HomeMy WebLinkAboutPROJECT SPECIFICATIONS FEB 2013 GATES PARK GOLF
COURSE STREAMBANK
STABILIZATION
LEISURE SERVICES
CITY OF WATERLOO
PROJECT SPECIFICATIONS
FEBRUARY, 2013
By:
Robinson Engineering Company
5751 Westminster Drive, Suite B
Cedar Falls, Iowa 50613
Phone: 319-859-0293
WATERLOO LEISURE SERVICES - GATES PARK GOLF COURSE
- STREAMBANK STABILIZATION
TABLE OF CONTENTS
1. NOTICE OF PUBLIC REARING AND NOTICE TO BIDDERS
2. INSTRUCTIONS TO BIDDERS
3. FORM OF BID OR PROPOSAL
4. SALES TAX EXEMPTION INFORMATION FORM
5. FORM OF BID BOND
6. NON-COLLUSION AFFIDAVITS
7. EQUAL OPPORTUNITY CLAUSE
8. RESIDENT BIDDER AND NON-RESIDENT BIDDER CERTIFICATION
9. AFFIRMATIVE ACTION PROGRAM
10. POTENTIAL ITEMS OF WORK FOR MBE/WBE PARTICIPATION
_ SUBCONTRACTOR'S BID REQUEST FORM,
LETTER FORM FOR SUBCONTRACTOR QUOTES,
MBE/WBE SCOPE LETTER,
MBE AND/OR WBE PREBID CONTACT INFORMATION FORM
11. WATERLOO/CEDAR FALLS MINORITY AND WOMEN BUSINESSES
ENTERPRISE CONSTRUCTION AND MAINTENANCE
CONTRACTOR'S GUIDE
12. STATEMENT OF BIDDER'S QUALIFICATIONS
13. FORM OF CONTRACT
14. FORM OF PERFORMANCE BOND
15. FORM OF PAYMENT BOND
16. PROJECT SPECIFICATIONS
Robinson Engineering Co. I hereby certify that this plan,
5751 Westminster Drive, Ste. B specification or report was prepared
Cedar Falls,IA 50613 by me under my direct personal supervision
and that I am a duly registered
Professional Engineer under the laws of
the State of Iowa.
- `lz8- 13
Signature Date
NOTICE OF PUBLIC HEARING
On Proposed Plans, Specifications, Form of Contract,
And Estimate of Cost and the
NOTICE TO BIDDERS
For the Taking of Construction Bids
_ For the
GATES PARK GOLF COURSE STREAMBANK STABILIZATION
In the City of Waterloo, Iowa
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her office in the
City Hall of the said City on the 18t February 2013, until 4:00 p.m. for the construction of the GATES
PARK GOLF COURSE STREAMBANK STABILIZATION, as described in detail in the plans and
specifications now available from Robinson Engineering Company.
OPENING OF BIDS
All proposals received will be opened in open Council meeting to be held in the Council Chambers in
the City Hall in the City of Waterloo, Iowa, on the 18th of February 2013, at 5:30 p.m., and the proposals
will be acted upon at such later time and place as may then be fixed.
PUBLIC HEARING
Notice is hereby given that the Council of said City will conduct a public hearing on the proposed plans,
_ specifications, form of contract, and estimate of cost for the construction of the above-described
improvement project at 5:30 p.m. on 18th of February 2013 said hearing to be held in the Council
Chambers in the City Hall in said City. The proposed plans, specifications, form of contract, and
estimate of cost for said improvements heretofore prepared by Robinson Engineering are now on file in
the office of the City Clerk for public examination, and any person interested therein may file written
objection thereto with the City Clerk before the date set for said hearing, or appear and make objection
—' thereto with the City Clerk before the date set for said hearing, or appear and make objection thereto at
the meeting above set forth.
SCOPE OF WORK
The extent of the work involved the installation of a large block retaining all for streambank stabilization
and the relaying of a storm sewer pipe to relieve drainage issues.
BEGINNING AND COMPLETION DATES
The work under the proposed contract shall be commenced within ten (10) working days after receipt of —
"Notice to Proceed" and all items shall be completed on or before May 31, 2013.
METHOD OF PAYMENT TO CONTRACTOR —
The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-five percent _
(95%) of the work as it is completed and materials delivered and work approved. Final payment will be
made thirty-one (31) days after completion of the work and acceptance by the Council. Before final
payment is made, vouchers showing that all subcontractors and workmen and all persons furnishing materials have been fully paid for such
materials and labor will be required unless the City is satisfied that material, men and laborers have been
paid. —
The Contractor is hereby notified that if the City does not have cash on hand to pay monthly pay —
estimates, according to Chapter 384.57 of the Code of Iowa, payment may be made by anticipatory
warrants issued bearing a rate of interest not exceeding that permitted by Chapter 74A, Code of Iowa.
PLANS AND SPECIFICATIONS
Plans and Specifications governing the construction of the proposed improvements have been prepared
by Robinson Engineering, which plans and specifications and also the prior proceedings of the City
Council referring to and defining said proposed improvements are hereby made a part of this notice, and —
the proposed contract by reference shall be executed in compliance therewith.
Plans and Specifications are available from Robinson Engineering Company (5751 Westminster Drive, —
Suite B, Cedar Falls, Iowa)upon receipt of a$25.00 refundable deposit. Deposits will be refunded if the
plans are returned in usable condition (i.e. free of highlights, ink markings, tears, stickers, water stains
and soiling) to Robinson Engineering's Office by the end of the 14th consecutive day after the project
p J
has been awarded. No deposits will be refunded for any plans received after the 14t consecutive day,
which includes plans returned via mail service. Plan holders are responsible for ascertaining when the —
project has been awarded.
This deposit policy shall also apply to the prime contractor awarded the project for all plans and
specifications obtained and distributed by the prime contractor to their subcontractors and suppliers in
determining the prime contractor's bid, if the prime contractor wishes for their deposit to be returned. —
Upon award of project, the prime contractor shall be supplied with the needed number of plans and
specifications at no additional cost.
CONTRACT AWARD
A contract will be awarded for each division of the contract to the qualified bidder submitting the lowest
— bid.
_ The City reserves the right to reject any or all bids, re-advertise for new bids, and to waive informalities
in the bids submitted that might be in the best interest of the City.
Bids may be held by the City of Waterloo, Iowa, for a period not to exceed thirty (30) days from the day
of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of
bidders,prior to awarding the contract.
By virtue of statutory authority, a preference will be given to products and provisions grown and coal
_ produced with the State of Iowa and preference will be given to local domestic labor in the construction
of the improvement.
— PROPOSALS SUBMITTED
The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly write or type
— the unit bid price and the bid item extension (Unit Price x Estimated Qty) in numerals on the blanks
provided. Should there be any discrepancy between the unit bid price and extension, the City of
Waterloo shall consider the unit bid price as being the valid unit bid price.
The bidder has the option to submit a computer-generated spreadsheet in lieu of the portion of the Form
of Bid or Proposal, which includes the Bid Item Number, Description, Unit, Estimated Quantity, Unit
Bid Price, Total Bid Price and Total Bid. The computer-generated spreadsheet shall include all of the
information listed in that portion of the Form of Bid or Proposal as well as bear the signature of the
— Prime Contractor submitting the bid. For the bidders who submit a computer-generated spreadsheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in the space(s) provided on the Form
of Bid or Proposal.
BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or cashier's check drawn on an Iowa
_ bank, or a bank chartered under the laws of the United States, a certified share draft drawn on a credit
union in Iowa or chartered under the laws of the United States, or bid bond, (on the form furnished by
the City) payable to the City of Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid
submitted, which certified check, certified share draft or bid bond will be held as security that the Bidder
will enter into a Contract for the construction of the work and will furnish the required bonds, and in
case the successful Bidder shall fail or refuse to enter into the Contract and furnish the required bonds,
his bid security may be retained by said City as agreed upon liquidated damages. If bid bond is used, it
must be signed by both the Bidder and the surety or surety's agent. Signature of surety's agent must be
supported by accompanying Power of Attorney.
PERFORMANCE & PAYMENT BONDS
The successful bidder will be required to furnish a "Performance Bond" and a "Payment Bond" within
ten (10) days after forms are presented to him in an amount equal to one hundred percent (100%) of the
contract price, said bond to be issued by a responsible surety approved by the City Council and shall —
guarantee the faithful performance of the contract and the terms and conditions therein contained, and
shall guarantee the prompt payment of all materials and labor and protect and save harmless the City
from claims of any kind caused by the operations of the contractor.
MAINTENANCE BOND —
Before the Contractor shall be entitled to receive final payment for work done under this contract, it
shall execute and file a bond in the penal sum of not less than 100% of the total amount of the contract, —
same to be known as "Maintenance Bond," and which bond must be approved by the City Council, and
which bond is in addition to the bond given by the Contractor to guarantee the completion of the work. —
CONTRACT COMPLIANCE PROGRAM/SUBCONTRACTING
The program proposes numerical projections regarding utilization of Minority Business Enterprise
(MBE) and Women Business Enterprise (WBE) and Section 3 as Subcontractors, vendors and suppliers
in the performance of Contracts awarded by the City of Waterloo, Iowa. —
A goal of at least ten percent (10%) for MBE participation on all City funded construction projects that
are estimated at $50,000.00 or more. A goal of at least two percent (2%) for WBE participation on all
City funded construction projects that are estimated at $50,000.00 or more. Any project funded in part
or in total with federal funds shall follow the respective agencies contract compliance program and —
goals. The Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance
MBE/WBE/Section3 goals. The MBE/WBE/Section3 subcontractors, suppliers or vendors must provide _
the Prime Contractor a reasonably competitive price for the service being rendered or the Contractor is
not required to accept their bid.
LIQUIDATED DAMAGES
Time is an essential element of this contract. It is important that the work be diligently pursued to
completion. If the work is not completed within the specified contract period, plus authorized
extensions, the contractor shall pay to the City Liquidated Damages in the amount of five hundred
dollars ($100.00)per day, for each day, as further described herein, in excess of the authorized time.
Days beyond the specified completion date for which Liquidated Damages will be charged will be —�
working days that the contractor does, or could have worked, from Monday through Saturday. Sundays
will be counted only if work is performed. Partial working days will be considered as a full working ---
day. Days not chargeable for Liquidated Damages will include rain days, Sunday if no work is done,
and legal holidays.
Working days will cease to be charged when only punch list items remain to be completed. Punch list
items do not include contract bid items or approved change/extra work orders.
When the Contractor believes the project to be substantially completed, a written notice stating the same
shall be submitted to the Engineer and a request made for a Punch List. If the work under the Contract
extends beyond the normal construction season for such work the Contractor shall submit to the
Engineer in writing a request that working days counted toward the project be suspended until work is
resumed the following construction season.
_ This amount is not construed as a penalty. These damages are for the cost to the City of providing the
required additional inspection, engineering and contract administration.
PRE-CONSTRUCTION CONFERENCE
Before the work is commenced on this contract, a conference shall be held for the purpose of discussing
the contract. The conference shall be attended by the prime contractor, subcontractors, and design
engineer.
RESIDENT BIDDER/NON-RESIDENT BIDDER
Attention of bidders is called to compliance with the provisions of the Resident Bidder/Non-Resident
Bidder requirements.
Each bidder submitting a bid shall execute and include with the bid, a Resident Bidder Certification or a
Non-Resident Bidder Certification in the form(s)herein provided.
SALES TAX EXEMPTION CERTIFICATES
Contractors and approved subcontractors will be provided a Sales Tax Exemption Certification to
purchase building materials or supplies in the performance of construction contracts let by the City of
Waterloo.
Published pursuant to the provisions of Division VI of Chapter 384 of the City Code of Iowa and upon
order to the City Council of said Waterloo, Iowa, on the 14th day of June 2012.
CITY OF WATERLOO, IOWA
BY:
Suzy Schares
City Clerk
INSTRUCTIONS TO BIDDERS
1. EXPLANATIONS TO BIDDERS
Any explanation desired by a bidder regarding the meaning or interpretation of the Notice to
Bidders, Plans, Specifications, etc., must be requested in writing and with sufficient time allowed
for a reply to reach bidders before submission of their bids. Any interpretation made will be in
the form of an amendment of the Notice to Bidders, Plans, Specifications, etc., and will be
furnished to all prospective bidders. Its receipt by the bidder must be acknowledged in the space
provided on the Proposal Form or by letter or telegram received before the time set for opening
of bids. Oral explanations or instructions given before the award of the contract will not be
binding.
2. EXAMINATION OF PROPOSED WORK
Bidders should visit the site and take such other steps as may be reasonably necessary to
ascertain the nature and location of the work, and the general and local conditions which can
affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility
for estimating properly the difficulty or cost of successfully performing the work. The owner
will assume no responsibility for any understanding or representation concerning conditions
made by any of its officers or agents prior to the execution of the contract, unless included in the
Notice to Bidders,the Specifications or related documents.
3. PREPARATION OF BIDS
a. Bids shall be submitted on the forms furnished, or copies thereof, and must be manually
_ signed. If erasures or other changes appear on the forms, each erasure or change must be
initialed by the person signing the bid.
The bidder has the option to submit a computer-generated spreadsheet in lieu of the
portion of the Form of Bid or Proposal, which includes the Bid Item Number,
Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price, and Total Bid.
The computer-generated spreadsheet shall include all of the information listed in that
portion of the Form of Bid or Proposal as well as bear the signature of the Prime
Contractor submitting the bid. For the bidders who submit a computer-generated spread-
sheet, the TOTAL BID (with alternates, if applicable) shall also be indicated in the
space(s)provided on the Form of Bid or Proposal.
b. The Bid Form may provide for submission of a price or prices for one or more items,
which may be lump sum bids, alternate prices, schedule items resulting in a bid on a unit
of construction or a combination thereof, etc. When the Bid Form explicitly requires that
the bidder bid on all items, failure to do so will disqualify the bid. When submission of a
price on all items is not required, bidders should insert the words "no bid" in the space
provided for any item on which no price is submitted.
c. Unless called for, alternate bids will not be considered.
d. Modifications of bids already submitted will be considered if received at the office —
designated in the Notice to Bidders by the time set for closing of bids. Telegraphic
modifications will be considered, but should not reveal the amount of the original or _
revised bid.
e. In preparing his bid, the bidder shall specify the price, written legibly in ink or with the —
typewriter, at which he proposes to do each item of work. The unit price shall be stated
in figures in the blank space provided (i.e., $7.14). In items where unit price is required,
the total amount of each item shall be computed at the unit prices bid for the quantities
given on the Bid Form and stated in figures in the blank space provided.
If the bidder chooses to submit the unit prices, total bid price, and total bid on a
computer-generated spreadsheet, all numbers shall be easily legible.
£ Any changes or alterations made in the Bid Form, or any addition thereto, may cause the
rejection of the bid. No bid will be considered which contains a clause in which the
contractor reserves the right to accept or reject a contract awarded him by the city
Council of Waterloo. Bids in which the unit prices are obviously unbalanced may be
rejected. —
g. If the bidder does not qualify as a resident bidder, the nonresident bidder shall specify on
the "Non-Resident Bidder Certification" form whether any preference to resident bidders, —
including but not limited to any preference to bidders, the imposition of any type of labor
force preference, or any other form of preferential treatment to bidders or laborers from
that state or foreign country is in effect in the nonresident bidder's state or country of
domicile at the time of a bid submittal.
4. SUBMISSION OF BIDS
a. A bid must be sealed in a separate envelope and marked to indicate its contents and be —
accompanied by the bid security in a separate envelope. If forwarded by mail, the two
envelopes shall be placed in a third and mailed to the City Clerk/Auditor. All bids must
be filed with the City Clerk/Auditor of the City of Waterloo at his office in the City Hall
before the time specified for closing bids.
b. Bids received prior to the advertised hour of opening will be securely kept sealed. The
officer whose duty it is to open them will decide when the specified time has arrived, and
no bid received thereafter will be considered; except that when a bid arrives by mail after
the time fixed for opening, but before the reading of all other bids is completed, and it is
shown to the satisfaction of the City of Waterloo, Iowa, that the non-arrival on time was
due solely to delay in the mails for which the bidder was not responsible, such bid will be
received and considered.
c. Bidders are cautioned that, while telegraphic modifications of bids may be received as
provided above, such modifications, if not explicit and if in any sense subject to
misinterpretation, shall made the bid so modified or amended, subject to rejection.
5. LATE BIDS AND MODIFICATIONS OR WITHDRAWALS
Bids and modifications or withdrawals thereof received at the office designated in the Notice to
— Bidders after the exact time set for closing of bids will not be considered. However, a
modification which is received from an otherwise successful bidder, and which makes the terms
_ of the bid more favorable to the City of Waterloo, will be considered at any time it is received
and may therefore be accepted. Bids may be withdrawn by written or telegraphic request
received from bidders prior to the time set for closing of bids.
6. PUBLIC OPENING OF BIDS
— Bids will be publicly opened at that time and place set for opening in the Notice to Bidders.
Their content will be made public for the information of bidders and others interested who may
be present either in person or by representative.
7. BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or cashier's check drawn on
an Iowa bank, or a bank chartered under the laws of the United States, a certified share draft
drawn on a credit union in Iowa or chartered under the laws of the United States, or bid bond (on
the form furnished by the City)payable to the City of Waterloo, Iowa, in the sum of not less than
five percent (5%) of the bid submitted, which certified check, certified share draft or bid bond
will be held as security that the Bidder will enter into a Contract for the construction of the work
and will furnish the required bonds, and in case the successful Bidder shall fail or refuse to enter
into the Contract and furnish the required bond, his bid security may be retained by said City as
agreed upon liquidated damages. If bid bond is used, it must be signed by both the bidder and
_ the surety or surety's agent. Signature of surety's agent must be supported by accompanying
Power of Attorney.
8. COLLUSIVE AGREEMENTS
a. Each bidder submitting a bid shall execute and include with the bid, a Non-Collusion
Affidavit in the form herein provided, to the effect that he as not colluded with any other
person, firm, or corporation in regard to any bid submitted.
b. Each bidder submitting a bid shall have each proposed subcontractor, if any, execute and
submit to the City Contract Compliance Officer by 5:00 P.M. the business day following
the day bids on this project are due, a Non-Collusion Affidavit in the form herein
provided, to the effect that he has not colluded with any other person, firm, or corporation
in regard to any bid submitted. Before executing any subcontract, the successful bidder
shall submit the name of any proposed subcontractor for approval by the City.
9. MINORITY AND/OR WOMEN AND/OR SECTION 3 BUSINESS ENTERPRISE
SUBCONTRACTORS
a. CITY OF WATERLOO AND/OR WOMEN BUSINESS ENTERPRISE PRE-BID
CONTACT INFORMATION FORM
The City of Waterloo Minority and/or Women and/or Section 3 Business Enterprise Pre-Bid Contact
Information Form shall be submitted with the Form of Bid or Proposal. Failure to do so shall be
grounds for the bid being rejected if subcontracting is proposed by the prime contractor.
10. MBE/WBE/SECTION3 CONTRACT COMPLIANCE PROGRAM
PURPOSE
The purpose of the Contract Compliance Program (hereinafter called Program) is to act
as an impetus for increasing the participation of minority and women disadvantaged
business enterprise (MBE/WBE/Section3) in City awarded construction contracts.
The Program does not propose to eliminate any bonafide contractor or subcontractor from —
bidding on City contracts, but it will hopefully serve as a needed stimulus to help local
MBE/WBE/Section3's grow and eventually become mainstream contractors and
subcontractors.
This Contract Compliance Program does not propose to include any set-aside or quotas, _
but only flexible goals where "good-faith efforts" are required by the contractor to use
MBE/WBE/Section3 subcontractors.
This Program shall not eliminate the need for contractors to continue their "good-faith
efforts" in using MBE/WBE/Section3 subcontractors on City contracts estimated at less
than$50,000. —
The City of Waterloo will make every effort to reduce in-house construction and
maintenance work that would be more cost effectively performed by the private sector
and, thus, would allow additional bidding opportunities for MBE/WBE/Section3 firms.
The City Contract Compliance Officer shall be advised of all City of Waterloo awarded
construction contracts.
DEFINITIONS
Goals:
A flexible numerically expressed objective which contractors are required to make
"good-faith efforts." The key to the requirement is to make documented efforts. Goals
are neither set-a-sides nor a device to achieve proportional representation or equal results.
Numerical goals do not create set-a-sides for specific groups, nor are they designed to
achieve proportional representation or equal results. Rather, the goal-setting process in
affirmative action planning is used to target and measure the effectiveness of affirmative
action efforts to eradicate and prevent discrimination.
Quota:
A flat numerical requirement that the contractor is required to meet in order to obtain the
benefit or be in compliance. The numerical goal component of affirmative action
programs is not designed to be, nor may it properly or lawfully be interpreted as,
permitting unlawful preferential treatment and quotas with respect to persons of any race,
color, religion, sex, or national origin. The regulations at 41 CFR 60-2.12(a), 60-2.15
and 60-2.30, specifically prohibit discrimination and the use of goals as quotas. (U.S.
Department of Labor)
Set Aside:
An arrangement in which a particular contract is reserved for competition solely among
minority and women business enterprises.
Contractor:
As used in this document means contractor, subcontractor, supplier, vendor, and
professional service provider.
Minority Business Enterprise (MBE)
Any business, which is at least 51%, owned by one or more minorities and whose
management and daily business operations are controlled by one or more such individuals
and is on the current State Unified Certification List, or were listed on the City of
Waterloo Certified MBE/WBE Contractors list as of July 1, 2002
Women Business Enterprise (WBE):
Any business which is at least 51% owned by one or more women and whose
management and daily business operations are controlled by one or more such individuals
and is on the current State Unified Certification List, or were listed on the City of
Waterloo Certified MBE/WBE Contractors list as of July 1, 2002
Minority:
Any person or persons who are considered as socially and economically disadvantaged
because of their identity as a group member without regard to their individual qualities.
The groups include: Black American, Hispanic American,Native Americans, Eskimos,
Aleuts, and Asian-Pacific Americans. 13 C.F.R. 124-1.1(c)(3)(ii)(1983).
Lowest Responsible Bidder:
Bidder who has offered the lowest bid and who has exhibited skill relative to the type of
work bid on,judgment, financial responsibility, and evidence of working with the
Affirmative Action Employment Program and the Contract Compliance Program.
Broker:
One buying or selling for others on commission or other fee basis without maintaining a
warehouse or other similar inventory storage facility.
Mayor's Advisory Committee:
Mayor's Advisory Committee for Minority, Female, and Disadvantaged Business
Enterprise.
Good Faith Efforts:
The successful bidder shall be selected on the basis of having submitted the lowest
responsible bid. The obligation of the bidder is to make good faith efforts. The bidder can
demonstrate that it has done so by the following:
1. The Prime Contractor met the project goal -No Action necessary
2. If the Prime Contractor failed to meet the goal, they must submit documentation of
good faith efforts.
CONTRACT COMPLIANCE PROGRAM SUBCONTRACTING
The program proposes numerical projections or goals regarding utilization of Minority
Business Enterprise (MBE) and Women Business Enterprise (WBE) and Section 3 as
subcontractors in the performance of contracts awarded by the City of Waterloo, Iowa. —
A goal of at least 10% for MBE participation on all City funded construction projects that are estimated at$50,000 or more and projects under$50,000 where applicable at the
Contract Compliance Officer's discretion. There is at least 2% WBE goal on City funded
projects. Any project which is funded solely or in part with Federal funds shall follow the respective agencies contract compliance program and goals. Any project which is
funded solely or in part with State funds shall follow the respective agencies contract _
compliance program and goals. The City of Waterloo Contract Compliance Program is
for City awarded construction contracts only. The prime contractor shall make "good-
faith efforts"to meet the Contract Compliance MBE/WBE/Section3 goals. The —
MBE/WBE/Section3 subcontracts must provide the prime contractor a reasonably
competitive price for the service being rendered or the contractor is not required to accept
the bid. —
Administrative Reconsideration:
As part of this reconsideration,the bidder will have the opportunity to provide written
documentation or arguments concerning the issue of whether they made adequate good —
faith efforts to meet the goals. The bidder will have the opportunity to meet in person
with the City of Waterloo's Administrative Reconsideration Committee to discuss the
issue of whether they made adequate good faith efforts. The Administrative —
Reconsideration Committee will forward a written decision on reconsideration to the
Mayor and City Council, explaining the basis for finding that the bidder did or did not —
meet the goal or make adequate good faith efforts to do so.
Documentation required will include but is not limited to the following:
* Making portions of the work available for MBE/WBE/Section 3 subcontracting —
* Evidence of negotiating with MBE/WBE/Section 3 firms
* MBE/WBE/Section 3 quotes obtained and non-MBE/WBE/Section 3 quotes used
* Reasons agreements were not reached —
* Follow-up after initial solicitations
* Efforts to assist in obtaining equipment, supplies and materials (at competitive prices), _
bonding, lines of credit, insurance, etc.
* Evidence of past compliance or non-compliance by same contractor
The Contract Compliance Officer will determine the weight to be given to each item
listed above (supported by appropriate documentation) based on overall program goals.
RESPONSIBILITIES
1. City of Waterloo
A. The City Contract Compliance Officer has the responsibility to assure the City's
compliance with Federal, State and Municipal regulations.
B. The City Contract Compliance Officer is responsible for maintaining a current directory of
certified firms. Certification of MBE/WBE/DBE contractors is through the Iowa
Department of Transportation and its Unified Certification Program. Only firms certified
based on guidelines prescribed in 49 CFR Part 26 and provisions of this agreement, shall be
recognized as certified by the City of Waterloo.
C. The City Contract Compliance Officer is responsible for making available a list of future
project information notices to MBE/WBE/Section 3 firms.
D. The City Contract Compliance Officer shall send notices to appropriate
MBE/WBE/Section 3 firms in the directory of each bid solicitation with opening date.
E. The City Contract Compliance Officer will receive MBE/WBE/Section 3 Letter(s) of Intent
to Bid and within two (2) business days forward the complete list of MBE/WBE/Section 3
bidders who submitted a Letter of Intent to Bid to prime contractors.
2. Prime Contractors
In order to be in compliance with the guidelines of this program, the prime contractor must
show good-faith efforts in following the MBE/WBE/Section 3 Contract Compliance
Program. Good-faith efforts include, but are not limited to, the following:
A. Prime contractors shall send solicitation letters (Form CCO-3)to appropriate
MBE/WBE/Section 3 (those certified in directory prepared by City Contract Compliance
Officer) at least seven(7) working days prior to bid date. Letters should identify specific
items to be subcontracted. A minimum of three (3) disadvantaged business contacts must
be made and documented, if there are at least three disadvantaged businesses offering
services in the area to be subcontracted (See City of Waterloo MBE/WBE Certification
List). If less than three (3) are offering the services to be subcontracted, then a contact is
required for any that are listed as providing that service. If the Prime Contractor submits a
MBE/WBE/Section 3 contact not on the City's MBE/WBE list, attach a copy of the
MBE/WBE/DBE/Section 3 Certifications from another government agency.
B. If a prime contract bidder is unable to identify MBE/WBE/Section 3 firms to perform
portions of the work,the City Contract Compliance Officer should be contacted for
assistance immediately.
C. Prime contract bidders may solicit MBE/WBE/Section 3 proposals by telephone or
personal interviews, but all such contacts shall be confirmed by Certified Mail, or
subcontract bid request forms (Form CCO-2).
_ D. If any MBE/WBE/Section 3 business submitting bids is not selected for subcontract
award, documentation must accompany the "MBE/WBE/Section 3 Business Enterprise
Pre-Bid Contact Information Form" (Form CCO-4 and CCO-4A) on why the
MBE/WBE/Section 3 was not selected. These reasons could include:
a.Not low bid. Copies of the competing bids may be required for verification.
b. MBE/WBE/Section 3 did not bid, withdrew bid or non-responsive.
c. Documentation of other business-related reason for not selecting the —
MBE/WBE/Section 3 business for a subcontract.
d. Prime contractor self performs work. —
e. Any other reason relied on by prime.
The Contract Compliance Officer will deteitnine the weight to be given to each item —
listed above (supported by appropriate documentation) based on overall program goals.
MBE/WBE Firms
F. MBE/WBE firms shall be certified by the Iowa Department of Transportation as owners and controllers of their respective businesses, or were listed on the City of Waterloo
Certified MBE/WBE Contractors list as of July 1, 2002.
G. MBE/WBE/Section 3 firms must perform the work on the project; they cannot act as a
broker by subcontracting the work out to others. —
C. Each MBE/WBE/Section 3 firm planning to submit quotes on construction projects with
goals, shall submit a Letter of Intent to Bid(Form CCO-5)to the City Contract —
Compliance Officer seven(7)working days prior to bid opening, listing specific items
which the MBE/WBE/Section 3 firm is interested in bidding. If sufficient Letters of
Intent to Bid are not received by the City Contract Compliance Officer seven(7) working —
days prior to bid opening, goals on subject project will be reduced accordingly.
Agreements between the bidder/proposer and a MBE/WBE/Section 3 in which the
MBE/WBE/Section 3 promises not to provide subcontracting quotations to other
bidders/proposers are prohibited.
NON-COMPLIANCE OF CONTRACTORS
A. Noncompliance exists when the contractor's actions are not consistent with the
requirements of the Contract Compliance Program in the areas of employment and
subcontracting. _.
B. A bidder's failure to show good-faith efforts to meet project goals or a failure to use
certified MBE/WBE/Section 3 firms may be grounds for fmding its bid not responsible.
C. The Contract Compliance Officer shall submit to City Council his/her recommendation —
on any non-compliant contract in writing.
NOTICE TO PROCEED
Notice to proceed on any project with goals will not be issued until City Contract Compliance —j
Officer determines the lowest responsible bidder has used good-faith efforts to comply with this
Compliance Program and the bid was responsive.
CONCLUSION
This program repeals or revises all sections of previous Waterloo Contract Compliance Programs.
11. EMPLOYMENT AND BUSINESS OPPORTUNITY
To the greatest extent feasible, suppliers, subcontractors, and low income workers owning
businesses or living in the Waterloo area must be given priority in supplying materials, bidding
for subcontract work, or applying for employment by the contractor on this project.
Opportunities for training and for employment arising in connection with this project, shall to the
greatest extent feasible be made available to lower income persons residing in the project area.
The contract area is the City of Waterloo.
The City of Waterloo will require the contractor to document his efforts in securing lower
income workers living in the project area and in purchasing supplies from, and awarding
subcontracts to, businesses owned by persons residing in the project area.
12. STATEMENT OF BIDDER'S QUALIFICATIONS
Each bidder shall, upon request of the City of Waterloo, Iowa, submit on the form furnished for
that purpose (a copy of which is included in the contract documents), a statement of bidder's
qualifications, his experience record in constructing the type of improvements embraced, and his
organization and equipment available for the work contemplated; and, when specifically
requested, a detailed financial statement. The City of Waterloo, Iowa, shall have the right to take
such steps as it deems necessary to determine the ability of the bidder to perform his obligations
under the contract, and the bidder shall furnish the City of Waterloo, Iowa, all such information
and data for this purpose as it may request. The right is reserved to reject any bid where an
investigation of the available evidence or information does not satisfy the City of Waterloo,
Iowa, that the bidder is qualified to carry out properly the terms of the contract.
13. AWARD OF CONTRACT
a. Award of contract will be made to that responsive and responsible bidder whose bid,
conforming to the Specifications, is most advantageous to the City of Waterloo; price and
other factors considered. The intention is to award the contract at any time of opening
bids, but the right is reserved to postpone such action for a reasonable time, not
exceeding thirty(30) days.
b. The City Council may, when in its interest, reject any or all bids or waive any informality
in bids received.
-- c. The bidder shall submit bids on all the items listed in the proposal and shall state the unit
bid price in words in the blank spaces provided beneath the item description. Should
there be any discrepancy between the unit bid price in words and listed numeral unit bid
price, the City of Waterloo shall consider the unit bid price in words as being the valid
unit bid price. A computer-generated spreadsheet as herein provided shall also be
acceptable. Proposals requiring mathematical computations to determine unit prices or
totals will be rejected. A contract will be awarded to the qualified bidder submitting the
lowest total bid as indicated in the NOTICE TO BIDDERS.
d. When a contract for a public improvement is to be awarded to the lowest responsive and
responsible bidder, a resident bidder shall be allowed a preference as against a
nonresident bidder from a state or foreign country if that state or foreign country gives or —
requires any preference to bidders from that state or foreign country, including but not
limited to any preference to bidders, the imposition of any type of labor force preference, —
or any other form of preferential treatment to bidders or laborers from that state or
foreign country. The preference allowed shall be equal to the preference given or
required by the state or foreign country in which the nonresident bidder is a resident. In —
the instance of a resident labor force preference, a nonresident bidder shall apply the
same resident labor force preference to a public improvement in this state as would be _
required in the construction of a public improvement by the state or foreign country in
which the nonresident bidder is a resident.
14. EXECUTION OF AGREEMENT,BONDS,AND CERTIFICATE OF INSURANCE
a. Subsequent to the award and within ten (10) days after the prescribed forms are presented —
for signature, the successful bidder shall execute and deliver to the City of Waterloo,
Iowa, an agreement in the form included in the contract documents in such number of _
copies as the City of Waterloo, Iowa, may require.
b. Having satisfied all conditions of award as set forth elsewhere in these documents, the —
successful bidder shall, within the period specified in paragraph "a" above, furnish a
surety bond and a payment bond in a penal sum not less than the amount of the contract
as awarded, as security for the faithful performance of the contract and terms and —
conditions therein contained and shall guarantee the prompt payment of all persons,
firms, or corporations to whom the contractor may become legally indebted for labor, —
materials, tools, equipment, or services of any nature including utility and transportation
services, employed or used by him in performing the work. The bonds shall protect and
save harmless the City from claims and damages of any kind caused by the operations of
the contractor and shall also guarantee the maintenance of the contract improvements for
the period stated in the Notice of Hearing from and after completion of said
improvements and their acceptance by the City. Such bonds shall be in the same form as
that included in the contract documents and shall bear the same date as, or a date
subsequent to that of the agreement. The current Power of Attorney for the person who —
signs for any surety company shall be attached to such bonds.
c. The successful bidder shall, within the period specified in paragraph "a" above, furnish a
certificate of insurance for approval in amounts of not less than the amounts specified in
the General Specifications for Construction, Section F. No. 4 "Liability Insurance," Pages
14 to 15 of 19 Pages. The certificate of insurance shall be furnished in such number of
copies as the City of Waterloo may require. The City of Waterloo shall be named as an
"Additional Insured." The contractor shall similarly submit his subcontractor's
certificates of insurance in the amounts for approval before each commences work. The
contractor shall carry or require that there be Workmen's Compensation Insurance for all
his employees and those of his subcontractors engaged in work at the site, in accordance
with State Workmen's Compensation Laws.
d. The failure of the successful bidder to execute such agreement and to supply the required
bond or bonds within ten (10) days after the prescribed forms are presented for signature,or within such extended period as the City of Waterloo, Iowa, may grant, based upon
reasons determined sufficient by the City of Waterloo, Iowa, may either award the
contract to the next lowest bidder or re-advertise for bids, and may charge against the
bidder the difference between the amount of the bid an the amount for which a contract
for the work is subsequently executed, irrespective of whether the amount thus due
exceeds the amount of the bid guaranty. If a more favorable bid is received by re-
advertising, the defaulting bidder shall have no claim against the City of Waterloo, Iowa,
_ for a refund.
15. RESIDENT BIDDER/NON-RESIDENT BIDDER PREFERENCE
Attention of bidders is called to compliance with the provisions of the Resident Bidder/Non-
Resident Bidder requirement.
Each bidder submitting a bid shall execute and include with the bid, a Resident Bidder
Certification or a Non-Resident Bidder Certification in the form(s) herein provided.
FORM OF BID OR PROPOSAL
GATES PARK GOLF COURSE STREAMBANK STABILIZATION
CITY OF WATERLOO, IOWA
Honorable Mayor and City Council
Waterloo, Iowa
Gentlemen:
1. The undersigned, being a Corporation existing under the laws of the State of
, a Partnership consisting of the following partners:
, having
_ familiarized (himself) (themselves) (itself) with the existing conditions on the project area
affecting the cost of the work, and with all the contract documents listed in the Table of
Contents and Addenda (if any), as prepared by the City Engineer of the City of Waterloo now
on file in the office of the City Clerk, City Hall, Waterloo, Iowa, hereby proposes to furnish all
supervision, technical personnel, labor, materials, machinery, tools, appurtenances,
equipment, and services, including utility and transportation services required to construct and
complete this GATES PARK GOLF COURSE STREAMBANK STABILIZATION, all in
accordance with the above-listed documents and for the unit prices for work in place for the
following items and quantities:
GATES PARK GOLF COURSE STREAMBANK STABILIZATION
BID UNIT EST. QTY.
- ITEM DESCRIPTION UNIT BID TOTAL BID PRICE
PRICE
1 CLEARING AND GRUBBING ACRE 0.04 $ $
2 MODULAR RETAINING WALL SQ FT 1080 $ $
3 TURF SEEDING (SUPER TURF II) ACRE 0.05 $ -- $-
4 NATIVE SEEDING (laDOT NATIVE MIX) ACRE 0.04 $ $—
5 EXCAVATE AND RELAY CONCRETE PIPE LIN. FT 130 $ $
6 TURF REINFORCEMENT MAT SQ FT 325 $ $
TOTAL BID $
2, It is understood that the quantities set forth are approximate only and subject to variation
and that the unit bid price for the work done shall govern in the actual payment to
Contractor.
3. In submitting this bid, the bidder understands that the right is reserved by the City of
Waterloo, Iowa, to reject any or all bids. If written notice of the acceptance of this bid is -
mailed, telegraphed, or delivered to the undersigned within thirty (30) days after the
opening thereof, or at any time thereafter before this bid is withdrawn, the undersigned
agrees to execute and deliver an agreement in the prescribed form and furnish the
required bond and certificate of the insurance within ten (10) days after the agreement is
presented to him for signature, and start work within ten (10) days, after "Notice to -
Proceed" is issued.
4. Security in the sum of Dollars ($
) in the form of , is submitted herewith in
accordance with the INSTRUCTIONS TO BIDDERS.
5. Attached hereto is a Non-Collusion Affidavit of Prime Contractor.
6. Attached hereto is a Resident Bidder Certification ( ), or Non-Resident Bidder
Certification ( ). (Mark one.)
7. The bidder is prepared to submit a financial and experience statement upon request.
8. The Prime Contractor and Subcontractor(s), which have performed an aggregate of
$10,000.00 in work for the City in the current calendar year, are prepared to submit an
AAP or Update and an EOC, within ten (10) days of notification that the bid submitted is
lowest and acceptable.
9. The bidder has received the following Addendum or Addenda:
Addendum No. Date _
10. The bidder shall list the MBENVBE/Section 3 subcontractor(s), amount of subcontracts
and bid items on the City of Waterloo Minority and/or Women and/or Section 3 Business _
Pre-bid Contact Information Form submitted with this Form of Bid or Proposal. The
apparent low Bidder shall submit a list of all other Subcontractor(s) to be used on this
Project to the City of Waterloo by 5:00 p.m. the business day following the day Bids on this
Project are due along with the Non-Collusion Affidavits of All Subcontractor(s).
The Contractor shall submit information on subcontractors on "SUBCONTRACTOR —
REQUEST AND APPROVAL" Form to be provided by City prior to approval of contract.
The subcontractors listed on this proposal and/or submitted to the Contract Compliance
Officer cannot be changed except for the following reasons:
1) The City of Waterloo does not approve the subcontractors.
2) The subcontractors submit in writing that they cannot fulfill their subcontracts.
11. The bidder has filled in all blanks on this proposal. Those blanks not applicable are
marked "none" or"NA".
12. The bidder has attached all applicable forms.
13,The Owner reserves the right to select alternates, delete line items, and/or to reduce
quantities prior to the award of a contract due to budgetary limitations.
(Name of Bidder) (Date)
BY: Title
Official Address: (Including Zip Code):
I.R.S. No.
INFORMATION NEEDED
FOR
IOWA CONSTRUCTION SALES TAX EXEMPTION CERTIFICATE
CONTRACTOR NAME:
ADDRESS:
(Check One) PRIME SUBCONTRACTOR
FEDERAL ID#:
PROJECT NAME:
PROJECT CONTRACT NO.:
DESCRIPTION OF WORK:
❑ Brickwork ❑ Landscaping
❑ Carpentry ❑ Painting
❑ Concrete ❑ Paving
❑ Drywall-Plaster-Insulation ❑ Plumbing
❑ Electrical ❑ Roofing-Siding-Sheet Metal
❑ Excavation/Grading ❑ Windows
❑ Flooring ❑ Wrecking-Demolition
❑ Heavy Construction ❑ Other (Please specify)
❑ Heating-Ventilating-Air Cond.
BID BOND
KNOW ALL MEN BY THESE PRESENTS,that we,
as Principal,and
as Surety are held and firmly bound unto the CITY OF WATERLOO , Iowa, hereinafter called
"OWNER." In the penal sum
Dollars ($ ) lawful money of the United States,for the payment
of which sum will and truly be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and
severally, firmly by these presents. The condition of this obligation is such that whereas the Principal has submitted the
accompanying bid dated the day of ,20 ,for
NOW,THEREFORE,
(a) If said Bid shall be rejected, or in the alternate,
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form specified and shall furnish a
bond for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in
connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid,
Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and
agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this
obligation as herein stated.
By virtue of statutory authority, the full amount of this bid bond shall be forfeited to the Owner in liquidation of damages
sustained in the event that the Principal fails to execute the contract and provide the bond as provided in the specifications or
by law.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way
impaired or affected by any extension of the time within which the Owner may accept such Bid or execute such contract; and
said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and seals, and such of them as are
corporations, have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers
this day of ,A.D.201
(Seal)
Principal
By
(Title)
(Seal)
Witness Surety
By
Witness Attorney-in-fact
NON-COLLUSION AFFIDAVIT OF PRIME BIDDER
State of )
)ss
County of )
,being first duly sworn,deposes and says that:
l. He is (Owner,Partner, Officer,Representative,or Agent) ,of
,the Bidder that has submitted the attached Bid;
2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances
respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham Bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in
interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with
any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the
attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner,
directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm
or person to fix the price or prices in the attached Bid or of any other Bidder, or,to fix any overhead, profit or cost
element of the bid price or the bid price of any other Bidder, or to secure through any collusion, conspiracy,
connivance,or unlawful agreement any advantage against the City of Waterloo,Iowa, or any person interested in the
Proposed Contract;and
5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy,
connivance or unlawful agreement on the part of the Bidder or any of its agents,representatives, owners,employees,
or parties in interest,including this affiant.
(Signed)
Title
Subscribed and sworn to before me this day of
,201_.
Title
My commission expires
NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR
State of )
) ss:
County of )
,being first duly sworn,deposes and says that:
1. He is (Owner,Partner, Officer,Representative,or Agent) ,of
hereinafter referred to as the "Subcontractor;"
2. He is fully informed respecting the preparation and contents of the subcontractor's proposal submitted by the
subcontractor to ,contract pertaining to the
project in •
(City or County and State)
3. Such subcontractor's proposal is genuine and is not a collusive or sham proposal;
4. Neither the subcontractor nor any of its officers, partners, owners, agents, representatives, employees, or parties in
interest, including this affiant, has in any way colluded, conspired, connived, or agreed, directly or indirectly, with
any other bidder, firm or person to submit a collusive or sham proposal in connection with such contract or to refrain
from submitting a proposal in connection with such contract, or has in any manner, directly or indirectly, sought by
unlawful agreement or connivance with any other bidder, firm or person to fix the price or prices in said
subcontractor's proposal, or to fix any overhead, profit or cost element of the price of prices in said subcontractor's
proposal, or to secure through collusion, conspiracy, connivance or unlawful agreement any advantage against the
City of Waterloo,Iowa, or any person interested in the proposed contract;and
5. The price or prices quoted in the subcontractor's proposal are fair and proper and are not tainted by any collusion,
conspiracy,connivance or unlawful agreement on the part of the bidder or any of its agents,representatives, owners,
employees,or parties in interest, including this affiant.
(Signed)
Title
Subscribed and sworn to before me this day of
,201_.
Title
My commission expires
EQUAL OPPORTUNITY CLAUSE
(As provided in Executive Order No. 11246)
All contractors, subcontractors, vendors and suppliers of goods and services doing business
with the City and value of said business equals or exceeds ten thousand dollars ($10,000.00)
annually agree as follows:
1. The contractors, subcontractor, vendor and supplier of goods and services will not
discriminate against any employee or applicant for employment because of race, color,
creed, sex, national origin, economic status, age, mental or physical handicap, political
opinions or affiliations. The contractor, subcontractor, vendor and supplier will develop an
Affirmative Action program to ensure that applicants are employed and that employees are
treated during employment without regard to their race, creed, color, sex, national origin,
religion, economic status, age, mental or physical disability, political opinions or affiliations.
Such actions shall include but not be limited to the following:
a. Employment
b. Upgrading
c. Demotion or Transfer
d. Recruitment and Advertising
e. Layoff or Termination
f. Rates of Pay or Other Forms of Compensation
g. Selection for Training Including Apprenticeship
2. The contractor, subcontractor, vendor and supplier of goods and services will, in all
solicitations or advertisements for employees, state that all qualified applicants will
receive consideration for employment without regard to race, creed, color, sex, national
origin, religion, economic status, age, mental or physical disabilities, political opinion or
affiliations.
3. The contractor, subcontractor, vendor and supplier or his/her collective bargaining
representative will send to each labor union or representative of workers which he/she
has a collective bargaining agreement or other contract or understanding, a notice
advising said labor union or workers' representative of the contractor's commitment
under this section.
4. The contractor, subcontractor, vendor and supplier of goods and services will comply
with all published rules, regulations, directives, and order of the City of Waterloo
Affirmative Action Program Contract Compliance Provisions.
5. The contractor, subcontractor, vendor and supplier of goods and services will furnish
and file compliance reports within such time and upon such forms as provided by the
Affirmative Action Officer. Said forms will elicit information as to the policies,
procedures, patterns, and practices of each subcontractor as well as the contractor
himself/herself and said contractor, subcontractor, vendor and supplier will permit
access to his/her employment books, records and accounts to the City's Affirmative
Action Officer, for the purpose of investigation to ascertain compliance with this contract
and with rules and regulations of the City's Affirmative Action Program—Contract
Compliance Provisions relative to Resolution No. 24664.
6. In the event of the contractor's non-compliance with the non-discrimination clauses of
this contract or with any of such rules, regulations and orders, this contract may be
canceled, terminated or suspended in whole or in part and the contractor may be ...
declared ineligible for further contracts in accordance with procedures authorized by the
City Council.
7. The contractor, subcontractor, vendor and supplier of goods and services will include, or
incorporate by reference, the provisions of the non-discrimination clause in every contract,
subcontract or purchase order unless exempted by the rules, regulations or orders of the
City's Affirmative Action Program, and will provide in every subcontract, or purchase order
that said provisions will be binding upon each contractor, subcontractor, or supplier.
8. We, the undersigned, recognize that we are morally and legally committed to non- -
discrimination in employment. Any person who applies for employment with our
company will not be discriminated against because of race, creed, color, sex, national
origin, economic status, age, mental or physical disabilities.
(Signed)
(Appropriate Official)
(Title)
(Date) L-
L
L
L.
L
RESIDENT/NON-RESIDENT BIDDER
RESIDENT BIDDER:
In accordance with Section 73A.21 of the Iowa Code, all non-federal-aid public improvement
projects, which include road construction, shall be performed by a qualified resident bidder.
The resident bidder has been further defined as follows:
Resident Bidder:
A person or entity authorized to transact business in this state and having a
business for at least three years prior to the date of the first advertisement for the
public improvement. If another state or foreign country has a more stringent
definition of a resident bidder, the more stringent definition is applicable as to
bidders from that state or foreign country.
The contractor shall provide the City with a certification that he is a qualified resident bidder
according to the above definition. The Certification shall be submitted with the contractor's bid.
A copy of the form of "Resident Bidder Certification" is included in the Contract Documents. If
it is determined that the contractor does not meet this qualification after he begins work, a
shutdown notice shall be issued and the voiding of the contract sha I begin unless the
contractor becomes qualified.
NON-RESIDENT BIDDER:
The contractor shall provide the City with a certification that he is a non-resident bidder
according to the above definition. The Certification shall be submitted with the contractor's bid.
A copy of the form of "Non-Resident Bidder Certification" is included in the Contract
Documents.
DJG
01/02/12
RESIDENT BIDDER CERTIFICATION
CONTRACT NO:
PROJECT NAME:
DATE OF LETTING:
To be a qualified resident bidder, the bidder shall be a person or entity authorized
to transact business in this state and having a business for at least three years
prior to the date of the first advertisement for the public improvement. If another
state or foreign country has a more stringent definition of a resident bidder, the
more stringent definition is applicable as to bidders from that state or foreign
country.
This qualification as resident bidder shall be maintained by the contractor and his
subcontractors at the work site until this project is completed.
I hereby certify that I am a resident bidder as defined above.
COMPANY NAME
CORPORATE OFFICER
TITLE
DATE
Revised February 2003
CONTRACTOR'S OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM
Check box that applies to party completing program:
( ) General Contractor
( ) Subcontractor
I. Section A to be completed by GENERAL CONTRACTORS only:
A.
Name of Company
Address of Company Zip
Telephone Number ( )
Federal ID Number (if no Federal ID Number, Owner/President's Social Security
Number)
Name of Equal Employment Officer
Name of Project
Project Contract Number
Estimated Construction Work Dates /
Start Finish
Section B to be completed by SUBCONTRACTORS only:
B.
— Name of General or Prime Contractor
— Name of Subcontractor
Subcontractor's Address Zip
Subcontractor's Telephone Number ( )
Subcontractor's Federal ID Number (if no Federal ID Number Owner/President's Social
Security Number)
Name of Equal Employment Officer
C. Remainder of program to be completed by party completing program, either
Prime or Subcontractor.
1. The Owners and/or Principals of your company:
Ethnic
Name Address Position Sex Origin
2. Other Areas of Interest:
If your company has branches or subsidiaries, or if your company is a branch or
subsidiary of a parent organization, give the following information:
Type of
Nay �e Address Affiliation Degree .—
II. EMPLOYER'S POLICY (Please read carefully.)
A. We, the undersigned, recognize that we are morally and legally committed to —
nondiscrimination in employment. Any person who applies for employment with
our company will not be discriminated against because of race, color, creed, sex, L
national origin, economic status, age, mental or physical handicap.
B. The employment policies and practices of the undersigned are to recruit and hire —
employees without discrimination, and to treat them equally with respect to
compensation and opportunities for advancement, including training, upgrading,
promotion, and transfer. However, we realize the inequities associated with —
employment training, upgrading, contracting and subcontracting for minorities
and women and we will direct our efforts to correcting any deficiencies to the
maximum extent possible. The same will be required of our
SUBCONTRACTORS and suppliers.
C. We submit this program to assure compliance with Executive Order 11246, as
amended, and other subsequent orders that may pertain to equal employment
opportunity and merit employment policies, fully realizing that our qualification
and/or merit system should be evaluated and revised, if necessary.
D. We agree to put forth the maximum effort to achieve full employment and
utilization of capabilities and productivity of all our citizens without regard to race,
creed, color, sex, national origin, economic status, age, and mental or physical
handicap.
E. will give training
(Name of Company)
and employment opportunities to local residents of Waterloo, Iowa, to the
greatest extent feasible.
III. AFFIRMATIVE ACTION
A. recognizes that the
(Name of Company)
effective application of a policy of merit employment involves more than just a
policy statement, and
(Name of Company)
will, therefore, re-evaluate our Affirmative Action Program to ensure that equal
employment opportunities are available on the basis of individual merit, and to
actively encourage minorities, women and local residents to seek employment
with our company on this basis.
B. will undertake the
(Name of Company)
following six (6) steps to improve our Affirmative Action Program:
1. Minority Recruitment and Employment;
2. Local Recruitment and Employment;
3. Disabled Veteran and Vietnam Era Veteran Recruitment and Employment;
4. Handicapped Recruitment and Employment;
5. Female Recruitment and Employment; and
6. Training, Upgrading and Promotional Opportunities.
C. will take
(Name of Company)
whatever steps are necessary to ensure that our total work force has adequate
minority, female, and local representation. We will utilize the following methods
in our recruitment attempts:
1. Local advertising media (newspapers, radio, TV);
2. Community organizations (churches, clubs, schools);
3. Public and private institutions in the area (UNI, Hawkeye Community
College); _.
4. Job Service of Iowa; and
5. Other.
D. will seek qualified minority,
(Name of Company) _
female, and local group applicants for all job categories and will make asserted
efforts to increase minority, female and group representation in occupations at
the higher levels or skill and responsibility.
E. All sources of employment used shall be aware that we are an Equal
Employment Opportunity Employer. Labor organizations representing our
employees will be notified of our Equal Employment Opportunity Policy and
Affirmative Action Program. _
F. Training, upgrading, promotion and transfer activities at all levels will be
monitored to ensure that full consideration has been given to qualified minority,
female, and local group employees.
G. will encourage other a..
(Name of Company)
companies with whom we are associated and/or do business, to do the same
and we will assist them in their efforts.
H. has taken the following
(Name of Company)
Affirmative Action to ensure that minority, female, local contractors and/or
suppliers were provided opportunities to negotiate and/or bid on this project: (if
none, write ,,NONE")
L
1.
2. -
I. As a result of the above efforts, we have involved minority, female, and local
contractors and/or suppliers in the following areas of subcontracting: (if none,
write "NONE")
1.
1
6..,
2.
J. will require approved
(Name of Company)
Affirmative Action Programs from all nonexempt contractors who propose to work
on this project and will take whatever steps are necessary to ensure that non-
minority contractors have adequate representation of minority, female and local
persons in their total work force.
K. In further accordance with rules and guidelines issued pursuant to Executive
Order 11246 as amended, we establish the goals for our company, based on
parity percentages supplied by the City, and we realize these goals will be
reviewed on an annual basis.
L. will keep records of
_ (Name of Company)
specific actions relative to recruitment, employment, training, upgrading and
promotion and will provide the City of Waterloo with any information relative to
same, including activities of our SUBCONTRACTORS and suppliers as
necessary or when requested.
M. Parity figures for companies located in Waterloo are as follows:
Minority Parity = .08 (8%)
N. Affirmative Action
(Name of Company)
Employment Goals:
The definition of Affirmative Action Goals is as follows: "Goals may not be rigid
and inflexible quotas which must be met, but must be targets, reasonably
attainable by means of applying every good faith effort to make all aspects of the
entire Affirmative Action Program work."
For the year 201_, please submit percentage targets for employing minorities
and women. If you already have reached your target for hiring minorities and
women, please submit that percentage,
*Goals for Minorities:
Goals for Women:
*Your affirmative action goals should be between 1% and 10% or more for
minorities and 1% and 5% or more for women.
Please be advised that the goals or targets are purely your estimation of how
many women and minorities your company can reasonably expect to hire in 201
. Note, that none of the goals are rigid or inflexible. They a"e targets that your
company calculates as reasonably attainable. This will help the City in its
monitoring procedures as required by City of Waterloo Resolution No. 1984-
- 142(4).
CONTRACTOR'S TOTAL WORK FORCE
(WATERLOO)
HOURLY
NAME AND ADDRESS JOB CATEGORY RACE SEX WAGE
INDICATE: DISABLED VETERAN: DV
VIETNAM ERA VETERAN: VV
HANDICAPPED: H
We hereby certify that we are in compliance with all City and Federal Affirmative
Action Regulations and agree to accept all liability for failure to comply.
Respectfully submitted,
By:
Company Executive
Date
By:
Equal Employment
Opportunity Officer
Date
City of Waterloo Affirmative Action Officer
Approved
Disapproved Reason:
By:
Date:
DESCRIPTION OF JOB CATEGORIES
1. Officials/Manager: Occupations in which employees set broad policies, exercise
overall responsibility for execution of all policies, or direct individual departments or
special phases of the agency's operations or provide specialized consultation on a
regional, district or area basis. Includes: department heads, bureau chiefs, division
chiefs, directors, deputy directors, controllers, examiners, wardens, superintendents,
unit supervisors, sheriffs, police and fire chiefs and inspectors and kindred workers.
2. Professionals: Occupations which require specialized and theoretical knowledge
which is usually required through college training or thorough work experience and
other training which provides comparable knowledge. Includes: personnel and labor
relations workers, social workers, doctors, psychologists, registered nurses,
C1:u11Vmists, dietitians, lawyers, system analysts, accountants, engineers, employment
and vocational rehabilitation counselors, teachers or instructors, police and fire captains
and lieutenants and kindred workers.
3. Technicians: Occupations which require a combination of basic scientific or technical -
knowledge and manual skill which can be obtained through specialized post-secondary
school education and through equivalent on-the-job training. Includes: computer
programmers and operations, draftsmen, surveyors, licensed practical nurses,
photographs, radio operators, technical illustrators, police and fire sergeants and
kindred workers.
4. Office/Clerical: Workers are responsible for internal and external communication,
recording and retrieval of data and/or information and other paper work required in an
office. Includes: bookkeepers, messengers, office machine operators, clerk-typists,
stenographers, court transcribers, hearing reporters, statistical clerks, dispatchers,
license distributors, payroll clerks and kindred workers.
5. Skilled Craft Workers: Workers perform jobs which require special manual skill and a —
thorough and comprehensive knowledge of the processes involved in the work which is
acquired through on-the-job training programs. Includes: Mechanics and repairman,
electricians, heavy equipment operators, stationary engineers, skilled machine "—
occupations, carpenters, compositors and typesetters and kindred workers.
6. Sales Workers: Occupations engaging wholly and primarily in direct selling. Includes:
advertising agents and salesman, insurance agents and brokers, real estate agents and
brokers, stock and bond salesmen, demonstrators, salesmen and sales clerks, grocery —
clerks and cashier checkers, and kindred workers.
7. Operatives (semi-skilled): Workers who operate machine or processing equipment or —
perform other factory-type duties of intermediate skill level which can be mastered in a
few weeks and require only limited training. Includes: apprentices (auto mechanics),
plumbers, building trades, metal working trades, bricklayers, carpenters, electricians,
machinists, mechanics, printing trades, etc., operatives, attendants (auto service and
parking), plasterers, chauffeurs, deliverymen and furnacemen, heaters (metal), laundry
and dry cleaning operatives, milliners, mine operatives and laborers, motormen, oilers
and greasers, (except auto painters), (except construction and maintenance),
photographic process workers, stationary fireman, truck and tractor drivers, weavers,
(textile), welders and flame cutters and kindred workers.
8. Laborers (unskilled): Workers in manual occupations which generally require no
special training. Perform elementary duties that may be learned in few days and require
the application of little or no independent judgment. Includes: garage laborers, car
washers and greasers, gardeners (except farm) and groundskeepers, longshoremen,
and stevedores, lumbermen, raftsmen and woodchoppers, laborers performing lifing,
digging, mixing, loading and pulling operations and kindred workers,
9. Apprentices: Persons employed in a program including work training and related
instruction to learn a trade or craft which is traditionally an apprenticeship, regardless of
whether the program is registered with a Federal or State agency.
10. Trainees (on-the-lob): Production. . . persons in formal training for craftsmen when not
trained under apprentice programs--operative laborer, and service occupations.
White Collar. . . persons engaged in formal training for clerical, managerial,
professional, technical, sales, office and clerical occupations.
ITEMS OF POTENTIAL MBE/WBE/SECTION 3 PARTICIPATION
NOTICE TO PROSPECTIVE BIDDERS:
The following are items from the GATES PARK GOLF COURSE STREAMBANK
STABILIZATION, that have a potential for MBE/WBE/SECTION 3 Participation. This listing,
however, is not intended to be all encompassing; to preclude MBE/WBE/SECTION 3
Contractors from bidding on any items of the Proposal as a Subcontractor or the entire
Proposal as a Prime Contractor.
BID TOTAL
ITEM DESCRIPTION UNIT QTY
1 Clearing and Grubbing Acre 0.04
2 Modular Retaining Wall Sq Ft 1080
3 Turf Seeding (Super Turf II) Acre 0.05
4 Native Seeding (la DOT Native Mix) Acre 0.04
5 Excavate and Relay Concrete Pipe Lin Ft 130
6 Turf Reinforcement Mat Sq Ft 325
MBE/WBE/SECTION 3 GOALS FOR THIS PROJECT
IMPORTANT: Prime Contract Bidders should be aware that ten percent (10%) MBE goal and
a two percent (2%) WBE goal is attached to this project. "Certified Returr Receipt" letters are
no longer needed with the bid showing proof of contacting MBE or WBE Subcontractors, but
the Pre-Bid Contact Information Form must be filled out completely.
City of Waterloo Contract Compliance Officer:
Contract Compliance Officer
Community Development Board
Carnegie Annex, Suite 202
620 Mulberry Street
Waterloo, IA 50703
Phone: (319) 291-4429
LETTER TO BE USED WHEN SOLICITING FOR SUBCONTRACTOR QUOTES
Subcontractor Company Name
Address
RE: Contract No.:
Dear •
(Prime Contractor's Company Name) is presently soliciting for the following work in connection
with the above referenced project.
(Insert bid Item Nos. and Description of Work)
(Prime Contractor's Company Name) is an Equal Opportunity Employer, and all qualified
bidders will not be discriminated against due to race, religion, color, sex, or origin.
If interested in bidding your proposal must be turned in to this office by
and
(Date) (Time)
Sincerely,
(Prime Contractor's Representative)
Form CCO-3 (11/28/2001)
SUBCONTRACTOR'S BID REQUEST FORM
PRIME BIDDER'S LETTERHEAD
Contract No.:
Letting Date:
I, (subcontractor's name), hereby attest that I have been solicited for a bid on (project name) in
the area of (description of work and bid item no.).
(Prime contractor) has informed me that if I am interested in bidding, a subcontracting bid
proposal must be submitted to the company office by (date) and (time).
Subcontractor's Company Name
Date Subcontractor's Signature
Date Prime Bidder's Signature
LETTER OF INTENT TO BID
(MBENVBE/SECTION 3 LETTER)
According to the Current MBE/WBE Contract Compliance Program - 2002, all
MBE/WBE/SECTION 3 Contractors interested in submitting subcontractor quotes on
construction projects with goals, MUST submit a LETTER OF INTENT TO BID to the City of
Waterloo Contract Compliance Officer at least seven (7) days prior to bid opening.
The LETTER OF INTENT TO BID must list the specific items which the MBENVBE/SECTION 3
Contractor is interested in bidding.
Letter should include the following:
Name of Project:
Your Company Name:
Address:
Phone: Date:
List of Specific items to be bid:
Item No. Description:
Item No. Description:
Item No. Description:
Item No. Description:
Item No. Description:
(Subcontractor's Company Name and authorized signature)
Return this LETTER OF INTENT TO BID to:
Contract Compliance Officer
Community Development Board
620 Mulberry St.
Carnegie Annex, Suite 202
Waterloo, IA 50703
Phone: (319) 291-4429
Form CCO-5 (06-20-2002)
O M mM
C z
C .�- 0 O L
= E � >, � pF- O o
o OU el" a) C U W al 0 a) -0 O N
Q a) •' O ca _w ca - c o coo V)) 0 ' 0)
C
_ • >O O N W -m 0 O O
.c .. 2 "6 .> m 0 o _ C O 4 Q
N o Z V L E t u)co CO v M p U)
(Doc LO ,_ W m : (=II O Z O "
5 .00 cpo � � 0 o a_ WM c m0 Q o
Q•CM C � c CO z 0 d cz v pU o �
L
`) � Z c°) o � � 0 ai� Q� cw •° c
OM0 0 0 was o � • -O F- Cl) 0 E0Lij C O � W O •-
aN) Z ~ E C _c � 0 Q .... UU) UO O .. m >,Z
U 'Lp c • = p � o � p0
y O w 0 0- ° N j N p 0 N 0) CI W Cl) .0 L W a
� F- W o o � o �c W c N m CO 0_ om 0)
conic)
aCc0 z � 'c60 � L 2 :«- cU
V) UW) N _ N CO a) a) • 1- W N Q J o Y`o W 'a
Z W , C p ° cn U p p c m co CO c° W 1)
M
Q Zmm "= OV NU " o � I- N O i0 o C .0 E Ul�mLE
WI. 0 � � 3 = � '- co E . z oc _ in -0 Q � �< o
uj
W = Um o o z _3 E c OU . �_ a) .0 � `n c > m 0_
tea' W2 cca 0ta � O_ i'_ > L c) . ° � M Q caEo , U)
d m c.) - N a) a 1- a) o p 0 3 c Z 0_ _c o N c CO
�/ �' W .cn N L i .0.. O N 0) m Z M O O 0 = 0 r ` cB `
W Z m C 0 Q' V C ca o ti W Z P ui D a) -O a)
z o vc5o CO 0 'c Ew �o C d UQ c`o � w > p f° Q
— Wce mgc •N Z , OmcCOa>) W Uw) OmOw a °0
U) Q � •= � o OE - WE ' LL w � cZ m v • a) ° Qn
° 0 a m w o o C N L N
CO V- ca cu 1- c CO Q L O cn o
W -c � a) Qa) cum E mcl- `� c .NcO.7)
Z Z CO E N c c W W OQ c w o .o � :0
® m U) Ir = 00 (13 .2 O E F- m � � � °- � m E o aiv o �
Z W 0 '� > 2 .' L c 45 L
DI- uu)) Nccu '0 LL .a° c° a) � c 'E W 2mN c� NU) 0 'c0 = o
c L i- E c ;c o 2 L 0 ;c c .c 0 c o cn a
m a o O C Z cn `o o N C E m C p tL C O 0 00. 000
— 6„a22 o00o) F- w0 - .> 0oC m
" ° " Z 0 o ca . 0 > .0 0W Q 00
z > u
� � mw c > 0omp p000l- - - - _� CU)� oZoW C i � cU co NQ o - o f o c o °
- - Z 0 .� 0, ..° + 20 . •-cE � � m � > NZ N L.
�( o o . O o � .
o
NU ° m 00 3 coc0c 1'
Hca ° v, � m Cp � (0 Uoo .0 `o20o o
— W UO _ UjNNNU "000 W CJo ,c) B -DC 0 O , 45ECmZ >' ° m ) o' d � m o u um -Q : a - c m cn Ea Oco° o wo Or° o coCd - c L
O ,_e
WU 0a . izUa 3— mo E - = mo .0mN wQ "+ w) 28 02 0 >,_0
Cm p ( ° NaM ( ) 'C >, mO (! . '_ o E . N c _ ,v Np (.0 z ° c � C •Em .� a o c
W ° c9- cWoOo ( QoQ c - cc Q-L0p CZ � oop � d E wo w � cE
_ a oZ > o ° E ° 0W o c �m _ m WUZ Um NI- taw
morn - W CW aU Up NOcC > CUo
N al 0.
.`(2Y mNt0wocw000po-0cw .N - m0
0 L 5 ° o
_ y O O E W O O w (0 U N O N 0 >mt5 U) O 75 _a `C 0 V V +-
`.,z 7 aS 0z o _ co E N °a-i -o v - w wM a) o_al , a) = 0 o - c
7 C o E E m O m m N o - m .._. •0 C 'o N Z (n N 0 ,O . Z C "-T' o uo) N
o mm g `o M I- � 0 c2 c � 0 GGL) cHm = oU c o UO cH Qog o 0
d LO O o 0 ° v ° -m L' E co u' C W Z 'C co � N N ccco vi O W o 3 0_ ~
fX � a�i mo I- a) .c a) UU � .c vZ o 0_� 0 = .0mc 0 0aCO a) � U � z 0
� NOQcc) Urn+- c o ° 00 � NWf- o3 ° USE ° � wa) o
r pL a) 'U m 'N -oN- 4- " m -c N ,0 OT.� L U U 0 -, a) O 0 rn L ,,,, , „ 0 ms 0-
L o _ 0 W0oEoocoo - .cwc°) °c ,- WCWcomo •o >, cLE° '0Uo -00w I.
... Q.O m c0 C o N N N o 0 Q - - m W ° Z - Q U o) C)
— _ 0 - -c6 Om, co •- C 03 om a) -0 ci2UO m cti -0 •0 -0 •ai . Q w � >,'� UW 00
° U 0- 2 t m 'C N U c c N 0 - O v U 0 c m U
o 'U o L CO O_ L E C N ° E L W N U 0 ° o N ° E
E E LE E c : E o < 'c'n o C 0 m 1- 0 ~= m - > � w Y co W Lp
` .`
ama.0oo � 0cac�im 0ceiconv2 ui . F- I- o v) - ocow w
N o
3 a) o
o a) 3o c L a)
—
Tv' ca o _c .N o its
co.o 0 U CO N O
rn Q E 0c co o o '`r
i6 N u a) O O w N 'a
y
'o� � U c a) .Q �.v
C >, W al -C O 0
Q = O C •
Q --LI c oas
L
o ... L =. co o C a)
al G O
o ° foo U o N v
o E W U c.) = .Q
c:),)
C U
O E m OL =
N C ` a-. C cn
JU
Q
a) > o ao `h doU Lo -3 = o
CU
V) ai •- >, u) L.
as .= O
C O
W co � z a o -c moo `� � ❑ ~ C'J ❑
03
teQ. a, cH . u) E °5 (Do o WH
� ® � w ai "_ 3 la v wZ
W LL. m v> > - o o c -C D. O N
EnW ca w o o () U C) 0
Zzp Mm o - , c � W �- Z
Z C:) o U Q) -= to
NQ O m .17- co u) o c Eo ❑ R"
N 02 a�i - � 0 o � - 'C
Z0 � � ) � ia ,.U_ n Via) mW co -I-.
cn O_ m co c ,o E '� ctsaa) C� F-
mZ � " � `� co 0 Fa ZW •C)Z CD p C
0,) I- w a ms o _, cn ` � � C.) O
U ,a) co if .0 -CI _Co4, Ca o O 0
I- o 2 0 o u) ' a ,N ) =
— O n. c N ;o -a -o = C f Z WO o >
U m� > nC
o ° Q W O ❑
cnL Hm d OZ�
❑ o E O w I- . o � a) u) < r ---
ill c a)
O d
o oZm `a � n o t c
a >-
,a) 2 12aiE cCo
oco_. om 0 F-
— ma `� Oc� c a) � ° za) ZU "0
cu
o � � v a) C {= Q- LL cn d 0
— in �, �0. � a) ° �) w o O w CTS 4-0
0R •`� Z Ina) wm ❑ o
O c• oa m cri0) o _0O W � � � 0
U E' cu ` M o to ~ Z00 c Q c W
< Ea
• V p O V a) "a W W 0 ' c
} 2 .2 o u) m
ai Z cn W ai O a a W 2 _c
— o m a) a)
cu U -C E 00 co 0o - > _c _c CI
Z m o < Z !IIoow ns Z N
o u) , u) J � .og � N O -
M N L CL o E Q d N ~ Al N
Z a (00 a) � C � C U O
U o O O dj m O E N N c �+ cp
—
a) U co O O C S O W O O
rp= m >
a WOE rn UmU E' - � N cc
\ �jm .a) o cn � � � 0 C _ w v
1►�Ii 9 W ,-0 Z O •� �-a) G N U aj j O m o
r�4,., i o m co m m a) n co n3 a) to o
.,�� ° = 0 V o � a) L. = � a) E E
c'=r 1+ d co C m J 'O 3 O �.
— 'mac�44a 0 .,r y O M J O O C >' u) "J -r. O
Z Q = U co Q .n >- W = ca E 3
CERTIFIED
MBE / WBE CONTRACTORS
CITY OF WATERLOO,IOWA
a
kNr
9,4
. r 472.
erlao \
_ CONTRACT COMPLIANCE OFFICE
Community Development Board
Carnegie Annex, Suite 202
620 Mulberry Street
Waterloo,Iowa 50703
— City WEB Site: www.ci.waterloo.ia.us
_ Contract Compliance
WEB Site
for listing updates: http://www.wplwloo.lib.ia.us/contractcompliance/
Contact: Rudy Jones, Community Development Director
Email: rudv.iones(u�waterloo-ia.org
Phone: (319)291-4429
— Fax: (319)291-4431
CERTIFIED MBE CONTRACTORS
CARTER ELECTRIC
725 Adams Street
Waterloo, IA 50703 —
Phone: (319) 232-9808
Pager: (319)235-4021
Contact: Derrick Carter
Specializing in:
ELECTRICAL CONTRACTOR
CULPEPPER ELECTRIC
1731 Cottage Grove Avenue
Waterloo, IA 50707
Phone: (319) 235-0885
Fax: (319) 236-8177
Contact: Martin Culpepper
Certified: City of Waterloo Certified MBE, Licensed Electrician
Specializing in: —
ELECTRICAL CONTRACTOR
DANIELS HOME IMPROVEMENT
339 Albany Street
Waterloo, IA 50703
Phone: (319) 961-1659
Contact: Sammy Daniels —
Specializing in:
ALL TYPES OF CONCRETE FLATWORK, POURED WALLS ALL TYPES, FOOTINGS, LIGHT
DEMOLITION —
D.C. CORPORATION
426 Beech Street
Waterloo, IA 50703
Phone: (319) 236-9075 —
FAX: (319) 236-0515
Contact: Terry Phillips I
Certified: City of Waterloo Certified MBE, Iowa DOT, TSB Certified —�
Specializing in:
COMMERCIAL AND RESIDENTIAL DEMOLITION, CONCRETE PAVING, DRIVEWAYS, TRUCKING —
(ALL TYPES), GENERAL CONSTRUCTION
- GREER'S WORKS
2003 Plainview Street
_ Waterloo, IA 50703
Phone: (319) 233-4701
Contact: Willie Greer
— Specializing in:
DRIVEWAYS, SIDEWALKS, CARPENTRY, ROOFING, GENERAL CONSTRUCTION
LOVE'S ENTERPRISE
835 West Fifth St.
— P.O. Box 246
Waterloo, IA 50704
Phone: (319) 233-3260
— Contact: David Love
Certified: Iowa DOT, City of Waterloo Certified MBE
Specializing in:
CONCRETE PAVING, ASPHALT, DRIVEWAYS, SIDEWALKS', TRUCKING
- OLD GREER'S WORKS
2309 Springview Street
Waterloo, IA 50707
Phone: (319) 233-2150
Contact: David L. Greer, Sr.
— Specializing in:
GENERAL CONSTRUCTION
QUICK CONSTRUCTION
217 Bates Street
— Waterloo, IA 50703
Phone: (319)215-4166
Contact: Leroy Harrington
Specializing in:
ALL TYPES OF CONCRETE FLATWORK AND GENERAL CONSTRUCTION
CERTIFIED WBE CONTRACTORS
ATLAS PAINTING, INC.* -
911 Sycamore Street
P.O. BOX 65
Waterloo, IA 50704
Phone: (319) 232-9164
Specializing in:
COMMERCIAL AND INDUSTRIAL PAINTING
PETERMAN & HAES CARPET ONE*
4003 University Avenue
Waterloo, IA 50701
Phone : (319) 233-6131
FAX: (319) 233-6133
email: JR11486@cfu.net
Certified: City of Waterloo WBE
Contact : Carol Reese
Specializing in:
FLOOR COVERING
WATCO CONSTRUCTION INC.*
2920 Texas Street —
Waterloo, IA 50702
Phone : (319) 233-7481
Certified: City of Waterloo WBE
Contact : Patricia J. Kimball
Specializing in: L
STORM SEWER, INLETS, DRAIN TILE, WATER MAIN, SANITARY SEWER, INTAKE STRUCTURES
* DENOTES WOMEN BUSINESS ENTERPRISE
L.
L.
STATEMENT OF BIDDER'S QUALIFICATIONS
(To be submitted by the Bidder only upon the specific request of the City of Waterloo, Iowa.)
All questions must be answered and the date given must be clear and comprehensive. This
statement must be notarized. If necessary, questions may be answered on separate attached
sheets. The Bidder may submit any additional information he desires.
1. Name of bidder.
- 2. Permanent main office address.
- 3, When organized.
4. If a corporation, when incorporated.
5. How many years have you been engaged in the contracting business unier your present
firm or trade name?
6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate
anticipated dates of completion.)
7. General character of work performed by your company.
8. Have you ever failed to complete any work awarded to you? If so, where and why?
9. Have you ever defaulted on a contract? If so, where and why?
— 10. List the more important projects recently completed by your company, stating the
approximate cost for each, and the month and year completed.
- 11. List your major equipment available for this contract.
12. Experience in construction work similar in importance to this project.
13. Background and experience of the principal members of your organization, including the
- officers.
14. Credit available: $
15. Give bank reference:
16. Will you, upon request, fill out a detailed financial statement and furnish any other
information that may be required by the City of Waterloo, Iowa?
17. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish
any information requested by the City of Waterloo, Iowa, in verification of the recitals
comprising this Statement of Bidder's Qualifications. -.
Dated at , this day of
, 201_.
(Name of Bidder)
By:
Title:
State of )
) ss:
County of )
, being duly sworn deposes and says that he is
of
(Name of Organization)
and that the answers to the foregoing questions and all statements therein contained are true and —.
correct.
Subscribed and sworn to before me this day of
, 201 —
Notary Public
My commission expires ,
FORM OF CONTRACT
CONTRACT FOR THE CONSTRUCTION OF
GATES PARK GOLF COURSE STREAMBANK STABILIZATION
CITY OF WATERLOO, IOWA
This contract made and entered into this day of , 20_, by and
between the City of Waterloo, Iowa, a Municipal Corporation, (hereinafter referred to
as City), and of Waterloo, Iowa, (hereinafter
referred to as Contractor), WITNESSETH:
PAR. 1 Contractor agrees to build and construct the RIDGEWAY TOWERS STORM SEWER
UNDERGROUND DETENTION SYSTEM and furnish all necessary tools, equipment,
materials, and labor necessary to do all the work called for in the plans and
specifications in a workmanshiplike manner and for the prices set forth in Contractor's
proposal, which was accepted by the City, and which is understood and agreed to be a
part of this contract.
PAR. 2 It is understood and agreed that the resolution adopted by the City Council ordering the
construction of the improvement, the Notice to Contractors as published, the Instruction
to Bidders, the Form of Proposal, the Construction and Maintenance Bonds, the Council
Proceedings relating to this matter, and the Plans and Specifications shall all be
considered as forming a part of the contract the same as though they were each set out
in said contract.
PAR. 3 The Contractor agrees to furnish at its own cost and expense, all necessary materials
and labor for said work and to construct said improvements in a thorough, substantial,
and workmanlike manner, and in strict accordance with the requirements of this
contract, and of the plans and specifications made a part hereof by reference, and to
the satisfaction and approval of the City and its engineer.
PAR. 4 The Contractor agrees to perform said work and install said improvements on the terms
set out in bid or proposal to the City which has been accepted by the City and which is
by reference made a part of this contract.
PAR. 5 The Contractor agrees to commence said work within ten (10) working days after
receipt of"Notice to Proceed" and complete it on or before 31ST DAY OF AUGUST 2012
unless an extension of time is granted in writing by the Council of the City.
PAR. 6 Should the Contractor fail to complete said improvements in strict accordance with the
terms and conditions of this contract, or the plans and specifications therefor promptly
by the date herein specified, the City may pay such additional sums as it may be _
required to pay by reason of the failure of said contractor and deduct any and all such
sums from any amount then due the Contractor.
PAR. 7 The Contractor agrees to comply with and obey all ordinances of the City of Waterloo,
Iowa, relating to the obstruction of streets and alleys, keeping open passage ways for __
water, traffic, and protecting any excavations in any street or alley, and maintaining
proper and sufficient barricades with lights and signals during all hours of darkness, to
see that the backfilling is properly done, and agrees to keep the City whole and defend
any and all suits that may be brought against the City by reason of any injuries that may
be sustained by any person or property allegedly caused by the Contractor, or his
agents, while work is done pursuant to this agreement.
PAR. 8 The Contractor agrees that in the event a law suit is brought against the City for _
damages allegedly sustained by reason of any act, omission or negligence of the
Contractor or its agents, or on account of any injuries allegedly sustained by reason of
any obstruction, hole, depression or barrier placed or dug by the defendant or its
agents, in the doing of the work herein contracted for, that it will defend said suit and
save the City harmless therein, and in case judgment is rendered against the City, the
Contractor agrees to pay the same promptly. The Contractor agrees to carry public
liability insurance in a solvent company in a sufficient amount to protect the City and
those who use the streets of the City. ...
PAR. 9 The City shall have the right to appoint one or more construction reviewers who shall
review the progress of the work in detail; also, to make any test or any material to be
used in such work. No material shall be used in any work until the same has first been
approved by the construction reviewer. Such construction reviewer shall have full —
authority to pass judgment upon all materials and upon the manner of doing the work,
and their judgment on rejecting any materials, substance, or manner of work shall be
final unless it is revoked or modified by the City Engineer. —
PAR. 10 Any material, which has been rejected by the construction reviewer, shall be at once
removed from the line of work and shall not be again taken thereon or placed with the —
material proposed to be used without the written consent of the City Engineer.
PAR. 11 The Contractor shall maintain no cause of action against the City on account of delays
and prosecution of work, but if said work is delayed by the City, the Contractor shall
have such extra time for completion of the job as was lost by reason of the delay
caused by the City.
PAR. 12 The Contractor agrees to pay punctually all just claims of labor, material, men, or
subcontractors who shall perform labor or furnish materials entering into this
improvement. It is agreed that the City need not pay the Contractor until all such claims
are paid by the Contractor. It is agreed that the City shall not be liable for said labor, 1
material, or men under this contract. I
C
PAR. 13 The Contractor agrees to furnish the City, simultaneously with this contract, a bond on a
form to be provided by the City in the amount provided by law as stated in the Notice to
Bidders, which shall be for the benefit of the City, and any and all persons injured by the
breach of any of the terms of this contract. Said bond shall be filed with the City Clerk
and shall be subject to the approval of the City Council, and is by reference made a part
of this contract.
PAR. 14 The Contractor agrees that should it abandon work under this contract or cease the
prosecution thereof for a period of thirty (30) consecutive days without reasonable
cause, and should it fail to proceed with said work within ten (10) days after a notice to
continue or carry it on has been mailed to it at the address given herein by the City, or
after such notice has been served on it, then the City may proceed to complete said
work, using any material, tools, or machinery found along said line of work, doing the
work either by contract or as it may elect, and the Contractor and the sureties on its
bond shall be liable to the City for the costs and expenses so paid out. Said costs shall
be retained by the City from any compensation due, or to become due the Contractor,
and may be recovered by the City in an action upon Contractor's bond.
PAR. 15 In consideration of the full compliance on the part of the Contractor with all the
provisions, stipulations, and conditions hereof, or contained in the various instruments
made a part of this contract by reference, and upon completion and acceptance of said
work, the City agrees to pay to the Contractor, in the manner set out in the Notice to
_ Contractors, the amount of money due the Contractor for work performed and accepted,
at the unit prices set out in the Contractor's proposal, which has been accepted by the
City.
PAR. 16 The total amount of the contract, based on the Engineer's estimates of quantities and
the Contractor's unit bid prices, and for which 100% surety k and is required is
$ 185,000.00
PAR. 17 After the completion of said work, the Contractor agrees to remove all debris and clean
up said streets, and to save the City harmless from any damage allegedly resulting from
a failure to clean up and remove the debris or put the street back in a proper condition
for travel.
PAR. 18 This contract is not divisible, but in the event of a conflict between tnis contract and the
various instruments incorporated by reference, this contract shall govern.
PAR. 19 Before the Contractor shall be entitled to receive final payment for work done under this
contract, it shall execute and file a bond in the penal sum of not less than 100% of the
total amount of the contract, same to be known as "Maintenance Bond," and which
bond must be approved by the City Council, and which bond is in addition to the bond
given by the Contractor to guarantee the completion of the work.
PAR. 20 The Contractor shall maintain all work done hereunder in good oraer for the period of
two (2) years from and after the date it is accepted by the Council of the City of
Waterloo, Iowa. Said maintenance shall be made without expense to the City or the
abutting property. In the event of the failure or default of the Contractor to remedy any
or all defects appearing in said work within a period of two (2) years from the date of its
acceptance by said Council, and after having been given ten (10) days notice so to do
by registered letter deposited in the United States Post Office in said town, addressed to
said contractor at the address herein given, then the City may proceed to remedy such —
defects. The costs and expenses thereof to be recovered from the Contractor and the
sureties on its maintenance bond by an action brought in any court of competent
jurisdiction. —
PAR. 21 The Contractor shall give notice to said City by registered letter directed to the Mayor or
City Clerk/Auditor thereof not more than four (4) and not less than three (3) months prior
to the expiration of the term during which the Contractor is required to maintain said
improvements, in good repair by the terms of its Contract. The liability of the Contractor —
and of the sureties on its bond for maintenance of the said improvements shall continue
until three (3) months after such notice has been given to the City, and, in any event,
until two (2) years after the acceptance of the work.
CITY OF WATERLOO, IOWA
Lj
Mayor
City Clerk --
Contractor
BY:
Title:
Approved by the City Council of the City of Waterloo, Iowa, this
day of , 20 .
ATTEST: , City Clerk
Waterloo, Iowa
PERFORMANCE BOND
— KNOW ALL MEN BY THESE PRESENTS:
That we, of
(the "Principal"), and of
(the "Surety"), are held and firmly bound unto the City of Waterloo, Iowa (the "Obligee"),
- in the penal sum of Dollars ($
), lawful money of the United States, for the payment of said sum in connection with a
contract (the "Contract") dated on or about for the purpose of_
The Contract is incorporated herein by reference as though fully set forth herein.
Whenever the Principal shall be and is declared by the Obligee to be in default under the Contract,
with the Obligee having performed its obligations in the Contract, then the Surety acknowledging that
- time is of the essence, may promptly remedy the default, or shall promptly undertake to:
1. Complete the Contract in accordance with its terms and conditions; or
2. Obtain one or more bids for completing the Contract in accordance with its terms and
conditions, and upon determination by the Surety of the lowest responsible bidder, or
negotiated proposal, or, if the Obligee elects, upon determination by the Obligee and
the Surety jointly of the lowest responsible bidder, or negotiated proposal, arrange for a
contract between such party and the Obligee. The Surety will make available as work
progresses sufficient funds to pay the cost of completion less the balance of the
Contract price. The cost of completion includes responsibilities of the Principal for
correction of defective work and completion of the Contract, the Obligee's legal and
design professional costs resulting directly from the Principal's default, and liquidated
damages or actual damages if no liquidated damages are specified in the Contract.
The term "balance of the Contract price" means the total amount payable by the
Obligee to the Principal under the Contract and any amendments thereto, less the
amount properly paid by the Obligee to the Principal; or
3. Determine the amount for which it is liable to the Obligee and pay the Obligee that
amount as soon as practicable.
In the event this bond is enforced, Principal and Surety agree to indemnify Obligee and hold Obligee
harmless from and against any and all costs of enforcement, including but not limited to reasonable
- attorneys' fees and expenses.
Every Surety on this bond shall be deemed and held, any contract to the contrary notwithstanding, to
consent to each and all of the following matters, without notice:
1. To any extension of time to the Contract in which to perform the Cortract.
2. To any change in the plans, specifications, or Contract when such change does not
involve an increase of more than twenty percent (20%) of the total Contract price, and
shall then be released only as to such excess increase.
3. That no provision of this bond or of any other contract shall be valid which limits to less
than one (1) year from the time of the acceptance of the work the right to sue on this _
bond for defect in workmanship or material not discovered or known to the Obligee at
the time such work was accepted.
If the Principal performs the Contract, then this bond shall be null and void; otherwise it shall remain in
full force and effect. In no event shall the Surety's total obligation exceed the penal amount of this
bond.
Terms used herein shall include, as appropriate, the singular or plural number, or the masculine, A
feminine or neuter gender.
IN WITNESS WHEREOF, the undersigned Principal and Surety have executed this Performance _
Bond as of
PRINCIPAL SURETY
Name Name
By: By:
Title: Title:
[attach Power of Attorney]
� i
NOTE: Date of BOND must not be prior to date of Contract.If CONTRACTOR is Partnership, all partners should execute BOND.
If this project_rncludes Federal Funds the followingapplies to the payment barpds
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's
most current list (Circular 570 as amended) and be authorized to transact business in the State —�
where the project is located.
L.
tI
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: that
(Name of Contractor)
(Address of Contractor)
a , hereinafter called Principal,
(Corporation, Partnership or Individual)
and
(Name of Surety)
(Address of Surety)
hereinafter called Surety, are held and firmly bound unto
(Name of Owner)
(Address of Owner)
hereinafter called OWNER, in the penal sum of Dollars, $( )
in lawful money of the United States, for the payment of which sum well and truly to be made, we
bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain
contract with the OWNER, dated the day of
20 , a copy of which is hereto attached and made a part hereof for the construction of:
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms,
- SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the
prosecution of the WORK provided for in such contract, and any authorized extension or
_ modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and
coke, repairs on machinery, equipment and tools, consumed or used in connection with the
construction of such WORK, and all insurance premiums on said WORK, and for all labor,
— performed in such WORK whether by SUBCONTRACTOR or otherwise, then this obligation shall
be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that
no change, extension of time, alteration or addition to the terms of the contract or to the WORK to
be performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise
affect its obligation on this BOND, and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of the contract or to the WORK or to the
SPECIFICATIONS.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
IN WITNESS HEREOF, this instrument is executed in counterparts, each one of
(number)
which shall be deemed an original, this the day of
20
ATTEST:
Principal
(Principal)Secretary
(SEAL) By (s)
(Address) ---
Witness as to Principal
(Address)
Surety
ATTEST: By
Attorney-in-Fact
Witness as to Surety (Address) ._
(Address)
NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is Partnership, all partners should execute BOND.
If this project includes Federal Funds,the following applies to the payment bond:
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's
most current list (Circular 570 as amended) and be authorized to transact business in the State
where the project is located.
Standard Specifications Division 1—Gene-al Requirements
Section 1010—Summary
SUMMARY
PART 1 -GENERAL
1.01 CONTRACT DESCRIPTION
A. The Contract Documents are intended to identify one complete project. The divisions and
sections of the specifications, identifications of any drawing or naming of any subcontractor is
not intended to delineate work performed by any specific trade. The Contractor shall be
responsible for assignment of work. The work is further defined as: Towers Paring Lot Retrofit.
B. Contract Type: Contract should be lump sum with unit prices included for reference.
C. Design Engineer:
Monica Smith, PE, CPESC, CESSWI
Robinson Engineering Company
5751 Westminster Drive, Suite B
Cedar Falls, Iowa 50613
319-859-0293
1.02 WORK BY OWNER
A. None
B. All separate contractors are responsible to work together and coordinate their efforts and use of
the site. The prime contractor will be responsible for coordinating efforts of all the contractors.
C. The Owner may hire other Contractors to perform various work items related to this project as
needed. This Contractor shall coordinate and cooperate with any other Contractor.
1.03 OWNER SUPPLIED PRODUCTS
A. Owner's Responsibilities
1. Arrange for and deliver Owner reviewed Shop Drawings, Product Data, and Samples, to
Design Professional and Contractor.
2. On delivery, inspect Products jointly with Contractor.
B. Contractor's Responsibilities:
1. Review approved Owner supplied shop drawings, product data, and samples for conformance to the
Contract Documents.
2. Receive and unload products at site; inspect for completeness or damage jc ntly with Owner.
(Coordinate with OCR)
3. Handle, store, install and finish products. (Coordinate with OCR)
4. Repair or replace items damaged after receipt.
C. Design Professional's Responsibility
1. Review shop drawings, product data and samples and incorporate Owner's ::omments and
suggestions.
2. Coordinate requirements with other areas of the project.
1.04 CONTRACTOR USE OF SITE AND PREMISES
(Reference General Conditions 3.13 and Supplementary Conditions Article 6)
A. Limit use of site and premises to allow:
1010-1
Standard Specifications Division 1—General Requirements
Section 1010—Summary
1. Owner occupancy.
2. Use of site and premises by the University student body for parking, as permitted.
B. Access to Site: Limited to daylight hours
C. Maintain use of all emergency building exits during construction for building occupants.
D. Time Restrictions for Performing Exterior Work: Daylight hours. No night work will be allowed without
prior approval.
E. No major utility shutdowns will be allowed for this project.
F. No minor utility outages will be allowed for this project.
G. Existing facilities and site shall be maintained and protected by the Contractor as outlined in section 1.50
and the General Conditions.
H. The area allocated for construction including equipment and material storage shall be minimized to allow
parking in other areas of the parking lot.
I. No signs of any type are permitted on the job site. Only project signs supplied by the Owner or
directional signs required by Owner due to obstructions caused by construction.
J. The Contractor shall not ship materials to the Owner's central receiving facility or any other department.
All shipments to the site must be sent to the project field office. The owner will reject all contractor
materials.
K. When construction will affect exits and access to existing buildings, the Contractor shall develop and
submit an emergency fire and rescue plan for review by the Owner and Cedar Falls emergency
personnel. The plan shall be revised until acceptable by all parties.
1.05 FUTURE WORK
A. None
1.06 WORK SEQUENCE
A. Construct work in phases to accommodate Owner's occupancy requirements during the construction
period, coordinate construction schedule and operations with Owner.
B. Provide Owner and Engineer with phasing plan prior to beginning construction.
1.07 OWNER OCCUPANCY
A. The Owner will occupy the area during the entire period of construction. Phase the construction to allow
parking to continue in the area.
B. Cooperate with Owner to minimize conflict, and to facilitate Owner's operations.
C. Schedule the Work to accommodate owner occupancy and use.
1.08 CONSTRUCTION KEYING
A. At or before the preconstruction conference the Owner and Contractor shall agree to a construction
keying sequence. A minimum of 1 week notice is required to obtain construction keying. Access doors
will be designated and construction cores installed. The Contractor will be required to sign for
construction keys and pay $50 per key for any keys lost or unreturned by final acceptance. Charges for
lost or unreturned keys and rekeying required due to missing keys will be deducted from Contractors
final payment. Final payment will not be made until all key issues are resolved.
1.9 WORK PROCEDURES
A. Normal work hours at the job site are Monday thru Friday, excluding University holidays, 7:00 AM to 5:00
PM except on residence projects or projects where noise will be heard in Residence Halls, 8:00 AM to
6:00 PM. Any exceptions must be approved by the Owner.
B. No Smoking is permitted anywhere on campus.
1010-2
Standard Specifications Division 1—General Requirements
Section 1010—Summary
C. Radios and boom boxes are permitted on the construction site as long as the volume is controlled. If the
Owner receives any complaints, the radio or boom box must be removed from the site.
D. The Contractor is responsible for the conduct of all workers on the project. Workers exhibiting
inappropriate conduct shall be removed from Campus.
END OF SECTION
1010-3
Standard Specifications Division 1-General Requirements
Section 1020-Price and Payment Procedures
PRICE AND PAYMENT PROCEDURES
PART IGENERAL
1.1 CASH ALLOWANCES
A. Cash Allowances shall be as defined in General Conditions Section 3.8.
B. Design Professional's Responsibility:
1. Consult with Contractor and/or Owners Representative for consideration and selection of
products, suppliers, and installers.
2. Select products in consultation with Owner and transmit decision to Contractor.
C. Contractor's Responsibilities:
1. Assist Design Professional and Owner in selection of products, suppliers and installers.
2. Obtain proposals from suppliers and installers, check conformity to Contact Documents and offer
recommendations.
3. On notification of selection by Owner, execute purchase agreement with designated supplier and
installer.
4. Arrange for and process shop drawings, product data, and samples. Arrange for delivery and
installation.
5. Promptly inspect Products upon delivery for completeness, damage, and defects. Verify
completeness of order.
6. Unload, handle, store and protect items delivered to the site. -_
D. Differences in costs will be adjusted by Change Order prepared by the Owner's Construction
Representative.
E. Allowances Schedule:
1. None
F. Invoices must accompany applications for payment that includes allowance items.
1.2 SCHEDULE OF VALUES
A. Submit Schedule of Values in duplicate within ten (10) days after date of Notice of Award.
B. The Schedule of Values must include as a minimum labor and material dollar values for each of the
following items:
• The Project Bond
• Project Startup and Mobilization
• Division 1 -General Requirements
• Project Closeout
• A line item for each applicable specification section. The schedule shall be further broken
itemized by floors or areas as designated by the Design Professional and Owner. Identify
each line item by specification number. _.
• Each allowance or unit price item included in the Contract.
C. Material values will include only anticipated bare costs of materials needed for the project and will
not include any markup for overhead or profit.
D. Labor values for each line item will include all costs not considered to be material bare costs and will
include the appropriate markup for overhead and profit.
1020-4
Standard Specifications Division 1—General Requirements
Section 1020—Price and Payment Procedures
E. Equipment, tools, engineering shop drawings and other items as necessary for clarity shall be
itemized separately.
F. Include in each line item, the amount of Allowances specified in this section. For unit cost
allowances, identify quantities taken from Contract Documents multiplied by the unit cost to achieve
the total for the item.
G. Revise schedule to list approved Change Orders, with each Application for Payment.
1.3 APPLICATIONS FOR PAYMENT
A. One week in advance of the meeting the Contractor shall publish the preliminary pay request on
Centric Project for review by the OCR and Design Professional.
B. The Design Professional, Owner and Contractor will meet at the project site prior to the construction
progress meeting for a pay request meeting. The meeting will be at the project site and all parties
must be present. No requests for payment(telephone conversations, faxes, etc.) prior to this
meeting will be acknowledged or accepted except stored materials. This will be the only time during
the course of a month that the Contractor will have the opportunity to make a request for payment.
C. The Design Professional, Owner and Contractor will use the pay request meeting to agree on the
appropriate percentage of completion for each line item listed in the Schedule of Values. The
meeting will not conclude until all issues on items for payment have been resolved. One week in
_ advance the Contractor shall submit photocopies of priced invoices for all material included in Stored
Materials on the pay request. Invoices shall contain a reference to the project and a specific
description of materials included. If invoices are not received and approved in advance, stored
materials will be deleted from the application. No invoices will be accepted after the conclusion of
that meeting until the next regularly scheduled pay request meeting. The Contractor is required to
verify all quantities claimed on request.
D. No payment will be made for materials stored off site unless the storage facilities have been
approved by the Owner prior to the pay request meeting, and the Contractor has provided an
insurance certificate listing UNI as loss payee and written statement giving UNI ownership without
possession or control of the item(s). Off-site storage approval will not be granted during the course
of a pay request meeting.
E. Submit four(4) copies of each application to the Design Professional and one (1) to the Owner, in
accordance with Section 9.3 of the General Conditions and the Supplementary Conditions.
F. Pay applications may be submitted monthly.
G. Include an updated construction progress schedule, in accordance with Section 1.30, an updated
submittal schedule and all Contractor Daily Reports with every Application For Payment.
1.4 CHANGE PROCEDURES
A. Changes in the Work shall be processed according to General Conditions Article 7 and as modified
below.
B. The Design Professional will advise of minor changes in the work not involving an adjustment to
Contract Price or Contract Time by issuing supplemental instructions or responding to a RFI.
C. When approved by the Owner, the Design Professional may issue a Proposal Request(PR) to the
Contractor with a copy to the Owner, which includes a detailed description of a proposed change
with supplementary or revised Drawings and specifications. Contractor will prepare and submit a
price within fifteen (15) calendar days. Price shall include a detailed break down of costs including:
labor, materials, equipment, tools, overhead and profit and quantity take offs of materials used for
estimating. Labor costs shall be itemized. Once accepted, PR's shall be included in a Change
Order monthly.
D. The Contractor may propose changes by submitting a request for change to the Design Professional
with a copy to the Owner, describing the proposed change and its full effect on the work. Include a
statement describing the reason for the change and its full effect on the Contract Price and Contract
1020-5
Standard Specifications Division 1—General Requirements
Section 1020—Price and Payment Procedures
Time with full documentation and a statement describing the effect on work by separate or other
Contractors. Document any requested substitutions in accordance with Section 1.60.
E. Construction Change Directive (CCD): Design Professional or Owner may issue a CCD instructing the Contractor to proceed with a change in the work, for subsequent inclusion in a Change Order.
Document will describe changes in the work, and designate method of determining any change in
Contract Price or Contract Time. Promptly execute the change. The price for a CCD must be —
agreed to by all parties before it is included on a payment application. A CCD can only be added to
an application for payment if the Change Order is delayed for an unreasonable amount of time and
approval for inclusion in the application is granted by the Associate Director of Construction _
Administration. A CCD can be used to allow the work to proceed immediately or if no agreement
can be reached on the price of a PR.
F. All cost proposals must be itemized to indicate unit price and unit quantity for materials; equipment;and man hours and hourly rate for labor. Credits and deducts applicable to each change should be
separately identified. Taxes, insurance, overhead, and profit must be separately identified. Pricing
which is not itemized will slow the approval process. —
The pricing of changes in the work which result in an adjustment to the Contract Sum shall be limited
to the direct expenses of the Contractor and subcontractors plus the applicable percentage of
overhead and profit as described below:1. Net costs of labor, including social security, old age, and unemployment insurance, fringe
benefits, and workmen's compensation insurance. Labor cost shall be itemized to indicate —
trade, hourly rate, man hours, and total cost. Certified payroll sheets must be submitted on
request.
2. Net costs of materials, supplies and equipment, including cost of transportation, whether —
incorporated or consumed. Material costs shall be itemized to include unit cost, quantity, and
total cost for each item.
3. Net rental costs of machinery and equipment, exclusive of hand tools, used solely for the —
Change Order work whether rented from the Contractor or others. Equipment costs shall be
itemized to include equipment type, number of each, hourly rate, and total cost for each item.
4. Costs of premiums for all bonds and insurance and permit fees related to the Work.
5. Costs of supervision and field office personnel directly attributable to the change.
6. Net costs of all work to be performed by the Contractor's subcontractors. Subcontractors costs
shall be appropriately itemized and the Contractors shall furnish copies of all subcontractor
quotations and an itemization for all cost included. It is the responsibility of the General _
Contractor to review and approve all pricing of additional work required of its subcontractors and
suppliers.
7. A percentage mark-up for overhead and profit subject to the following limits: —
a. Fifteen (15) percent maximum for Work directly performed by employees of the Contractor,
subcontractor, or sub-subcontractor.
b. Five (5) percent maximum for Work performed or passed through by a subcontractor and
passed through to the Owner by the Contractor.
c. Five (5) percent maximum subcontractor's mark-up for Work performed by a sub-contractor and passed through to the Owner by the subcontractor and Contractor.
d. The maximum allowable mark-up shall be twenty-five (25) percent passed through to the _
Owner by the Contractor under any circumstances. Each percentage shall be applied to the
base amount. Percentages shall not be taken on previously calculated percentages.
G. All completed CCD's and approved PR's will be included in Change Orders on a monthly basis.H. Maintain detailed records of work done on time and material basis. Provide full information required
for evaluation of proposed changes, and to substantiate costs for changes in the work.
1020-6
Standard Specifications Division 1—General Requirements
Section 1020—Price and Payment Procedures
I. Material invoices, time sheets and pay stubs may be required to verify costs.
1.5 CHANGE IN TIME
A. Any request for a change in time must be accompanied by a justification for the change and a
description of the impact on the critical path for the project as a minimum. Additional information
may be requested by the Owner.
B. A revised schedule showing the effect of the change shall be submitted with the request for
additional time. No time extensions will be granted without detailed documentation.
1.6 MEASUREMENT AND PAYMENT—UNIT PRICES
A. Measurement methods are delineated in the individual specification sections.
B. The Design Professional or the OCR will take measurements and compute quantities accordingly.
The Contractor shall assist in the taking of measurements.
— C. Unit Quantities: Quantities and measurements indicated in the Bid Form are for contract purposes
only. Quantities and measurements supplied or placed in the work shall determine payment.
D. Payment includes: Full compensation for required labor, Products, tools, equipment, plant and
facilities, transportation, services and incidentals; erection, application or installation of an item of the
work; overhead and profit.
— E. The unit price for work may be reevaluated if the quantity for that item varies by more than 20% from
the estimated quantity.
1.7 ALTERNATIVES
A. Accepted alternatives will be identified in Agreement.
B. Coordinate related work and modify surrounding work as required.
C. Schedule of Alternatives: (include alternates as required.)
1. Alternative A: The replacement of the sidewalk on the West side of the parking lot per plans.
2. Alternative B: Spreading recycled asphalt on parking lots at various locations on campus.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTIONS
Not Used.
END OF SECTION
1020-7
Standard Specifications Division 1—General Requirements
Section 1030—Administrative Requirements
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 COORDINATION
A. Coordinate, scheduling, submittals, and work of the various sections of the specifications to assure
efficient and orderly sequence of installation of interdependent construction elements, with provisions for
accommodating items installed later.
B. Verify utility requirements and characteristics of operating equipment are compatible with building utilities.
Coordinate work of various sections having interdependent responsibilities for installing, connecting to,and placing in service, such equipment.
C. Coordinate space requirements, supports, and installation of mechanical and electrical Work which are —
indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely
as practicable; place runs parallel with lines of building. Use spaces efficiently to maximize accessibility
for other installations, for maintenance, and for repairs. In congested areas the contractor shall prepare
coordination drawings to insure proper fit and clearance for all items. —
D. In finished areas, except as otherwise indicated, conceal pipes, ducts, and wiring within the construction.
Coordinate locations of fixtures and outlets with finish elements.
E. Coordinate completion and clean-up of work of separate sections in preparation for Substantial
Completion and for portions of work designated for Owner's partial occupancy.
F. After Owner occupancy of premises, coordinate access to site with OCR for correction of defective work
and work not in accordance with Contract Documents, to minimize disruption of Owner's activities.
G. If a regulatory agency(OSHA or others) is inspecting the job site both the Associate Director of —
Construction Administration and the University Safety Officer must be notified and will attend the
inspection.
1.2 INTERNET BASED PROJECT COMMUNICATIONS
A. An internet based project communication and management system will be utilized on this project to share
information among team members and conduct and track project communications. The Contractor is _.
required to participate with the project team and use the system for viewing correspondence and
information posted by other project team members, posting correspondence and information for viewing
by other project team members, and logging and/or responding to such as RFI's and Shop Drawings. —
There are no fees required for access to the system. University of Northern Iowa will provide team
members with password protected access privileges to the project web site.
Minimum System and Software Requirements: —
• Operating Systems: Microsoft Windows 98, Windows NT 4.0, Windows 2000, Windows ME, or
Windows XP
• Minimum 32 MB RAM
• Processor: PC Compatible, 233 MHz Pentium II or better
• Minimum 60 MB free hard disk space for application —
• Minimum 120 MB of temporary free hard disk space used during installation
• Video Card and display capable of True Color(24-bit)
• Internet connection (high speed connection recommended)• Internet Explorer 5.5, 5.5 SP1, 5.5 SP2, 6.0, or 6.0 SP1
• Software to create and read Adobe Acrobat files
• Scanner —
All submittals, RFIs, ASIs, PRs, CCDs, COs, Application for Payment and other project related
correspondence and documentation shall be conducted in Centric Project.The electronic file should contain all relevant project information.
1030-8
Standard Specifications Division 1—General Requirements
Section 1030—Administrative Requirements
A separate manual is available from the Owner describing the Project Management System.
1.3 FIELD ENGINEEERING
A. Employ a Land Surveyor registered in the State of Iowa, to locate control points and datum as shown on
the drawings.
B. Contractor shall locate and protect survey control and reference points.
C. Verify setbacks and easements; confirm drawing dimensions and elevations.
D. Provide field engineering services. Establish elevations, lines, and levels, utilizing recognized
engineering survey practices.
— 1.4 PRECONSTRUCTION CONFERENCE
A. The Owner's Construction Representative will schedule a meeting after Notice of Award.
B. Attendance Required: Owner, Design Professional, Contractor, and major subcontractors.
C. A list of key personnel and the initial construction progress schedule shall be submitted seven (7)
calendar days prior to the preconstruction meeting.
D. During the pre-construction conference or before starting the work, the Contractor shall conduct a survey
of the proposed construction area to locate and document existing damage on video and provide a copy
of the documentation to the OCR. On completion of the project any damage found that is not
documented shall be repaired by the Contractor at no cost to the Owner.
E. Agenda:
1. Introductions: Contractor, Sub-Contractors, Design Professional, Owner, Others. This
includes designation of responsible personnel throughout the duration of the contract.
2. Status of Contract Documents
a. Notice of Award
b. Form of Agreement
c. Insurance Certificates
d. Construction Set Documents
3. Sub-Contractors
a. Review Sub-Contractor List(Submittal required within 48 hours of the receipt of the
Notice of Award). Post on Centric Project
4. List of Key Personnel
a. Project Superintendent
b. Other Key Personnel
c. Telephone Numbers; On-site, Office, Emergency/After Hours.
d. Communication
5. Construction Schedule
a. Start/Commence Date
b. Discussion of Schedule
c. Contract Time
d. Liquidated Damages, if appropriate
6. Construction Progress Meetings
1030-9
Standard Specifications Division 1—General Requirements
Section 1030—Administrative Requirements
1.4 PRECONSTRUCTION CONFERENCE (Continued)
a. Meetings shall be minimum of once every two weeks. Once a week if
schedule/circumstances deem necessary. —
b. Set day of week, time, location and frequency.
c. Meetings shall be run by Contractor. —
d. Minutes/Distribution by Design Professional.
e. Other meetings —.
7. Application for Payment
a. Schedule of Values (Not required for unit price contracts, shall be approved by Owner
prior to initial pay application.)
b. Stored Materials, On/Off Site (Bill of Sale/Insurance)
c. Post preliminary copy of Application for Payment in Centric Project to allow Owner and
Consultant to review prior to Pay Request meeting.
d. Four copies to Design Professional, one to Owner simultaneously (submitted on a —
monthly basis).
e. Form Provided by Owner.
f. Provide updated submittal schedule and progress schedule with Application for Payment
g. NPDES documentation when required.
8. Shop Drawings
a. Contractor to provide a submittal schedule outlining all required submittals and
anticipated time frame. —
b. All submittals shall be numbered both sequentially and according to specification section
with sub numbers for each submittal.
c. Submittals shall be submitted electronically via Centric Project. Reviewed and
commented on and reposted or adjusted as required on Centric Project.
d. Re-submittals shall maintain the same section number but add an R. —
e. No substitutions will be permitted unless prequalified and presented in accordance with
Section 1.60 of the specifications
9. Changes to Contract Amount
a. Construction Change Directive _
b. Proposal Request
c. Change Orders
d. Change in time
10. Clarifications of Documents
a. Engineers Supplemental Instructions
b. Request for Information
11. Utilities
a. Locations, Responsibility
b. Temporary
c. Usage of University Utilities by Contractor
1030-10
Standard Specifications Division 1—General Requirements
Section 1030—Administrative Requirements
d. Telephone
e. Toilet Facilities
12. Testing and Scheduling Owner's Testing Agency
a. All testing required by the technical specifications shall be scheduled with the OCR and
the Owner's appointed testing agency.
13. Security
a. Job Site Security
b. Temporary Lighting
c. Fencing/Barricades
d. Keys
e. Maintenance and Housekeeping Procedures
f. UNI Alert System
14. Use of Site
a. Contractor Parking
b. Construction Parking Permits
c. Construction Limits
d. Owner approval of fence and gate location
15. Other Issues Related to Project(Examples below. Shall be customized as needed.)
a. Materials Testing
b. Material Deliveries
_ c. Construction Staking
d. Working Hours
e. Excess Dirt Removal/Disposal
f. Salvage Items
g. Owner Furnished Materials
h Concrete Truck Wash-Out
i. Hydrant Meter/Water Keys
j. Hot Work Permits
k. Owner Occupancy
I. No smoking anywhere on campus
16. Substantial Completion
a. Punch List Inspection
b. Owner Occupancy
c. Equipment Training/Demonstration
d. Substantial Completion Certificate
e. As-Built Drawings/Documents
f. Operation and Maintenance Manuals
1030-11
Standard Specifications Division 1—General Requirements
Section 1030—Administrative Requirements
17. Project Acceptance
a. Punch List Completion
b. Final Inspection c. Final Application for Payment/Retainage
d. TSB Reporting Form 1.5 PROGRESS MEETINGS
A. The Contractor shall schedule and administer meetings throughout progress of the work at —
minimum of every two weeks. More frequently if deemed necessary by the OCR.
B. Attendance Required: Job superintendent, major Subcontractors and suppliers, Owner, Design
Professional, as appropriate to agenda topics for each meeting.
C. The Contractor shall prepare and distribute copies of logs for: submittals, RFI's, ASI's,
PR's/CCD's and Change Orders to the Design Professional and OCR. The Contractor shall also —
provide a short term schedule with 3 or 4 week duration of anticipated progress.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions. Identification of problems which impede
planned progress.
4. Planned progress during succeeding work period and coordination of projected progress— —
utility shutdowns, road closings, etc. required during the next work period.
5. Review of submittals schedule and status of submittals. _
6. Review of schedule status and corrective measures to regain projected schedules if needed.
7. Status of PR's, CCD's., CO's. and RFI's.
8. Safety and security.
9. Outstanding issues to be resolved.
E. Design Professional to record minutes and post on Centric Project within seven (7) days after
meeting to participants, Owner, and those affected by decisions made.
1.6 SUBCONTRACTORS MEETING A. The Contractor shall inform the OCR of the times of all subcontractor and coordination meetings
and other meetings related to progress or schedule of the project. _
1.7 PREINSTALLATION MEETING
A. When required in individual specification sections, the Contractor shall convene a preinstallation
meeting at the site prior to commencing work of the section.
B. Require attendance of parties directly affecting, or affected by, work of the specific section.
C. Notify Design Professional and Owner's Construction Representative a minimum of one week in —"
advance of meeting date. Coordinate with regularly scheduled progress meetings.
D. Contractor shall prepare agenda and preside at meeting:
1. Review conditions of installation, preparation and installation procedures.
2. Review coordination with related work.
3. Record minutes and post on Centric Project within three (3)days after meeting to
participants.
1030-12
Standard Specifications Division 1—General Requirements
Section 1030—Administrative Requirements
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTIONS
3.1 CUTTING AND PATCHING
A. The Contractor shall be responsible for cutting and patching surfaces to make the work fit in
accordance with General Conditions Section 3.14.
B. Employ skilled and experienced installer to perform cutting and patching.
C. Submit written request in advance of cutting or altering elements which affect:
1. Structural integrity of element. All beams, columns or other structural elements must be
reviewed by the Design Professional prior to cutting.
2. Integrity of weather-exposed or moisture-resistant elements.
3. Efficiency, maintenance, or safety of element.
4. Visual qualities of sight exposed elements.
5. Work of Owner or separate Contractor.
D. Execute cutting, fitting, and patching including excavation and fill, to complete work, and to:
1. Fit the several parts together, to integrate with other work.
2. Uncover Work to install or correct ill-timed work.
3. Remove and replace defective and nonconforming work.
4. Remove samples of installed Work for testing.
5. Provide openings in elements of work for penetrations of mechanical and electrical work.
E. Execute Work by methods to avoid damage to other Work, and which will provide proper surfaces
to receive patching and finishing.
F. Cut masonry and concrete materials using masonry saw or core drill.
— G. Restore Work with new products in accordance with requirements of Contract Documents.
H. Fit Work tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces. Provide
fire rated or sound rated seals where required.
I. Maintain integrity of wall, ceiling, or floor construction; completely seal voids.
J. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest
intersection; for an assembly, refinish entire unit.
K. Identify hazardous substances or conditions exposed during the Work to the Design Professional
and OCR for decision or remedy.
3.2 ALTERATION PROJECT PROCEDURES
A. Materials: As specified in Product sections; match existing Products and Work for patching and
extending work.
B. Employ skilled and experienced installer to perform alteration Work.
C. Close openings in exterior surfaces to protect existing Work from weather and extremes of
temperature and humidity.
D. Remove, cut, and patch Work in a manner to minimize damage and to provide means of restoring
Products and finishes to original condition.
1030-13
Standard Specifications Division 1—General Requirements
Section 1030—Administrative Requirements
E. Refinish existing visible surfaces to remain in renovated rooms and spaces, to specified condition
of each material, with a neat transition to adjacent finishes.
F. Where new Work abuts or aligns with existing, provide a smooth and even transition. Patch Work —
to match existing adjacent work in texture and appearance.
G. When finished surfaces are cut so that a smooth transition with new Work is not possible,
terminate existing surface along a straight line at a natural line of division and submit
recommendation to Design Professional for review.
H. Where a change of plane of%4-inch (6 mm) or more occurs, submit recommendation for _
providing a smooth transition; to Design Professional for review.
I. Patch or replace portions of existing surfaces which are damaged, lifted, discolored, or showing
other imperfections.
J. Finish surfaces as specified in individual Product sections.
END OF SECTION _
1030-14
Standard Specifications Division 1—General Requirements
Section 1033—Submittal Procedures
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 CONSTRUCTION PROGRESS SCHEDULES in accordance with General Conditions 3.10,
Supplementary Conditions Article 3 and the following:
A. The initial construction progress schedule shall be submitted with, or prior to, the first application
for payment. The schedule shall be a CPM type schedule. The schedule must be approved
before an application for payment will be processed. When accepted by the Owner, the schedule
will become an official contract document to be modified only by Change Order.
B. The estimated start date, duration time, and finish date and the actual start date, duration time,
_ and finish date shall be indicated for each item defined in the schedule of values. Interdependent
activities shall be suitably linked to indicate proper sequencing and the critical path shall be
clearly denoted.
C. The Construction Schedule shall include the following at a minimum:
1. Notice of Award Date.
— 2. Substantial Completion Date and Final Completion Date for all phases of the project and all
other milestone dates specified herein.
3. Date that construction will begin on site.
4. Proposed start date, duration time, and finish date of each item defined in the schedule of
values.
5. Required decision dates.
6. Preinstallation meetings as specified.
7. Required delivery dates for Owner Furnished Equipment.
8. Programming of control systems.
9. Time for testing and balancing of all systems.
10. Equipment start up and commissioning for each system.
11. Time restraints imposed by the Owner that affect progress.
12. Acceptance testing, required inspections and punch list dates.
13. Time for completion of punch list.
14. Owners move in and occupancy.
D. Any and all tie-ins, outages, or interruptions to the Owner's operations must be noted in the
construction schedule as stated in 3.10.1 of the General Conditions and Section 01 10 00 must
be approved by the Owner prior to inclusion in the construction schedule. All such tie-ins,
outages, or interruptions to the Owner's operations must be designated by the Contractor or
design engineer and approved by the Owner's Construction Representative.
E. The schedule shall be marked up to reflect actual progress relative to original projection. Each
line shall indicate approximate percentage complete. A marked up schedule shall be submitted
with each application for payment or more frequently if deemed necessary by the Owner.
F. The schedule shall be a cooperative effort of all contractors and subcontractors and shall indicate
all significant milestones including (Insert list here. Consult with Facilities Planning)
G. In addition to the monthly overall schedule, the Contractor shall provide short term schedules at
_ each progress meeting as noted in Section 1030 1.4C.
H. For each area where work is behind schedule, a detailed plan must be prepared to accelerate the
work efforts to get back on schedule, at no additional cost to the Owner. If work falls behind
1033-15
Standard Specifications Division 1—General Requirements —
Section 1033—Submittal Procedures
schedule an updated schedule shall be presented at every progress meeting along with an —
assessment of how the acceleration plan is working. If plans to accelerate the work to get back
on schedule do not succeed in one month the Contractor must provide a detailed written
manpower analysis for each task that is behind schedule. The analysis should indicate the total —
man hours required for the task and the proposed staffing.
I. As the project nears completion (around 70%) or within four months of the substantial completion _
date, the Contractor shall prepare a new CPM type completion schedule. This schedule shall
maintain the same milestones and critical path as the original schedule, but shall include more
detail to be able to track the project on a more detailed basis.
This schedule on acceptance will also be considered a contract document and shall be
updated and submitted in the same manner as the original schedule.
1.2 SUBMITTAL PROCEDURES
A. Submittals shall be processed in accordance with Sections 3.10, 3.11 and 3.12 of the General —
Conditions.
B. The Contractor shall publish shop drawings and product data on Centric Project. Submittals are _
numbered consecutively by Centric. The title of the submittal should start with the specification
section number then a brief description of the item. All submittals shall be electronic.
C. Submit color and material samples in duplicate, 1 to Owner and 1 to Design Professional. —
Samples for the Owner shall be maintained at the Contractor's trailer or site office until
completion of the project,
D. The Owner and the Design Professional shall review submittals, and the Design Professional —
shall respond as follows:
1. No Exceptions Taken —
2. Make Corrections Noted.
3. Revise and Re-Submit.
4. Rejected.
E. The Design Professional shall post reviewed shop drawing on Centric Project. _
F. Revised submittals shall be renumbered in sequence with an R-1, R-2, etc. noted for each
revision.
G. Submittals are required for the following items and additional items as required to describe the —
work:
MR—Mfg. Report SD—Shop Drawings R—For Review —
MI —Mfgr. Info PD—Product Data I —Information Only
DD—Design Data S—Sample C—Certification —
T—Test Report E— Erection Drawing
Submittal
Spec SD,PD,S,
Section Description MR,MD,MI Action Remarks
C,T,E,DD R I
01 10 00 Emergency Plan R Before
1033-16
Standard Specifications Division 1—General Requirements
Section 1033—Submittal Procedures
preconstruction
01 20 00 Schedule of Values R In 10 Days
01 30 00 Coordination Drawings E,
01 30 00 List of Key Personnel I 7 days before
preconstruction
01 30 00 Product List R
01 30 00 Subcontractor List R Within 48 hours of
award
01 30 00 Cutting and Patching R
01 30 00 Damage Survey I
Documentation
01 33 00 Construction Progress R Before
Schedule Preconstruction
Meeting
01 33 00 Product List R I Within 25 Days of
Award
01 33 00 Submittal Schedule R, I Before
Preconstruction
Meeting
01 70 00 Certification that work is R
complete
01 70 00 Record Documents R
01 70 00 0 & M Manuals R
01 70 00 Construction Keys -
01 70 00 TSB Reports -
01 75 00 Report of Equipment R
Installation
List All Items Where Submittals Are Required)
(Prepare And Insert A Complete List Of Submittals Not Specification Sections)
(Note: Design Professional may insert list with their own format)
H. The Contractor shall prepare and maintain a submittal schedule in accordance with 3.10.2 of the
General Conditions.
I. Submittal Schedule to be submitted with or prior to the first Application For Payment. The Design
Professional will review and approve the submittal schedule to serve as the basis for submittal
reviews. An updated submittal schedule shall be included with each Application For Payment.
J. Shop Drawings, Product Data and samples shall be submitted in accordance with General
Conditions 3.12. Shop Drawings will be reviewed by Owner and the Design Professional within
fourteen (14) calendar days of receipt, in accordance with the approved submittal schedule.
1033-17
Standard Specifications Division 1—General Requirements
Section 1033—Submittal Procedures
1.3 PRODUCT DATA _
A. Product Data For Review:
1. Submitted to Design Professional and Owner for review for the limited purpose of checking
for conformance with information given and the design concept expressed in the contract
documents.
B. Product Data For Information:
1. Submitted for knowledge of the Design Professional and the Owner.
C. Mark each copy to identify applicable products, models, options, and other data. Supplement
manufacturers' standard data to provide information specific to this Project.
D. Indicate Product utility and electrical characteristics, utility connection requirements, and location
of utility outlets for service for functional equipment and appliances.
E. Submit Manufacturers Safety Data Sheets with each product to be used. MSDS sheets to be
kept on file with Contractor and Owner.
F. If any products contain one of the following chemicals, the product and amount of chemical shall
be reported to the OCR; ammonium nitrate, nitric acid, nitric oxide, potassium nitrate, potassium
permanganate or sodium nitrate. The amounts of these specific chemicals must be recorded and
reported to the OCR.
1.4 SHOP DRAWINGS (Reference General Conditions 3.12)
A. Shop Drawings For Review:
1. Submitted to Design Professional and Owner for review for the limited purpose of checking —.
for conformance with information given and the design concept expressed in the contract
documents.
B. Shop Drawings For Information:
1. Submitted for knowledge of Design Professional and the Owner.
C. Indicate special utility and electrical characteristics, utility connection requirements, and location
of utility outlets for service for functional equipment and appliances.
1.5 SAMPLES
A. Samples For Review:
1. Submitted to Design Professional and Owner for review for the limited purpose of checking
for conformance with information given and the design concept expressed in the contract
documents. Samples for Owner review shall be maintained at the Contractor's job site
trailer/office until completion of the project.
B. Samples For Information:
1. Submitted for knowledge of Design Professional and the Owner.
C. Samples For Selection:
1. Submitted to Design Professional and Owner for aesthetic, color, or finish selection.
2. Submit samples of finishes from the full range of manufacturers' standard colors, textures,
and patterns for Owner selection.
D. Submit samples to illustrate functional and aesthetic characteristics of the Product, with integral
parts and attachment devices. Coordinate sample submittals for interfacing work.
E. Include identification on each sample, with full Project information.
F. Submit the number of samples specified in individual specification sections; one (1) of which will
be retained by Design Professional and one (1) by Contractor, on site, for the Owner.
1033-18
Standard Specifications Division 1—General Requirements
Section 1033—Submittal Procedures
G. Reviewed samples which may be used in the Work are indicated in individual specification
sections.
H. Samples will not be used for testing purpose unless specifically stated in the specification section.
1.6 DESIGN DATA
A. Submit for the Owner's information.
B. Submit for information for the limited purpose of assessing conformance with information given
and the design concept expressed in the Contract Documents.
1.7 TEST REPORTS
A. Submit for the Owner's information as contract administrator.
B. Submit test reports for information for the limited purpose of assessing conformance with
information given and the design concept expressed in the Contract Documents.
1.8 CERTIFICATES
A. When specified in individual specification sections, submit certification by the manufacturer,
installation/application subcontractor, or the Contractor to Design Professional, in quantities
specified for Product Data.
B. Indicate material or Product conforms to or exceeds specified requirements. Submit supporting
reference data, affidavits, and certifications as appropriate.
C. Certificates may be recent or previous test results on material or Product, but must be acceptable
to Design Professional and Owner.
1.9 MANUFACTURER'S INSTRUCTIONS
A. When Specified in individual specification sections, submit printed instructions for delivery,
storage, assembly, installation, start-up, adjusting, and finishing, to Design Professional for
delivery to Owner in quantities specified for Product Data.
B. Indicate special procedures, perimeter conditions requiring special attention, and special
environmental criteria required for application or installation.
C. Refer to Section 01400—Quality Control, Manufacturers' Field Services article.
1.10 MANUFACTURER'S FIELD REPORTS
A. Submit reports for the information to the Design Professional and the Owner.
B. Submit report in duplicate within thirty(30) days of observation to Design Professional and Owner
for information.
C. Submit for information for the limited purpose of assessing conformance with information given
and the design concept expressed in the Contract Documents.
1.11 ERECTION DRAWINGS
A. Submit drawings for the knowledge of the Design Professional and the Owner.
B. Submit for information for the limited purpose of assessing conformance with information given
and the design concept expressed in the Contract Documents.
C. Data indicating inappropriate or unacceptable work may be subject to action by the Design
Professional or Owner.
1.12 DAILY LOGS
A. Contractor shall publish copies of his daily logs that indicate number of workers on site for each
trade, weather and other specific job conditions to the OCR on Centric Project in the Project
Observations category.
1033-19
Standard Specifications Division 1—General Requirements
Section 1033—Submittal Procedures
B. Copies to be posted weekly.
1.13 GROUPING OF SUBMITTALS
A. Submittals for items that are connected or interrelated should be made at the same time to
expedite review. Contractor and Design Professional to coordinate timing when preparing the
submittal schedule.
B. Partial or incomplete submittals may be rejected without review.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTIONS
Not Used.
END OF SECTION
1033-20
Standard Specifications Division 1—General Requirements
Section 1050—Temporary Facilities and Controls
QUALITY REQUREMENTS
PART 1 GENERAL
1.1 QUALITY ASSURANCE—CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and
workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C, Should manufacturers' instructions conflict with Contract Documents, request clarification from
Design Professional before proceeding.
D. Comply with specified standards as minimum quality for the Work except where more stringent
tolerances, codes, or specified requirements indicate higher standards or more precise
workmanship.
E. Perform Work by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the
manufacturer.
G. Secure Products in place with positive anchorage devices designed and sized to withstand
stresses, vibration, physical distortion, or disfigurement.
1.2 TOLERANCES
A. Monitor fabrication and installation tolerance control of Products to produce acceptable work. Do
not permit tolerances to accumulate.
B. Comply with manufacturers'tolerances. Should manufacturers' tolerances conflict with Contract
Documents, request clarification from Design Professional before proceeding.
1.3 INSPECTION AND TESTING LABORATORY SERVICES (GC 13.5)
A. The Owner reserves the right to engage an independent testing agency for testing as outlined in
General Conditions Section 13.5 unless noted otherwise in the individual technical specifications.
B. The Contractor shall notify both the OCR and the Owner's testing agency of all tests to be
conducted a minimum of 24 hours in advance so arrangements can be made to perform tests or
observe the procedure as required.
C. Written reports shall be prepared for all testing performed by the Contractor. Reports to include
name of person performing test, type of test, date of test, results of test, specification section
requiring the test and Owner's Representative that witnessed the test. Two copies of reports
shall be given to OCR. Additional copies of all testing reports shall be included and submitted
— with the commissioning manual at project closeout.
D. Owner reserves the right to obtain the services of a testing firm for all testing by Owner as listed
in the individual technical specifications. Failure to perform these tests does not relieve the
— Contractor from his responsibility to construct the project in accordance with the contract
documents.
The Owner will have the following tests performed as outlined in the technical specifications.
1. Evaluate foundation subgrade
2. Compaction of backfill
3. Concrete strength
4. Structural steel welding
5. Metal deck welding
6. Stud welding
1050-21
Standard Specifications Division 1—General Requirements
Section 1050—Temporary Facilities and Controls
7. Pipe welding
8. Testing and balancing of mechanical systems
Note: Add, edit as required for the project.
E. If the Contractor fails to notify the Owner or the Owner's testing agency of the need for a test, the
Contractor will be responsible for all testing costs to prove the work is acceptable.F. The Contractor shall assist the Owner's testing agency and the balancer by providing personnel
and equipment as required to allow for proper access to and inspection of areas to be tested.
G. The Contractor shall provide suitable reference and control points to allow the testing company to
identify the exact location and elevation of the test being performed.
H. Testing does not relieve Contractor of his duty to perform work to contract requirements. —
I. Retesting required because of nonconformance to specified requirements shall be performed by
the same independent firm on instructions by the OCR. Payment for retesting will be charged to _
the Contractor by deducting testing charges from the Contract Price.
1.4 MANUFACTURERS' FIELD SERVICES
A. When specified in individual specification sections, require material or Product suppliers or
manufacturers to provide qualified staff personnel to observe site conditions, conditions of
surfaces and installation, quality of workmanship, start-up of equipment and test, adjust and
balance of equipment as applicable, and to initiate instructions when necessary. Services to be —
scheduled a minimum of one week in advance with Owner's Construction Representative.
B. Submit qualifications of observer to Design Professional thirty(30) days in advance of required —
observations. Observer subject to approval of Design Professional.
C. Report observations and site decisions or instructions given to applicators or installers that are
supplemental or contrary to manufacturers' written instructions. See Section 01 75 00 for start up of systems.
1.5 STATE FIRE MARSHALL
Some UNI projects are subject to review and code inspection by the State Fire Marshall's office. The
Contractor is responsible for scheduling all required inspections. All fees will be paid by UNI except
for reinspections due to failed inspections. Refer to Special Conditions for specific requirements, if —
any.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTIONS
3.1 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.
Beginning new work means acceptance of existing conditions.B. Verify that existing substrate is capable of structural support or attachment of new work being
applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Verify that utility services are available, of the correct characteristics, and in the correct locations.
3.2 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
B. Seal cracks or openings of substrate prior to applying next material or substance.
END OF SECTION
1050-22
Standard Specifications Division 1—General Requirements
Section 1050—Temporary Facilities and Controls
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
Refer to General Condition Paragraph 2.2.1, 3.3, 3.4, 3.9, 3.13, and 9.8
1.1 CONSTRUCTION AREA
A. It is the intent of the Owner to keep the construction area as inconspicuous as possible and the
campus attractive and pleasant for the public and students. The Contractor's understanding of
_. this policy and cooperation in carrying it out is vital to the successful promotion and preservation
of the Owner's property. Specific requirements are contained throughout the Contract
Documents that govern use of the site.
B. The Contractor shall limit his construction activities, including materials storage, to the areas
shown on the drawings or otherwise designated by the OCR. Contractor personnel may not enter
or use buildings or facilities adjacent to the construction site. Where the project requires work
within an existing building, contractor personnel shall be limited to the construction area
designated. The Contractor shall maintain all facility exits and passageways in a continually
usable condition and promptly inform the OCR of any activities that may interfere with exits or
passageways.
C. Smoking is not permitted anywhere on campus.
D. Limited remote storage areas on campus may be available for storage trailers or bulk material
storage. Verify availability with the Owner's Construction Representative, prior to bidding.
E. There are no areas on campus available for storage or disposal of excess excavated material. All
excess dirt shall be removed from campus.
F. Any excavated material stock piled within the construction limits for use on the project shall be
protected and maintained in a way to prevent dust or dirt from leaving the site. All stockpiles
must be stabilized to comply with SWPPP and NPDES requirements. After 14 days stockpiles
must be seeded.
G. The Owner reserves the right to have work done to comply with these site and maintenance
standards if the Contractor fails to respond to requests from the OCR the same day. Costs to
perform this work will be deducted from the Contract by Change Order in accordance with the fee
schedule at the end of this section.
H. All gas, oil and fuel tanks and vehicle fueling and maintenance areas shall be isolated from all
storm drains and capable of containing any spill.
I. Provide a plastic lined or other impervious area on site for concrete truck washout. All excess
concrete and mortar must be disposed of in this pit and removed on completion of the work.
1.2 UNDERGROUND UTILITIES
A. The Contractor shall contact Iowa One Call for both on campus and off campus utility location
services a minimum of forty-eight(48) hours prior to starting the Project(excluding weekends and
holidays), in accordance with Supplementary Conditions. The Contractor shall comply with all
standard Iowa One Call procedures for remarking and maintenance.
B. Any utility damaged by the Contractor shall be repaired immediately at no cost to the Owner.
Repairs shall be continuous until service is restored.
C. The Contractor shall document the location and elevation of all utilities uncovered during the
'— course of the work, and include their locations on the record documents.
D. No utility shall be shutdown by the Contractor. Shutdowns require a two week advance notice
minimum. Certain utilities will require long term notification based on service. The Owner will
perform all utility shutdowns and restarts.
E. The Contractor shall not assume that all utilities are shown on the drawings.
1050-23
Standard Specifications Division 1—General Requirements
Section 1050—Temporary Facilities and Controls
F. The Contractor shall keep record of the location of all utilities uncovered whether active or
abandoned and notify the OCR each time a utility is uncovered. All utilities shall be recorded on
record documents.
G. A separate set of utility record documents shall be provided to the Owner on completion of all
utility work or one month prior to substantial completion whichever comes first.
1.3 TEMPORARY ELECTRICITY A. Cost: By Owner; Contractor to connect to Owner's existing power service where directed by
Owner. Do not disrupt Owner's use of service. Owner will only pay cost of energy used in lieu of —
General Conditions section 3.4.1. Exercise measures to conserve energy.
B. Provide temporary electric feeder from existing building electrical service at location as directed.
Do not disrupt Owner's use of service.C. Complement existing power service capacity and characteristics as required.
D. Provide power outlets for construction operations, with branch wiring and distribution boxes —
located as required. Provide flexible power cords as required.
E. Provide main service disconnect and over-current protection at convenient location.
F. Permanent convenience receptacles may be utilized during construction.
1.4 TEMPORARY LIGHTING FOR CONSTRUCTION PURPOSES
A. Provide and maintain incandescent lighting for construction operations to achieve a minimum
lighting level of 2 watt/sq.ft.
B. Provide and maintain 1 watt/sq.ft. H.I.D. lighting to exterior staging and storage space areas after —
dark for security purposes.
C. Provide and maintain 0.25 watt/sq.ft. H.I.D. lighting to interior work areas after dark for security
purposes.
D. Provide branch wiring from power source to distribution boxes with lighting conductors, pigtails,
and lamps as required. —
E. Maintain lighting and provide routine repairs.
F. Permanent building lighting may be utilized during construction, if authorized by the OCR.1.5 TEMPORARY HEATING/COOLING
A. Shall NOT be required —
1.6 TEMPORARY VENTILATION
A. Shall NOT be required
1.7 TELEPHONE SERVICE
A. Provide, maintain, and pay for telephone service to field office or provide cellular phone on the
jobsite. Contact UNI Voice Services at 273-7778 to coordinate installation and billing. —
1.8 FACSIMILE SERVICE
A. Provide, maintain and pay for facsimile service to field office at time of project mobilization.Contact UNI Voice Services at 273-7778 to coordinate installation and billing.
1.9 INTERNET —
A. Provide, maintain and pay for internet connection and email service to field office. UNI will not
provide network connections for internet use, however, if available an additional phone line could
be provided. —
1.10 TEMPORARY WATER SERVICE
1050-24
Standard Specifications Division 1—General Requirements
Section 1050—Temporary Facilities and Controls
A. Connect to existing water source for construction operations at time of project mobilization.
Owner will pay cost of water used in lieu of General Conditions section 3.4.1. Exercise measures
to conserve water. Owner will indicate area of connection.
B. Extend branch piping with outlets located so water is available by hoses with threaded
connections. Provide temporary pipe insulation to prevent freezing as needed.
C. Owner has a limited supply of metered water assemblies available for attaching directly to
hydrants. Coordinate with OCR.
1.11 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Existing facility use is not permitted.
Provide at time of project mobilization. Temporary facilities must be maintained and located in a
manner to minimize potential problems. If the project has a NPDES permit, comply with the BMP
established by the plan. Facilities must be located so that if ruptured the contents would be
contained and would not enter a drain.
**** * [OR}******
A. Existing designated facilities may be used during construction operations. Maintain daily in clean
and sanitary condition.
B. At end of construction, return facilities to same or better condition as originally found. Document
preconstruction conditions as part of 1030 1.4 D video.
1.12 BARRIERS
A. Provide barriers to prevent unauthorized entry to construction area, to allow for Owner's use of
site, and to protect existing facilities and adjacent properties from damage from construction
operations and demolition.
B. Provide barricades and covered walkways to maintain public rights-of-way and for public access
to existing building.
C. Provide barriers and warning devices at the edges of all construction operations until conditions
are fully restored.
D. Protect vehicular traffic, stored materials, site, and structures from damage.
1.13 FENCING
A. Construction: Commercial grade chain link fence (with top rail where required for installation of
fabric).
B. Provide 6 foot(1.8 m) high fence around construction site; equip with vehicular and pedestrian
gates with locks. Provide key to OCR, or use Owner provided padlocks.
C. Areas designated on the plan shall have a privacy fabric attached to the fence. The Contractor
shall furnish and install the fabric and remove the fabric and fence on completion of the project.
D. Maintain all fence lines in a straight and neat condition. Adjust and repair damage as needed.
1.14 CONSTRUCTION SIGNAGE
A. When a construction project blocks or interferes with any campus access, road or sidewalk, the
Contractor shall provide temporary construction signage directing people around the obstruction
and provide suitable descriptions. Signs shall be at least 2' x 3' and located as directed by the
OCR. Signs shall indicate names of nearby buildings and directions to get to the building.
B. Contractor shall install project signs. Project signs will be purchased by UNI, Contractor shall
pick up sign, provide suitable supports and install in location as directed by the OCR.
C. No additional signage is permitted. No signage shall include the name of the Contractor(s).
1.15 WATER CONTROL
1050-25
Standard Specifications Division 1—General Requirements
Section 1050—Temporary Facilities and Controls
A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping —
equipment. Do not discharge sediment laden water on to paved surfaces or into storm water
systems. Protect all inlets as required by SWPPP and NPDES.
B. Protect site from puddling or running water. Provide water barriers as required to protect site
from soil erosion.
1.16 DUST CONTROL A. During dry periods when soil dries out and excess dust accumulates within the construction site,
the Contractor shall take appropriate measures to reduce dust and prevent dust from leaving the —
construction area.
1.17 EXTERIOR ENCLOSURES
A. Shall NOT be needed.
1.18 INTERIOR ENCLOSURES
A. Shall NOT be needed 1.19 PROTECTION OF INSTALLED WORK
A. Protect installed work and provide special protection where specified in individual specification
sections.
B. Provide temporary and removable protection for installed products. Control activity in immediate —
work area to prevent damage.
C. Provide protective coverings at walls, projections,jambs, sills, and soffits of openings.
D. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of
heavy objects, by protecting with durable sheet materials, plywood or other measures as
required. This includes concrete that will serve as the finished surface or concrete that will be _
stained. Stained or damaged concrete that serves as a finish surface will be removed and
replaced.
E. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary,
obtain recommendations for protection from waterproofing or roofing material manufacturer. As a
minimum, provide a layer of separation material and a layer of rigid walkway or work surface.
F. Prohibit traffic from landscaped areas. —
1.20 SECURITY
A. Provide security and facilities to protect work, existing facilities, and Owner's operations from
unauthorized entry, vandalism, or theft.
B. Coordinate with Owner's security program. _
C. Provide keys for all Contractor supplied locks to Owner's Construction Representative or provide
padlocks that will accept Owner's construction cores.
1.21 EXISTING FACILITIES —
A. Prior to the start of construction, the Contractor's superintendent shall inspect the construction
area and paths of travel to and from the area. If damage exists the Contractor shall notify the —
OCR and they will photograph or otherwise document conditions and existing damages if any. If
no damage is reported the existing facilities will be considered to be in good undamaged
condition. The Contractor will be responsible for repair of all damage to existing facilities prior to —.
project closeout. Provide the OCR with one copy of the damage documentation.
B. The Contractor is responsible for maintenance, protection and restoration of the site and
structures within the construction area and areas crossed over in transit to or from the —
construction area. All facilities shall be restored to original condition at completion of the work.
1050-26
Standard Specifications Division 1—General Requirements
Section 1050—Temporary Facilities and Controls
C. Protect underground utilities, tunnels and other structures from heavy equipment traffic and
storage of heavy materials. Damage to any existing utility or structure shall be repaired by the
Contractor at no expense to the Owner. If existing utilities or structures are found that are not
shown on the drawings, stop work immediately and contact the OCR.
The Contractor shall not operate any valve, switch or contact on any existing utility without prior
approval of the Owner. Generally UNI employees will open and close all utilities.
D. Lawn and landscape areas within the confines of the Contractor's operations and along both
Y sides of fence lines shall be maintained on a weekly basis to maintain an appearance similar to
the surrounding area. If the area is not maintained, the Owner reserves the right to give twenty-
four(24) hours notice of the problem and then maintain the site and deduct cost from the
Contract.
E. Any tree, shrubbery or planting damaged during construction shall be replaced by the Contractor
at no cost to the Owner.
F. No material shall be stored or vehicles parked within the drip line of trees that are to remain. All
trees within the construction limits shall be protected by snow fence or safety fence at their drip
line.
G. Trash shall be disposed of regularly and not allowed to accumulate on site. The site shall be
cleaned at least weekly of all trash, debris and construction material.
1.22 FIRE PROTECTION
A. Contractor shall familiarize himself with Owner's existing fire protection facilities including alarms,
sprinkler systems and extinguishers.
B. Existing fire alarm systems shall be maintained in operation throughout the project unless agreed
to in writing by the Owner. Temporarily cover and protect all smoke detectors in demolition areas
to prevent accidental activation and false alarms. Contractor shall notify Public Safety(273-2712)
and the Owner's Construction Representative prior to covering any detectors.
C. Any false alarms or unintentional activation of alarm systems shall be reported to UNI Police
(273-2712) immediately or Contractor will be responsible for costs in responding to the alarm.
D. Provide fire extinguishers to meet OSHA requirements or a minimum of two (2) U.L. listed
multipurpose dry chemical fire extinguishers per floor or work area, in addition to Owner's
facilities. The Contractor shall replace the Owner's extinguishers for the duration of the
construction project. The Owner's extinguishers shall be set aside for removal by Owner. Each
extinguisher shall be rated 2A20BC. Additional extinguishers may be provided to meet
Contractor's safety requirements.
E. Observe all normal fire safety practices.
F. Provide shields for all welding, cutting, burning, grinding or other spark producing activity.
G. Provide fireproof blankets or tarps as needed to protect existing and new facilities.
H. Provide fire watch personnel as needed to watch for falling sparks.
I. Observe all necessary safety precautions for flammable/volatile fluids. Do not store them in the
construction area.
J. Review use and protection of existing sprinkler and alarm systems.
K. Contractor to coordinate efforts with the approved fire safety and rescue plan. (01010, 1.41)
L. The Contractor shall, in addition to following OSHA and all other applicable safety procedures,
develop a Hot Work Permit system to exercise further control over any hot work including but not
-- limited to; welding, cutting, brazing, soldering and grinding or any other activity that has the
potential to generate heat or sparks and start a fire. In addition to the fire extinguishers, fire
blankets, and fire watch listed above the Contractor shall issue permits to the employee or
1050-27
Standard Specifications Division 1—General Requirements —'
Section 1050—Temporary Facilities and Controls
subcontractor that will be doing the work. The permit shall include as a minimum; date of issue, —"
duration of the work, specific location of the work, type of work and a checklist of hazards that
need to be monitored such as; are sources of energy isolated, fire extinguisher at the site, fire
blankets available, fire watch personnel available, fire hazards removed or controlled and other —
items as deemed necessary by the Contractor. All hot work permit areas shall be checked by the
Contractor at the end of each work day and initialed and dated.
The permit shall be signed by the person doing the work, and approved by the General '—
Contractor's superintendent. There shall also be a date time and signature spot for the
superintendent to sign on successful completion of the work. These permits shall be published on
Centric Project when the permit is issued and on completion of the work. —"
1.23 SAFETY
A. The Contractor shall observe all safety laws and regulations as noted in Article 10 of the General
Conditions.
B. The Owner has a lock-out tag-out(LOTO) and confined space (CS) procedures that the
Contractor must be familiar with. Any operations that require LOTO or CS shall be coordinated
with Owner. Contact the OCR to coordinate review of these procedures.
C. When working in existing facilities, the Contractor can review MSDS sheets for any hazardous —
material in the building by contacting the University Safety office.
1.24 ACCESS ROADS/SITE TRAFFIC
A. Construct and maintain temporary roads accessing public thoroughfares to serve construction
area.
B. Extend and relocate as work progress requires. Provide detours necessary for unimpeded traffic —"
flow.
C. Provide and maintain access to fire hydrants, free of obstructions.
D. Provide stone tire cleaners or other means of removing mud from vehicle wheels before entering
streets. Tire cleaners shall be cleaned and refreshed periodically to keep dirt from being carried
off site. Any mud inadvertently carried off site shall be removed immediately. Streets shall be —
broom cleaned to remove all dirt. Protect all inlets in the area of street access.
E. If the streets are not cleaned by 3:00 p.m., the Owner will have the streets cleaned and the costs
will be deducted from the Contract according to the schedule in Item 1.31 of this section.
F. The Owner's Construction Representative shall designate existing on-site roads that may be used
for construction traffic. —
1.25 PARKING
A. No parking on grass. —
B. No parking on sidewalks.
C. Parking needs must be addressed through UNI Police. All vehicles must be permitted through _
UNI Police. All vehicles must park in the designated remote parking lot, assigned by UNI Police.
No parking will be allowed at the site unless approved by UNI Police and the OCR.
D. Parking tickets will be issued to illegally parked vehicles. Unpaid tickets will be deducted from the —
General Contractors payment at project closeout, or more frequently if required.
1.26 PROGRESS CLEANING AND WASTE REMOVAL
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly
condition. Cleaning shall be done daily and shall include sweeping to remove all dust and dirt.
B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or
remote spaces, prior to enclosing the space.
1050-28
Standard Specifications Division 1—General Requirements
Section 1050—Temporary Facilities and Controls
C. Broom, vacuum and wipe clean all interior areas prior to start of surface finishing, and continue
cleaning to maintain area being finished free of dust.
D. Collect and remove waste materials, debris, and rubbish from site weekly and dispose off-site.
E. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate covered
—" containers.
F. If the Project or project site is not maintained in a clean condition, the Owner reserves the right to
have cleaning done. Costs will be deducted from the contract in accordance with General
Conditions Section 3.15. All debris and discarded items shall be cleaned from the site weekly.
G. When excavation and earthwork or other construction activities causes muddy conditions on site,
provisions shall be made to prevent mud from being carried off site. Any mud inadvertently
carried beyond the construction limits shall be cleaned immediately and additional provisions
made to prevent that from reoccurring.
H. Stone tire cleaners or other methods of tire cleaning shall be employed at each entrance and
shall be refreshed and reworked every time mud starts getting carried off of the construction site.
I. The Contractor shall monitor and adjust site conditions to prevent wind erosion and dust from
leaving the construction area.
J. If the Contractor fails to maintain the area adjacent to the site in a clean condition, the Owner
reserves the right to clean the area and charge the Contractor according to the fee schedule
established in Item 1.31 of this section.
1.27 USE OF ELEVATOR
A. Shall NOT be needed.
1.28 FIELD OFFICES AND SHEDS
A. Use and location of temporary offices, sheds and trailers must be approved by the Owner.
B. Locate offices and sheds as directed by Owner within the construction area as noted on the
plans.
C. The Contractor shall maintain a set of as-built documents in his field office that reflects all
changes made to the documents. These documents shall be available to the OCR during
construction and shall be turned over to the Owner at Substantial Completion.
1.29 REMOVAL OF UTILITIES, FACILITIES, AND CONTROL
A. Remove temporary utilities, equipment, facilities, materials, prior to Substantial Completion
inspection.
B. Remove underground installations to a minimum depth of 2 feet. Grade site as indicated.
C. Clean and repair damage caused by installation, use or removal of temporary work.
D. Review entire construction area and access with Owner's Construction Representative to
determine extent of damage and repairs required.
E. Restore existing and permanent facilities used during construction to original condition. Restore
new permanent facilities used during construction to specified condition.
F. Permanent building equipment used during construction shall be cleaned, all filters and
_ disposable parts replaced. Each item used during construction shall be maintained, lubricated,
adjusted and inspected by the Contractor and manufacturers representative prior to turning the
building over. A statement from the manufacturer indicating the condition of the equipment and
noting the parts that were replaced and service provided shall be submitted to the OCR. The
Contractor shall maintain a list of equipment used during construction and note the day it was
placed in service and each time it was serviced and filters replaced and provide to OCR.
1050-29
Standard Specifications Division 1—General Requirements
Section 1050—Temporary Facilities and Controls
1.30 SEDIMENT AND EROSION CONTROL
UNI has a general NPDES permit that covers all campus in addition to special project permits for
specific projects.Prior to the start of construction or any earth moving activities the contractor shall implement the
storm water pollution prevention plan (included in these documents) and install the associated _
sediment and erosion controls. When a specific project permit is required the Contractor shall also
sign the certification statement and become a co-permittee, as a co-permittee the Contractor will be
responsible for implementing and maintaining all requirements of the permit. The control measures
shall be implemented by experienced workers in accordance with the NPDES permit, and the
technical specifications.
The Contractor's superintendent shall inspect and maintain the protective measures a minimum of
once every 7 days and after every rain or snow melt. The inspection must include all disturbed areas
of the site; areas of material storage, locations where vehicles enter and exit the site, and all of the
sediment and erosion controls that were installed must be inspected.
The inspector must prepare a written report summarizing his inspection. It shall include as a minimum
1. The name and qualifications of the person making the inspection.
2. The date of the inspection
3. Identify any damages or deficiencies in the control measures _
4. Identify actions taken to correct the problems found.
5. Identify what actions will be taken to modify procedures.
6. Include the following certification statement signed by an officer of the contracting company.
Inspection Report Certification Statement
"I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or —
persons who manage the system or those persons directly responsible for gathering the information,
the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I
am aware that there are significant penalties for submitting false information, including the possibility
of fine and imprisonment for knowing violations.
Signed and certified copies of these reports shall be submitted to the OCR. Payments will be withheld
if inspection reports are not current. _.
Maintenance of required controls and facilities shall be recorded. This can be accomplished on the
periodic reports. The contractor shall also keep a log of construction activity on site including:
1. The dates when major grading activities occur
2. The dates when construction activity ceases in an area and if it is temporary or permanent.
3. The dates when an area is stabilized either temporarily or permanently.
Copies of these records shall be provided to the OCR on a monthly basis, with the application for
payment and the updated schedule. —
If the Storm Water Pollution Prevention plan is not working the contractor shall work with the Design
Professional to immediately address the defects and make corrections to the plan as needed. The
Contractor shall be responsible for complying with all requirements of the plan and regulations. —
The Contractor is liable for all fines or penalties levied against the Owner due to violation of NPDES
regulations and environmental requirements due to construction activities. The Contractor shall
report any hazardous condition in accordance with Iowa law.
1050-30
Standard Specifications Division 1—General Requirements
Section 1050—Temporary Facilities and Controls
The Contractor shall maintain all sediment and erosion control measures in place until the site is
stabilized and approved.
At project closeout the Contractor shall furnish a complete set of documents covering inspections,
maintenance, construction activities and a copy of the Notice of Discontinuation for the project to the
OCR.
1.31 FEE SCHEDULE
First Violation $250.00/ea.
Second Violation $500.00/ea.
Subsequent Violations $1,000.00/ea. or per day
The above fees apply to all violations of NPDES permits including but not limited to the following;
Dirt on street.
Concrete truck washout not in approved area.
Failure to provide stabilization.
Failure to inspect and report.
Failure to protect inlets.
Failure to provide temporary stabilization of stockpiles and inactive areas.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTIONS
Not Used.
NOTE: Consultant to include written SWPPP here including all applicable best management
practices to be followed by the Contractor.
END OF SECTION
1050-31
Standard Specifications Division 1—General Requirements
Section 1060—Product Requirements
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.1 PRODUCTS
A. Do not use materials and equipment removed from existing premises, except as specifically
permitted by the Contract Documents.
B. Provide interchangeable components of the same manufacture for components being replaced.
1.2 TRANSPORTATION AND HANDLING
A. Transport and handle products in accordance with manufacturer's instructions.
B. Contractor shall be responsible for receiving all shipments of materials to the job site. Shipments
will not be accepted by Owner.
C. Promptly inspect shipments to ensure that products comply with requirements, quantities are
correct, and products are undamaged.
D. Provide equipment and personnel to handle products by methods to prevent soiling,
disfigurement, or damage.
1.3 STORAGE AND PROTECTION
A. Store and protect product in accordance with manufacturer's instructions.
B. Store with seals and labels intact and legible.
C. Store all hazardous or potentially hazardous materials with provision for secondary containment
to prevent pollution of ground or water. Provide MSDS sheets to OCR and maintain copy on site.
D. Store sensitive products in weathertight, climate controlled, enclosures in an environment
favorable to product.
E. For exterior storage of fabricated products, place on sloped supports above ground.
F. Provide off-site storage and protection when site does not permit on-site storage or protection.
G. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to
prevent condensation and degradation of products.
H. Store loose granular materials on solid flat surface in a well-drained area. Prevent mixing with
foreign matter.
I. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement,
or damage.
J. Arrange storage of products to permit access for inspection. Periodically inspect to verify
products are undamaged and are maintained in acceptable condition.
1.4 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Any Product meeting those
standards or description.
B. Products Specified by Naming One or More Manufacturers: Products of manufacturers named
and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions:
Submit a request for substitution for any manufacturer not named in accordance with the
following article.
D. Products specified by naming one manufacturer as the basis of design with other manufacturers
as potential acceptable alternates. Products of other manufacturers must be approved to be
equal to the basis of design product.
1060-32
Standard Specifications Division 1—General Requirements
Section 1060—Product Requirements
1.5 SUBSTITUTIONS
A. Design Professional will consider requests for Substitutions only prior to bid as outlined in Article
12 of Instructions to Bidder.
B. After receipt of bids, substitutions may be considered when a Product becomes unavailable
through no fault of the Contractor or if it is an advantage, in cost or time, to the Owner.
C. Document each request with complete data substantiating compliance of proposed Substitution
with Contract Documents.
D. A request constitutes a representation that the Contractor:
1. Has investigated proposed Product and determined that it meets or exceeds the quality level
of the specified Product.
2. Will provide the same warranty for the Substitution as for the specified Product.
3. Will coordinate installation and make changes to other Work which may be required for the
Work to be complete with no additional cost to Owner.
4. Waives claims for additional costs or time extension which may subsequently become
apparent.
5. Will reimburse Owner and Design Professional for review or redesign services associated
with re-approval by authorities.
E. Substitutions will not be considered when they are indicated or implied on shop drawing or
product data submittals, without separate written request, or when acceptance will require
revision to the Contract Documents.
F. If substitutions are made on shop drawings without formal notification and request, the Contractor
will be liable for removal and replacement with originally specified product.
G. Proposed Post Bid Substitution Submittal Procedure;
1. Submit three (3) copies of request for Substitution, two (2) copies to Design Professional and
one (1) copy to Owner, for consideration. Limit each request to one proposed Substitution.
2. Submit shop drawings, product data, and certified test results attesting to the proposed
product equivalence. Burden of proof is on Contractor.
3. Indicate advantage to Owner if substitution is allowed, including cost and/or time savings.
4. The Design Professional will notify Contractor in writing of decision to accept or reject
request.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTIONS
Not Used.
END OF SECTION
1060-33
Standard Specifications Division 1—General Requirements
Section 1070—Execution and Closeout Requirements
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 1 GENERAL
1.1 CLOSEOUT PROCEDURES
A. Contractor shall submit written certification to the Design Professional and OCR that Contract
Documents have been reviewed, work has been inspected, and that work is complete in
accordance with Contract Documents and ready for Design Professional review in accordance
with Article 9.6 of the General Conditions. Submit a list of known incomplete items.
B. Provide marked up contract documents as outlined in Item 1.4 to reflect as-built conditions along
with the request for inspection.
C. Provide electronic copies of 0 & M manuals with warranties as outlined in Item 1.5 to Design
Professional and Owner for review.
D. Provide two (2) copies of the commissioning manual as outlined in Item 1.6 to the OCR.
E. Provide one copy of all warranties bound and indexed in a three ring binder.
F. Return all construction keys. Furnish all TSB reporting data.
G. Owner will occupy portions of the building as specified in Section 01 10 00.
H. Conduct a post construction survey with OCR to evaluate conditions. Any damage found as a
result of the construction operations shall be repaired at no cost to Owner.
1.2 FINAL CLEANING
A. Execute final cleaning prior to final project assessment and occupancy. Cleaning shall be
performed by a commercial cleaning company to the standard normally expected in office
cleaning.
B. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces.
Wipe clean all hard surfaces.
C. Scrub clean all hard surface floors. Apply four coats of S.C. Johnson Carefree—wax/sealer to all
newly installed concrete and vinyl floors.
D. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the
surface and material being cleaned.
E. Replace filters of operating equipment.
F. Clean all ducts &equipment used during construction, review with OCR.
G. Clean debris from roofs, gutters downspouts, and drainage systems.
H. Clean site; sweep paved areas, rake clean landscaped surfaces.
I. Remove waste and surplus materials, rubbish, and construction facilities from the site.
J. Remove all tire marks from curbs and sidewalks.
K. Once the Owner has occupied all or a part of the project area, all additional required cleaning will
be provided by the Owner, unless specifically noted in the punchlist.
1.3 ADJUSTING
A. Adjust operating Products and equipment to ensure smooth and unhindered operation.
1.4 PROJECT RECORD DOCUMENTS
A. Maintain one set of the following record documents; record actual revisions to the work:
1. Drawings
1070-34
Standard Specifications Division 1—General Requirements
Section 1070—Execution and Closeout Requirements
2. Specifications—indicate actual material used.
3. Change Orders and other modifications to the Contract including RFI's, PR's, CCD's and
—' SI's.
4. Required documentation for NPDES.
5. Shop Drawings—one set of all submittals with field changes marked.
B. Ensure entries are complete and accurate, enabling future reference by Owner.
C. Record information concurrent with construction progress.
D. Specification: Legibly mark and record at each Product section description of actual Products
installed, including the following:
1. Manufacturer's name and product model and number.
_ 2. Product substitutions or alternates utilized.
E. Record Drawings: Legibly mark each item to record actual construction including:
1. Measured depths of foundations in relation to finish first floor datum.
2. Measured horizontal and vertical locations of underground utilities and appurtenances,
referenced to permanent surface improvements.
3. Measured locations of internal utilities and appurtenances concealed in construction,
referenced to visible and accessible features of the work.
4. Field changes of dimension and detail.
5. Details not on original Contract drawings.
_ 6. Record in detail all clarifications and changes that have occurred throughout the course of the
project. Written description are not adequate, drawings should be marked graphically.
F. Submit all record documents to OCR prior to request for substantial completion inspection.
1.5 OPERATION AND MAINTENANCE DATA
A. Submit 0 & M manuals electronically for review by Design Professional and Owner.
B. Prepare manual to include a cover with printed title "OPERATION AND MAINTENANCE
INSTRUCTIONS", title of project and subject matter of binder when multiple binders are required.
C. Internally subdivide the manual contents with permanent page dividers, logically organized as
described below.
D. Contents: Prepare a Table of Contents for each volume, with each Product or system description
identified in three parts as follows:
1. Part 1: Directory, listing names, addresses, and telephone number of Design Professional,
Contractor, Subcontractors, and major equipment suppliers. Identify the proper contact
person for warranty work on each piece of equipment.
2. Part 2: Operation and maintenance instructions arranged by system and subdivided by
specification section. For each category, identify names, addresses, and telephone numbers
of Subcontractors and suppliers. Identify the following:
a. Significant design criteria
b. List of equipment
c. Parts list for each component
d. Operating instructions
e. Maintenance instructions for equipment and systems
1070-35
Standard Specifications Division 1—General Requirements
Section 1070—Execution and Closeout Requirements
f. Maintenance instructions for special finishes, including recommended cleaning methods
and materials, and special precautions identifying detrimental agents.
3. Part 3: Project documents and certificates, including the following:
a. Shop drawings and product data
b. Air and water balance reports
c. Certificates d. Originals of warranties and bond
E. Submit an initial electronic copy of completed volumes sixty (60) days prior to substantial
completion to the OCR and Design Professional for review. Prior to Substantial Completion,
comments will be returned for corrections. Revise content of all as required prior to final
acceptance.
F. Submit a new electronic copy and one hard copy of final volumes, incorporating all comments
received, within ten (10) days after substantial completion inspection.
1.6 COMMISSIONING MANUAL
A. Submit information bound in 3 ring binders of appropriate size with durable plastic covers.
B. Prepare a table of contents.
1. UNI standard commissioning forms.
2. Record of all required testing.
3. Attendance sheets for all Contractor provided training.
4. Cover up review sheets.
C. Each section to be separated by tabs.
D. Submit one (1) copy prior to request for substantial completion.
1.7 SUBSTANTIAL COMPLETION
A. The Contractor's one year warranty and all other manufacturer's warranties will go into effect on
the date of Substantial Completion.
B. When all project documentation is submitted including record documents, 0 & M manuals and
commissioning manuals and the work is substantially completed and ready for Owner occupancy
the Contractor may request a final observation. With the request, the Contractor shall prepare
and submit a comprehensive list of incomplete items to be completed or corrected including the
date each item will be completed or corrected. The Contractor shall continue his work while the
Owner and Design Professional schedule and conduct a final observation to determine if the work
is substantially complete. If the Contractor's list is not accurate the Owner may elect to stop
inspection until an accurate list is provided.
C. If the Contractor's list or the inspection contain a significant amount of items that in the opinion of
the Owner and Design Professional can not be completed in the standard 30 day time frame the
project will not be considered to be substantially complete. The inspection may be completed for
record purposes but a certificate will not be issued and the warranties will not go into effect.
1.8 OWNER OCCUPANCY
A. The date identified in the contract is critical to the Owners use of the facility. If an inspection is
made and the project is not determined to be substantially complete the Owner may still use or
occupy all or a portion of the facility as needed to maintain its operations. The list of incomplete
items will be issued to record conditions prior to Owner occupancy. An agreement will be made
between the Owner and Contractor outlining the responsibilities assigned to each of them for
payments, retainage, security, maintenance, heat utilities, damage to the work and insurance.
1070-36
Standard Specifications Division 1—General Requirements
Section 1070—Execution and Closeout Requirements
B. The Contractor shall continue to complete the work and items contained on the observation
report. When the Contractor feels that he has completed the punchlist or the work has
progressed to the point where he believes it to be substantially complete he should review and
sign off all items that he believes are complete and request a final inspection. The Contractor
should continue to complete the work while the Owner and Design Professional schedule and
conduct an observation.
C. When the Owner and Design Professional have completed their observation and found the
project to be substantially complete a Certificate of Substantial Completion will be issued with the
punchlist attached of items to be corrected.
1.9 SPARE PARTS AND MAINTENANCE PRODUCTS
_ A. Provide spare parts, maintenance, and extra Products in quantities specified in individual
specification sections.
B. Prepare a receipt form for signature of OCR that lists all spare parts and extra materials provided
to the Owner.
C. All materials shall be delivered to a designated location and turned over to OCR prior to final
acceptance.
D. Include copies of all signed receipts with the closeout documents.
1.10 WARRANTIES AND BONDS
A. Provide one (1) notarized copy.
B. Execute and assemble transferable warranty documents from Subcontractors, suppliers, and
manufacturers.
C. Provide Table of Contents and assemble in suitable binder of appropriate size with durable plastic
cover.
D. Submit prior to final Application for Payment.
E. For items of work delayed beyond date of Substantial Completion, provide updated submittal
within ten (10) days after acceptance, listing date of acceptance as start of warranty period.
1.11 REDUCTION OF RETAINAGE
A. At any time, 30 days or more after Substantial Completion the Contractor can request a
Reduction in Retainage based on the amount of work remaining to be completed. The Contractor
shall request in writing by submitting a revised Application for Payment, a completed Consent of
— Surety to Reduction in Retainage form and lien waivers from all subcontractors and an updated
copy of the current punchlist with completed items checked off.
B. On receipt of this information the Owner and Design Professional shall schedule a follow up
inspection of punchlist items. On completion of the inspection, an updated punchlist will be
prepared with values assigned to all items that have not been satisfactorily completed. Values
— will be 200% of the estimated cost to complete the item, including Owner's cost.
1.12 PROJECT COMPLETION
A. The Design Professional and Owner will conduct on-site observations for the purpose of closing
out the project. The first observation will be scheduled when the Contractor completes all
requirements for the project to be considered to be Substantially Complete. The Contractor will
notify both the Owner and the Design Professional that the project is substantially complete. At
—" that time the Contractor shall provide a list of items that he knows are not complete along with
dates when they will be completed in accordance with Section 9.6.
B. If the second observation finds that the items were not successfully completed the Owner and
Design Professional will establish a date where all work must be completed. An additional
observation will be conducted on that date to verify completion. If the items are still not complete
1070-37
Standard Specifications Division 1—General Requirements —
Section 1070—Execution and Closeout Requirements
the Owner reserves the right to complete the punchlist without further notice to the Contractor or —
their Surety.
C. Cost for additional observations required due to: failure to complete punchlist items, failure to be
substantially complete when requesting the observation or any other reason that requires —
additional observations by any of the Design Professionals will be the Contractor's responsibility.
1.13 FINAL ACCEPTANCE
A. On successful completion of all punchlist items the Contractor shall submit a Final Application for
Payment in accordance with Section 9.8 of the General Conditions. A consent of surety to
release of retainage form along with final lien waivers and any other close out documentation not
previously submitted.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTE
Commissioning forms are available at UNI Facilities Services website at
www.vpaf.uni.edu/fs/contractinfo/procedures manual.shtml and the cover-up review form is available
at www.vpaf.uni.edu/fs/organization/staff resources.shtml or from the project OCR. —
END OF SECTION
1070-38
Standard Specifications Division 1—General Requirements
Section 1080—Starting and Adjusting
STARTING AND ADJUSTING
PART 1 GENERAL
1.1 STARTING SYSTEMS
A. Coordinate schedule for start-up of equipment and systems with the OCR and Design
Professional. The Contractor shall make every effort to combine start ups of various systems
and coordinate with regular progress meetings to minimize trips required by the Design
Professional.
B. Notify Design Professional and OCR a minimum of seven (7) days prior to start-up of each item.
C. Verify that each piece of equipment or system has been checked for proper lubrication, drive
rotation, belt tension, control sequence, and for conditions which may cause damage.
D. Verify tests, meter readings, wiring and specified electrical characteristics agree with those
required by the equipment or system manufacturer.
E. Verify that support components for equipment are complete and tested.
F. Execute start-up under supervision of applicable manufacturer's representative in accordance
with manufacturers' instructions.
G. Manufacturer to provide authorized representative to be present at site to inspect, check, and
approve equipment or system installation prior to start-up, and to supervise placing equipment or
system in operation. Coordinate with OCR.
H. Submit a written report to the OCR that equipment or system has been properly installed and is
functioning correctly. Report should include start-up checklist as noted above and any other
pertinent information.
I. Complete the Owner's commissioning forms as required for each system.
J. Contractor shall develop a sign off sheet for each piece of equipment that is started, indicate the
name of the equipment, date, and a list of all those present for training and startup and whether
the equipment was left running or was shut down. OCR, the Area Mechanic and the Design
Professional must be present for all start ups. Those present shall complete the Owner's
standard commissioning form.
K. Equipment that does not require training according to part 1.2 shall also be started and listed by
Contractor.
1.2 DEMONSTRATION AND INSTRUCTIONS
A. Demonstrate operation and maintenance of Products to Owner's personnel a minimum of two
weeks prior to date of Substantial Completion. Notify OCR and Design Professional a minimum
of one week prior to date of instruction, to allow for coordination of affected personnel.
B. Demonstrate project equipment by a qualified manufacturers' representative who is
knowledgeable about the project and knowledgeable about recommended maintenance, testing
and trouble shooting.
C. For equipment or systems requiring seasonal operation, perform demonstration for other season
within six months.
D. Utilize operation and maintenance manuals as basis for instruction. Review contents of manual
with Owner's personnel in detail to explain all aspects of operation and maintenance.
E. Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance,
and shutdown of each item of equipment at scheduled time at equipment location. Contractor
shall assist UNI personnel with completion of equipment maintenance forms.
F. Prepare and insert additional data in operations and maintenance manuals when need for
additional data becomes apparent during instruction.
1080-39
Standard Specifications Division 1—General Requirements —
Section 1080—Starting and Adjusting
G. The minimum amount of time required for instruction on each item of equipment and system is that specified in individual sections or as recommended by the manufacturer, whichever is
greater.
H. Contractor shall prepare sign-in sheets for each training session listing; project, system,
Contractor, manufacturer's representative, OCR and length of time for training. Each sheet shall
be signed and dated by the Owner and Contractor. All sign-in sheets shall be submitted with 0
& M manuals.I. Training shall be provided to designated Owner personnel for each item or system as noted
below. (Edit list to suit project)
Electronic Speed Controllers—Testing &troubleshooting procedures.
VAV's—Testing &troubleshooting procedures.
HVAC Pumps—Recommended maintenance—disassembly procedures.
Water Softeners—Testing, recommended maintenance&troubleshooting procedures.
Building Automation and Automatic Temperature Control Systems—See attached description of
training requirements we would like implemented for Energy Conservation, HVAC, and Area
Maintenance personnel. —
Electronic Reheat Valves—Testing &troubleshooting procedures.
Mixing Valves—Troubleshooting procedures. —
Thermostatic Mixing Valves—Troubleshooting procedures.
Air Dryers—Recommended maintenance& repair procedures.
Chillers—Sequence of operation, testing, recommended maintenance, and troubleshooting
procedures.
Air Handling Units— Recommended maintenance. —
Smart Breakers/Lighting Controls—Testing procedures, recommended maintenance, &
troubleshooting procedures. —
Electric Panels/Breakers/Emergency Panels—Training on physical locations, and what they
supply.
Fire Alarm Panels—Training on physical locations, and what they supply. Technology updates
where applicable.
Elevators—Recommended maintenance, &testing procedures. Technology updates where —
applicable.
Generators— Recommended maintenance, &testing procedures. Technology updates where
applicable. —'
De-superheaters—Troubleshooting procedures, recommended settings.
Instantaneous Hot Water Heaters— Recommended maintenance &troubleshooting procedures. —
Humidifiers—Recommended maintenance, testing and troubleshooting procedures.
Electric Meters —
Sewer Ejector Pumps
Fume Hoods, Kitchen Exhaust, Dust Collectors &Other Specialty Exhaust. —
Heat Recovery Systems
Heat Exchangers —
1080-40
Standard Specifications Division 1—General Requirements
Section 1080—Starting and Adjusting
1.3 TESTING, ADJUSTING,AND BALANCING
(Note: review with Owner on small project balancing can be in the contract.)
A. Owner will select and pay for an independent firm to perform testing, adjusting, and balancing.
B. The independent firm will perform services specified in Section 15990.
C. Contractors shall cooperate with and assist balancing firm in performance of their work on a
continuous basis, providing personnel and equipment as required to allow for proper access to
the work.
D. The mechanical, electrical and controls contractors shall each have a representative available to
the balancing contractor full time for a minimum of two days as selected by the balancing
_ contractor in addition to the periodic assistance mentioned above.
E. Reports will be submitted by the independent firm to the Design Professional and Owner,
indicating observations and results of tests and indicating compliance or noncompliance with the
requirements of the Contract Documents.
1.4 COMMISSIONING MANUAL
— A. The Contractor shall assemble copies of all test results, commissioning forms completed by the
Contractor, reports, sign off sheets, start-up documentation, training data and any other
information related to starting equipment into a 3 ring binder with sections tabbed for each
— system or piece of equipment.
B. Copies of manual to be submitted as part of project closeout. 01 70 00
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTIONS
Not Used.
END OF SECTION
1080-41
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgrade, and Subbase
EARTHWORK,SUBGRADE, AND SUBBASE
PART 1 —GENERAL
1.01 SECTION INCLUDES
A. Clearing and Grubbing
B. Earthwork, Excavation, and Embankment Construction
C. Subgrade Preparation
D. Subbase Construction
E. Topsoil
1.02 DESCRIPTION OF WORK
Excavate and construct embankments, subgrades, and subbases.
1.03 SUBMITTALS
Follow the General Provisions(Requirements) and Covenants, as well as the followiig:
Submit results of Standard Proctor and in-place density tests on compactions when -equired.
1.04 SUBSTITUTIONS
Follow the General Provisions (Requirements) and Covenants.
1.05 DELIVERY, STORAGE, AND HANDLING
Follow the General Provisions (Requirements) and Covenants.
1.06 SCHEDULING AND CONFLICTS
Follow the General Provisions(Requirements) and Covenants.
1.07 SPECIAL REQUIREMENTS
If impractical, or if scheduling does not allow the removal of utilities before excavatioi, work
around the utilities.
1.08 MEASUREMENT AND PAYMENT
A. Clearing and Grubbing by Units: The quantity of clearing and grubbing will be the quantity,
in units, shown in the contract documents.
1. Measurement:
a. Trees 6 inches in diameter or greater will be counted and the circumferer ce will be
measured at a height of 18 inches above the ground. The diameter will be calculated by
measuring the circumference to the nearest inch and dividing by 3.14. See Table 2010.01
for identification of units per tree for clearing, grubbing, and clearing and grubbing.
b. Stumps 6 inches in diameter or greater will be counted and the diameter, in inches,
calculated by determining the average diameter at cutoff. See Table 2010.01 for
identification of units per stump for grubbing.
c. Logs and down timber 6 inches in diameter or greater will be measured at a point 18
inches from the end of the log with greatest diameter or 18 inches from the base of the
tree for down timber for clearing.
d. Hedge rows will be measured in linear feet and converted to units using a rate of 30 units
per 100 linear feet of hedge row.
e. Brush will be measured in square feet and converted to units by using a rate of 0.8 units
per 100 square feet of brush.
f. Growing corn will be measured in square feet and converted to units by using a rate of
0.2 units per 100 square feet of growing corn.
g. Vegetation removal will not be measured for payment.
2010—pg 1
Standard Specifications Division 2-Earthwork
Section 2010- Earthwork,Subgrade,and Subbase
1.08 MEASUREMENT AND PAYMENT(Continued)
h. Field fence removal, included in clearing and grubbing, will be measured in stations and
converted to units at a rate of 6.0 units per station of fence.
For each tree or stump counted as identified in Items a, b, and c, units will be determined
as identified in the following table:
Table 2010.01: Tabulation of Units for Removal of Trees and Stumps
Unit
Size Diameter
Clearing Grubbing Clearing and Grubbing
Over 6 in. to 9 in. incl. 1.1 2.8 3.9
Over 9 in. to 12 in. incl. 1.9 4.8 6.7
Over 12 in. to 15 in. incl. 2.8 6.6 9.4
Over 15 in. to 18 in. incl. 4.7 8.8 13.5 Over 18 in. to 24 in. incl. 8.4 13.6 22.0
Over 24 in. to 30 in. incl. 11.4 17.6 29.0
Over 30 in. to 36 in. incl. 22.0 28.0 50.0
Over 36 in. to 42 in. incl. 30.0 50.0 80.0
Over 42 in. to 48 in. incl. 40.0 80.0 120.0
Over 48 in. to 60 in. incl. 60.0 100.0 160.0 Over 60 in. to 72 in. incl. 80.0 120.0 200.0
Over 72 in. 120.0 160.0 280.0
I
2. Payment: Payment will be at the unit price per unit.
3. Includes: Unit price includes, but is not limited to, placement of backfill in area where
roots have been removed, and removal and disposal of all materials.
B. Clearing and Grubbing by Area:
1. Measurement: Measurement will be the area in acres based on the area shown in the
contract documents, computed from a need line, or computed from a right-of-way line if
the limits are not shown for this item in the contract documents.
2. Payment: Payment will be at the unit price per acre.
3. Includes: Unit price includes, but is not limited to, removal and disposal of all materials
and placement of backfill in area where roots have been removed.
C. Clearing and Grubbing by Lump Sum:
1. Measurement: Lump sum item; no measurement will be made.
2. Payment: Payment will be the contract lump sum price.
D. Topsoil:
1. On-site Topsoil:
a. Measurement: Measurement will be in cubic yards of topsoil stripped, salvaged, and
spread, and will be computed on the basis of a uniform 8 inch finished thickness, or as
specified.
b. Payment:
2010-pg2
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgrade, and Subbase
1.08 MEASUREMENT AND PAYMENT(Continued)
1) Payment will be at the unit price per cubic yard.
2) Topsoil salvaged from excavated areas and paid as topsoil will not be included in
excavation quantities for which payment is made.
3) Overhaul will not be paid.
2. Compost-amended Topsoil:
a. Measurement: Measurement will be the same as for on-site topsoil.
b. Payment: Payment will be the unit price per cubic yard.
c. Includes: This work includes, but is not limited to, furnishing and incorporating
compost.
3. Off-site Topsoil:
a. Measurement: Measurement will be in cubic yards for furnishing, excavating,
hauling, and incorporating the material.
b. Payment: Payment will be at the unit price per cubic yard.
E. Class 10, Class 12, or Class 13 Excavation:
1. Measurement:
a. Measurement for Class 10, Class 12, and Class 13 material excavated from the
project site and borrow areas will be the plan quantity in cubic yards, without final
field measurement. Adjustments may be made to the plan quantities if agreed to by
both the Engineer and the Contractor.
b. If either the Contractor or the Engineer desires actual measurements rather than
using contract document quantities, that party must provide written notice to the other
party prior to starting work.
1) If actual measurements are used, use cross-section surveys by the Engineer
before and after work for the basis of computing the cubic yards of e)cavation.
The extra survey cost will be paid by the party requesting the survey.
2) When the Engineer determines it is impractical to make cross-sectior surveys,
use the truck count method, with a shrinkage factor, resulting in volume per truck
type and size determined by the Engineer. Unless otherwise specified, use a
shrinkage factor of 1.35 for Class 10 and Class 13 excavation. No shrinkage
factor will be used for Class 12.
2. Payment:
a. Payment will be at the unit price per cubic yard.
b. Payment will not be made for excavation work done prior to the staking and, if
necessary, cross-sectioning.
_ 3 Includes, but is not limited to:
a. Site preparation for, and the construction of, embankment, fills, shoulder backfill, and
backfill behind curbs.
b. Overhaul.
c. Finishing the soil surface, including roadways, shoulders, behind curbs, s de ditches,
slopes, and borrow pits.
d. Repair or replacement of any fences that have been unnecessarily damaged or
— removed.
e. Compaction testing, as specified in the contract documents.
4. Does not include: Stripping, salvaging, and spreading 8 inches of topsoil, unless
otherwise specified in the contract documents.
F. Below Grade Excavation (Core Out): If unsuitable or unstable soil is encountered below
the 12 inches of subgrade, measurement and payment for removal and replacement of such
materials is as follows:
1. Measurement: Will be measured and paid as extra work, unless otherwise specified in
2010—pg 3
Standard Specifications Division 2—Earthwork —'
Section 2010- Earthwork,Subgrade, and Subbase
1.08 MEASUREMENT AND PAYMENT(Continued)
the contract documents.
2. Payment: To be considered for payment, the Engineer must order the removal and
replacement of the material. Payment will be considered only in previously undisturbed
areas and not in existing embankments or following proof rolling operations.
3. Includes: Payment includes, but is not limited to, equipment, tools, labor, disposal of
unsuitable materials, dewatering, drying, furnishing, and placement of foundation
materials as required by the Engineer, compaction and finishing of the excavated area,
and all incidental work as may be required.
G. Subgrade Preparation:
1. Measurement: The area of the proposed pavement under which the subgrade
preparation is performed, plus 2 feet on each side, will be measured in square yards.
2. Payment: Payment will be at the unit price per square yard.
3. Includes: Work includes, but is not limited to, excavating, manipulating, replacing,
compacting, and trimming to the proper grade.
H. Subgrade Treatment:
1. Measurement: The area of the proposed pavement under which subgrade treatment is
provided, plus 2 feet on each side, will be measured in square yards.
2. Payment:
a. Payment will be at the unit price per square yard for each type used.
b. Payment is in addition to subgrade preparation.
3. Includes: Work includes, but is not limited to, furnishing, placing, and incorporating the
subgrade treatment material [cement, asphalt, fly ash, lime, geogrid (type), or
geotextiles].
I Subbase:
1. Measurement: The area of the proposed pavement under which subbase is provided,plus 2 feet on each side, will be measured in square yards.
2. Payment: Payment will be at the unit price per square yard.3. Includes: Work includes, but is not limited to, furnishing, placing, compacting, and
to the proper grade.
J. Removals:
1. Structures:
a. Measurement: Each specified structure removed will be counted.
b. Payment: Payment will be at the unit price for each specified structure removed.
c. Includes: Unit price includes, but is not limited to, removal and disposal of
structures.
2. Culverts:
a. Known Box Culverts:
1) Measurement: Each type and size of box culvert removed will be measured in
linear feet from end to end along the centerline of the flowline.
2) Payment: Payment will be at the unit price per linear foot for each type and size
of box culvert removed.
3) Includes: Unit price includes, but is not limited to, removal and disposal of box
culverts.
b. Unknown Box Culverts: Removal of unknown box culverts will be measured and paid
as extra work.
2010—pg4
Standard Specifications Divisic,n 2—Earthwork
Section 2010- Earthwork,Subgrade, and Subbase
1.08 MEASUREMENT AND PAYMENT(Continued)
c. Known Pipe Culverts:
1) Measurement: Each type and size of pipe culvert removed will be measured in
linear feet from end to end at the flowline.
2) Payment: Payment will be at the unit price per linear foot for each type and size
of pipe culvert removed.
3) Includes: Unit price includes, but is not limited to, removal and disposal of pipe
culverts.
d. Unknown Pipe Culverts: Removal of unknown pipe culverts will be measured and
paid as extra work.
3. Pipes and Conduits:
a. Known Pipes and Conduits:
1) Measurement: Each type and size of pipe and conduit removed will be
measured in linear feet from end to end.
2) Payment: Payment will be at the unit price per linear foot for each type and size
of pipe and conduit removed.
3) Includes: Unit price includes, but is not limited to, removal, disposal, and
plugging, if specified, of pipes and conduits.
4) Abandoned Private Utilities: Removal of all private utility lines is the
responsibility of the respective utility agency, and will not be measured or paid.
b. Unknown Pipes and Conduits: Removal of unknown pipes and conduits will be
measured and paid as extra work.
4. Pavement: Comply with Section 7040.
K. Filling and Plugging of Pipe Culverts, Pipes, and Conduits:
1. Known pipe culverts, pipes, and conduits:
a. Measurement: Each type and size of pipe culvert, pipe, and conduit filled and
plugged will be measured in linear feet from end to end.
b. Payment: Payment will be at the unit price per linear foot for each type ald size of
pipe culvert, pipe, and conduit filled and plugged.
c. Abandoned Private Utilities: Filling and plugging of all private utility lines is the
responsibility of the respective utility agency, and will not be measured or paid.
2. Unknown pipe culverts, pipes, and conduits: Filling and plugging of unknown pipe
culverts, pipes, and conduits will be measured and paid as extra work.
L. Compaction Testing:
1. The Contractor will not be responsible for compaction testing or payment unless
otherwise specified in the contract documents.
2. If the contract documents specify that the Contractor is responsible for compaction
testing, performed by an independent testing laboratory hired by the Contractor,
measurement and payment will be as follows:
a. Measurement: Lump sum item; no measurement will be made.
— b. Payment: Payment will be the contract lump sum price.
3. The Contractor will be responsible for payments associated with all retesting -esulting
from failure of initial tests.
2010—pg5
Standard Specifications Division 2—Earthwork mm
Section 2010- Earthwork,Subgrade,and Subbase
PART 2-PRODUCTS
2.01 TOPSOIL
Use suitable topsoil of uniform quality, free from hard clods, roots, sod, stiff clay, hard pan, stones larger than 1 inch (1/2 inch for turfgrass seeding), lime cement, ash, slag, concrete, tar residue,
tarred paper, boards, chips, sticks, or any undesirable material.
Use on-site topsoil, unless compost-amended or off-site topsoil is specified.
A. On-site Topsoil: On-site topsoil material is material excavated from the top 12 inches of the
site. Use of on-site topsoil material is subject to the Engineer's approval.
B. Compost-amended On-site Topsoil: Amend low-quality on-site topsoil, not meeting the
requirements specified for off-site topsoil, with a minimum of 1 inch of compost for every 3
inches of topsoil. Use compost meeting the requirements of mulch for pneumatic seeding in Section 9010, 2.07.
C. Off-site Topsoil: Contains at least 3% organic matter, according to ASTM D 2974, has a
high degree of fertility, is free of herbicides that prohibit plant growth, has a pH level between
6.0 and 8.0, and meets the following mechanical analysis requirements:
Sieve Percent Passing
1" 100
95*to 97*
%" 40 to 60
No. 100 40 to 60
No. 200 10 to 30
*100%for turfgrass
The Engineer will approve the source of off-site topsoil. Surface soils from ditch bottoms,
drained ponds, and eroded areas, or soils that are supporting growth of noxious weeds or
other undesirable vegetation, will not be accepted. The Engineer will determine if testing is
necessary. The Contractor will be responsible for payment of the testing if the off-site topsoil
does not meet the above requirements. If the testing verifies the off-site topsoil does meet
the above requirements, payment for the testing will be the responsibility of the Jurisdiction.
2.02 EXCAVATION MATERIALS
All project site and borrow excavation will be classified as Class 10, Class 12, or Class 13 as
defined below, and as indicated in the contract documents.
A. Class 10 Excavation:
1. Class 10 excavation includes all normal soil such as loam, silt, gumbo, peat, clay, soft
shale, sand, and gravel. It includes fragmentary rock handled in the manner normal to
this class of excavation.
2. Includes any combination of the above described materials and any other material not
classified as Class 12 or Class 13.
B. Class 12 Excavation:
1, Material deposits so firmly cemented together that they cannot be removed without
continuous use of pneumatic tools or blasting.
2. Class 12 excavation includes the actual measured volume of granite, trap, quartzite,
chert, limestone, sandstone, hard shale, or slate in natural ledges or displaced masses.
3. Also includes the estimated or measured volume of rock fragments or boulders that occur
on the surface or in subsurface deposits mixed with soil, sand, or gravel when their size,
2010—pg6
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgrade, and Subbase
2.02 EXCAVATION MATERIALS (Continued)
number, or location prevents them from being handled in a manner normal to Class 10
excavation.
C. Class 13 Excavation:
1. Class 13 excavation includes all materials listed under the definitions of Classes 10 and
12, and any other material encountered, regardless of its nature.
2. This classification covers work commonly referred to as"unclassified excavation."
3. The contract documents will specify the limits for Class 13 excavation. Excavation within
these limits will not be classified as Class 10 or Class 12 excavation.
D. Unsuitable or Unstable Materials:
1. Material encountered during excavation above or below grade that does not meet the
suitable soil requirements in Section 2010, 2.03.
2. Rubbish and debris, including trees, stumps, waste construction materials, scrap metals,
and other materials that cannot be buried or used for backfill or topsoil.
3. Moisture content does not determine suitability of materials.
E. Borrow: Unless otherwise provided in the contract documents, when the quanti"y of fill
material required is not available within the limits of the project cross-sections or specific
borrow areas as indicated, the Contractor should make up the deficiency from borrow areas
provided by the Engineer, or furnish equivalent material from other borrow areas
2.03 SUITABLE EMBANKMENT MATERIALS
Meet the following requirements for all soils provided for the construction of embankments:
A. Density of 95 pcf or greater according to ASTM D 698 or AASHTO T 99 (Standard Proctor
Density).
B. AASHTO M 145 index of less than 30.
C. Soils not meeting these requirements are considered unsuitable soils.
D. For soils to be placed below water, use clean granular material.
2.04 FOUNDATION MATERIALS
A. Select Subgrade Materials:
1. All soils required for select subgrade materials must be approved by the Eng neer.
Approval of materials and their use will be based on AASHTO M 145.
a. Cohesive soils must meet all of the following requirements:
1) 45%or less silt size fraction.
2) Density of 110 pcf or greater according to ASTM D 698 or AASHTO T 99
(Standard Proctor Density).
3) Plasticity index greater than 10.
4) A-6 or A-7-6 soils of glacial origin.
b. Granular soils must meet all of the following requirements:
1) Density of 110 pcf or greater according to ASTM D 698 or AASHTO T 39
(Standard Proctor Density).
2) 15%or less silt and clay.
3) Plasticity index of 3 or less.
4) A-1, A-2, or A-3 (0).
2. Crushed stone, crushed PCC, crushed composite pavement, or RAP; mixtures of gravel,
sand, and soil; or uniformly-blended combinations of the above; as approved by the
Engineer.
2010—pg7
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgrade, and Subbase
3. The Engineer may authorize a change in select subgrade materials subject to materials
available locally at time of construction.
B. Granular Stabilization Materials:
1. Clean, crushed stone or crushed concrete, with the following gradation:
Sieve Percent Passing
2 '/2' 100
2" 90 to 100
1 'h" 35 to 70
1" 0to20
W 0to5
2. The Engineer may authorize a change in gradation, subject to materials available locally
at time of construction.
C. Subgrade Treatment:
1. Cement: Meet the requirements of AASHTO M 85 for portland cement.
2. Asphalt: Meet the requirements of AASHTO M 140.
3. Fly ash:
a. Meet requirements of ASTM C 618 or AASHTO M 295.
b. Either Class C or Class F. For Class C, the pozzolanic activity test with lime will not
be required.
c. Approval of source required.
4. Lime: Hydrated lime should meet requirements of ASTM C 207, Type N or AASHTO M
')1Ft mnrri ethers.
J. �eVgr Id:
a. Rectangular or Square: Use an integrally-formed grid structure manufactured of a
stress-resistant polypropylene material. Use Type 1 geogrid, unless Type 2 is
specified. Meet the following minimum physical properties:
Table 2010.01: Geogrid (Rectangular or Square)
Property Test Method Units Type 1, Type 2
Aperture stability modulus at 20 kg-cm Kinney2-01 kg-cm/deg 3.2 6.5
Minimum true initial modulus in use
Machine direction (MD) 15,080 32,890
ASTM D 6637 lb/ft
Cross Machine direction (CMD) 20,560 44,725
Tensile strength, 2% strain
MD 270 410
ASTM D 6637 lb/ft
CMD 380 590
Junction efficiency GRI-GG2-87 % 93 93
Flexural rigidity ASTM D 1388 Mg-cm 250,000 750,000
Aperture size
Minimum N/A In. 0.5 0.5
2010—pg8
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgrade, and Subbase
Maximum 2.0 2.0
Geogrids meeting the requirements of Iowa DOT Article 4196.01,B and Materials I.M.496.01 will be acceptable.
2 Dr.Thomas C. Kinney,P.E.and US Army Corps of Engineers.
b. Triangular: Use punched and drawn polypropylene that is oriented in three
substantially equilateral directions. Meet the following minimum physical properties:
Table 2010.02: Geogrid (Triangular)
- Property Test Method Units Type 3 Type 4
Aperture stability modulus at 5 kg-cm Kinneyi-01 kg-cm/deg 3.0 3.6
Resistance to loss of load capacity
Chemical resistance EPA 9090
Immersion
90-130 90-100
Ultra-violet light and weathering ASTM D 4355
(500 hrs)
Junction efficiency GRI-GG2-87 % of ultimate 93 93
GRI-GG1-87 tensile strength
_ Radial stiffness ASTM D 6637 lb/ft @ 0.5% 15,0J0 20,000
strain
Rib Patch
Longitudinal
N/A in. 1.5-1 75 1.5-1.75
Diagonal
Mid-rib depth N/A in. 0.04-C 06 0.05-0.08
Mid-rib width N/A in. 0.0035-0.05 0.035-0.055
Dr.Thomas C.Kinney, P.E.and US Army Corps of Engineers.
6. Geotextiles: Use a woven or non-woven permeable fabric, manufactured of polymer
fibers, meeting the requirements of ASTM D 4439.
D. Subbase:
1. Special Backfill:
a. Comply with Iowa DOT Specifications Section 4132. The quality requirements of
Iowa DOT Materials I.M. 210 for recycled pavements are waived.
b. The Engineer may authorize a change in gradation subject to materials a./ailable
locally at time of construction.
2. Granular Subbase:
a. Comply with Iowa DOT Specifications Section 4121.
b. The Engineer may authorize a change in gradation subject to materials a°'ailable
locally at time of construction.
3. Modified Subbase:
a. Comply with Iowa DOT Specifications Section 4123.
b. The Engineer may authorize a change in gradation, subject to materials a vailable
locally at time of construction.
2010—pg9
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgrade,and Subbase
PART 3-EXECUTION
3.01 CLEARING AND GRUBBING •
A. Notification: Notify the Engineer prior to start of clearing and grubbing activities.
B. Removal: Remove the following items:
1. Trees and stumps, including roots, to a depth of at least 12 inches. Place backfill to fill
the hole.
2. Logs and downed timber.
3. Hedge rows, brush, field fence, and agricultural products.
4. Vegetation and rubbish.
5. Other objectionable materials.
C. Disposal: Material from clearing and grubbing may be removed according to Iowa Code 335
and must meet local ordinances.1. Process by chipping logs, downed timber, or brush for mulching material; or salvage logs
and downed timber for firewood.
2. Other vegetation, including corn stubble, may be disked into the existing soil if approved
by the Engineer.
3. Haul vegetative materials from clearing and grubbing that are not handled on the project
to a yard waste disposal site.
4. Remove field fence and other non-vegetative materials from the project.
3.02 STRIPPING, SALVAGING,AND SPREADING TOPSOIL
A. Stripping and Salvaging Topsoil:
1. Mow all weeds, grass, and growing crops or other herbaceous vegetation close to the
around and remove from the site. Shred sod by shallow plowing or blading and thorough
disking. Thoroughly shred to allow the soil to be easily spread in a thin layer over areas
to be covered. If allowed by the Engineer, herbicides may be applied, and vegetation
may be incorporated into the topsoil.
2. Remove an adequate amount of topsoil from the upper 12 inches of existing on-site
topsoil to allow finish grading with a finished grade of 8 inches of salvaged or amended
topsoil. The topsoil may be moved directly to an area where it is to be used, or may be
stockpiled for future use.
B. Preparation for Topsoil Placement:
1. Finish excavation and embankment work according to the specified grades and crosssections;
grade and slope all surfaces to drain away from buildings and prevent ponding.
Conform to the grading plan within ±2 inches.
2. Loosen surface to a minimum depth of 4 inches to reduce compaction.
C. Topsoil Spreading and Finish Grading:
1. Place the topsoil after all grading and trenching activities in the area have been
completed.
2. Place topsoil at least 8 inches deep; smooth and finished grade according to the contract
documents. If topsoil is being amended with compost, thoroughly blend compost with onsite
topsoil at the rate specified in Section 2010, 2.01.
3. After finish grading the topsoil, remove clods, lumps, roots, litter, other undesirable
2010—pg10
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgra de, and Subbase
material, or stones larger than 1 inch (1/2 inch for turfgrass).
3.03 EXCAVATION
A. Notification: Notify the Engineer prior to start of excavation activities.
B. Pavement Removal:
1. Cut surface pavement to full depth as required, and at designated removal I nes.
2. Remove all pavement materials.
a. If specified in the contract documents or allowed by the Engineer, process for re-use.
b. Dispose of excess material as follows:
1) Use as unsuitable soil according to this section.
2) If specified in the contract documents, deliver and stockpile at a site designated
by the Engineer.
3) Otherwise, properly dispose of off-site.
3. Remove pavement material broken or damaged by the Contractor beyond designated
removal lines to new line designated by the Engineer, and replaced at the Contractor's
expense.
4. Protect subgrade beneath existing pavement removal areas.
C. Excavation: Perform Class 10, 12, or 13 grading, as specified in the contract documents, to
the prescribed grade.
D. Shaping of Borrows:
1. Ensure that borrow areas provided by the Contractor are regular in cross-section to allow
accurate measurement.
2. Ensure that care is taken to blend to natural land forms and avoid unnecessary damage
to the land.
3. Do not divert natural drainage of surface water onto adjoninuing owners, and 4 c diligent
in
draining the surface water in its natural course or channel.
4. Complete excavation in a way consistent with the existing natural drainage conditions.
E. Drainage:
1. Provide temporary drainage facilities to prevent damage to public or private nterests
when necessary to interrupt natural drainage or flow of artificial drains.
2. Restore original drainage as soon as work allows.
3. The Contractor is responsible for damage resulting from their neglect to provide erosion
control or artificial drainage.
F. Unsuitable or Unstable Materials:
1. Remove unsuitable or unstable materials to a depth specified in the contract documents,
or as directed by the Engineer.
2. The Engineer will determine the need for and type of backfill material, includ,ng select soil
or granular subbase.
3. Remove all soft areas. Replace with approved materials.
4. If subbase materials are used, provide weight tickets at the time of delivery.
5. Dispose of unsuitable or unstable materials according to the requirements in this section.
G. Removal of Boulders: Remove all boulders with a minimum diameter of 6 inches.
2010—pg11
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgrade, and Subbase
3.03 EXCAVATION (Continued)
H. Rock Excavation:
1. When excavation to the subgrade elevation results in a surface consisting of loose or
solid rock:
a. Excavate 1 foot below the finished subgrade elevation.
b, Construct subgrade with suitable material. _.
c. Conduct operations so the Engineer is given the opportunity to measure crosssection
before placement of subgrade material.
2. When pre-splitting of rock cuts is necessary, the limits of the area and the procedure
used will be subject to the approval of the Engineer.
3. Dispose of rocks and boulders 6 inches in diameter and greater off-site. _
Removal or Filling of Pipe Culverts, Pipes, and Conduits: Remove, plug, and/or fill with
flowable mortar, as directed by the Engineer.
3.04 EMBANKMENT CONSTRUCTION
A. Notification: Notify the Engineer prior to start of embankment activities.
B. Site Preparation:
1. Remove all ground cover from the area.
2. When an embankment is placed on or against an existing slope that is steeper than 3:1
and is more than 10 feet high, cut the slope into steps as the construction of the new
embankment progresses. The steps should ensure that all sod or other potential sliding
surfaces are removed. Cut each step or series of steps to approximate horizontal planes
which have vertical slope dimensions of at least 3 feet.
C. Depositing Embankment Material:
1. Except for rock fills and granular blankets, deposit embankment material in horizontal
layers no greater than 8 inches in loose thickness. Do not incorporate vegetative
materials in embankments. If some otherwise suitable soil contains small amounts of vegetative materials, such soils may be deposited outside of the shoulder line, within the
outer 3 feet of the embankment.
2. When the width at the attained height is 30 feet or more, divide the area upon which the
layer is to be placed into separate and distinct dump areas, having widths of at least 15
feet. If hauling equipment is operated within a dump area, cover the area with at least
one passage of a tandem-axle disk, or two passages with a single-axle disk, prior to
compaction.
3. Keep hauling equipment off dump areas of embankments 36 feet or more in width during
compaction operations. Within 36 feet of a bridge or other limiting structure, or where the
width of the embankment is less than 36 feet at the attained height, empty hauling units
may travel on the dump area during compaction operations, as necessary to pass loaded
hauling units. If the design width of the embankment is less than 30 feet at the attained
height, hauling units will be allowed to travel through areas where compaction operations
are in progress. When any hauling equipment is allowed to pass through compaction
operations, do not require water, disking, and compacting equipment to deviate from their
intended paths.
4. Deposit the material over the dump area as a separate and distinct operation. If the
material, as deposited, contains an average of more than one lump per square yard,
large enough to have at least one dimension greater than 12 inches, cover the area by at
least one passage of a tandem-axle disk, or two passages of a single-axle disk. Use a
disk that is designed and operated to cut and stir to the full depth of the layer.
5. After depositing and disking, if required, smooth the material to a uniform depth with a
2010—pg12
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgrade, and Subbase
suitable motor patrol, bulldozer, or self-propelled sheepsfoot-type roller with a blade
attachment. In addition to the initial smoothing operation, continue this smoothing and
leveling of the lift during compaction, as necessary to provide a surface area free from
ruts and other objectionable irregularities.
Use the self-propelled sheepsfoot-type roller(meeting the requirements of Ic;wa DOT
Article 2001.05) under the following conditions:
a. Leveling must be done according to the prescribed rolling pattern.
b. Compaction should be the primary function of the unit.
c. Prevent spinning of the power drums.
d. When, in the opinion of the Engineer, the unit cannot satisfactorily accomplish both
leveling and rolling, use a separate dozer or motor patrol for the leveling 13peration
prior to initiation of compaction.
e. For embankments constructed primarily of sand or other granular material, the
Contractor may substitute a pneumatic-tired roller meeting the requirements of Iowa
— DOT Article 2001.05.
6. Keep the outer portion of an embankment lower than its center, and wherever
construction will be suspended for a period during which rain is likely to occur, roughen
the surface to prevent erosion. This can be done by tracking, disking, or scarifying.
Stones 6 inches and smaller in diameter may be placed in embankments, but distributed
to avoid pockets. No stones larger than 3 inches may be placed within 1 foot of the
finished subgrade elevation.
D. Compaction with Moisture and Density Control: Compact with moisture and density
control, unless Type A compaction is specified in the contract documents. See E ection 2010,
3.09 for moisture and density requirements.
E. Type A Compaction:When Type A compaction is specified in the contract documents,
compact as follows:
1. After the surface layer has been smoothed, and before material for the next ayer is
deposited on it, compact the layer with at least one passage of the sheepsfoot-type roller
per inch of loose thickness of the layer, until the roller is supported entirely on its feet.
The roller will be considered to be supported entirely on its feet when the tamping feet
penetrate no more than 3 inches into an 8 inch lift or layer being compacted.
2. Determine if moisture content of the material is excessive or suitable for satisfactory
compaction.
a. Start rolling operations immediately after the smoothing operation, or dewy them, and
instead aerate the material in preparation for rolling.
b. Perform aeration and compaction operations without unnecessary delay
c. Rolling operations made prior to any aeration operations for a lift will not be counted
as any of the required coverages.
3. If the material is dry to the extent that it will not likely be satisfactorily compacted by
rolling, moisten the material.
a. The Engineer may order the material to be moistened uniformly before it is
compacted.
b. The Engineer may authorize the use of water in the final finishing of the roadbed.
c. Delays from the ordering of moistening or drying will be at the Contractor's expense.
4. The Contractor may substitute compaction with moisture and density control for Type A
Compaction, providing all testing as required, at the Contractor's expense.
3.05 USE OF UNSUITABLE SOILS
Unsuitable soils are not allowed in the right-of-way, unless otherwise specified in the contract
documents or allowed by the Engineer.
2010—pg 13
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgrade, and Subbase
3.06 SUBGRADE PREPARATION
Shape and consolidate subgrade in preparation for the placement of pavement.
A. Uniform Composition: Provide uniform composition of at least 12 inches below top of
subgrade under new paving or subbase, plus 2 feet on each side. Use select subgrade
materials unless granular stabilization materials or subgrade treatment is specified.
1. Subgrade Compaction in Fill Sections:
a. Follow the compaction with moisture and density control requirements in Section
2010, 3.04.
b. Construct in two 6 inch lifts.
2. Subgrade Compaction in Cut Sections:
a. Excavate and stockpile the top 6 inches of subgrade.
b. Scarify, mix, and re-compact the next 6 inches of subgrade.
c. Replace, mix, and compact the top 6 inches of subgrade.
3. Remove stones over 3 inches from subgrade.
4. Construct to elevation and cross-section such that, after rolling, surface will be above
required subgrade elevation.
B. Subgrade Stability:
1. Perform proof rolling with a truck loaded to the maximum single legal axle gross weight of
20,000 pounds or the maximum tandem axle gross weight of 34,000 pounds. Operate
trucks at less than 10 mph. Make multiple passes for every lane. The subgrade will be
considered to be unstable if, under the operation of the loaded truck, the surface shows
yielding (soil wave in front of the loaded tires)or rutting of more than 2 inches, measured
from the top to the bottom of the rut at the outside edges.
2. If soft or yielding areas are located, remove unstable materials and replace with suitable
fofoundationmaterials as approved by the Engineer, meeting Section 2010, 2.03.
Compact subgrade materials in cut sections as required by the Engineer. If stabilization
material is used, place and compact as required for subbase.
B. Final Subgrade: Complete final subgrade by excavation to grade by use of steel-shod
template supported on side forms, support rollers, or by use of an automatically-controlled
subgrade excavating machine.
C. Subgrade Check: Check subgrade elevation and grade by method approved by Engineer
prior to paving.
D. Ruts: If ruts or other objectionable irregularities form in subgrade during construction, reshape
and re-roll subgrade before placing pavement. Fill ruts or other depressions with
material similar to other subgrade material, and compact.
3.07 SUBGRADE TREATMENT
A. Lime, Cement, Fly Ash, or Asphalt:
1. Incorporate the subgrade treatment material uniformly during subgrade preparation to the
depth and rate specified in the contract documents.
2. Place subgrade treatment in the areas specified in the contract documents for the width
of the pavement, plus 2 feet on each side.
B. Geogrid or Geotextiles:
1. Install according to manufacturer's recommendations, on top of the prepared subgrade.
2. Place in the areas specified in the contract documents for the width of the pavement, plus
2 feet on each side.
2010—pg14
Standard Specifications Division 2—Earthwork
Section 2010- Earthwork,Subgrade, and Subbase
3.08 SUBBASE
A. Subgrade: Compact subgrade and shape smooth before subbase material is placed.
B. Construction: Construct the specified type of subbase to the specified depth, p us 2 feet
outside the pavement area.
C. Moisture and Density: Compact subbase and provide testing according to Sec:ion 2010,
3.09.
D. Final Elevation:
1. Trim to the design elevation and shape to the final template with an automat callycontrolled
trimming machine. Excess material may be salvaged and spread for use on
any other approved project location or operation.
2. Conform to the design profile and cross-section to the extent that no point is higher than
the designated elevation, and no point is lower than 0.05 foot below the des gn elevation.
3. Ensure that the top 1 inch of the subbase is uniformly moist prior to paving.
4. Do not allow hauling equipment and other traffic on completed subbase,
3.09 FIELD QUALITY CONTROL
A. Compaction Testing: If it is specified in the contract documents that the Contractor will
conduct compaction testing, use the services of an independent testing laborato-y approved
by the Engineer.
B. Moisture Content and Density:
1. Ensure that moisture content falls within a range of optimum moisture to 4% above
optimum moisture.
2. Compact cohesive soils to no less than 95% of maximum Standard Proctor Density; and
cohc4.sionless soils to no less than 70°u of Relative Density.
C. Testing:
1. Lab Test: Determine laboratory density of material according to ASTM D 698 or
AASHTO T 99 (Standard Proctor Density) or ASTM D 4253 and ASTM D 4254
(Maximum and Minimum Index Density for Cohesionless Soils). Provide at least one
analysis for each material type used unless provided by the Engineer.
2. Field Test:
a. Perform in-place field density and moisture testing according to ASTM D 2922 and
ASTM D 3017 (nuclear) or ASTM D 1556 (sand cone) and ASTM D 2216 (moisture
content).
b. Frequency:
1) Urban Section: Provide one test per lift per 150 feet. If section is less than 300
feet, perform at least two tests per lift.
2) Rural Section: Provide one test for each 500 cubic yards of material placed, with
at least two tests per lift.
3. Test only locations selected by the Engineer.
4. The Engineer may require additional testing if noncompliance or change in cDnditions
— occur.
E. Test Failure: Rework, recompact, and retest as necessary until required compaction is
achieved.
END OF SECTION
2010—pg15
Standard Specifications Division 3—Trench and Trenchless Construction
Section 3010—Trench Excava:ion and Backfill
TRENCH EXCAVATION AND BACKFILL
PART 1 -GENERAL
1.01 SECTION INCLUDES
A. Trench Excavation for Pipe Systems
B. Trench Foundation Stabilization
C. Pipe Bedding and Backfill
1.02 DESCRIPTION OF WORK
A. Excavate trench for pipe installation.
B. Stabilize trench and install pipe bedding materials.
C. Place backfill material in trench.
1.03 SUBMITTALS
Comply with Division 1 -General Provisions and Covenants, as well as the following
A. Gradation reports for bedding materials.
B. Results of required testing.
C. Dewatering plan.
1.04 SUBSTITUTIONS
Comply with Division 1 -General Provisions and Covenants.
1.05 DELIVERY, STORAGE,AND HANDLING
Comply with Division 1 - General Provisions and Covenants.
1.06 SCHEDULING AND CONFLICTS
Comply with Division 1 -General Provisions and Covenants.
1.07 SPECIAL REQUIREMENTS
None.
1.08 MEASUREMENT AND PAYMENT
— A. General: The following items are incidental to the underground utility being insta led and will not
be paid for separately:
1. Standard trench excavation.
2. Removal and disposal of unsuitable backfill material encountered during staniard trench
excavation.
— 3. Removal of abandoned private utilities encountered during trench excavation
4. Furnishing and placing granular bedding material.
5. Placing and compacting backfill material.
6. Dewatering.
7. Sheeting, shoring, and bracing.
8. Adjusting the moisture content of excavated backfill material to the range specified for
placement and compaction.
9. Temporary support for existing water, sewer, gas, telephone, electric, and otter utilities or
services that cross the trench.
3010-pg 1
Standard Specifications Division 3—Trench and Trenchless Construction
Section 3010—Trench Excavation and Backfill
B. Rock Excavation:
1. Measurement: Measurement will be by cubic yards of rock removed.
2. Payment: Payment will be at the unit price per cubic yard for the quantity of rock removed.
C. Trench Foundation:
1. Measurement: Measurement will be in tons for the quantity of stabilization material required
to replace material removed by over-excavation. Measurement will be based on the scale
tickets for the material delivered and incorporated into the project. Trench foundation required
to correct unauthorized over-excavation will not be measured.
2. Payment: Payment will be at the unit price per ton for the quantity of stabilization material
furnished and placed.
3. Includes: Unit price includes, but is not limited to, removal and disposal of over-excavated
material required to stabilize trench foundation; and furnishing, hauling, and placing
stabilization material.
D. Replacement of Unsuitable Backfill Material:
1. Measurement: Measurement will be in cubic yards for the quantity of backfill material
required to replace unsuitable backfill material removed during standard trench excavation.
Measurement will be based on compacted material in place.
2. Payment: Payment will be at the unit price per cubic yard for the quantity of backfill material
furnished.
3. Includes: Unit price includes, but is not limited to, furnishing, hauling, and placing backfill
material.
E. Special Pipe Embedment or Encasement:
1. Measurement: Measurement will be by the linear foot along the centerline of pipe for each
type of special embedment or i i ent.
2. Payment: Payment will be at the unit price per linear foot for each type of special pipe
embedment or encasement.
3. Includes: Unit price includes but is not limited to, furnishing and placing all required special
pope embedment or encasement materials.
F. Trench Compaction Testing:
1, The Contractor is not responsible for trench compaction testing unless otherwise specified in
the contract documents.
2. If the contract documents specify that the Contractor is responsible for french compaction
testing performed by an independent testing laboratory hired by the Contractor, measurement
and payment will be as follows:
a. Measurement: Lump sum item; no measurement will be made.
b. Payment: Payment will be the contract lump sum price.
3. The Contractor will be responsible for payments associated with all retesting resulting from
failure of initial tests,
3010-pg 2
Standard Specifications Division 3—Trench and Trenchl ess Construction
Section 3010—Trench Excavation and Backfill
PART 2 - PRODUCTS
_ 2.01 MATERIALS EXCAVATED FROM A TRENCH
A. Standard Trench Excavation: All materials encountered during trench excavat on, except rock
and over-excavation.
1. Suitable Backfill Material: Class II, Class Ill, Class IVA, or Class IVB as defined in Section
3010, 2.02.
2. Unsuitable Backfill Material: Includes, but is not limited to, the following materials:
a. Soils not classified as suitable backfill material, as defined in Section 3010, 2.02.
b. Individual stones or concrete chunks larger than 6 inches and averaging more than one
_ per each cubic foot of soil.
c. Frozen materials.
d. Stumps, logs, branches, and brush.
e. Trash, metal, or construction waste.
f. Soil in clumps or clods larger than 6 inches, and without sufficient fine materials to fill
voids during placement.
g. Environmentally contaminated soils.
h. Materials removed as rock excavation or over-excavation.
3. Topsoil: Class V material. Comply with Section 3010, 2.03.
B. Rock Excavation: Boulders or sedimentary deposits that cannot be removed in trenches
without continuous use of pneumatic tools or blasting.
C. Over-excavation: Excavation of unsuitable or unstable material in trenches below the pipe
zone, comply with Figure 3010.101 (SW-101).
2.02 BEDDING MATERIAL
A. Class I Material:
1 r rush..d stone rnmplying .yith the following gradation:
Sieve Percent Passing
1 1/" 100
1" 95 to 100
25to60
No. 4 O to 10
No. 8 0 to 5
2. The Engineer may allow the use of gravel or authorize a change in gradation subject to
materials available locally at the time of construction.
3. The Engineer may authorize the use of crushed PCC for pipe sizes up to 12 inches.
4. Use aggregates having a percentage of wear, Grading A or B, not exceeding 50%
determined according to AASHTO T 96.
3010-pg 3
Standard Specifications Division 3—Trench and Trenchless Construction
Section 3010—Trench Excavation and Backfill
2.03 BACKFILL MATERIAL
A. Class II Material: Manufactured and non-manufactured open-graded (clean) or densegraded
(clean) processed aggregate, clean sand, or coarse-grained natural soils (clean)with little or no
fines. Class II materials are futher described in Table 3010.01.
Table 3010.01: Class II Material Percentage Passing Sieve Sizes
Soil Group
Class Type Symbol ASTM D Description
2487 1 Yin. No.4 No.200
(40 mm) (4.75 mm) (0.075 mm)
it Coarse-Grained Soils, GW Well-graded gravels and gravel-sand 100% <50%of <5%
clean mixtures;little or no fines. "Coarse
Fraction"
GP Poorly-graded gravels and gravel sand
mixtures;little or no fines.
SW Well-graded sands and gravelly sands; >50%of
little or no fines. "Coarse
Fraction"
SP Poorly-graded sands and gravelly
sands;little or no fines.
Coarse-Grained Soils, Sands and gravels which are borderline 100% Varies 5%to 12%
borderline clean to with e.g.GW-GC,SP- between clean and with fines.
Ifines SM
B. Class III Materials:
1. Natural coarse-grained soils with fines. Class III materials are further described in Table
3010.02.
2. Do not use where water condition in trench may cause instability.
Table 3010.02: Class III Material
Soil Group Symbol
Class Type ASTM D 2487 Description
III Coarse-Grained Soils,with GM Silty gravels,gravel-sand-silt mixtures
fines GC Clayey gravels,gravel-sand-clay mixtures
SM Silty sands,sand-silt mixtures.
SC Clayey sands,sand-clay mixtures.
C. Class IVA Material:
1. Natural fine-grained inorganic soils. Class IVA materials are further described in Table
3010.03.
2. The Engineer will determine if material is not suitable for use as backfill material under
deep fills,surface applied wheel loads, heavy vibratory compactors,tampers,or other
conditions.
3. Do not use where water conditions in trench may cause instability.
3010-pg 4
Standard Specifications Division 3—Trench and Trench ess Construction
Section 3010—Trench Excavation and Backfill
2.03 BACKFILL MATERIAL(Continued)
4. Material is suitable for use in dry trench conditions only.
Table 3010.03: Class IVA Material
Class Type Soil Group Symbol Description
ASTM D 2487
IVA Fine-Grained Soils Inorganic silts and very fine sands,rock flour,
(inorganic) ML silty or clayey fine sands,silts with slight
plasticity.
CL Inorganic clays of low to medium plasticity,
gravelly clays,sandy clays,silty clay,lean clay.
D. Class IVB Material:
1. Natural fine-grained inorganic(high elastic silts and plastic clays—fat clay)with a liquid
limit greater than 50%. Class IVA materials are further described in Table 3010.04.
2. When approved by the Engineer, material may be used as final trench backfill in a dry
— trench.
3. Do not use in the pipe embedment zone.
Table 3010.04: Class IVB Material
Class Type Soil Group Symbol Description
ASTM D 2487
IVB Fine-Grained Soils Inorganic silts,micaceous or diat:)maceous fine
I (inorganic) I ' I sandy or silty soils,elastic silts. I
II li CH Inorganic clays of high plasticity, at clays.
2.04 TOPSOIL
A. Class V Material:
1. Organic soils. Class V materials are further described in Table 3010.05.
2. Use only as topsoil outside of the pavement, unless otherwise specified or i:Ilowed by the
Engineer.
3. Do not use in the pipe embedment zone.
Table 3010.05: Class V Material
Class Type Soil Group Description
Symbol
— V Organic silts and organic silty clays of
Organic Soils(Unsuitable OL low plasticity.
for backfill) OH Organic clays of medium to high --
plasticity,organic silts.
Highly Organic(Unsuitable PT Peat and other high organic soils.
for backfill)
3010-pg 5
Standard Specifications Division 3—Trench and Trenchless Construction —°
Section 3010—Trench Excavation and Backfill
2.05 STABILIZATION (FOUNDATION) MATERIALS
A. Clean 2%inch crushed stone with the following gradation:
Sieve Percent Passing
2'A" 100
2" 90 to 100
1 3z" 35 to 70
1" 0 to 20
0to5
B. The Engineer may authorize a change in gradation depending on materials available locally at
time of constructions.
C. Crushed concrete may be used, if approved by the Engineer, if it is within +5%of the gradation
for each size of material.
2.06 SPECIAL PIPE EMBEDMENT AND ENCASEMENT MATERIAL
A. Concrete Cradle,Arch,or Encasement: Use Iowa DOT Class C concrete.
B. Flowable Mortar: Comply with Iowa DOT Article 2506.02.
C. CLSM:
1. Approximate quantities per cubic yard:
a. Cement: 50 pounds
b. Fly ash: 250 pounds/1
a:. Fine aggregate: 2,910 pounds
d. Water: 60 gallons
2. A compressive strength of at least 50 psi compressive strength at 28 calendar days can be
expected.
3, Comply with material requirements of Iowa DOT Article 2506.02.
PART 3—EXECUTION
3.01 TRENCH EXCAVATION
A. Notify the Engineer prior to the start of excavation activities.
B. Remove topsoil to a minimum depth of 12 inches and stockpile.
C. Excavate trench to required elevations and dimensions. Comply with Figure 3010.101,
1. Protect existing facilities,trees,and shrubs during trench excavation.
2. Place excavated material away from trench.
3. Grade spoil piles to drain. Do not allow piles to obstruct drainage.
D. Unsuitable Backfill Material:
1. If unsuitable backfill material is encountered, notify the Engineer.
2. Remove rock, rubbish, boulders,debris,and other unsuitable backfill materials at least 6
inches below and on each side of the pipe.
3010-pg 6
Standard Specifications Division 3—Trench and Trenchless Construction
Section 3010—Trench Excavation and Backfill
3.01 TRENCH EXCAVATION (Continued)
3. Keep unsuitable backfill material separated from suitable backfill material z nd topsoil.
4. Restore trench to design dimensions using bedding or stabilization material.
3.02 ROCK OR UNSTABLE SOILS IN TRENCH BOTOOM
A. Notify the Engineer prior to over-excavation.
B. The Engineer will determine the need for over-excavation and trench foundation stabilization
prior to installation of pipes and structures.
C. Comply with Figure 3010.101 for over-excavation of rock and wet or soft foundations.
3.03 TRENCH PROTECTION
A. Install adequate trench protection (sheeting, shoring, and bracing)to prevent g-ound
movement or damage to adjacent structures, pipelines, and utilities.
B. Move trench boxes carefully to avoid disturbing pipe, bedding, or trench wall.
3.04 DEWATERING
A. Maintain water levels below the bottom of trench excavation.
B. Perform the dewatering operation according to the dewatering plan approved by the Engineer.
The dewatering plan may be modified to meet actual field conditions,with app oval of the
Engineer.
C. Ensure operation of the dewatering system does not damage adjoining structures and facilities.
Cease dewatering operations and notify the Engineer if damage is observed.
D. Discharged Water:
1. Do not discharge water into sanitary sewers.
2. Discharging water into storm sewers requires Engineer's approval.
3. Obtain permission of adjacent property owner prior to discharging water onto their
property.
4. Maintain and control water discharge as necessary to prevent a safety haza~d for vehicular
and pedestrian traffic.
5. Direct water discharge away from electrical facilities or equipment.
6. Use dewatering equipment that will minimize disturbance from noise and fumes.
7. Protect discharge points from erosion. Provide sediment control for sediment
contaminated water discharged directly from trench.
3.05 PIPE BEDDING AND BACKFILL
A. General: Comply with Figures 3010.101 through 3010.105, as appropriate.
1. Bedding and backfill used for pipe installation will depend on:
a. Type of installation (water main, sanitary sewer gravity main, sanitary sewer force
main,or storm sewer).
b. Pipe Material.
c. Depth of bury.
3010-pg 7
Standard Specifications Division 3—Trench and Trenchless Construction Section 3010—Trench Excavation and Backfill
3.05 PIPE BEDDING AND BACKFILL(Continued)
d. Pipe diameter.
2. After pipe installation, place remaining bedding material and immediately place backfill in
trench.
3. Adjust the moisture content of excessively wet, but otherwise suitable, backfill material by
spreading,turning aerating, and otherwise working material as necessary to achieve
required moisture range.
4. Adjust the moisture content of excessively dry, but otherwise suitable,backfill material by
adding water,then turning, mixing, and otherwise blending the water uniformly
throughout the material until the required moisture range is achieved.
5. Hydraulic compaction (flooding with water) is not allowed unless authorized by the
Engineer.
B. Pipe Bedding:
1. Granular Material:
a. Class I granular bedding material is required for all gravity mains. Use when specified
for pressure pipes.
b. Comply with Figures 3010.101 through 3010.105.
c. Place bedding material in the bottom of the trench in lifts no greater than 6 inches
d. Shape bedding material to evenly support pipe at the proper line and grade,with full
contact under the bottom of the pipe. Excavate for pipe bells.
e. Install pipe and system components.
f. Place,consolidate, and moderately compact additional bedding material adjacent to
the pipe to a depth equal 1/6 the outside diameter of the pipe.
2. Suitable Backfill Material:
a. Only use with pressure pipe. Comply with Figure 3010.104.
b. Use suitable backfill material to shape trench bottom to evenly support pipe at the
proper line and grade,with full contact under the bottom of the pipe. Excavate for pipe
bells.
3. Special Pipe Embedment and Encasement Materials:
a. Concrete,Flowable Mortar,or CLSM:
1) If specified in the contract documents, use concrete,flowable mortar,or CLSM in
lieu of other bedding materials.
2) Secure pipe against displacement of flotation prior to placing concrete,flowable
mortar,or CLSM.
b. Waterstop:
1) Place Class IVA clay backfill material, and compact to at least 90%of Standard
Proctor Density. Obtain required compaction within a soil moisture range of
optimum moisture to 4%above optimum moisture content.
2) If trench stabilization material is required,extend waterstop through stabilization
material to bottom of trench.
C. Haunch Support: Place from the top of the pipe bedding to the springline of the pipe.
3010-pg 8
Standard Specifications Division 3—Trench and Trenchless Construction
Section 3010—Trench Excavation and Backfill
3.05 PIPE BEDDING AND BACKFILL(Continued)
1. Granular Material:
a. Place Class I material in lifts no greater than 6 inches thick.
b. Consolidate and moderately compact by slicing with a shovel or using cther approved
techniques.
2. Suitable Backfill Material:
a. Place in lifts no greater than 6 inches thick.
b. For Class II backfill material, consolidate and moderately compact by sl cing with a
shovel or using other approved techniques.
— c. For Class III and Class IVA backfill materials, compact to at least 90°%o of Standard
Proctor Density. Obtain required compaction within a soil moisture range of optimum
moisture to 4% above optimum moisture content.
3. Special Pipe Embedment and Encasement Materials:
a. Concrete, Flowable Mortar,or CLSM:
1) If specified in the contract documents, use concrete,flowable mortar, or CLSM in
lieu of other bedding materials.
2) Secure pipe against displacement of floatation prior to placing con( rete,flowable
mortar, or CLSM.
b. Waterstop: Place and compact Class IVA clay backfill material accordir g to the suitable
backfill material requirement above.
D. Primary and Secondary Backfill:
1. General:
a. For primary backfill, place from the springline of the pipe to the top of the pipe.
b. For secondary backfill, place from the top of the pipe to 1 foot above the top of the
pipe.
2. Granular Material:
a. Place in lifts no greater than 6 inches thick.
b. Compact to at least 65% relative density.
3. Suitable Backfill Material:
a. Place in lifts no greater than 6 inches thick.
b. For Class II backfill material, compact to at least 65%relative density.
— c. For Class III and Class IVA backfill materials, compact to at least 95%of Standard
Proctor Density. Obtain required compaction within a soil moisture range of optimum
moisture to 4%above optimum moisture content.
4. Special Pipe Embedment and Encasement Materials:
a. Concrete, Flowable Mortar, or CLSM:
— 1) If specified in the contract documents, use concrete,flowable mortar,or CLSM in
lieu of other bedding materials.
2) Secure pipe against displacement or flotation prior to placing concrete,flowable
mortar, or CLSM.
b. Waterstop: Place and compact Class IVA clay backfill material according to the suitable
backfill material requirement above.
3010-pg 9
Standard Specifications Division 3—Trench and Trenchless Construction
Section 3010—Trench Excavation and Backfill
3.05 PIPE BEDDING AND BACKFILL(Continued)
E. Final Trench Backfill:
1. Place suitable backfill material from 1 foot above the top of the pipe to the top of the
trench.
a. Use no more than 8 inch thick lifts for backfill areas more than 3 feet below the bottom
of pavement.
b. Use no more than 6 inch thick lifts for backfill areas less than or equal to 3 feet below
the bottom of pavement.
2. Place backfill material after recording locations of connections and appurtenances or at the
Engineer's direction.
3. Class III and Class IVA Backfill Material:
a. Compact to at least 65% relative density within right-of-way.
b. Compact to at least 50% relative density outside right-of-way.
4. Class III and Class IVA Backfill Material:
a. Compact to at least 95%of Standard Proctor Density within right-of-way.
b. Compact to at least 90%of Standard Proctor Density outside right-of-way.
c. Obtain required compaction within a soil moisture range of optimum moisture to 4%
above optimum moisture content.
5. In areas to remain unpaved,terminate backfill material 8 inches below finished grade. Use
topsoil for the final 8 inches above trench backfill material.
6. Terminate backfill material at subgrade elevation in areas to be paved.
3.06 TRENCH COMPACTION TESTING
A. General: When trench compaction testing is specified in the contract documents as the
Contractor's responsibility, provide testing of trench backfill material using the services of an
independent testing laboratory approved by the Engineer.
B. Soil Testing:
1. Cohesive Soils:
a. Determine moisture-density relationships by ASTM D 698 (Standard Proctor). Perform
at least one test for each type of cohesive soil used.
b. Determine in-place density and moisture content. Use ASTM D 1556 (sand-cone
method) and ASTM D 2216 (laboratory moisture content),or use ASTM D 6938 (nuclear
methods for density and moisture content).
C. Field Testing:
1. Testing Frequency and Locations: Perform testing of the final trench backfill, beginning at
a depth of 2 feet above the top of the pipe,as follows:
a. Coordinate the timing of testing with the Engineer.
b. The Engineer will determine the location of testing.
c. For each 2 vertical feet of consolidated fill, provide tests at a maximum horizontal
spacing of 200 feet may be required by the Engineer in the event of non-compliance or
if conditions change.
3010-pg 10
Standard Specifications Division 3—Trench and Trenchless Construction
Section 3010—Trench Excavation and Backfill
3.06 TRENCH COMPACTION TESTING(Continued)
d. Additional testing may be required by the Engineer in the event of non-compliance or if
conditions change.
e. If necessary,excavate to the depth and size as required by the Engineer to allow
compaction tests. Place backfill material and recompact.
2. Test Failure and Retesting: Rework, recompact, and retest as necessary until specified
— compaction and moisture content is achieved in all areas of the trench. In the event of
failed tests,the Engineer may require retesting as deemed necessary.
END OF SECTION
3010-pg 11
Standard Specifications Division 4—Sewers and Drains
Section 4020 —Storm Sewers
STORM SEWERS
PART 1 -GENERAL
1.01 SECTION INCLUDES
A. Storm Sewers
B. Abandonment of Storm Sewers
1.02 DESCRIPTION OF WORK
A. Construct storm sewers.
B. Abandon storm sewers.
1.03 SUBMITTALS
Comply with Division 1 - General Provisions and Covenants.
1.04 SUBSTITUTIONS
Comply with Division 1 - General Provisions and Covenants.
1.05 DELIVERY, STORAGE, AND HANDLING
Comply with Division 1 -General Provisions and Covenants.
1.06 SCHEDULING AND CONFLICTS
Comply with Division 1 -General Provisions and Covenants.
1.07 SPECIAL REQUIREMENTS
None.
— 1.08 MEASUREMENT AND PAYMENT
A. Storm Sewer:
1. Trenched:
a. Measurement: Each type and size of pipe installed in a trench will be measured in
linear feet along the centerline of the pipe from center of intake or manhole to center
of intake or manhole. Where the end of the pipe discharges to a ditch or waterway,
measurement will be to the end of the pipe, exclusive of aprons. Lengths of elbows
and tees will be included in the length of pipe measured.
b. Payment: Payment will be made at the unit price per linear foot for each type and
size of pipe.
c. Includes: Unit price includes, but is not limited to, trench excavation, dewatering,
furnishing bedding material, placing bedding and backfill material,joint wrapping,
wyes and other fittings, pipe joints, pipe connections, testing, and inspection.
2. Trenchless:
a. Measurement: Each type and size of pipe installed by trenchless methods will be
measured in linear feet along the centerline of the pipe.
b. Payment: Payment will be made at the unit price per linear foot for each type and
size of pipe.
c. Includes: Unit price includes, but is not limited to, furnishing and installing pipe;
trenchless installation materials and equipment; pit excavation, dewate'ing, and
placing backfill material; pipe connections; testing; and inspection.
B. Storm Sewer with Casing Pipe:
1. Trenched:
a. Measurement: Each type and size of pipe installed with a casing pipe in a trench
will be measured in linear feet along the centerline of the casing pipe from end of
casing to end of casing.
4020—pg 1
Standard Specifications Division 4—Sewers and Drains
Section 4020—Storm Sewers
1.08 MEASUREMENT AND PAYMENT(Continued)
b. Payment: Payment will be made at the unit price per linear foot for each type and
size of pipe.
c. Includes: Unit price includes, but is not limited to, furnishing and installing both carrier pipe and casing pipe, trench excavation, dewatering, furnishing bedding
material, placing bedding and backfill material, furnishing and installing annular
space fill material, casing spacers, pipe connections, testing, and inspection.
2. Trenchless:
a. Measurement: Each type and size of pipe installed by trenchiess methods with a
casing pipe will be measured in linear feet along the centerline of the casing pipe
from end of casing to end of casing.
b. Payment: Payment will be made at the unit price per linear foot for each type and
size of carrier pipe.
c. Includes: Unit price includes, but is not limited to, furnishing and installing both
carrier pipe and casing pipe; trenchiess installation materials and equipment; pit
excavation, dewatering, and placing backfill material; casing spacers; furnishing and
installing annular space fill material; pipe connections; testing; and inspection.
C. Removal of Storm Sewer:
1. Measurement: Each type and size of pipe removed will be measured in linear feet from
end to end.
2. Payment: Payment will be made at the unit price per linear foot for each type and size of
pipe removed.
3. Includes: Unit price includes, but is not limited to, removal, disposal, and capping (if
specified) of pipe.
D. Connection to Existing Manhole or Intake: Connections to existing manhole or intake will
be measured and paid according to Section 6010, 1.08.
E. Storm Sewer Abandonment:
1. Plug: Plugging storm sewers is incidental to other work and will not be paid for
separately.
2. Fill and Plug:
a. Measurement: Each size of pipe filled and plugged will be measured in linear feet
from end of pipe to end of pipe.
b. Payment: Payment will be at the unit price per linear foot for each size of pipe filled
and plugged.
PART 2-PRODUCTS
2.01 STORM SEWERS
A. Reinforced Concrete Pipe(RCP):
1. Comply with ASTM C 76.
2. Minimum Class III, Wall B (Iowa DOT Class 2000D).
3. Use tongue and groove joints with cold applied bituminous or rubber rope gasket jointing
materials, unless otherwise specified. If specified, use rubber 0-ring or profile gasket
complying with ASTM C 443.
4. If specified, wrap exterior of each joint with engineering fabric.
B. Reinforced Concrete Arch Pipe(RCAP):
1. Comply with ASTM C 506,
4020—pg2
Standard Specifications Division 4—Sewers and Drains
Section 4020—Storm Sewers
2.01 STORM SEWERS (Continued)
2. Minimum Class A-III (Iowa DOT Class 2000D).
3. Use tongue and groove joints with cold applied bituminous or rubber rope gasket jointing
materials, unless otherwise specified.
4. If specified, wrap exterior of each joint with engineering fabric.
C. Reinforced Concrete Elliptical Pipe(RCEP):
1. Comply with ASTM C 507.
2. Minimum Class HE III (Iowa DOT Class 2000D) or Class VE III (Iowa DOT C ass 2000D).
3. Use tongue and groove joints with cold applied bituminous or rubber rope gasket jointing
materials, unless otherwise specified.
4. If specified, wrap exterior of each joint with engineering fabric.
D. Reinforced Concrete Low Head Pressure Pipe(RCPP):
1. Comply with ASTM C 361; minimum Class C 25.
2. Use tongue and groove joints. Comply with ASTM C 361 for rubber 0-rings Cr profile
gaskets.
E. Polyvinyl Chloride Pipe (PVC):
1. Use pipe complying with the following:
a. Types of PVC pipes:
1) Corrugated exterior, smooth interior, ASTM F 949.
2) Solid wall, ASTM D 3034 or ASTM F 679.
3) Closed profile, ASTM F 1803.
4) Composite, ASTM D 2680.
b. PVC plastic meeting ASTM D 1784, Cell Classification 12454. Do not exceed 10
parts by weight per 100 of PVC resin in the compound for additives and t Hers,
including but not limited to stabilizers, antioxidants, lubricants, and colorants.
c. Minimum pipe stiffness of 46 psi.
d. Integral bell and spigot joints with elastomeric seals according to ASTM D 3212 and
ASTM F 477.
2. Do not use in the right-of-way. Use only outside the right-of-way in public L tility
easement areas where no utilities exist or are proposed (running parallel or c rossing) or
where the trench for the PVC pipe will not be disturbed, and where the Engineer allows.
F. High Density Polyethylene Pipe (HDPE):
1. Use pipe complying with the following:
a. AASHTO M 294, Type S corrugated exterior and smooth interior.
b. ASTM D 3350 minimum resin Cell Classification 335420 C.
c. Minimum pipe stiffness at 5% deflection according to ASTM D 2412.
d. Integral bell and spigot joints with elastomeric seals complying with ASTM F 477.
e. Maximum 5% deflection of the average inside diameter by testing after installation
according to Section 4060, 3.05.
2. Do not use in the right-of-way. Use only outside the right-of-way in public utility
easement areas where no utilities exist or are proposed (running parallel or crossing) or
where the trench for the HDPE pipe will not be disturbed, and where the Engineer allows.
G. Corrugated Metal Pipe (CMP):
1. Use pipe complying with the following:
a. AASHTO M 36, Type I.
b. Zinc coating complying with AASHTO M 218.
4020—pg 3
Standard Specifications Division 4—Sewers and Drains
Section 4020—Storm Sewers
2.01 STORM SEWERS (Continued)
c. Corrugated steel circular section with annular or helical corrugations.
d. Gage of pipe according to Iowa DOT Standard Road Plan RF-32 or as specified in
the contract documents.
e. Coupling bands with annular or helical corrugations to match pipe ends.
2. Do not use in the right-of-way. Use only outside the right-of-way in public utility easement areas where no utilities exist or are proposed (running parallel or crossing) or
where the trench for the CMP will not be disturbed, and where the Engineer allows.
H. Spiral Rib Pipe:
1. Use pipe complying with the following:
a. ASTM A 760 Type 1 R.
b. Corrugation profile of 3/4 inch by 3/4 inch by 7 1/2 inches.
c. Type 2 aluminized steel complying with ASTM A 929.
d. Minimum thickness of 0.064 inch. Use gage of pipe according to manufacturer's
requirements or as specified in the contract documents.
e. Coupling bands complying with manufacturer's recommendations.
2. Do not use in the right-of-way. Use only outside the right-of-way in public utility
easement areas where no utilities exist or are proposed (running parallel or crossing) or
where the trench for the spiral rib pipe will not be disturbed, and where the Engineer
allows.
I. Coated Corrugated Metal Pipe:
1. Use in corrosive soil or effluent conditions, or where specified in the contract documents
or required by the Engineer.
2. Comply with AASHTO M 274. Use gage of pipe according to Iowa DOT Standard Road
Plans RF-32.or as specified in the contract documents.
3. Do not use in the right-of-way. Use only outside the right-of-way in public utility
easement areas where no utilities exist or are proposed (running parallel or crossing) or
where the trench for the coated CMP will not be disturbed, and where the Engineer
allows.
J. Corrugated Metal Arch Pipe(CMAP):
1. Use pipe complying with the following:
a. AASHTO M 36, Type II.
b. Zinc coating complying with AASHTO M 218.
c. Corrugated steel Type I pipe reformed into a pipe-arch having an approximately flat
bottom.
d. Coupling bands with annular corrugations or helical corrugations to match pipe ends.
e. Gage of pipe according to Iowa DOT Standard Road Plan RF-32.
2. Do not use in the right-of-way. Use only outside the right-of-way in public utility
easement areas where no utilities exist or are proposed (running parallel or crossing) or
where the trench for the CMAP will not be disturbed, and where the Engineer allows.
K. Spiral Rib Arch Pipe:
1. Use pipe complying with the following:
a. ASTM A 760 Type I I R.
b. Corrugation profile of 3/4 inch by 3/4 inch by 7 1/2 inch.
c. Type 2 aluminized steel complying with ASTM A 929.
d. Minimum thickness of 0.064 inch. Use gage of pipe complying with manufacturer's
requirements or as specified in the contract documents.
e. Coupling bands complying with the manufacturer's recommendations.
4020—pg 4
Standard Specifications Division 4—Sewers and Drains
Section 4020--Storm Sewers
2.01 STORM SEWERS (Continued)
2. Do not use in the right-of-way. Use only outside the right-of-way in public utility
easement areas where no utilities exist or are proposed (running parallel or crossing) or
where the trench for the spiral rib arch pipe will not be disturbed, and where the Engineer
allows.
L. Jointing Material for Concrete Pipe:
1. Bituminous Jointing Material: Use a cold-applied mastic sewer joint sealing compound
recommended by the manufacturer for the intended use and approved by the Engineer.
Comply with AASHTO M 198.
2. Rubber Rope Gasket Jointing Material: Comply with ASTM C 990.
3. Rubber 0-ring or Profile Gasket: Comply with ASTM C 443 (for RCP) or ASTM C 361
(for RCPP).
M. Bituminous Joint Primer: Material intended for use in priming concrete joints. Comply with
the requirements of ASTM D 41.
N. Engineering Fabric: Comply with Iowa DOT Article 4196.01.
O. Non-Shrink Grout: Comply with Iowa DOT Materials I.M. 491.13.
2.02 CASING PIPE
Comply with Section 3020, 2.02 for casing pipe requirements.
4020—pg 5
Standard Specifications Division 4—Sewers and Drains
Section 4020—Storm Sewers
PART 3 -EXECUTION
3.01 EXAMINATION
A. Verify measurements at site; make necessary field measurements to accurately determine
pipe makeup lengths or closures.
B. Examine site conditions to ensure construction operations do not pose hazards to adjacent
structures or facilities.
3.02 PIPE INSTALLATION
A. General:
1. Clean pipe interior and joints prior to lowering into trench. Keep pipe clean during
construction.
2. Begin at the lowest point in the line. Lay groove or bell end pointing upstream unless
specifically noted otherwise.
3. Place pipe with lifting holes at the top of the pipe and fill lift hole with non-shrink grout or
manufactured plugs.
4. Assemble joints as specified by the pipe manufacturer. When specified, wrap exterior of
storm sewer pipe joints with engineering fabric.
5. Use a saw to cut ends of pipe flush with inside wall of manholes, intakes, and structures.
Do not use hammer or other means to break pipe.
6. Provide manholes and intakes as specified in the contract documents.
7. Use watertight stopper, plug, or other approved means to protect the exposed upstream
ends of the pipe and prevent soil sediment from entering the storm sewer system.
B. Trenched:
1. Excavate trench and provide pipe bedding and backfill material as specified in Section
3010. If RCEP is used, provide pipe bedding as specified in the contract documents.
2. Prepare trench bottom to design line and grade so that only minor movement of the pipe
is necessary after installation.
3. Lay pipe to design line and grade. Set field grades to invert of pipe.
4. Provide uniform bearing for full pipe barrel length. Excavate bell holes as necessary for
uniform support of pipe barrel on bedding material.
5. Do not lay pipe in water or on saturated soil or bedding, or allow water to rise in trench
around pipe prior to placing backfill material.
6. Do not disturb installed pipe and bedding when using movable trench boxes and shields.
Block or anchor pipe as necessary to prevent joint displacement.
C. Trenchless: Comply with Section 3020.
3.03 STORM SEWER INSTALLED WITHIN A CASING PIPE
Comply with Section 3020, 3.04 for installation of storm sewer within casing pipe.
3.04 PIPE JOINTING
A. General:
1. Clean joint surfaces to remove soil or foreign material prior to jointing pipe.
2. Assemble joints according to pipe manufacturer's recommendations. Use equipment that
does not apply damaging forces to pipe joints
4020—pg 6
Standard Specifications Division 4-Severs and Drains
Section 4020 -Storm Sewers
3.04 PIPE JOINTING (Continued)
B. Reinforced Concrete Pipe (RCP), Reinforced Concrete Arch Pipe(RCAP),and
Reinforced Concrete Elliptical Pipe(RCEP):
1. Use cold applied bituminous or rubber rope gasket jointing materials unless otherwise
specified.
a. Apply joint material to entire tongue, or to top half of tongue and bottom half of
groove, in sufficient quantity to fill the joint. Close the joint between pipes.
b. Fill remaining voids in the joint, both inside and outside of pipe, with joint material.
Smooth the joint material on the inside of pipes 24 inches and larger.
2. If a rubber 0-ring or profile gasket is specified for RCP, coat the rubber gasket and joint
with soap-based lubricant immediately prior to closing the joint.
3. If wrapped pipe joint is specified, comply with Figure 4020.211. Secure engineering
fabric in place to prevent displacement while placing backfill material.
4. Place pipe such that joint openings on the outside or inside of the pipe do not exceed 1/8
inch at the bottom and 5/8 inch at the top.
- C. Reinforced Concrete Low Head Pressure Pipe (RCPP); Polyvinyl Chloride Pipe(PVC)
and Corrugated PVC Pipe; and High Density Polyethylene Pipe(HDPE): Cc at gasket
and joint with soap-based lubricant immediately prior to closing the joint.
D. Corrugated Metal Pipe (CMP)and Corrugated Metal Arch Pipe (CMAP): Lap coupling
bands to form a tightly closed joint upon installation.
E. Connections between Dissimilar Pipes:
1. Use manufactured adapters or couplings approved by the Engineer.
2. Where adapters or couplings are not available, the Engineer may authorize Jse of a
concrete collar as shown in Figure 4020.211.
3.05 TOLERANCES
The following tolerances apply to utilities installed by open trench construction. For trenchless
construction, comply with Section 3020.
A. Ensure horizontal and vertical alignment of gravity sewer lines does not vary frorr design line
and grade at any point along the pipe by more than 1% of the inside diameter of the pipe or
1/4 inch, whichever is larger.
B. Tolerance is allowed only if design line and grade is sufficient to prevent backslop:e when
tolerance limits are reached.
C. Reverse slope on pipe is prohibited. Remove and reinstall pipe to proper grade.
3.06 STORM SEWER ABANDONMENT
A. Plug:
1. Prior to placing the sewer plug, the Engineer will verify the sewer line is not in use.
2. Construct sewer plug by completely filling the end of the pipe with concrete. Force
concrete into the end of the pipe for a distance of 16 inches, or one-half the pipe
diameter, whichever is greater.
- B. Fill:
1. Prior to filling the sewer, the Engineer will verify the sewer line is not in use.
2. If specified in the contract documents, fill the line to be abandoned with flowable mortar
or CLSM (comply with Section 3010) by gravity flow or pumping.
4020-pg 7
Standard Specifications Division 4—Sewers and Drains
Section 4020—Storm Sewers
3.07 CONNECTION TO EXISTING MANHOLE OR INTAKE
Comply with Section 6010, 3.05.
3.08 CLEANING, INSPECTION,AND TESTING
Clean, inspect, and test according to Section 4060.
END OF SECTION
4020—pg 8
Standard Specifications Division 9—Site Work aid Landscaping
Section 9010-Seeding
SEEDING
PART 1 -GENERAL
1.01 SECTION INCLUDES
A. Certification of Products
B. Acceptance and Warranty
C. Seed Types and Mixes
D. Equipment
— E. Application of Seed
1.02 DESCRIPTION OF WORK
Includes the requirements for seedbed preparation; furnishing, applying, and coverinc: the seed;
and compaction of the seedbed.
1.03 SUBMITTALS
Comply with Division 1 -General Provisions and Covenants, as well as the following:
— A. Submit certification of products to the Engineer prior to seed placement:
1. Seed: Submit a mechanically printed seed tag from an Iowa Crop Improvement
Association-approved seed conditioner or grower. Submit a laboratory analysis for all
seeds, specifying the purity and germination. Provide 48 hours notice prior to mixing the
seed and give the Engineer an opportunity to witness the seed mixing.
2. Fertilizer: Submit certification of the fertilizer analysis with scale weight and statement of
guaranteed analysis. Submit from a certified fertilizer dealer, a mechanically printed
commercial fertilizer label, or bill of lading. Comply with the inspection and a::ceptance
requirements of Iowa DOT Materials I.M. 469.03.
3. Wood Cellulose Fiber Mulch: Submit certification of the degradable wood ce lulose fiber
mulch ingredients with applicable use and rate, and the water retention capacity by
manufacturer or supplier.
4. Wood Excelsior Mulch: Bale wood excelsior and determine the mass (weight). Use the
mass of the material, furnished by the manufacturer, to determine the rate of application.
— 5. Straw Mulch: Certify weight. Furnish a list of the number of bales and a corresponding
ticket from an approved scale for the mulch material to be used on the project.
6. Compost: Submit certification of composted organics analysis with U.S. Compost
Council's Seal of Testing Assurance (STA), recommended rates of application, and
manufacturer's estimated cubic yards per ton.
7. lnoculant: Furnish information from inoculant packaging.
8. Tackifier: Submit certification of the tackifier ingredients, recommended rater of
application, and expiration date.
B. When requested, submit written instructions recommending procedures for maintenance of
— seeded areas.
9010—pg 1
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
1.04 SUBSTITUTIONS
Comply with Division 1 -General Provisions and Covenants.
1.05 DELIVERY, STORAGE, AND HANDLING
Comply with Division 1 -General Provisions and Covenants, as well as the following:
A. Deliver packaged materials in original, unopened, and undamaged containers. Do not mix or
blend materials except in the presence of the Engineer.
B. Deliver, handle, and store all materials according to product recommendations, and protect
from loss, damage, and deterioration.
C. Materials not meeting these requirements will be rejected.
1.06 SCHEDULING AND CONFLICTS
Comply with Division 1 -General Provisions and Covenants, as well as the following:
A. Coordinate the seeding schedule with all other work on the project. Notify the Engineer at
least three calendar days prior to the start of seeding operations.
B. After all land-disturbing activities are complete and the seedbed has been approved by the
Engineer, perform seeding operations.
1.07 SPECIAL REQUIREMENTS
None.
1.08 MEASUREMENT AND PAYMENT
A. Conventional Seeding:
1. Seeding:
a. Measurement: Measurement will be in acres for each type of seed.
b. Payment: Payment will be in unit price per acre for each type of seed.
c. Includes: Unit price includes, but is not limited to, removal of rock and other debris
from the area; repairing rills and washes; preparing the seedbed; furnishing and
placing seed, including any treatment required; furnishing and placing fertilizer and
mulch; and furnishing water and other care during the care period, unless these items
are bid separately.
2. Fertilizing:
a. Measurement: Measurement will be in acres of fertilizer.
b. Payment: Payment will be at unit price per acre of fertilizer.
3. Mulching:
a. Measurement: Measurement will be in acres of mulch.
b. Payment: Payment will be in unit price per acre of mulch.
B. Seeding, Fertilizing, and Mulching for Hydraulic Seeding:
1. Measurement: Measurement will be in acres for each type of seed.
2. Payment: Payment will be in unit price per acre for each type of seed.
3. Includes: Unit price includes, but is not limited to, removal of rock and other debris from
the area; repairing rills and washes; preparing the seedbed; furnishing and placing seed,
including any treatment required; furnishing and placing fertilizer and mulch; and
9010—pg2
Standard Specifications Division 9—Site Work al id Landscaping
Section 9010-Seeding
1.08 MEASUREMENT AND PAYMENT (Continued)
furnishing water and other care during the care period, unless these items are bid
separately.
C. Seeding, Fertilizing, and Mulching for Pneumatic Seeding:
1. Measurement: Measurement will be in acres for each type of seed.
2. Payment: Payment will be in unit price per acre for each type of seed.
3. Includes: Unit price includes, but is not limited to, removal of rock and other debris from
the area; repairing rills and washes; preparing the seedbed; furnishing and placing seed,
including any treatment required; furnishing and placing fertilizer and mulch; and
furnishing water and other care during the care period, unless these items are bid
separately.
D. Watering:
1. Measurement: Measurement will be by metering of water applied. If metering is not
available, measurement will be by counting the loads from a transporting tar K of known
volume and gauging the contents of the transporting truck for partial loads.
2. Payment: Payment will be at the unit price per 1,000 gallons of water used.
E. Warranty:
1. Measurement: Lump sum item; no measurement will be made.
2. Payment: Payment will be at the lump sum price for the warranty.
3. Includes: Lump sum price includes, but is not limited to, all work required to correct any
defects in the original placement of the seeding for the period of time designated.
PART 2 - PRODUCTS
2.01 SEED
A. General:
1. Provide fresh, clean, new crop, certified seed complying with tolerance for germination
and purity and free of poa annua, bent grass, and noxious weed seed. Furnish all seeds,
including grass, legume, forbs, and cereal crop seeds, from an established seed dealer
or certified seed grower. All materials and suppliers are to follow Iowa Seed Law and
Iowa Department of Agriculture and Land Stewardship regulations, and be labeled
accordingly.
a. Turfgrass will have a certified "blue tag."
b. Native grass and forbs that are source-identified as GO-Iowa certified yellow tag,
when available.
2. Mix seed to the specified proportions by weight. Use methods approved by tie Engineer.
B. Seed Quality: Ensure the seed provided meets or exceeds the minimum requirements of
purity and germination stated on an analysis document that specifies quality. Approval of all
seed for use will be based on the accumulated total of Pure Live Seed (PLS)for each phase
of work. PLS is obtained by multiplying purity times germination. PLS shall not be less than
the accumulated total of the PLS specified.
9010—pg3
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
2.01 SEED(Continued) —
If the seed does not comply with minimum requirements for purity and germination and such
seed cannot be obtained, the Engineer may approve use of the seed on a basis of PLS or
may authorize a suitable substitution for the seed specified.
C. Requirements on Containers:
1. Seed: Provide seed with a tag on each container. Ensure the seed analysis on the label
is mechanically printed.
2. Mulch:When packaged, provide mulch in new labeled containers.
3. Tackifier: Provide tackifier packaged in new labeled containers.
4. Inoculant: Use inoculant that has a manufacturer's container, indicating the specific
legume seed to be inoculated and the expiration date. All inoculant must meet
requirements of the Iowa Seed Law. Follow precautions specified on the product label.
5. Sticking Agent: Use a commercial sticking agent recommended by the manufacturer of
the inoculant. For quantities less than 50 pounds, the sticking agent need not be a
commercial agent, but requires approval by the Engineer. Apply sticking agent
separately prior to application of inoculant. Follow safety precautions specified on the
product label. -
Table 9010.01: Domestic Grasses
Common Name Scientific Name Purity (%) Germination —
(%)
Bluegrass, Kentucky Poa pratensis 85 80 ._
Bluegrass, Ky. RAM-1 Poa pratensis-RAM-1 95 85
Bluegrass, Ky. PARK Poa pratensis-PARK 95 85 --
Brome, smooth-LINCOLN Bromus inermis 90 85
Fescue, tall, FAWN Festuca arundinacea-FAWN 98 85 --
Fescue, chewings, red Festuca rubra var. commutate 98 90
Fescue, creeping, red Festuca rubra 98 85 —
Fescue, red-PENNLAWN Festuca rubra PENNLAWN 98 85
Fescue, tall, olympic(fineleaf) Festuca arundinacea-Olympic 98 85 —
Fescue, tall, rebel (fineleaf) Festuca arundinacea 98 85
Fescue, sheeps Festuca ovina 98 85 —
Orchardgrass Dactylis glomerata 90 90
Red top Agrostis alba 92 85 —
Reed canarygrass Phalaris arundinacea 98 70
Wildrye, Canada Elymus Canadensis 95 85 —
Wildrye, Russian Elymus junceus 95 85
Ryegrass, perennial Lolium perenne 95 90
Timothy Phleum pretense 99 85
9010—pg4
Standard Specifications Division 9—Site Work aid Landscaping
Section 9010-Seeding
2.01 SEED (Continued)
Table 9010.02: Legumes
Common Name Scientific Name Purity(%) Germination
(%)
Alfalfa, RANGER/VERNAL Medicago sativa 99 90*
Alfalfa, travois Medicoa spp. 99 90*
Birdsfoot trefoil EMPIRE Lotus corniculatus 98 85*
Crownvetch, emerald Coronilla varia 98 70*
Hairy vetch Vicia villosa 96 85*
Lespedeza, Korean Lespedeza stipulacea 98 80*
Red clover, medium Trifolium pretense 99 90*
Alsike clover Trifolium hybridurn 99 90*
White clover Trifolium repens 98 90*
* Includes hard seed.
Table 9010.03: Stabilizing Crop
Common Name Scientific Name Purity(%) Germination
(%)
Oats Avena sativa 97 90
Rye Secale cereale 97 90
Sudangrass, PIPER Sorghum vulgare var. Sudanese 98 85
_ Table 9010.04: Native Grasses
Common Name Scientific Name PLS (%)
Big bluestem* Andropogon gerardii 30
Little bluestem* Andropogon scoparius 30
Switchgrass* Panicum virgatum 63
9010—pg5
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
Indiangrass* Sorghastrum nutans 30
Sideoats grama* Bouteloua curtipendula 30
Western wheatgrass* Agropyron smithii 56 —
Buffalograss* Buchloe dactyloides 60
Sand bluestem* Andropogon gerardii, var. paucipilus 30
Blue grama Bouteloua gracilis 30
Intermediate wheatgrass Agropyron intermedium 70 —
Slender wheatgrass Agropyron trachycaulum, var. unilaterale 70
Prairie dropseed Sporobolus heterolepis 65
Sand dropseed Sporobolus cryptandrus 65
Sand lovegrass Eragrostis trichodes 65 —
Weeping lovegrass Eragrostis curvula 85 —
Hairy wood chess Bromus purgans 60
Blue joint grass Calamagrostis Canadensis 47
Bottlebrush sedge Carex comosa 62
Tussock sedge Carex stricta 78 —
Fox sedge Carex vulpinoidea 64 •
Virginia wild-rye Elymus virginicus 60
Reed manna grass Glyceria grandis 50
Fowl manna grass Glyceria striata 72
Common rush Juncus effuses 80 —
Rice cut grass Leesia oryzoides 62
Rye grass, annual Lolium italicum 89
9010—pg6
Standard Specifications Division 9—Site Work a-id Landscaping
Section 9010-Seeding
Fowl bluegrass Poa palustris 72
Green bulrush Scirpus atrovirens 45
Wool grass Scirpus cyperinus 78
Soft-stem bulrush Scirpus vallidus 78
Indian grass Sorghastrum nutans 60
Spike rush Eleocharis palustris 71
* Furnish seed certified as Source Identified Class (Yellow Tag) Source GO-Iowa.
If the purity and/or germination of native grasses exceed the minimum required, tie application
rate may be adjusted based on PLS.
9010—pg7
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
2.01 SEED(Continued)
Table 9010.05: Forbs
Common Name Scientific Name PLS
(%)
Canada anemone Anemone Canadensis 72 —
Marsh milkweed Asclepias incarnate 25
New England aster Aster novae-angliae 25
Swamp aster Aster puniceus 25
Showy tic-trefoil Desmodium canadense 25 —
Joe-pye weed Eupatorium maculatum 66
Boneset Eupatorium perfoliatum 41 —
Ox eye sunflower Heliopsis helianthoides 38
Blue-flag iris Iris virginica-shrevii 19 _
Meadow blazingstar Liatris ligulistylis 24
Tall blazingstar Liatris pycnostachya 24 —
Great blue lobelia Lobelia siphilitica 13
Reed manna grass Glyceria grandis 50 --
Fowl manna grass Glyceria striata 72
Common rush Juncus effuses 80
Rice cut grass Leesia oryzoides 62
2.02 SEED MIXTURES AND SEEDING DATES See the contract documents for the specified seed mixture. If a mixture is not specified, use the
following. The Contractor may submit a modification of the mixture for the Engineer's
consideration.
A. Type 1 (Permanent Lawn Mixture): Used for residential and commercial turf site, fertilized,
and typically mowed. Use between March 1 and May 31 and between August 10 and
September 30.
Table 9010.06: Type 1 Seed Mixturel
Common Name Application Rate lb/acre
Kentucky bluegrass cultivar2 S5
Kentucky bluegrass cultivar2 65
Kentucky bluegrass cultivar2 65
Creeping red fescue 25
Fine-leafed perennial ryegrass3 20
Fine-leafed perennial ryegrass3 20
Annual ryegrass 40
9010—pg8
Standard Specifications Division 9—Site Work and Landscaping
Sectior 9010-Seeding
1 A commercial mixture may be used if it contains a high percentage of similar bluegrasses;
it may or may not contain Creeping Red Fescue.
2 Choose three different cultivars of Kentucky Bluegrass.
3 Choose two different cultivars of Fine-Leafed Perennial Ryegrass,at 20 pounds/acre each.
B. Type 2 (Permanent Cool Season Mixture for Slopes and Ditches): Not typically mowed.
Reaches a maximum height of 2 to 3 feet, low fertility requirements, grows in the spring and
fall, and can go dormant in the summer. Use between March 1 and May 31 and between
August 10 and September 30.
Table 9010.07: Type 2 Seed Mixture
Common Name Application Rate lb/acre
Fawn rescue 55
Ryegrass (perennial) 45
Birdsfoot trefoil (empire) 5
Grain rye 40
C. Type 3 (Permanent Warm-Season Slope and Ditch Mixture): Not typically mowed.
Reaches a height of 5 to 6 feet, stays green throughout summer, and responds IA ell to being
burned in spring; no fertilizer. Use between March 1 and June 30.
Table 9010.08: Type 3 Seed Mixture
Common Name Application Rate lb/acre
Little bluestem 3 PLS
Indiangrass 4 PLS
Side-oats gama 5 PLS
Switchgrass 1 PLS
Big bluestem 3 PLS
Oats 16
Grain rye 40
C. Type 4(Urban Temporary Erosion Control Mixture): Short lived (6 to 8 months) mix for
erosion control.
Table 9010.09: Type 4 Seed Mixture
Common Name Application Rate lb/acre
SPRING - March 1 - May 20
Oats* 65
Annual ryegrass 40
SUMMER -May 21 -August 14
Oats* 95
9010—pg9
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
Annual ryegrass 50
FALL-August 15-September 30
Oats* 65
Annual Ryegrass 40
*Engineer may delete for previously established urban areas.
E. Type 5(Rural Temporary Erosion Control Mixture): Short lived mix for erosion control.
Table 9010.10: Type 5 Seed Mixture
Common Name Application lb/acre
SPRING -March 1 - May 20
Oats 65
Grain rye 25
Red clover 5
Timothy 5
SUMMER- May 21 -August 14
Oats 95
Grain rye 35
Red clover 5
Timothy 5
FALL-August 15-September 30
Oats 65
Grain rye 35
Red clover 5
Timothy 5
F. Type 6 (Salt-resistant Mixture): Use for grass medians and areas immediately back of curb
on streets subject to regular salt applications for winter de-icing. Apply between March 1 and
May 31 and between August 10 and September 31.
Table 9010.11: Type 6 Seed Mixture
Common Name Application Rate lb/acre
Fults alkali grass 75
Hard fescue 50
Sheeps fescue 50
Nublue Kentucky bluegrass 37.5
9010—pg 10
Standard Specifications Division 9—Site Work E.rid Landscaping
Section 9010-Seeding
Blue chip Kentucky bluegrass 37.5
G. Wetland Seeding: Between April 1 and June 30 and between August 1 and August 31, use
the following seed mixture for wetland grass seeding areas.
— Table 9010.12: Wetland Grass Seed Mixture
Common Name Scientific Name PLS
(per ac)
Blue vervain Verbena Hastata 1 oz.
Boneset Eupatorium perfoliatum 1 oz.
Nodding bur marigold Bidens cernua 8 oz.
Swamp milkweed Asclepias incarnata 1 lb.
Sneezeweed Helenium autumnale 2 oz.
Water plantain Alisma plantago-aquatica 4 oz.
Arrowhead Sagittaria latifolia 4 oz.
New England aster Symphyotrichum novae-angliae 2 oz.
Big Bluestem Andropogon gerardii 1 lb.
Switchgrass Panicum virgatum 8 oz,
IPrairie cordgrass Spartina pectinata 1 lb.
Virginia wild-rye Elymus virginicus 5 lbs.
Bluejoint grass Calamagrostis 1 oz.
Rice cutgrass Leersia oryzoides 4 oz.
Dark Green bulrush Scirpus atrovirens 1 oz.
Fox sedge Carex vulpinoidea 4 oz.
Softstem bulrush Schoenoplectus tabernaemontani 8 oz.
_ Spike rush Eleocharis palustris 4 oz.
Porcupine sedge Carex hystericina 8 oz.
Broom sedge Carex scoparia 2 oz.
Tussock sedge Carex stricta 2 oz.
9010—pg11
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
2.02 SEED MIXTURES AND SEEDING DATES (Continued)
H. Native Grass and Wildflower Seeding: Between April 1 and June 30 and August 1 and
August 31, use the following seed mixture for areas designated for native grass and
wildflower seeding.
Table 9010.13: Native Grass and Wildflower Seeding Mixture*
Common Name Scientific Name PLS PLS
(per ac) (per ha)
Grain rye Secale cereale 22.5 lbs 25 kg
Canada wild rye Elymus Canadensis 12 lbs. 13 kg
Switchgrass Panicum virgatum 2 lbs. 2.2 kg
Big bluestem Andropogon gerardi 8 lbs. 9 kg
Indiangrass Sorghastrum nutans 8 lbs. 9 kg
Little bluestem Schizachyrium scoparium 4 lbs. 4.5 kg
Sideoats grama Bouteloua curtipendula 3 lbs. 3.4 kg
Blue grama Bouteloua gracilis 3 lbs. 3.4 kg
Purple prairie clover Dalea purpurea 4 oz. 280 g
Blackeyed susan Rudbeckia hirta 4 oz. 280 g
Prairie blazing star Liatris pycnostachya 4 oz. 280 g
Butterfly weed Asclepias tuberosa 4 oz. 280 g
Wild bergamot Monarda fistulosa 4 oz. 280 g
Gray-headed coneflower Ratibida pinnata 4 oz. 280 g
New England aster Symphyotrichum 2 oz. 140 g
novae-angliae
*Furnish seed certified as Source Identified Class(Yellow Tag)Source GO-Iowa.Grain Rye is
excluded from this requirement.
2.03 FERTILIZER
Use fertilizer of the grade, type, and form specified that complies with rules of the Iowa
Department of Agriculture and Land Stewardship and the following requirements:
A. Grade: Identify the grade of fertilizer according to the percent nitrogen (N), percent of
available phosphoric acid (P205), and percent water soluble potassium (K2O), in that order,
and base approval on that identification.
The Contractor may substitute other fertilizer containing analysis percentages different from
those specified, provided that the minimum amounts of actual nitrogen, phosphate, and
potash per acre are supplied, and that in no case does the total amount per acre of the three
fertilizer elements be exceeded by 30% of the following minimum amounts.
1. For Conventional Seeding, Permanent: Apply a 13-13-13 commercial fertilizer or the
equivalent units of nitrogen, phosphate, and potash at the rate of 450 pounds per acre.
2. For Conventional Seeding,Temporary: Apply commercial fertilizer to all seeded areas
at the rate of 450 pounds per acre of 13-13-13 (or equivalent) unless otherwise specified
9010—pg12
Standard Specifications Division 9—Site Work a nd Landscaping
Section 9010-Seeding
in the contract documents.
3. For Hydraulic Seeding: Apply fertilizer in combination with seeding by a hycraulic
seeder and as specified in Iowa DOT Article 2601.03, B. Apply a 13-13-13 cc rnmercial
fertilizer or the equivalent units of nitrogen, phosphate, and potash at the rate of 450
pounds per acre.
4. For Pneumatic Seeding: Based on the compost nutrient analysis, supply ar additional
commercial fertilizer necessary to meet the 13-13-13 units of nitrogen, phosphate, and
potash at the rate of 450 pounds per acre as the compost is applied.
B. Type: Use fertilizer that can be uniformly distributed by the application equipmen°. Furnish
fertilizer either as separate ingredients or in chemically-combined form.
2.04 STICKING AGENT
A. Use a sticking agent that is a commercial material recommended by the manufacturer to
improve adhesion of inoculant to the seed. For small quantities less than 50 pour ds, the
sticking agent need not be a commercial agent, but it must be approved by the Engineer and
must be applied separately, prior to application of inoculant.
B. Follow safety precautions specified on the product label. A sticking agent is not required if a
liquid formulation of inoculant is used.
2.05 INOCULANT FOR LEGUMES
An inoculant is a culture of bacteria specifically formulated for each legume seed (alfalfa, clovers,
lespedesa, birdsfoot trefoil, hairy vetch, and crownvetch). Ensure the manufacturer's container
indicates the specific legume seed to be inoculated and the expiration date. Use inoculant that
meets the requirements of the Iowa Seed Law. Follow the safety precautions specified on the
product label.
2.06 WATER
Use water that is free of any substance harmful to seed germination or plant growth.
2.07 MULCH
A. For Conventional Seeding:
1. Material used as mulch may consist of the following:
a. Dry cereal straw(oats, wheat, barley, or rye)
b. Prairie hay
c. Wood excelsior composed of wood fibers, at least 8 inches long, based on an
average of 100 fibers, and approximately 0.024 inch thick and 0.031 inch wide. The
fibers must be cut from green wood and be reasonably free of seeds or other viable
plant material.
2. Do not use other hay (bromegrass, timothy, orchard grass, alfalfa, or clover).
3. All material used as mulch must be free from all noxious weed, seed-bearing stalks, or
roots and will be inspected and approved by the Engineer prior to its use.
4. The Contractor may use other materials, subject to the approval of the Engineer.
B. For Hydraulic Seeding:
1. Wood Cellulose:
9010—pg13
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
2.07 MULCH (Continued)
a. Use material that is a natural or cooked cellulose fiber processed from whole wood
chips, or a combination of up to 50% of cellulose fiber produced from whole wood
chips, recycled fiber from sawdust, or recycled paper(by volume).
b. Product contains a colloidal polysaccharide tackifier adhered to the fiber to prevent
separation during shipment and avoid chemical co-agglomeration during mixing.
c. Form a homogeneous slurry of material, tackifier, and water.
d. Use a slurry that can be applied with standard hydraulic mulching equipment.
e. Dye the slurry green to facilitate visual metering during application.
f. Do not use materials that have growth or germination-inhibiting factors or any toxic
effect on plant or animal life when combined with seed or fertilizer.
2. Bonded Fiber Matrix(BFM):
a. Produced from long-strand wood fibers, held together by organic tackifiers and
bonding agents that, when dry, become insoluble and non-dispersible.b. Upon curing 24 to 48 hours, form a continuous, 100% coverage, flexible, absorbent,
erosion-resistant blanket that encourages seed germination. -.
c. Manufactured to be applied hydraulically.
d. Physical Properties:
1) Fibers: Virgin wood, greater than 88% of total volume.
2) Organic Material: Greater than 96% of total volume.
3) Tackifier: 8-10%.
4) pH: 4.8 minimum. -'
5) Moisture Content: 12% +/- 3%.
6) Water-holding Capacity: 1.2 gal/lb.
e. Dyed green to facilitate visual metering.3. Mechanically-Bonded Fiber Matrix(MBFM):
a. Produced from long-strand wood fibers and crimped, interlocking synthetic fibers.
b. Within two hours of application, form a continuous, 100% coverage, flexible,
absorbent, porous, erosion-resistant blanket that encourages seed germination.
c. Manufactured to be applied hydraulically.
d. Physical Properties:
1) Wood Fibers: 73% minimum.
2) Tackifier: 10% +/- 1%.
3) Crimped, Interlocking Synthetic Fibers: 5% +/- 1%.
4) Moisture Content: 12% +/-3%.5) Water holding capacity: 1.2 gal/lb.
6) Minimum pH: 4.8.
e. Dyed green to facilitate visual metering.
C. For Pneumatic Seeding: Use compost meeting the following requirements.
1. Derived from a well-decomposed source of organic matter.
2. Produced using an aerobic composting process, meeting Code of Federal Regulations
(CFR) 503 for time, temperature, and heavy metal concentrations.
3. No visible admixture of refuse or other physical contaminants, nor any material toxic to
plant growth.
4. Certified by the U.S. Composting Council's Seal of Testing Assurance (STA) program.
9010—pg14
Standard Specifications Division 9—Site Work znd Landscaping
Section 9010-Seeding
2.07 MULCH (Continued)
5. Conforms to chemical, physical, and biological parameters of AASHTO MP 10-03, with
the following additional requirements:
a. Follow U.S. Composting Council's TMECC guidelines for all testing.
b. Organic Matter Content: 30% minimum.
c. pH: between 6.0 and 8.0.
d. Maturity (growth screening): Minimum 90% emergence for all compost tc, be
vegetated.
e. Particle Size:
Sieve Size Percent Passing*
2" 100
1" 90-100
3/" 65-100
3/8" 0-75
*6 inch maximum particle length.
9010—pg15
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
PART 3 -EXECUTION
3.01 EQUIPMENT
A. Aerial Equipment: When aerial application of seed and fertilizer is specified, use aerial
equipment capable of providing a uniform distribution of seed and fertilizer on the specified
area.
B. Compost Blower: A compost blower is pneumatic equipment to blow compost over the
desired area. It may be equipped with a supplemental seed injection system. Use
equipment with sufficient power to cover the required area without driving on the prepared
seedbed.
C. Cultipacker: Use a pull-type cultipacker with individual rollers or wheels. Cultipackers with
sprocket-type spacers between the wheels may be used. The cultipacker must produce a
corrugated surface on the area being compacted. Operate the cultipacker separately from all
other operations, and do not attach the cultipacker to the seeder or disk, unless combined
cultipacker seeder is manufactured to operate as a unit. Make provisions for addition of
weight.
D. Disk: When preparing a seedbed on ground having heavy vegetation, use a disk with
cutaway blades. Make provisions for the addition of weight to obtain proper cutting depth.
E. Endgate Cyclone Seeders: Endgate cyclone seeders must be suitably mounted.
Movement must be provided by mechanical means. The seed drops through an adjustable
flow regulator onto a rotating, power driven, horizontal disk or fan.
F. Expanded Mesh Roller: Use equipment that is an open grid type or a cultipacker type,
modified by covering with expanded metal mesh. _.
G. Field Tiller: Use equipment designed for the preparation of the seedbed to the degree
specified.
H. Gravity Seeders: Gravity seeders must provide agitation of the seed, have an adjustable
gate opening, and uniformly distribute seed on the prepared seedbed. Use a seed hopper
equipped with baffle plates spaced no more than 2 feet apart. The baffle plates must extend from the agitator shaft to within approximately 2 inches of the top of the seed hopper, Wind
guards are required to facilitate seeding when moderate wind conditions exist and when
ordered by the Engineer. Place wind guards in front or in back(or both) of the seed outlet
and extend them to near the ground line. This seeder may be used for application of
fertilizer.
I. Hand Cyclone Seeders: Hand cyclone seeders are carried by the person dispensing seed.
The seed drops through an adjustable flow regulator onto a rotating, hand driven, horizontal —
disk or fan.
J. Hydraulic Seeder: Use hydraulic seeding equipment with a pump rated at no less than 100
gallons per minute. Inoculant, seed, and fertilizer may be applied in a single operation. The
equipment must have a suitable working pressure and a nozzle adapted to the type of work.
Supply tanks must have a means of agitation. Calibrate tanks and provide them with a
calibration stick or other approved device to indicate the volume used or remaining in the
tank.
K. Mowers: Use mowers that are rotary, flail, disk, or sickle type. Do not use mowers that
bunch or windrow the mowed material.
9010—pg16
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
3.01 EQUIPMENT(Continued)
L. Mulch Stabilizer: Use a mulch stabilizer designed to anchor straw or hay mulch into soil by
means of dull blades or disks. It should have flat blades or disks, may have cutaway edges,
must have a nominal minimum diameter of 20 inches, and must be spaced at approximately
8 inch intervals. The mulch stabilizer must be pulled by mechanical means and weigh
approximately 1,000 pounds. When directed by the Engineer, increase the weight by
addition of ballast.
L. Native Grass Seed Drill: Use a native grass seed drill designed to provide unifo-m
distribution of native grass and wildflower seeds. Provide separate seed boxes tc apply both
small seeds as well as fluffy bearded seeds. If a no-till attachment is specified, use an
attachment of the same manufacturer as the drill.
N. Pneumatic Seeder: Use an air blown system with sufficient power and hose to reach 300
feet.
O. Pulverizer: Use equipment designed to break up compacted soil to prepare a seedbed.
P. Rotary Tiller: Use equipment with rotary-type blades designed for the preparations of
seedbed to the degree specified.
Q. Slope Harrow: Use a slope harrow, consisting of a rolling weight attached by heavy chain to
a tractor. The chain must be of suitable length, with picks attached, and a means of rotating
the picks as the rolling weight is pulled in a direction parallel to the movement of the tractor.
R. Spike Tooth Harrow: Use equipment designed to provide adjustment of the spike teeth to
level the ground, or to be used as specified by the Engineer.
S. Straw Mulching Machine: Use a machine to uniformly apply mulch material over the
desired area without excessive pulverization. The Engineer may consider excessive
pulverization as the general absence of straw longer than 6 inches after distribution.
3.02 AREA OF SEEDING
Place seed only in the areas specified in the contract documents. Repair damaged areas that are
disturbed outside the contract limits at the expense of the Contractor. Do not disturb areas
having a satisfactory growth of desirable grasses or legumes.
3.03 FINISH GRADING AND TOPSOIL
See Section 2010 for finish grading and topsoil placement.
3.04 CONVENTIONAL SEEDING
A. Order of Operations:
1. Fertilizing
2. Seedbed preparation
3. Seed preparation/application
4. Mulching
B. Fertilizing:
1. Apply fertilizer immediately prior to seedbed preparation. Incorporate the fertili.er into
the top 2 to 3 inches of topsoil during the seedbed preparation. Equipment tha- results in
9010—pg 17
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
3.04 CONVENTIONAL SEEDING (Continued)
ruts or excessive compaction will not be allowed.
2. Do not apply fertilizer with native grass, wildflower, or wetland seeding.C. Seedbed Preparation, Permanent:
1. Limit preparation of seedbed to areas that will be seeded immediately upon completion.
2. Work areas accessible to field equipment to a depth of no less than 3 inches. Use
mechanical rotary tillage equipment for the preparation of seedbed on earth shoulders,
urban or raised medians, and rest areas. Prepare by hand areas inaccessible to field
machinery, to a depth of no less than 2 inches. Use care that the entire width of the
shoulder and areas around headwalls, wingwalls, flumes, and other structures are
prepared in the manner specified. Where weed growth has developed extensively, they
may be disked into the ground. If weed growth develops sufficiently to interfere with
proper seedbed preparation, mow the weeds and remove them from the project at no
additional cost to the Contracting Authority.
Use crawler type or dual-wheeled tractors for seedbed preparation. Operate equipment
in a manner to minimize displacement of soil and disturbance of the design cross-section.
Harrow ridging in excess of 4 inches due to operation of tillage equipment prior to rolling
with the cultipacker. Roll the area with no less than one pass of the cultipacker prior to
permanent seeding.
3. Shape and fine grade to remove rills or gullies, water pockets, undesirable vegetation,
and irregularities to provide a smooth, firm, and even surface true to grade and crosssection.
For Type 1 (lawn seeding), prepare to a fine texture and without soil lumps.
Coordinate preparation of all ditches designated for special ditch control with the seedbed
preparation. Till parallel to the contours.
4. Smooth the seedbed with a cultivator-type tillage tool having a rake bar or a rock rake.
Pick up and remove all debris, such as rocks, stones, concrete larger than 2 inches (1/2
inch maximum for lawn seeding), or roots and other objectionable material that will
interfere with the seeding operation. A spring tooth cultivator may be used in lieu of a
rock picker. Remove the rock by hand after each use of the cultivator; repeat the process
until the soil is relatively free of rock as determined by the Engineer.
5 Choose equipment to minimize soil compaction. Operate equipment in a manner to
minimize displacement of soil and disturbance of the design cross-section. Roll the area —
with at least one pass of the cultipacker. Remove ruts that develop during the sequence
of operations before subsequent operations are performed. This must be completed just
prior to seeding and the work approved by the Engineer before the seeding application.
D. Seedbed Preparation,Temporary: Till the soil to a minimum depth of 5 inches with a disk,
harrow, or field cultivator.
E. Seeding:
1. Seed Preparation:
a. Thoroughly mix all seed specified for the contract prior to placing the seed in the
seed hopper. Provide 48 hours notice prior to mixing the seed, and give the
Engineer an opportunity to witness the seed mixing. The mixing of a certified blue
tag seed mix at an approved (by Iowa Crop Improvement Association) seed
9010—pg18
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
3.04 CONVENTIONAL SEEDING (Continued)
conditioner's facility need not be witnessed.
b. Treat all legume seed with a commercial sticking agent to be applied prior to
application of inoculant, or as a mixture when the sticking agent is compatible with
other materials. A sticking agent is not required if a liquid formulation of inoculant is
used. Use mechanical mixing equipment to apply sticking agent and inoculant on
seed quantities over 50 pounds.
c. Inoculate all legumes with a standard product humus culture before being mixed with
other seeds for sowing.
d. Inoculate all legumes with a standard culture at the rate specified by the
manufacturer of the inoculant according to Iowa DOT Article 4169.04. De not expose
inoculated seed to direct sunlight for more than 30 minutes. Re-inoculate seed that is
not sown within 8 hours after inoculation prior to use. Pre-inoculated seed with
manufacturer's recommended protective coating may be used in lieu of seed with
Contractor-applied inoculant.
e. When the gravity or cyclone seeder is used for application of seed, inocu ate legume
seed according to the manufacturer's recommended procedures, before nixing with
other grass seeds for sowing. Furnish and apply inoculant.
2. Seed Application, Permanent:
a. Prior to seeding, the seedbed will be inspected and approved by the Eng neer. Use
methods and procedures consistent with equipment manufacturer's
recommendations; however, do not operate ground-driven equipment at speeds
greater than 10 mph.
b. On all areas accessible to machinery, sow seed with a gravity seeder, endgate
cyclone seeder, or seed drill.
c. On areas inaccessible to field machinery, the use of hand-operated cyclone seeders
will be allowed, but no other hand-seeding methods will be accepted.
d. The application of grass and legume seed with hand seeders on early spr ng work
must be performed as separate operations. No mixing of the two types of seed will
be allowed.
e. All seeded areas will have one pass with a roller or cultipacker to firm the soil.
3. Seed Application, Temporary:
a. On areas accessible to field machinery, sow seed with an endgate cyclone seeder.
b. On areas inaccessible to field machinery, the use of hand-operated cyclone seeders
will be allowed, but no other hand-operated seeding methods will be accepted.
c. Cover the seed and fertilizer by lightly tilling the seeded area with a disk, rigid harrow,
i spring tooth harrow, or field cultivator.
4. Seeding Outside of the Specified Seeding Dates: With the agreement of the Engineer
and at the full responsibility of the Contractor, seeding operations may be conducted
outside the specified seeding dates. Should the seeded areas require reseeding, it must
be done as specified and at no additional cost to the Contracting Authority.
a. Dormant Seeding: When winter dormant seeding is allowed or specified by the
Jurisdiction, complete it when air temperatures are consistently below 40°F and prior
to December 25 of a given year. Dormant seeding is not allowed on snow.
1) Prepare the seedbed before the ground freezes.
2) To ensure protection of the seed, apply on a frosty morning or before a predicted
snow.
9010—pg19
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
3.04 CONVENTIONAL SEEDING (Continued)
3) Seeding may be done by hand or with seeding equipment.
4) For hydraulic seeding, apply the fertilizer at no more than 0.5 pounds nitrogen
per 1000 square feet, followed by the seed.
b. Frost Seeding (Overseeding):
1) Complete frost seeding, also referred to as overseeding, in the spring when the
ground is friable from frost action (February 1 to April 1).
2) Frost seeding is not allowed on more than 1 inch of snow.
3) Seeding can be done with a hand-operated cyclone seeder or other equipment.
4) Seedbed preparation will not be required provided the ground is friable from frost
action.
F. Mulching:
1. Mulch all conventionally seeded areas the same day the seed is sown. Uniformly --
distribute the mulch over the required areas at a rate of 1.5 tons/acre for dry cereal straw,
or native grass straw. Prairie hay is not suitable for Type 1 (lawn seeding).
2. Work the mulch into the soil with a mulch stabilizer designed to anchor the mulch into the
soil by means of dull blades or disks. Operate equipment in a manner to minimize
displacement of the soil and disturbance of the design cross-section. --
3.05 HYDRAULIC SEEDING
A. Order of Operations:
1. Seedbed preparation
2. Seed application, fertilizing, and mulching
B. Seedbed Preparation: Follow seedbed preparation for conventional seeding in Section
9010, 3.04.
C. Seed Preparation: lnoculant, in the quantities specified above, may be applied directly into
the supply tank with seed, water, and other material.
D. Seed Application, Fertilizing, and Mulching:
1. Place all material, seed, fertilizer, mulch, and tackifier(if applicable) in hydraulic mulching
equipment specifically manufactured for hydraulic seeding. Do not apply fertilizer with
native grass, wildflower, or wetland seeding.
2. Ensure the hydraulic equipment, pump, and application process do not damage or crack
seeds.
3. Mix materials with fresh potable water using a combination of both recirculation through
the equipment's pump, and mechanical agitation to form a homogeneous slurry.
4. Apply mixture within 1 hour after seed and fertilizer are placed in the hydraulic seeder.
5. If necessary, dampen dry, dusty soil, to prevent balling of the material during application.
6. Apply the slurry evenly over all specified areas at component material rates specified.
a. Wood Cellulose Mulch:
1) Mulch: Minimum 2,600 lb/acre dry weight.
2) Tackifier: Minimum 50 lb/acre.
9010—pg 20
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
3.05 HYDRAULIC SEEDING (Continued)
b. Bonded Fiber Matrix: Minimum 3,600 lb/acre dry weight.
c. Mechanically-bonded Fiber Matrix: Minimum 3,600 lb/acre dry weight.
7. Retain and count empty bags of mulch to ensure final application rate.
8. Hydromulching may be done over conventional seeding and/or fertilizing, if approved by
the Engineer.
3.06 PNEUMATIC SEEDING
A. Order of Operations:
1. Seedbed preparation
2. Seed preparation
3. Seed application
B. Seedbed Preparation: Follow seedbed preparation for conventional seeding in Section
9010, 3.04.
C. Seed Preparation: Follow seed preparation for conventional seeding in Section 9010, 3.04.
Pre-inoculate seed in the quantities specified above prior to placing in the seed equipment.
D. Seed Application:
1. Place all material, seed, fertilizer, and compost in equipment with a calibratec seeder
attachment specifically designed for pneumatic seeding. Do not apply fertilizer with
native grass, wildflower, or wetland seeding.
2. Apply compost to a 1 inch minimum depth on all designated disturbed areas. Apply the
compost with a pneumatic (air blower) system with sufficient power and hose to reach
300 feet. Driving on the soil to apply compost will not be allowed.
3. Inject seed and fertilizer into the top 1/4 inch to 1/2 inch of compost during application
with a calibrated seed injector at the specified rate.
3.07 WATERING
A. Provide water, equipment, transportation, water tanker, hoses, and sprinklers.
B. Use enough water to keep the soil and mulch moist to a depth of 1 inch and ensut e growth of
the seed. For turfgrass seeding areas, sufficiently water to keep the soil moist for 3 minimum
of 21 days. If natural rainfall is adequate to keep the soil and mulch moist, artificia watering
may not be needed.
3.08 RE-SEEDING
A. When all work related to seeding, fertilizing, and/or mulching has been completed on an area,
and is washed out or damaged, re-seed, fertilize, and/or mulch the area at the cor tract unit
price(s)when so ordered by the Engineer.
B. When work related to seeding, fertilizing, and/or mulching has not been completec in an area
and is washed out or damaged, re-seed, fertilize, and/or mulch the area as necessary at no
additional cost to the Contracting Authority.
9010—pg21
Standard Specifications Division 9—Site Work and Landscaping
Section 9010-Seeding
3.09 CLEAN UP
All work related to clean up throughout the project and upon completion is the responsibility of the
Contractor, at no additional cost to the Contracting Authority.
A. Remove all excess materials, debris, and equipment upon completion of work.
B. Clean all paved surfaces open for public use at the end of each day and prior to forecasted
precipitation.
C. Repair any damage resulting from seeding operations.D. Remove hydraulic slurry and other excess debris related to seeding operations from
buildings, landscaping, mulch, pavement, signs, sign posts, and any other areas not specified
for application, at the end of each day.
3.10 ACCEPTANCE AND WARRANTY
A. Acceptance:
1. Guarantee in writing that all work has been completed as specified and provide the date
that all activities were completed. When a warranty is a separately-bid item, this also
establishes the beginning of the warranty period.
2. Acceptance will occur, provided seeded areas are in a live, healthy, growing, and well
established condition without eroded areas, bare spots, weeds, undesirable grasses,
disease, or insects.
a. Projects without a separately-bid warranty will be accepted no sooner than 60 days
from the date that all activities were completed.
b. When a warranty is established as a bid item and the warranty period excludes 60
days, projects may be accepted after all specified work, excluding the warranty, is
satisfactorily completed, and a supplemental contract for the warranty is executed
according to the Code of Iowa Section 573.27.
B. Warranty:
1. Required only when established as a bid item by the Engineer.
2. The warranty is to guarantee completed seeding areas for a maximum period of twelve
months.
3. During the warranty period, correct and reseed any defects in the seeded areas and
grass stand, such as weedy areas, eroded areas, and bare spots, until all affected areas
are accepted by the Engineer.
4. Replace or repair to original condition, all damages to property resulting from the seeding
operation or from the remedying of defects, at the Contractor's expense.
5. Replacement costs are the Contractor's responsibility, except for those resulting from
loss or damage due to occupancy of the project in any part, vandalism, civil
disobedience, acts of neglect on the part of others, physical damage by animals,
vehicles, fire, or losses due to curtailment of water by local authority, or by"Acts of God."
END OF SECTION
9010—pg22
SUDAS Standard Specifications Division 9-Site Work and Landscaping
Section 9070- Landscape Retaining Walls
LANDSCAPE RETAINING WALLS
PART 1 -GENERAL
1.01 SECTION INCLUDES
A. Modular Block Retaining Walls
B. Limestone Retaining Walls
C. Landscape Timber Retaining Walls
1.02 DESCRIPTION OF WORK
A. Construction of modular block retaining walls.
B. Construction of limestone retaining walls.
C. Construction of landscape timber retaining walls.
1.03 SUBMITTALS
Comply with Division 1 -General Provisions and Covenants, as well as the following:
—' A. Upon request, submit certification that products supplied comply with identified specifications.
B. Test results on modular blocks, if required.
C. Catalog cuts for modular retaining wall blocks and cap stones indicating the size, type, and
color proposed for installation.
1.04 SUBSTITUTIONS
Comply with Division 1 -General Provisions and Covenants.
1.05 DELIVERY, STORAGE, AND HANDLING
Comply with Division 1 -General Provisions and Covenants.
1.06 SCHEDULING AND CONFLICTS
Comply with Division 1 -General Provisions and Covenants.
1.07 SPECIAL REQUIREMENTS
None.
1 10/18/2011
SUDAS Standard Specifications Division 9-Site Work and Landscaping
Section 9070-Landscape Retaining Walls
1.08 MEASUREMENT AND PAYMENT
A. Modular Block Retaining Wall: ---
1. Measurement: Measurement will be in square feet for the area of the face of retaining
wall, measured from the top of the leveling pad to the top of the wall, including coping or
cap stones.
2. Payment: Payment will be at the unit price per square foot of retaining wall.
3. Includes: Unit price includes, but is not limited to, excavation,foundation preparation,
furnishing and placing wall units, geogrid (if necessary), leveling pad, subdrain, porous
backfill material for subdrain, engineering fabric for subdrain, granular backfill material,
suitable backfill material, and shoring as necessary.
B. Limestone Retaining Wall: —
1. Measurement: Measurement will be in square feet for the area of the face of retaining
wall.
2. Payment: Payment will be at the unit price per square foot of retaining wall.
3. Includes: Unit price includes, but is not limited to, excavation, foundation preparation,
furnishing and placing leveling pad, limestone, subdrain, porous backfill material for
subdrain, engineering fabric for subdrain, suitable backfill material, and shoring as
necessary.
C. Landscape Timbers:
1. Measurement: Measurement will be in square feet for the area of the face of retaining
wall, measured from the top of the leveling pad to the top of the wall.
2. Payment: Payment will be at the unit price per square foot of retaining wall.
3. Includes: Unit price includes, but is not limited to, excavation,foundation preparation,
furnishing and placing leveling pad, landscape timbers, spikes, reinforcing bar, subdrain,
porous backfill material for subdrain, engineering fabric for subdrain, suitable backfill
material, and shoring as necessary.
D. Excavation and Suitable Backfill Material: If bid separately, excavation for wall
construction and placement of suitable backfill material will be measured and paid according
to Section 2010.
E. Fence: If the contract documents require a fence, the fence will be measured and paid
according to Section 9060.
F. Safety Rail: if the contract documents require a safety rail, the railing will be measured and
paid according to Section 9080.
2 10/18/2011
SUDAS Standard Specifications Division 9-Site Work and Landscaping
Section 9070-Landscape Retaining Walls
PART2-PRODUCTS
2.01 MATERIALS
A. Modular Block Walls:
1. Dry-cast Concrete Units:
_ a. Comply with ASTM C 1372. Test units and provide samples according to ASTM C
140.
b. Provide certification that the blocks comply with the freeze-thaw durability
requirements of ASTM C 1262 and the additional requirements for concrete units of
Iowa DOT Materials I.M. 445.04.
c. Furnish from an approved supplier.
1) Iowa DOT Materials I.M. 445.04, Appendix A lists approved suppliers.
2) Provide written certification that the blocks comply with ASTM C 1372 and the
additional materials requirements of Iowa DOT Materials I.M.445.04, Appendix
A.
d. In lieu of furnishing blocks from an approved supplier, provide blocks from an
approved system.
1) Iowa DOT Materials I.M. 445.04, Appendix B lists approved systems.
2) Test the required number of blocks from the lot to be installed according to Iowa
DOT Materials I.M. 445.04.
3) Submit results of test data to the Engineer.
2. Wet-cast Concrete Wall Units: Comply with the materials and compressive strength
requirements of Iowa DOT Materials I.M.445.05.
a. Furnish from an approved supplier.
1) Iowa DOT Materials I.M. 445.05, Appendix A lists approved suppliers.
2) Provide written certification that the blocks comply with Iowa DOT Materials I.M.
445.05.
b. In lieu of furnishing blocks from an approved supplier, provide blocks from an
approved system.
1) Iowa DOT Materials I.M.445.05, Appendix B lists approved systems.
2) Test the required number of blocks from the lot to be installed according to Iowa
DOT Materials I.M. 445.05.
3) Submit results of test data to the Engineer.
B. Limestone: Furnish limestone slabs with a flat bottom and top and a clean face. Provide
slabs with a minimum depth of 8 inches, or as specified in the contract documents, to ensure
stability of the wall.
C. Landscape Timbers:
1. Minimum 6 inch by 6 inch (nominal) pressure-treated landscape timbers rated for ground
contact. Ensure timbers are straight, solid, have at least three good sides, and are free
of visible dry rot, with only a minor amount of splitting or cracking. Ensure all timbers
used in a wall have the same cross-sectional area.
2. Provide 3/8 inch diameter galvanized spikes, 10 to 12 inches long.
D. Leveling Pad: Provide material recommended by the wall manufacturer or supplier.
1. Granular Material: Comply with Iowa DOT Section 4132.
2. Concrete: Comply with Section 6010. Provide Class C Concrete.
E. Subdrain: Comply with Section 4040, 2.02. Minimum 4 inch diameter pipe.
3 10/18/2011
SUDAS Standard Specifications Division 9-Site Work and Landscaping
Section 9070-Landscape Retaining Walls
2.01 MATERIALS (Continued)
F. Porous Backfill Material (for Subdrain): Comply with Section 4040, 2.04.G. Engineering Fabric: Provide fabric complying with Iowa DOT Article 4196.01 for subsurface
drainage.
H. Unit Fill Material: Comply with Iowa DOT Section 4131.
I. Backfill Material:
1. Granular Backfill Material: Comply with Iowa DOT Section 4133 when granular backfill
material is necessary according to the manufacturer's requirements.
2. Suitable Backfill Material: Comply with Section 2010.
J. Fence: If the contract documents require a fence, comply with Section 9060.
K. Safety Rail: If the contract documents require a safety rail, comply with Section 9080.
•
L
4 10/18/2011
SUDAS Standard Specifications Division 9-Site Work and Landscaping
Section 9070-Landscape Retaining Walls
PART 3-EXECUTION
3.01 EXCAVATION AND EMBANKMENT
A. Prior to beginning wall construction, compact proposed embankment behind the wall
according to the field quality control requirements of Section 2010 with the following
exceptioll. compact to a minimum of 90°o of maximum Standard Proctor Density.
B. Excavate to the line and grade specified in the contract documents. Minimize over-
excavation. Install sheeting, shoring, or other retention systems as required to ensure the
stability of the excavation.
3.02 INSTALLATION
A. General:
1. Height: Overall wall height is limited to 4 feet.
2. Foundation Soil Preparation: Excavate and compact 12 inches of native soil beneath
the leveling pad to 95% of maximum Standard Proctor Density.
3. Leveling Pad:
a. Construct a minimum 6 inch thick leveling pad of granular material, at a depth such
that the entire first course will be completely below the finished grade at the base of
the wall.
b. Compact granular material with a minimum of three passes of a vibratory plate
compactor.
4. Subdrain:
a. Install subdrain behind the first course of retaining wall. Place porous backfill
material around the subdrain to a minimum cover of 3 inches, and ensure a trench
width of at least 8 inches.
b. Wrap porous backfill material with engineering fabric.
c. Ensure positive drainage on subdrain, and outlet subdrains into a storm sewer or
along a slope at an elevation lower than the lowest point in the pipe behind the wall.
5. Fence: If the contract documents require a fence, comply with Section 9060.
6. Safety Rail: If the contract documents require a safety rail, comply with Section 9080.
B. Modular Block Retaining Wall:
1. Unit Installation:
a. Place units side by side for the full length of wall alignment. Establish alignment by
means of a string line or offset from the base line.
b. Ensure units are in full contact with the leveling pad.
_ c. Install connecting pins. Fill open cells of blocks with unit fill material; tamp the fill.
d. Sweep all excess material from top of units and install the next course. Ensure each
course is completely filled prior to proceeding to the successive course.
e. Place each course so that pins protrude into adjoining courses a minimum of 1 inch
or to tolerances recommended by the supplier/manufacturer. Two pins are required
per unit. Repeat the above procedure for each course to the top of wall height.
f. At the end of each course, where the wall changes elevation, turn the units into the
backfill material. Place units to create the minimum radius possible. Install a
minimum of three units into the grade. Ensure only the front face of the units is
visible from the side of the wall.
5 10/18/2011
SUDAS Standard Specifications Division 9-Site Work and Landscaping
Section 9070- Landscape Retaining Walls
3.02 INSTALLATION (Continued)
2. Backfill Material Placement: —
a. Place each lift of granular backfill material following the erection of each lift of wall.
Where reinforcement material is present, roughly level the backfill material before
placing and connecting the reinforcement. If necessary, decrease the lift thickness to
obtain the specified density.
b. At the end of each day's operations, shape the last level of backfill material to allow
runoff of rain water away from the wall face. _
c. Compact granular backfill material according to the field quality control requirements
of Section 2010 with the following exception:ensure the moisture content falls within
a range from 3% under optimum moisture to no more than the optimum moisture
content. —
d. Place and compact backfill material without disturbing or distorting the tieback
reinforcement(if present)or the wall. Do not use tamping type rollers or other rollers
that may damage the reinforcing. Use light mechanical tampers to achieve the —
required compaction in a strip 3 feet wide adjacent to the backside of the wall;
compaction density testing will not be required within 3 feet of the back of the wall.
3. Tieback Reinforcement Installation: Install tieback reinforcement according to the
manufacturer's requirements.
C. Limestone Retaining Wall:
1. Place limestone slabs. Ensure adjacent slabs are in full contact without gaps.
2. Stagger vertical joints so no joint is located closer than 2 feet to a joint in the course
below it.
3. After each course is laid, place backfill material behind the wall and compact with hand
tools to a density equal to or greater than the existing soil behind the wall.
D. Landscape Timbers:
1. Lay first course of timbers horizontally, ensuring timbers are level. Set back each
succeeding course 1/2 inch.
2. Secure each course to the course below it using spikes placed 2 feet from each joint and
spaced at no more than 4 feet. Drill pilot holes in timbers to facilitate installation of —I
spikes.
3. Stagger vertical joints so no joint is located closer than 2 feet to a joint in the course
below it.
4. Install tiebacks with length equal to the wall height, perpendicular to the wall face, spaced
at 8 feet. Stagger location of tieback on each course. Do not install tiebacks in bottom
three courses or upper two courses of timbers. Ensure the end of the tieback is flush
with the front of the retaining wall. Attach tieback to course below it using a spike.
5. After each course is laid, place backfill material behind the wall and compact with hand
tools to a density equal to or greater than the existing soil behind the wall.
END OF SECTION
6 10/18/2011