HomeMy WebLinkAboutMEMO •`
lr.xilik.,
I fJr E rr1 1 COMMUNITY DEVELOPMENT
17.-Z- -sr 620 Mulberry Street,Carnegie Annex • Waterloo,IA 50703 • (319)291-4429 Fax(319)291-4431
0terioo `
March 30, 2011
Mayor MEMORANDUM
BUCK
CLARK TO: Jay Llewellyn, Advanced Environmental
Water Works General Manager
Eric Thorson, City Engineer
COUNCIL Pat Treloar, Chief of Fire Services
MEMBERS Mark Boesen, Manager or Rehabilitation Services
Craig Clark, Building Official
Bob Ball, Building Inspection
DAVID Brian Baker, Building Inspection
JONEs Bruce Meisinger, Black Hawk County Health Dept.
Ward r Katy Petersen, Mid American Energy
Pat O'Regan, Qwest Communications
CAROLYN Richard Buchanan, Black Hawk County Superintendent
COLE Steve Decker, Street/Sanitation Superintendent
Ward 2 Aric Schroeder, City Planner
Noel Anderson, Community Planning &Development Director
HAROLD David Zellhoeffer, Assistant City Attorney
GETTY Suzy Schares, City Clerk
Ward Michelle Weidner, Finance Director
QUENTIN M. Rudy D. Jones, C mmu 'ty velopment Director
HART
Ward 4 FROM: Louis Starks 0-
Contracts and Grants Coordinator
RON
WELPER RE: COMMUNITY DEVELOPMENT
Wards Asbestos Removal Contract No. 139-AR-03-21-11-EDI
BOB Please be advised that a pre-removal conference for the Community Development Block
GREENWOOD Grant Project listed above will be held on Tuesday, April 5, 2011 at 9:00 a.m., in the
At-Large Carnegie Annex Conference Room (lower level next to Human Rights) at 620 Mulberry
STEVE Street, Waterloo, Iowa.
SCHMITT All interested parties should be in attendance.
At-Large
If you have any questions, please contact me at 291-4429.
LS:an
J:\LOUIS-S\Asbestos Removal Contracts\139-AR-03-21-11-EDI\AR PRE-CONFERENCE MEMO.doc
ittiCITY WEBSITE:www.cityofwaterlooiowa.com
EQUAL HOUSING
G WE'RE WORKING FOR YOU!
OPPORTUNITY
An Equal Opportunity/Affirmative Action Employer
rn M , > K D * a D 03 00
o Q.
xj °8- ocp
fl o
a — DcD i Dm
Cn - D v =
N < Cl)
> CD - Cr
r— X CD in CA
I— CD 0 3 D O C 0
o O
2) N O X
Cn ,-. CD
5 tQ
p 90 0
> <
C- fv
CO
CD w _
3
-aA
CD ,A (I)N . .
0
_ Si
i
n
WA
W
1
i
x
1
O
co.)
n
c� s - (3 Oa II
U — o _1 o -C. a:
r ^ 0 0
c
tic oett.%t 3IS-4 60
March 4, 2011
Mr. Roger C. Nielson
August Enterprises, LLC
P. O. Box 295
Jefferson, Iowa 50129-0295
RE: Bid for Removal of Asbestos
Contract No. 13 9-AR-03-21-11 EDI
Dear Mr. Nielson:
The Community Development Board is soliciting bids for the removal of asbestos from six
(6) structures located in the City of Waterloo, Iowa:
706 W. 1st Street
915-17 Lafayette Street
919 Lafayette Street
1013 Lafayette Street
1021 Lafayette Street
Alternate: 927 Lafayette Street
We require an itemized quote that is to be totaled. This will also require immediate DNR
notification.
1. Bid must be SIGNED and bear the official title of the person signing. Bids must be
accompanied by a 5% Bid bond, certified funds or corporate surety.
2. Bidders must be prepared to proceed as soon as possible.
3. Bid must be submitted SEALED in an envelope addressed to:
Suzy Schares
CITY CLERK
715 Mulberry Street
Waterloo, Iowa 50703
and must be marked in the lower left-hand corner as follows:
BID FOR ASBESTOS REMOVAL AND DISPOSAL
139-AR-03-21-11 EDI
TO BE OPENED: 5:30 P.M. March 14,2011
March 4, 2011
Page 2
3. Sufficient time should be allowed for mailed bids to be delivered by normal postal
operation. Late bids will not be considered. Bids must be received by 3:30 p.m.,
March 14, 2011 in the City Clerk's office. Bids will be opened at the City Council
regular meeting of Finance/Building and Grounds Committees at 5:30 p.m.
4. Asbestos abatement shall be completed within Ten (10)working days of
Notice to Proceed(NTP).
TIME IS OF THE ESSENCE and default requirements will be strictly adhered to. Failure to
complete the project as set forth herein, shall constitute a material default and the City may
immediately hire another contractor to complete work and deduct any costs associated from
the original contract price associated with the contract substitution. Execution of this
Contract requires flexibility and the ability to perform under extraordinary conditions.
5. Your bid proposal shall include spaces for authorized signature(s) of the City's
representative,to be signed if the lowest responsible bid. Submit proposals in
duplicate. Bids to be awarded at the City Council Meeting March 21, 2011.
6. Enclosed is a list of asbestos items for each property. Remove only areas indicated
on the report as having asbestos in the structure.
7. Please pay attention to the Asbestos Inspection Report's Notes &
Recommendations.
8. Proposals should include (1) OSHA required personal and excursion air monitoring,
and (2)work performed in accordance with EPA-EHERA,NESHAP, Iowa DNR
and Iowa DNR regulations.
Please feel free to contact me at (319) 291-4429 if you should have any questions.
Sincerely,
Louis Starks
Contracts and Grants Coordinator
LS:an
Enclosures
J:\LOUIS-S\Asbestos Removal Contracts\139-AR-03-21-11-EDI\Request for Bids.doc
Cc: Noel Anderson,Planning and Community Development Director
Rudy D.Jones,Community Development Director
�—Suzy Schares,City Clerk
3/4/11
Bids sent to:
Mr. Mike Poe
Advanced Environmental Testing &Abatement, Inc.
803 Ricker Street
Waterloo, Iowa 50703
Mr. Jeff Intelkofer
Affordable Hazards Removals, Inc.
121 East Grand Street, Suite B
Monticello, IA 52310
Mr. Thomas J. Petersen
Envirobest, Inc.
910 2nd Avenue, SW# C
Cedar Rapids, IA 52404
Mr. Roger C.Nielson
August Enterprises, LLC
P. O. Box 295
Jefferson, Iowa 50129-0295