Loading...
HomeMy WebLinkAboutINVOICE 284404 Invoice EARTHT E C H A Vico INTERNATIONAL LTD.COMPANY Invoice To: Date: November 12,2003 Mr.Eric Thorson Project Number: 71529 City of Waterloo ' " ` 715 Mulberry Street Invoice No: 28440 K Waterloo,Iowa 50703 Jed ?� -- co_l_ RE,� 42o N Your Authorization: Professional Services Agreement Dated September 22, 2003 " \4,0 ' A. - t i Cedar Valley Riverfront Renaissance p , Waterloo Vision Iowa Projects ' f /ITC, ' Riverwalk Loop/Cedar River Dam/ 90 SO Cedar River Plaza and Amphitheatre Progress Billing: Project Start Through October 31,2003 Classification Hours Amount Senior Professional 2.0 $ 378.00 Project Professional 76.0 8,482.80 Word Processor 2.0 109.53 Direct Expenses 0.00 Total Costs to Date $8,970.33 Less Previous Billing 0.00 TOTAL AMOUNT DUE $8,970.33 Fj K / -- etf, --( 1/41< L:Awork\ADMIN\INVOICE\WatRiverfront.doc Remit To: Earth Tech,Inc. • P.O.Box 1497 • Waterloo,Iowa 50704-1497 1 501 Sycamore Street,Suite 222 • Waterloo,Iowa 50703 • (319)232-6531 • Fax:(319)232-0271 i1 , \ / \ 9 k f 0 3 � � \ f « / 0 ® j /\ . a CD 2 \ R \ I \ cn co a \ \ = �� 5E \ o § ' co �� m = \ ► 2 co o } ° or 2 CD f / - 4" 2 ! CD§ CO g i =* * / o / $ ® 3 } k * M. / * * = 2 ** y 1 . ) F ,- k... F ] k v o o o >1‹71 H— k / / / \ 0 \ f E / d \ m 0 2 §i rri e O < Z / @ m / -o a k < / ? a / k ƒ O m co ® > \ CD \ \ o ° 6 Z C R \ \ / M \ R < -0 CD 7 P _ \ / / r < \ § m R 7 o ® 70 g 2 k E f § G - e R. m / a , . co \ k 2 7 3 § \ .. - § \ / / i 0 7 « c ƒ — $ / § ] / ® co O CD c \ O. , \ f P \ / \ o / \ - / / / CONSTRUCTION PROJECT BUDGET WORKSHEET Project Name Cedar Valley Riverfront Renaissance City Contract No. Waterloo Vision Iowa Projects Budget Total $ $469,700.00 Subproject Name Other Source/City Funding % Split Subproject No. Project Manager Jamie Knutson Department Engineering Activity Consulting Fund: 425 Fund: Fund: (E.g.010 (E.g.290 (E.g.412 General Fund) Reimbursable) Bond Fund) Total REVENUES: 3000 Cash on Hand 3112 Local Option Sales Tax 3350 Federal Grant 3353 Federal U-Step Grant 3358 Shared Program - City 3360 Shared Program -State 3361 State Grant 3365 State RISE Grant 3368 EPA Grant 3377 EDA Grant 3750 Sale of Bonds 3800 Miscellaneous Revenue Solid Waste Refund $469,700.00 $469,700.00 TOTALS $469,700.00 $ $ $469,700.00 EXPENDITURES: 2103 Engineering &Consulting $469,700.00 $469,700.00 2125 Traffic Control Equipment 2140 Land Acquisition 2144 Land Improvements 2154 Demolitions 2156 Bikeway Construction 2161 Bridges 2162 Storm Sewers 2163 Sanitatry Sewers 2164 Sidewalks 2165 Streets & Roadways TOTALS $469,700.00 $ $ $469,700.00 Yes No Have you attached a brief description of the project? �X El Have you attached copies of any grant agreements that will fund the project? ❑ ❑X Is the project partially state funded? If Yes, please list source and identify if federal El El pass-through funding. ,(R �fI�QK�-�1 11/17/03 (Signature Dept. Head) Date (Signature Finance Dept. Review) Date users:\Project Budget Form org\Construction (April 2003) WATERLOO RIVERFRONT RENAISSANCE VISION IOWA PROJECTS 1. PROJECT REVIEW A. River Walk Loop i- Cedar River Downtown Loop: Mullan to 6th Street 6th Street to 18th Street )= North Side of River—Mullan to Cedar Bend Park y South Side of River—Mullan to River Road Y Connections to MLK Drive and Grout Museum Connections to Cedar River Plaza Area Approximately 33,000 feet of new trails are proposed for the project. This includes reconstruction of downtown river wall at locations where deterioration has occurred. Approximate Construction Cost-$5.97 Million B. Cedar River Dam Y Raise Existing Dam Approximately 4 to 5 Feet (Create 8-Foot Deep Channel From the Dam Upstream) fr Planning Level Study Completed By Corps in 2002 r Currently, Option is Adding Inflatable Bladder to Existing Dam r= Will Review for Potential Kayaking Pass-Through Approximate Construction Cost-$3.50 Million C. Cedar River Plaza and Amphitheatre y Cedar River Plaza: 44,000 Square Foot Promenade Connecting the Center For the Arts and the Cedar River Parking Will be Accommodated Below the Upper Plaza Area and Promenade i% Amphitheatre: 15,000 Square Foot Amphitheatre Constructed at Edge of Cedar River Approximate Construction Cost-$4.40 Million