HomeMy WebLinkAboutPAYEMNT VOUCHER C D o 0 ? < ƒ 2 0 Z « 0 2
m 6 6 Eg / ' CL3
3 e. 8 ± a) ]
o o m @ 2 m_ ƒ o
k ® ® R cc) CO
J
a m _• 0 0) ƒ <
J ƒ a g E0
z o / o < -,
ƒ % • ƒ %
@ 0 T O Q
q J
/ ~4 a k -'
« /
¥ It / § /
00 o .<
A ? - S ? ƒ
0 C
— C FA
E
-0) — ®
9 . o $
/ /
£
a
A » m
rn a) o §
7 � m
_ .o
-o .
o 0
z
< -<
m
\ \ 2 2 * a. m O
j ® a� $ * ®
\ < \ / f / *
* j « >
0
N . % f R } co 01
0 M
0 O ( ( } S m r
\ %2 i 2c P3 O
r 1 9 b * ° 0
a a ® * 0 CD
± I 9 *
/
CD ƒ A * 0 §
O e i f ..
_cD E ƒ o
£
_ a)
( ` E Z
CD 0 a) co I
| \ = =
n Q
k k ¥ ] /
@
? C
® . .
0 0 ƒ -
w / §
% ƒ
$ /
§ 7
Bergmann Bros. Trucking & Excavating SEP 0 5 2007
Invoice
Box G
Frederika, IA 50631 DATE INVOICE #
9/4/2007 3066
BILL TO
City Waterloo
620 Mulberry St
%Louis Starks
Waterloo Iowa 50703
P.O. NO. TERMS PROJECT 319-275-4796
Net 30
ITEM DESCRIPTION QUANTITY RATE AMOUNT
Work completed on demolition project#
147-D-GO-03-19-07
1007 Logan Ave
Excavating Loading hauling disposing of the cement. 1,556.25 1,556.25
Trucking Filling the hole. 3,003.03 3,003.03
Excavating Leveling the site. 345.00 345.00
Black Dirt 224.40 224.40
0.00 0.00
807 Beech
Excavating Loading hauling and disposing of the 1,556.25 1,556.25
cement.
Trucking Filling the hole. 1,156.73 1,156.73
Excavating Leveling the site. 230.00 230.00
Black Dirt 224.40 224.40
316 Cottage Street
Excavating Loading hauling and disposing of the 622.50 622.50
cement.
Trucking Filling the hole. 1,423.67 1,423.67
Excavating Leveling the site. 330.00 330.00
Black Dirt 224.40 224.40
Thanks
Total
Page 1
Bergmann Bros. Trucking & Excavating SEP 0 5 'n9Invoice
Box G
Frederika, IA 50631 DATE INVOICE #
9/4/2007 3066
BILL TO
City Waterloo
620 Mulberry St
%Louis Starks
Waterloo Iowa 50703
P.O. NO. TERMS PROJECT 319-275-4796
Net 30
ITEM DESCRIPTION QUANTITY RATE AMOUNT
519 Webster
Excavating Loading hauling and disposing of the 622.50 622.50
cement.
Trucking Filling the hole. 1,112.22 1,112.22
Excavating Leveling the site. 230.00 230.00
Black Dirt 224.40 224.40
121 East Ninth Street.
Excavating Taking down structure and disposing of the 2,265.00 2,265.00
wood and junk.
Excavating Loading hauling and disposing of the 622.50 622.50
cement.
Trucking Filling the hole. 1,388.12 1,388.12
Excavating Leveling the site. 230.00 230.00
Black Dirt 224.40 224.40
0.00 0.00
Thanks
Total $17,815.77
Page 2