AGREEMENT FOR DEMOLITION AND SITE CLEARANCE
GROUP 137-D-GO-04-04-05
THIS AGREEMENT made this 22nd day of April , 2005, by and between LEHMAN
TRUCKING & EXCAVATING, INC. , a corporation organized and existing under the
laws of the State of Iowa, hereinafter called the "CONTRACTOR", and the CITY OF
WATERLOO, IOWA, hereinafter called the "CITY".
WITNESSETH, that the Contractor and the City for the consideration stated herein
mutually agree as follows:
ARTICLE 1. STATEMENT OF WORK. The Contractor shall furnish all supervision,
technical personnel, labor, materials, machinery, services, and perform and substantially
complete all work within 30 days after receipt of Notice to Proceed, all work required for
the Demolition and Site Clearance in an efficient and workmanlike manner as follows:
DEMOLITION OF BUILDINGS ON, AND CLEARANCE OF SITES of all parcels as
enumerated in Bid Schedule attached to and forming a part of this Contract, within the
City of Waterloo Demolition Project 137-D-GO-04-04-05 all in strict accordance with
the Contract Documents for Demolition and Site Clearance including all Addenda
thereto,
Numbered and Dated
Numbered and Dated
ARTICLE 2. THE CONTRACT PRICE. The Local Public Agency will pay the
Contractor for the performance of the Contract in current funds, subject to additions
and deductions as provided in the Section "Changes in the Work" under General
Conditions, Part I, and subject to all other conditions set forth in the Contract Documents,
the sum of TWENTY THOUSAND, THREE HUNDRED NINETY AND NO/100
DOLLARS($20,390.00), in addition to and above the value of such salvaged materials
specified to become the property of the Contractor, and in accordance with the
contractor's bid.
ARTICLE 3. CONTRACT. The executed Contract Documents shall consist of the
following:
a. This Agreement f. General Conditions
b. Addenda Part I, II, and III
c. Invitation to Bid g. Special Conditions
d. Instructions to Bidders h. Technical Specifications
e. Signed copy of Bid i. Drawings as listed in the
Schedule of Drawings
AGR-1
THIS AGREEMENT, together with the other documents enumerated in this Article 3,
which said other documents are as fully a part of the Contract as if hereto attached or
herein repeated, forms the Contract between the parties hereto. In the event that any
provision in any component part of this Contract conflicts with any provisions of any
other component part, the provision of the component part first enumerated in this Article
3 shall govern, except as otherwise specifically stated.
NOTICE TO PROCEED. After execution of the Agreement, a Notice to Proceed will be
issued to the contractor, whereupon the contractor shall proceed with his/her work in
accordance with the Contract time established in the SPECIAL CONDITIONS
contained herein.
ARTICLE 4.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed
in three(3) original copies on the day and year first above written.
LEHMAN TRUCKING& EXCAVATING, INC. ATTEST:
Contractor Name (for individual or partnership)
By: , By:
CITY OF WATERLOO ATTEST:
By: / By:
Timothy J. ey, Mayo Nanc Eck , City Clerk
In o 0
o
o W o 0 0 0 "
o U CIn o cn a
C o o rn
0 W Q `n `� o
L7 Zia 6 Ers-
A
M
ti
z °
wQd- °
a 0
° = Z z cu
at
C7 rip
W
a
Q
W
C
a Q � o
aa w Z w
Q
W
N
,E=1 W
°? C
Q E-, 0 N
.
o �.
o o o
a
,-, N
°
° O V)
-14
O Qc,,
m
GL,
E-,
M
U� Q Cl) rf),d N O
M