HomeMy WebLinkAboutAGREEMENT AGREEMENT FOR DEMOLITION AND SITE CLEARANCE
GROUP 157-D-GO-05-26-08
THIS AGREEMENT made this 26th day of May, 2008, by and between LEHMAN
TRUCKING & EXCAVATING, INC., a corporation organized and existing under the laws of
the State of Iowa, hereinafter called the "CONTRACTOR", and the CITY OF WATERLOO,
IOWA, hereinafter called the "CITY".
WITNESSETH, that the Contractor and the City for the consideration stated herein mutually
agree as follows:
ARTICLE 1. STATEMENT OF WORK. The Contractor shall furnish all supervision, technical
personnel, labor, materials, machinery, services, and perform and substantially complete all work
within 30 days after receipt of Notice to Proceed, all work required for the Demolition and Site
Clearance in an efficient and workmanlike manner as follows: DEMOLITION OF BUILDINGS
ON, AND CLEARANCE OF SITES of all parcels as enumerated in Bid Schedule attached to
and forming a part of this Contract, within the City of Waterloo Demolition Project 157-D-GO-
05-26-08 all in strict accordance with the Contract Documents for Demolition and Site Clearance
including all Addenda thereto,Numbered Addendum No. 1 and dated May 15, 2008.
ARTICLE 2. THE CONTRACT PRICE. The Local Public Agency will pay the Contractor
for the performance of the Contract in current funds, subject to additions and deductions
as provided in the Section "Changes in the Work" under General Conditions, Part I, and subject
to all other conditions set forth in the Contract Documents, the sum of
TWENTY-NINE THOUSAND, ONE HUNDRED TWENTY DOLLARS AND NO/100
DOLLARS ($29,120.00), in addition to and above the value of such salvaged materials specified
to become the property of the Contractor, and in accordance with the contractor's bid.
ARTICLE 3. CONTRACT. The executed Contract Documents shall consist of the following:
a. This Agreement f. General Conditions
b. Addenda Part I, II, and III
c. Invitation to Bid g. Special Conditions
d. Instructions to Bidders h. Technical Specifications
e. Signed copy of Bid i. Drawings as listed in the
Schedule of Drawings
AGR-1
THIS AGREEMENT, together with the other documents enumerated in this Article 3, which said
other documents are as fully a part of the Contract as if hereto attached or herein repeated, forms
the Contract between the parties hereto. In the event that any provision in any component part of
this Contract conflicts with any provisions of any other component part, the provision of the
component part first enumerated in this Article 3 shall govern, except as otherwise specifically
stated.
NOTICE TO PROCEED. After execution of the Agreement, a Notice to Proceed will be issued
to the contractor, whereupon the contractor shall proceed with his/her work in accordance with
the Contract time established in the Contract Documents contained herein.
ARTICLE 4.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed in three
(3) original copies on the day and year first above written.
LEHMAN TRUCKING& EXCAVATING, INC.
323 KOTHE STREET
WATERLOO, IOWA 50703 ATTEST:
(for individual or partnership)
Contractor Name
BY' By:
CITY OF WATERLOO ATTEST:
By: B ,
imothy J. H y Mayor Nancy Ecke - 'ty Clerk
AGR-2
,
ao 0 0 0 0 0 0 0 '
0 0 0 o 0 0 0 o
N W O O O NO O 0 --�
cvl
kii U ^ w M O rn LE)
0 a rn
V Z CO b9 69 EPS 69 69 69
i
A
N
L
O
z
a
c4
0 0 0
w M a
CZ F
U
,A z 0 0z c °
w a)
a
x
Z
w � ¢ w w w w w
U > a o 0 P.
P.
P. •
H iz w w w w w Z
w
cA
No
a)
E
c c C a.., C
CD N
41 OA SVD <S 01 Cin
00
czt
w w w ; w w
O o 0 0 0 0 0
aw o Cl) C/) v) - Cl) Cl) z A CID .-., nn4 N
O
F
O Onl
a
Q �"
75 I- v v -el.)
A Q s vp
a? a? p
Co ra Q = F- F- °�°
Ckt
HO d' N N NN en N M .
U U W ,-, .-. — ,-a S