HomeMy WebLinkAboutCOUNCIL NOTES •
•
•
November 5, 2007 n Page 5
•
Unfinished Business continued , /
126166. - Cole/Schmitt 0141 V" 1 •
•
1i�
that communication' ' from 'Contracts and Grants' .Coordinator_ transmitting
recommendation of ..award of contract in the amount of $46,595.00 to Lehman
Trucking and Excavating, Inc. of Waterloo, Iowa in conjunction with General
obligation Bond Demolition Project, Contract No. 154-D-GO-11-05-07, be received,
placed on file and "Resolution approving award of said contract", be adopted:
Ayes: Seven.
Resolution adopted and upon approval by Mayor assigned No,' 2007-933.
DOCUMENTS •
126167 Cole/Schmitt
that communication from Senior Planner transmitting request'of Iowa Heartland
Habitat for Humanity for tax exemptions on improvements totaling $90,200.00 for ,
65 Mulberry Street located in the . Consolidated Urban Revitalization Area,
together with recommendation of approval, be received, placed on file and
• "Resolution approving said request", be adopted' and:City Clerk instructed to
notify Black Hawk County Assessor of same: Ayes: Seven. ,
•
Resolution adopted and upon approval by Mayor assigned No. 2007-934.
126168 - Cole/Schmitt
that communication from Associate Engineer transmitting Change Order No. 2 for a
net increase in the amount of $3,771.71 for work performed. by Mike Dolan
• Concrete & Masonry, Inc. of Waterloo, Iowa in conjunction with F.Y.' 2007 Flood
Wall Joint Repairs, Contract No. 729, he received, placed on file and approved
and Mayor authorized to execute same. Ayes: Seven. Motion carried.
126169 - Cole/Schmitt
that communication from Assistant City Engineer transmitting Change Order No. 5
for a net increase in the amount of $29,564.24 for work performed by Aspro, Inc..
and Its Subsidiary of Waterloo, Iowa in conjunction with F.Y. 2006 - Rath
Brownfields Street Reconstruction Program, Contract No. 686,' be received, placed
on file and approved and Mayor authorized to execute same. . Ayes: Seven.
Motion carried.
126170' - Cole/Schmitt •
that communication.from Associate Engineer, transmitting extra. construction costs
• for a net increase in the amount. of $9,190.00 in conjunction with F.Y. 2007 U.S.
'63/Westfield Avenue Connection, Contract No, 730, be received, placed on file
and approved and Mayor authorized to execute same.'
•
Prior to a vote'on the above motion, the following comments were heard.
Eric Thorson, City Engineer, reported the contractor.started paving last Friday, :
will pave tomorrow and Wednesday, and that Westfield should be open by the end
of the construction season,
Following comments a vote was taken on ' the above motion with the following.
result: Ayes: Seven. Motion carried. •
126171.- Cole/Schmitt '
. that communication from City Engineer transmitting Completion of Project and
Acceptance of Work performed by Mike Dolan Concrete & Masonry, Inc. of Waterloo,
Iowa, at' a_total cost of $78,424.67 in conjunction with F.Y. 2007' Flood Wall
Joint Repairs, 'Contract No. 729, ' be received, placed on file. and "Resolution
. . approving said documents", be approved and two-year maintenance bond be received '
and placed on file. Ayes: Seven.
Resolution adopted and upon approval by Mayor assigned No-. 2007-935.
•
•
•
November 5, 2007
Page 5
Unfinished Business!continued {„ /• �
126166 Cole/Schmitt i1Y"f �ti.W '
t
--that communication from Contracts and - Grants' .Coordinator. ` transmitting recommendation of award of contract in the amount of $46,595.00 to .Lehman.
Trucking and "Excavating, Inc. of Waterloo, Iowa in conjunction with General
;obligation Bond Demolition Project, Contract No. 154-D-G0-11-05-07, be received,
!laced on file and "Resolution approving award of said contract", be adopted.
Ayes: Seven.
Resolution adopted and upon approval by Mayor assigned No. 2007-933.
CUMENTS
126167 Cole/Schmitt_
that communication from Senior Planner transmitting request of Iowa Heartland
ilabitat for Humanity for tax exemptions on improvements totaling $90,200.00 .for
is mulberry Street located in the Consolidated Urban Revitalization Area,
together with recommendation of approval, be received, placed on file and
rResolution 'approving said request", be adopted and City Clerk instructed to
notify Black Hawk County Assessor of same. Ayes: Seven. .
Resolution adopted and upon approval by Mayor assigned No. 2007-934.
126168 - Cole/Schmitt
that communication from.Associate Engineer transmitting Change Order No. 2 for a
net increase in .the amount of $3,771.71 for work performed by Mike Dolan
WConcrete E. Masonry, Inc. of. Waterloo, Iowa in conjunction with F.Y.' 2007 Flood
all Joint: Repairs, Contract No. 729, be received, placed on file and approved
and Mayor authorized to execute same. Ayes: 'Seven. Motion carried.
3.261,69 Cole/Schmitt
that:communication from Assistant City Engineer transmitting Change Order No. 5
• f,or a net increase in, the amount of $29,564.24 for work performed by Aspro, Inc.
4nd Its .Subsidiary of ; Waterloo, Iowa in conjunction withF.Y. 2006 Rath
,o&rownfields Street Reconstruction Program,Contract No. 686,. be received, placed
Mn file and approved and Mayor authorized to execute same. . .Ayes: Seven.
otion carried.
.126170. - Cole/Schmitt
that communication from Associate Engineer transmitting extra construction costs.
fior a net increase in the amount. of $9,190.00 in conjunction with F.Y. 2007 U.S.
663/Westfield Avenue .Connection, Contract No. 730, be received,` placed on file
and approved and Mayor authorized to execute same.'
Prior to a vote on the above motion, the following comments were heard.
Eric Thorson, City Engineer, reported the contractor started paving last Friday,
Will..pave tomorrow and Wednesday, and that Westfield should be open by the end
of the construction season.
Following comments .avote was taken on the above motion with the following
rhsult. Ayes: Seven. Motion carried.
126171 - Cole/Schmitt •
.that communication from City Engineer transmitting Completion of Project and
Abceptance of Work performed by Mike Dolan Concrete & Masonry, Inc, of Waterloo,
JoiIbwas:at a total cost of $78,424.67 in conjunction with F.Y. 2007 Flood Wall
nt` Repairs, Contract No: 729, `be received, placed on file and :"Resolution"
approving.:said documents", be approved and two-year maintenance bond be received
aid placed n file Ayes: Seven.
Resolution adopted and upon approval by Mayor assigned No. 2007-935.
ti