HomeMy WebLinkAboutINVOICE 284404 Invoice
EARTHT E C H
A Vico INTERNATIONAL LTD.COMPANY
Invoice To: Date: November 12,2003
Mr.Eric Thorson Project Number: 71529
City of Waterloo ' " `
715 Mulberry Street Invoice No: 28440 K
Waterloo,Iowa 50703 Jed
?� --
co_l_ RE,� 42o N
Your Authorization: Professional Services Agreement Dated September 22, 2003 " \4,0 ' A. -
t i
Cedar Valley Riverfront Renaissance p ,
Waterloo Vision Iowa Projects ' f /ITC, '
Riverwalk Loop/Cedar River Dam/ 90 SO
Cedar River Plaza and Amphitheatre
Progress Billing: Project Start Through October 31,2003
Classification Hours Amount
Senior Professional 2.0 $ 378.00
Project Professional 76.0 8,482.80
Word Processor 2.0 109.53
Direct Expenses 0.00
Total Costs to Date $8,970.33
Less Previous Billing 0.00 TOTAL AMOUNT DUE $8,970.33 Fj K / -- etf,
--( 1/41<
L:Awork\ADMIN\INVOICE\WatRiverfront.doc
Remit To: Earth Tech,Inc. • P.O.Box 1497 • Waterloo,Iowa 50704-1497
1
501 Sycamore Street,Suite 222 • Waterloo,Iowa 50703 • (319)232-6531 • Fax:(319)232-0271
i1 , \ / \ 9 k f 0
3 � � \ f « / 0 ® j
/\ . a CD 2 \ R \ I
\ cn co a \ \ =
�� 5E \ o
§ ' co
�� m =
\
► 2
co o } ° or
2 CD f / -
4" 2 ! CD§ CO
g i =*
*
/ o
/ $
® 3 }
k *
M.
/ *
*
= 2 **
y
1 .
) F ,- k... F ]
k v o o o >1‹71 H—
k / / / \ 0 \
f E / d \ m 0
2
§i rri e O < Z
/ @ m
/ -o a k < / ? a / k ƒ O m
co ® > \ CD \ \ o ° 6 Z C
R \ \ / M \ R < -0 CD 7 P
_ \ / / r < \ § m R
7 o ® 70 g
2 k E f § G
- e R.
m
/ a , . co
\ k 2 7 3 §
\ .. - § \ /
/ i 0 7
« c
ƒ — $ /
§
]
/ ® co
O CD
c \ O.
, \
f P
\ /
\ o
/ \
- /
/ /
CONSTRUCTION PROJECT BUDGET WORKSHEET
Project Name Cedar Valley Riverfront Renaissance City Contract No.
Waterloo Vision Iowa Projects Budget Total $ $469,700.00
Subproject Name Other Source/City Funding % Split
Subproject No. Project Manager Jamie Knutson
Department Engineering
Activity Consulting
Fund: 425 Fund: Fund:
(E.g.010 (E.g.290 (E.g.412
General Fund) Reimbursable) Bond Fund) Total
REVENUES:
3000 Cash on Hand
3112 Local Option Sales Tax
3350 Federal Grant
3353 Federal U-Step Grant
3358 Shared Program - City
3360 Shared Program -State
3361 State Grant
3365 State RISE Grant
3368 EPA Grant
3377 EDA Grant
3750 Sale of Bonds
3800 Miscellaneous Revenue
Solid Waste Refund $469,700.00 $469,700.00
TOTALS $469,700.00 $ $ $469,700.00
EXPENDITURES:
2103 Engineering &Consulting $469,700.00 $469,700.00
2125 Traffic Control Equipment
2140 Land Acquisition
2144 Land Improvements
2154 Demolitions
2156 Bikeway Construction
2161 Bridges
2162 Storm Sewers
2163 Sanitatry Sewers
2164 Sidewalks
2165 Streets & Roadways
TOTALS $469,700.00 $ $ $469,700.00
Yes No
Have you attached a brief description of the project? �X El
Have you attached copies of any grant agreements that will fund the project? ❑ ❑X
Is the project partially state funded? If Yes, please list source and identify if federal El El
pass-through funding.
,(R �fI�QK�-�1 11/17/03
(Signature Dept. Head) Date (Signature Finance Dept. Review) Date
users:\Project Budget Form org\Construction (April 2003)
WATERLOO RIVERFRONT RENAISSANCE
VISION IOWA PROJECTS
1. PROJECT REVIEW
A. River Walk Loop
i- Cedar River Downtown Loop: Mullan to 6th Street
6th Street to 18th Street
)= North Side of River—Mullan to Cedar Bend Park
y South Side of River—Mullan to River Road
Y Connections to MLK Drive and Grout Museum
Connections to Cedar River Plaza Area
Approximately 33,000 feet of new trails are proposed for the project. This includes
reconstruction of downtown river wall at locations where deterioration has occurred.
Approximate Construction Cost-$5.97 Million
B. Cedar River Dam
Y Raise Existing Dam Approximately 4 to 5 Feet (Create 8-Foot Deep Channel From
the Dam Upstream)
fr Planning Level Study Completed By Corps in 2002
r Currently, Option is Adding Inflatable Bladder to Existing Dam
r= Will Review for Potential Kayaking Pass-Through
Approximate Construction Cost-$3.50 Million
C. Cedar River Plaza and Amphitheatre
y Cedar River Plaza: 44,000 Square Foot Promenade Connecting the Center
For the Arts and the Cedar River
Parking Will be Accommodated Below the Upper Plaza
Area and Promenade
i% Amphitheatre: 15,000 Square Foot Amphitheatre Constructed at Edge
of Cedar River
Approximate Construction Cost-$4.40 Million