HomeMy WebLinkAboutAGREEMENT RESOLUTION 2005-666 7- a5--n S �.o, aoo5-��� IOWA DEPARTMENT OF TRANSPORTATION AGREEMENT FOR'1'HL FISCAL YEAR 6 COMMERCIAL SERVICE VERTICAL INFRASTRUCTURE PROGRAM THIS AGREEMENT is made between the Iowa Department of Transportation called the"Iowa DOT" and the city of Waterloo, hereafter the"SPONSOR". 1.00 PURPOSE: The purpose of this agreement is to set forth terms, conditions and obligations for accomplishment of certain improvements at the Waterloo Regional Airport, hereafter the"Airport". Improvements shall consist of Hangar renovations as specified in the work plan, as more clearly defined in the project application. It shall be referred to as the"Project" and shall be identified by project number: 9I060AL0200 contract number: 07978 2.0 GENERAL PROVISIONS 2.01 The SPONSOR shall have the project under contract no later than 12 months after the date of the agreement or the Iowa DOT reserves the right to revoke this grant. 2.02 The Iowa DOT agrees to reimburse the SPONSOR 100% of the eligible project costs, not to exceed the maximum amount payable of$107,951, incurred according to the terms of this agreement. Reimbursement will be made in whole dollar amounts only, rounded down. Final payment request may include documentation of unreimbursed amounts due to rounding. Final reimbursement will made up to the contract amount in whole dollars. 2.03 For all projects totaling more than $25,000, a bid process detailed in Division VI, Chapter 384 of the Code of Iowa must be used and the project plans, specifications and construction contract documents shall be prepared and signed by a professional engineer licensed to practice in the State of Iowa. The SPONSOR shall submit the plans, specifications and other contract documents to the Iowa DOT for its files. 2.04 Should the SPONSOR fail to comply with any Condition or Assurance provided herein, the Iowa DOT may withhold further payment and may require reimbursement of any or all payments made by the Iowa DOT toward accomplishment of the Project. 2.06 The Iowa DOT shall not waive any right of authority by making payments pursuant to this agreement, and such payments shall not constitute approval or acceptance of any part of the Project. 2.07 Neither the Department nor the Sponsor intend to create rights in, and shall not be liable to, any third parties by reason of this agreement. 2.08 If any provision of this agreement is held invalid, the remainder of this agreement shall not not be affected thereby if such remainder would then continue to conform to applicable law and the intent of this agreement. 2.09 The Iowa DOT shall determine what costs charged to the project account are eligible for participation under the terms of this agreement and the SPONSOR shall bear all additional costs accepted and paid. 2.10 Notwithstanding any other provisions of this agreement, the Iowa DOT shall have the right to enforce, and may require the SPONSOR to comply with, any and all Conditions and Assurances agreed to herein. 2.11 The Iowa DOT's obligations hereunder shall cease immediately, without penalty of further payment being required, in any year for which the General Assembly of the State of Iowa fails to make an appropriation or reappropriation to pay such obligations, and the Iowa DOT's obligations hereunder shall cease immediately without penalty of further payment being required at any time where there are not sufficient authorized funds lawfully available to the Iowa DOT to meet such obligations. The Iowa DOT shall give the SPONSOR notice of such termination of funding as soon as practicable after the Iowa DOT becomes aware of the failure of funding. In the event the Iowa DOT provides such notice, the SPONSOR may terminate this agreement or any part thereof. 2.12 The SPONSOR is the contracting agent and, as such, retains sole responsibility for compliance with local, state and federal laws and regulations related to accomplishment of the Project. 2.13 The attached Exhibit A, "Utilization of Targeted Small Business (TSB) Enterprises on Non-Federal Aid Projects (Third-Party State Assisted Projects),"will apply and is hereby made a part of this Agreement. 2.14 Funding will be available for reimbursement of the project until the end of fiscal year 2007, unless appropriations are withdrawn under 2.10. Assurances in this agreement remain in full force and effect for a period of 20 years from the date of the agreement. 3.00 PROJECT CONDITIONS 3.10 The SPONSOR Agrees to: (a) Let contracts according to provisions of Division VI, Chapter 384 of the Code of Iowa and preside at all public hearings occasioned by the Project. (b) Contract for all professional and construction services. (c) Establish and maintain a project schedule, to preclude unnecessary construction delays and to assure minimum inconvenience to the public. (d) Submit to the Iowa DOT a Request for Reimbursement form,copies of invoices, and proof of payment for reimbursement. Progress payments are allowed. (e) Inspect work and equipment, test materials, and control construction to ensure that the design intent of the plans and specifications is achieved. (g) Inform the Iowa DOT of construction completion and allow the Iowa DOT access to review the completed project. (h) Retain all records relating to project cost, including supporting documents, for a 2 period of three(3)years following final payment by the Iowa DOT, and to make such records and documents available to Iowa DOT personnel for audit. 4.00 SPECIAL PROVISIONS 4.01 The Project is for the sole purpose and use of aviation related activities and must be owned by the SPONSOR. The SPONSOR shall not lease airport space constructed with this grant to activities unrelated to aviation. 5.00 SPONSOR ASSURANCES By authorizing execution of this agreement the SPONSOR hereby certifies that: 5.01 It will not enter into any transaction which would operate to deprive it of any of the rights and powers necessary to perform any or all of the assurances made herein, unless by such transaction the obligation to perform all such covenants are assumed by another public agency. 5.03 It will not dispose of or encumber its title or other interests in the site and facilities during the 20-year period of this agreement. 5.04 It will operate and maintain in a safe and serviceable condition the Airport and all facilities thereon and connected therewith which are necessary to service the aeronautical users of the Airport and will not permit any activity thereon which would interfere with its use for airport purposes. 5.05 Insofar as it is within its power and reasonable, the Sponsor will, either by the acquisition and retention of easements or other interests in or rights for the use of land or airspace and by the adoption and enforcement of zoning regulations,prevent the construction, erection, alteration, or growth of any structure, tree, or other object in the approach areas of the runways of the Airport,which would constitute an obstruction to air navigation according to the criteria or standards prescribed in Section 77.23 as applied to Section 77.25, Part 77, of the Federal Aviation Regulations. In addition, the Sponsor will not erect or permit the erection of any permanent structure or facility that would interfere materially with the use, operation, or future development of the Airport, or any portion of a runway approach area in which the Sponsor has acquired, or hereafter acquires. 5.06 It will operate the Airport as such for the use and benefits of the public. In furtherance of this covenant(but without limiting its general applicability and effect), the SPONSOR specifically agrees that it will keep the Airport open to all types, kinds, and classes of aeronautical use on fair and reasonable terms without unlawful discrimination between such types, kinds, and classes. The SPONSOR may establish such fair, equal, and not unjustly discriminatory conditions to be met by all users of the Airport as may be necessary for the safe and efficient operation of the airport. The SPONSOR may also prohibit or limit any given type, kind, or class of aeronautical use of the Airport if such action is necessary for the safe operation of the Airport or necessary to serve the civil aviation need of the public. 5.07 It will operate the Airport on fair and reasonable terms, and without unjust 3 In furtherance of the covenant (but without limiting its general applicability and effect,) the SPONSOR specifically covenants and agrees: (a) That in its operation and the operation of all facilities on the Airport,neither it nor any person or organization occupying space or facilities thereon will discriminate against any person or class or persons by reason of race, color, creed, or national origin in the use of any of the facilities provided for the public on the Airport. 5.08 The SPONSOR will keep up-to-date and provide to the Iowa DOT an airport layout plan. The SPONSOR will not make or permit the making of any changes or alterations in the Airport or any of its facilities other than in conformity with the airport layout plan, if such changes or alterations might adversely affect the safety, utility, or efficiency of the Airport. 6.00 EXECUTION OF THE AGREEMENT. By resolution made a part of this agreement the SPONSOR authorized the undersigned to execute this agreement. .�h Signed this P 5 day of Q , 1 o b5 , on behalf of the SPONSOR. O By: Attested: rc-Ptec.t Title: K )Q y a r2 Title: C y C f t r l c Signed this / �h day of 7 ,c>17j5, on behalf of the Iowa Department of Transportation By: i17 , Michelle F. cEnany Director Office of Aviation Exhibit A June 2004 UTILIZATION OF TARGETED SMALL BUSINESS (TSB)ENTERPRISES ON NON-FEDERAL AID PROJECTS (THIRD-PARTY STATE-ASSISTED PROJECTS) In accordance with Iowa Code Section 19B.7 and 541 Iowa Administrative Code Chapter 4, it is the policy of the Iowa Department of Transportation (Iowa DOT) that Targeted Small Business (TSB) enterprises shall have the maximum practicable opportunity to participate in the performance of contracts financed in whole or part with state funds. Under this policy it is the responsibility of the recipients of state funds to help finance projects to make a positive effort to solicit bids from and to utilize TSBs as contractors and ensure that the contractors make positive efforts to utilize these enterprises as subcontractors, suppliers or participants in the work covered by this agreement. The Recipient's "positive efforts" should include,but not be limited to: 1. Obtaining the names of qualified TSB contractors from the Iowa Department of Inspections and Appeals(515-281-7357) or from its website: www.iowa.net/iowa/dia/tsb. 2. Notifying qualified TSBs of proposed projects involving state-assisted funding. Notification should be made in sufficient time to allow the TSBs to participate effectively in the bidding process. 3. Soliciting bids from qualified TSBs on each project, and identifying for TSBs the availability of subcontract work. 4. Including in the bid proposals for state-assisted projects, a contract provision titled "TSB Affirmative Action Responsibilities on Non-Federal Aid Projects (Third-Party State-Assisted Projects)", or a similar document developed by the Recipient. 5. Ensuring that the awarded contractor has and shall follow the contract provisions. The Recipient is encouraged to establish goals or percentages to achieve TSB participation in these projects. Contract goals may vary depending on the type of project, the projects sub-contractible items, the type of service or supplies needed for the project, and the availability of qualified TSBs in the area. The Recipient shall agree to provide the Iowa DOT the following documentation: 1. Copies of correspondence and replies, and written notes of personal and/or telephone contacts with any TSBs. Such documentation can be used to demonstrate the Recipient's positive efforts and it should be placed in the general project file. 2. Bidding proposals noting established TSB goals, if any. 3. The dollar amount contracted to, subcontracted to, or supplied by qualified TSBs for the project or projects covered by this agreement. 4. The attached "Checklist and Certification" form shall be filled out upon completion of each project and forwarded to the Iowa DOT's EEO Administrator, Office of Contracts, 800 Lincoln Way, Ames, Iowa 50010. me 2004 CHECKLIST AND CERTIFICATION OF THE UTILIZATION OF TARGETED SMALL BUSINESS(TSB) ON NON-FEDERAL AID PROJECTS(THIRD-PARTY STATE-ASSISTED PROJECTS) CITY: PROJECT NUMBER: COUNTY: AGREEMENT NUMBER: 1. Were qualified TSB names obtained from the Iowa Department of Inspections and Appeals? YES NO If no,explain 2. Were qualified TSBs notified of project? YES NO If yes,by letter ,telephone ,personal contact ,other If no,explain 3. Were bids solicited from qualified TSBs? YES NO If no,explain 4. Was a goal or percentage(%)established YES NO for TSB participation? If yes,what was the goal or percentage(%) If no,explain why not 5. Did the prime contractor use positive efforts to YES NO utilize TSBs on subcontracts? If no,what action was taken by County/City Is documentation in files? YES NO 6. What was the dollar amount reimbursed to the City/County from the Iowa Department of Transportation? $ What was the final project cost? $ What was the dollar amount performed by TSBs? $ Was the goal or percentage(%)achieved? YES NO If no,explain I certify that the COUNTY/CITY(circle one)used positive efforts to utilize TSBs as participants in this project. PROJECT ENGINEER/MANAGER DATE Exhibit E CONTRACT PROVISION Targeted Small Business (TSB) Affirmative Action Responsibilities on Non-Federal Aid Projects (Third-Party State-Assisted Projects) June 2004 June 2004 TSB AFFIRMATIVE ACTION RESPONSIBILITIES ON NON-FEDERAL AID PROJECTS (THIRD-PARTY STATE-ASSISTED PROJECTS) 1. TARGETED SMALL BUSINESS (TSB)DEFINITION A TSB is a small business, as defined by Iowa Code Section 15.102(5), which is 51%or more owned, operated and actively managed by one or more women,minority persons or persons with a disability. Generally this is a for-profit small business enterprise under single management, is located in Iowa and has an annual gross income of less than 3 million dollars computed as an average of the three preceding fiscal years. 2. TSB REQUIREMENTS In all state-assisted projects made available through the Iowa Department of Transportation, local governments have certain affirmative action requirements to encourage and increase participation of disadvantaged individuals in business enterprises. These requirements are based on Iowa Code Section 19B.7 and 541 Iowa Administrative Code Chapter 4. These requirements supersede all existing TSB regulations, orders, circulars and administrative requirements. 3. TSB DIRECTORY INFORMATION Available from: Iowa Department of Inspections and Appeals Targeted Small Business Lucas Building Des Moines, IA 50319 Phone: 515-281-7357 Website: www.iowai.net/iowa/dia/tsb 4. THE CONTRACTOR'S TSB POLICY The contractor is expected to promote participation of disadvantaged business enterprises as suppliers, manufactures and subcontractors through a continuous, positive, result- oriented program. Therefore the contractor's TSB policy shall be: It is the policy of this firm that Targeted Small Business (TSB) concerns shall have the maximum practical opportunity to participate in contracts funded with state-assisted funds which are administered by this firm (e.g. suppliers, manufactures and subcontractors). The purpose of our policy is to encourage and increase the TSB participation in contracting opportunities made available by state-assisted programs. 5. CONTRACTOR SHALL APPOINT An EQUAL EMPLOYMENT OPPORTUNITY (EEO) OFFICER The contractor shall designate a responsible person to serve as TSB officer to fulfill the contractors affirmative action responsibilities. This person shall have the necessary statistics, funding, authority and responsibility to carry out and enforce the firm's EEO policy. The EEO officer shall be responsible for developing, managing and implementing the program on a day-to-day basis. The officer shall also: A. For current TSB information, contact the Iowa Department of Inspections and Appeals (515-281-7357) to identify potential material suppliers, manufactures and contractors. B. Make every reasonable effort to involve TSBs by soliciting quotations from them and incorporating them into the firm's bid. C. Make every reasonable effort to establish systematic written and verbal contact with those TSBs having the materials or expertise to perform the work to be subcontracted, at least two weeks prior to the time quotations are to be submitted. Maintain complete records of negotiation efforts. D. Provide or arrange for assistance to TSBs in seeking bonding, analyzing plans/specifications or other actions that can be viewed as technical assistance. E. Ensure the scheduled progress payments are made to TSBs as agreed in subcontract agreements. F. Require all subcontractors and material suppliers to comply with all contract equal opportunity and affirmative action provisions. 6. COUNTING TSBs PARTICIPATION ON A PROJECT TSBs are to assume actual and contractual responsibilities for provision of materials/supplies, subcontracted work or other commercially useful function. A. The bidder may count: (1) Planned expenditures for materials/supplies to be obtained from TSB suppliers and manufacturers; or (2) Work to be subcontracted to a TSB; or (3) Any other commercially useful function. ti B. The contractor may count: (1) 100% of an expenditure to a TSB manufacturer that produces/supplies goods manufactured from raw materials. (2) 60% of an expenditure to TSB suppliers that are not manufacturers; provided the suppliers perform a commercially useful function in the supply process. (3) Only those expenditures to TSBs that perform a commercially useful function in the work of a contract, including those as a subcontractor. (4) Work the Contracting Authority has determined that it involves a commercially useful function. The TSB must have a necessary and useful role in the transaction of a kind for which there is a market outside the context of the TSB program. For example, leasing equipment or purchasing materials from the prime contractor would not count. 7. REQUIRED DATA, DOCUMENTS AND CONTRACT AWARD PROCEDURES FROM BIDDERS/CONTRACTORS FOR PROJECTS WITH ASSIGNED GOALS A. Bidders Bidders who fail to demonstrate reasonable positive efforts may be declared ineligible to be awarded the contract. Bidders shall complete the bidding documents plus a separate form called "TSB Pre-Bid Contact Information". This form includes: (1) Name(s) of the TSB(s)contacted regarding subcontractable items. (2) Date of the contract. (3) Whether or not a TSB bid/quotation was received. (4) Whether or not the TSB's bid/quotation was used. (5) The dollar amount proposed to be subcontracted. B. Contractors Using Quotes From TSBs Use those TSBs whose quotes are listed in the "Quotation Used in Bid" column along with a"yes" indicated on the Pre-bid Contact Information form. C. Contractors NOT Using Quotes From TSBs If there are no TSBs listed on the Pre-bid Contract Information form, then the contractor shall document all efforts made to include TSB participation in this project by documenting the following: (1) What pre-solicitation or pre-bid meetings scheduled by the contracting authority were attended? (2) Which general news circulation, trade associations and/or minority- focused media were advertised concerning the subcontracting opportunities? (3) Were written notices sent to TSBs that TSBs were being solicited and was sufficient time allowed for the TSBs to participate effectively? (4) Were initial solicitations of interested TSBs followed up? (5) Were. TSBs provided with adequate information about the plans, specifications and requirements of the contract? (6) Were interested TSBs negotiated with in good faith? If a TSB was rejected as unqualified, was the decision based on an investigation of their capabilities? (7) Were interested TSBs assisted in obtaining bonding, lines of credit or insurance required by the contractor? (8) Were services used of minority community organization, minority contractors groups; local, state and federal minority business assistance offices or any other organization providing such assistance. The above documentation shall remain in the contractor's files for a period of three (3) years after the completion of the project and be available for examination by the Iowa Depaitiuent of Inspections and Appeals. 8. POSITIVE EFFORT DOCUMENTATION WHEN NO GOALS ARE ASSIGNED Contractors are also required to make positive efforts in utilizing TSBs on all state- assisted projects which are not assigned goals. Form "TSB Pre-bid Contact Information" is required to be submitted with bids on all projects. If there is no TSB participation, then the contractor shall comply with section 7C. of this document prior to the contract award. o •o U 4,3 g E') `�VU > o p 1-3 O AA .4 U U o y t0 P a. a I 0. 0 a • 0 u, AO o Q 4 d .01 .a z 0 o g ' ' 0' a) o v 0 o F A U (kW�` O> CA 3 H P9 W V y v, , aF F d o , A z"8 WdWO U Q O U a U W .-. o ce) o on U g fx . C7 b co H F U O PI ZxO C/ oa b 0W z . . g Zb 0 o F`a ril O bo U v] O. Pa ,,, 0 p 4.,, A v) d a k' '� a — EW,., w ' t a Om AOU Q w ripd U a> .a F AS 0 g F El ? ;, 0 a ao 5 E. a o o o ly y 10 Oo Pil a O 1. > C F "i s o 12, C U h g 0 F. .4 by OU g o d 8 — I � 8,8 t y O,E ;0 a C s bs gC) b o F � > s o v �n W c> I bt00 v 4 0 v a'" 4 z ? - o une 2004 CHECKLIST AND CERTIFICATION OF THE UTILIZATION OF TARGETED SMALL BUSINESS (TSB) ON NON-FEDERAL AID PROJECTS (THIRD-PARTY STATE-ASSISTED PROJECTS) CITY: PROJECT NUMBER: COUNTY: AGREEMENT NUMBER: 1. Were qualified TSB names obtained from the Iowa Department of Inspections and Appeals? YES NO If no, explain 2. Were qualified TSBs notified of project? YES NO If yes,by letter , telephone ,personal contact , other If no, explain 3. Were bids solicited from qualified TSBs? YES NO If no, explain 4. Was a goal or percentage(%) established YES NO for TSB participation? If yes,what was the goal or percentage(%) If no, explain why not 5. Did the prime contractor use positive efforts to YES NO utilize TSBs on subcontracts? If no,what action was taken by County/City Is documentation in files? YES NO 6. What was the dollar amount reimbursed to the City/County from the Iowa Department of Transportation? $ What was the final project cost? $ What was the dollar amount performed by TSBs? $ Was the goal or percentage (%) achieved? YES NO If no, explain I certify that the COUNTY/CITY (circle one)used positive efforts to utilize TSBs as participants in this project. PROJECT ENGINEER/MANAGER DATE CLAIM FOR REIMBURSEMENT OF AIRPORT PROJECT COSTS 1. Request No.: 2. Contract No.: (Circle: Progress or Final Request) 3. Date: 4. Project No.: 5. Airport Name: 6. Airport Sponsor: (City—County—Authority) 7. Type of Project: 8. Total Iowa DOT Agreement Amount: $ 9. Total Project Payment to Vendor/Consultant to Date: $ 10. Total Paid for ineligible costs $ 11. Total Eligible Cost (Line 9-10) $ 12. DOT Agreement Percent Participation of Eligible Cost X . 13. Costs eligible for reimbursement (Multiply Line 11 by Line 12) $ 14. Compare Line 8 with Line 13 and Enter Smaller Amount $ 15. Total Amount Previously Reimbursed (Line 14 of previous claim) $ 16. Amount Due this Request $ (Subtract Line 15 from Line 14) I hereby certify that all eligible project activities for which reimbursement is requested have been completed in substantial compliance with the project plans, specifications, the project agreement and the laws of the State of Iowa and the ordinances of the CITY/COUNTY. Signature (Project Engineer or Project Manager) (Date) I certify that the items claimed for payment are proper and true and that no part of this claim has been paid by DOT. Signature (Airport Sponsor) Title (Date) Instructions for Use of Form "Claim for Reimbursement of Project Costs" Line 1. The first claim is invoice No. 1,the next No. 2, and so on. Line 2. Contract Number shown on the agreement your jurisdiction signed with the DOT. Line 3. Date the claim is prepared. Line 4. The number printed on the agreement with the DOT, such as 9I-XX- X-XXX Line 5. Airport Name Line 6. Airport Sponsor—City of , or County, or Airport Authority Line 7. List the type of project. Examples: Engineering services, planning, runway rehabilitation, hangar rehabilitation, etc. Line 8. Total Amount found in the Iowa DOT Agreement Line 9. Total Amount paid to contractors or vendors to date. Attach a ledger or spreadsheet that lists all the bid items and the number of units each completed. The costs of each item to date should also be shown, by item. On this line, enter the total amount paid. Line 10. Show the total dollar amount paid to the contractor for items not eligible for reimbursement as--specified in the agreement or as shown on the plans. Line 11. Subtract line 10 from line 9 and enter the difference here. Line 12 The percentage shown in the agreement that the DOT will participate in the reimbursement of eligible item costs. Line 13. Multiply amount shown on line 11 by the percentage from line 12. Line 14. Costs eligible for reimbursement—smaller amount of line 8 or 13. Line 15. Total amount already paid by the DOT on prior claims for this grant. (Line 14 on previous claim) Line 16. Subtract line 15 from line 14 and enter the difference here. Amount due for this claim. Note: The certification of the claim must be signed by the Project Engineer or Project Manager. Note: The person who signs on this line must be authorized to do so by the City, County or other agency, either in the agreement or by policy.