLIVAN BROTHERS/PAINTING AND WALL FINISH
Ward 3 CONTRACT/MICHAEL PAINT/CHANGE ORDER#1
JOHN A.
KINCAID
Ward 4 In September 2005 the Finance Committee approved a $15,270.00 painting
RON contract with Michael Paint to refinish many areas of the Five Sullivan Brothers
WELPER Convention Center. Rooms 10-13 had many surface problems that needed
Ward 5 repairing before painting. The walls around the room partitions had been
structurally damaged over the years. These were repaired. The acoustical panels
BOB on the wall
disintegrated when theywere taken off the wall to recover. We finished
GREENWOOD
At-Li,-se those two (2) walls by laminating sheet rock to the block walls and covering the rock
with the acoustical fabric.
ERIC
GUNDERSON The above descriptions are two (2) areas that are reflected in the attached Change
At-LargeOrder#1 for the project. The total cost of the change order is $7,515.76.
Thank you for reviewing this change order and for your approval.