HomeMy WebLinkAboutRESOLUTION 2010-45 RESOLUTION NO. 2010-45
RESOLUTION APPROVING ENGINEERING AGREEMENT
WITH AECOM AND DIRECTING EXECUTION OF SAID
AGREEMENT BY MAYOR.
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA,
that the Engineering Agreement dated January 25, 2010, at a cost
not to exceed $40, 000 . 00, for design and acquisition services of
snow removal equipment and de-icing equipment at the Waterloo
Regional Airpot, by and between AECOM of Waterloo, Iowa and the
City of Waterloo, Iowa, be and the same is hereby approved, and
the Mayor authorized to execute the same in behalf of the City of
Waterloo, Iowa.
PASSED AND ADOPTED this 25th d of January, 2010 .
ya
rnest G. Clark, Mayor
ATTEST:
C-17-1.>
Suzy h�res, CMC
City Clerk
WATERLOO
CRUISE A NEW ALTITUDE
January 19, 2010
TO: City Council
Mayor Clark
Michelle Weidner, CFO
Suzy Schares, City Clerk
FROM: Bradley Hagen,Airport Director fot
RE: Approval of Engineering Agreement
Snow Removal Equipment(SRE)/De-Icing Vehicle
Waterloo Regional Airport
City of Waterloo, Iowa
FAA AIP Project No. 3-19-0094-37
Enclosed is a contract between City of Waterloo, through Waterloo Regional Airport, and AECOM, of
Waterloo, Iowa in the amount of $40,000 for Design and Acquisition Services of a Snow Removal
Equipment and De-icing equipment at Waterloo Regional Airport.
FAA has worked with Airport staff to negotiate and ensure the required services are competitive to
complete the scope of services. AECOM is our engineer of record. The Airport bid engineering
services in September 2008 for a 5-year period.
The scope of services required and detailed cost summary is enclosed.
The funding for this agreement is from a FAA grant (95%) and our Passenger Facility Charge (PFC)
program(5%).
FAA has asked us to proceed with this contract. We do not yet have a grant in hand to fund this
proposed agreement. As with every engineering contract every year for FAA projects, we execute the
contract and receive a grant later in the year to fund both the engineering and construction/acquisition
portions of the work. FAA includes both engineering and construction/acquisition in one grant and
won't issue a grant until we receive bids on the construction later in the spring.
If you have any questions or require additional information,please feel to call.
2790 Livingston Ln * Waterloo IA 50703 • P. 319-291-4483 • F: 319-291-4250 • www.FIyALO.com