HomeMy WebLinkAboutAGREEMENT 4
AGREEMENT FOR DEMOLITION AND SITE CLEARANCE
GROUP 147-D-GO-03-19-07
THIS AGREEMENT made this 19th day of March 2007, by and between BERGMANN
BROTHERS TRUCKING AND EXCAVATING, INC., a corporation organized and existing
under the laws of the State of Iowa, hereinafter called the "CONTRACTOR", and the CITY OF
WATERLOO,IOWA, hereinafter called the "CITY".
WITNESSETH, that the Contractor and the City for the consideration stated herein
mutually agree as follows:
ARTICLE 1. STATEMENT OF WORK. The Contractor shall furnish all supervision, technical
personnel, labor, materials, machinery, services, and perform and substantially complete all work
within 30 days after receipt of Notice to Proceed, all work required for the Demolition and Site
Clearance in an efficient and workmanlike manner as follows: DEMOLITION OF BUILDINGS
ON, AND CLEARANCE OF SITES of all parcels as enumerated in Bid Schedule attached to
and forming a part of this Contract, within the City of Waterloo Demolition Project 147-D-GO-
03-19-07 all in strict accordance with the Contract Documents for Demolition and Site Clearance
including all Addenda thereto,
Numbered and Dated
Numbered and Dated
ARTICLE 2. THE CONTRACT PRICE. The Local Public Agency will pay the Contractor
for the performance of the Contract in current funds, subject to additions and deductions
as provided in the Section "Changes in the Work" under General Conditions, Part I, and subject
to all other conditions set forth in the Contract Documents, the sum of
THIRTY-THREE THOUSAND, SEVEN HUNDRED THIRTY-THREE AND .02/100
Dollars ($33,733.02), in addition to and above the value of such salvaged materials specified to
become the property of the Contractor, and in accordance with the contractor's bid.
ARTICLE 3. CONTRACT. The executed Contract Documents shall consist of the following:
a. This Agreement f. General Conditions
b. Addenda Part I, II, and III
c. Invitation to Bid g. Special Conditions
d. Instructions to Bidders h. Technical Specifications
e. Signed copy of Bid i. Drawings as listed in the
Schedule of Drawings
AGR-1
4 v
THIS AGREEMENT,together with the other documents enumerated in this Article 3,which said
other documents are as fully a part of the Contract as if hereto attached or herein repeated, forms
the Contract between the parties hereto. In the event that any provision in any component part of
this Contract conflicts with any provisions of any other component part, the provision of the
component part first enumerated in this Article 3 shall govern, except as otherwise specifically
stated.
NOTICE TO PROCEED. After execution of the Agreement, a Notice to Proceed will be issued
to the contractor, whereupon the contractor shall proceed with his/her work in accordance with
the Contract time established in the SPECIAL CONDITIONS contained herein.
ARTICLE 4.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed in three
(3) original copies on the day and year first above written.
BERGMANN BROTHERS TRUCKING &
EXCAVATING, INC. ATTEST:
Contractor Name (for individual or partnership)
By: aAQ/ By:
Kenny ALBergmann,President
CITY OF WATERLOO ATTEST:
By: By
Timothy J. ey,May Nancy cker , ty i erk
AGR-2
N c, el 1-
,--i en
W M 4 M N M
M 00 '—' M a1 U v� s
O N N M s
O a N v� N a M
H. Q w Ca M
C.7 z m sg z m s9 sP
A a
H
z O H H
Vi CA
z
o A z q
w C) I o
w Q 0 o o w Q o A U
oca Z Z c7 Z ox, z A
w
ct
x rf rf r r a
U 0 Q
u' w w w 4. ..,
Uy 0 0 0 o w o Q
a
w .=
Han w w w w ai w
w
Z
Q =
_N
W 00
^ N f.:
VD H w r�
V) r V)
00
00
w " ono w
a) w >. a)
c. F
o
�-+ O V� C%� N O
— o ciD
ZN N N ,-4 E ,--1
0
1 O0 A
N
W� y
Q V-11 vi r-+ N rn C%1
0H. W s.,
a rx
wz - Q z Q C
O N
N
O � w U al s W H w
p Q Nca o 01
U L7 Pa M 00 o Q' c ,r
i