Loading...
HomeMy WebLinkAboutMEMO TO COUNCIL CITY OF WATERLOO Council Communication City Council Meeting: April 5, 2010 Prepared: March 30, 2010 Dept. Head Signature: Sandie Greco, Traffic Operations Superintendent # of Attachments: Request for Executive Session SUBJECT: Hammond & Ridgeway Project Submitted by: Sandie Greco Recommended City Council Action: Summary Statement Update right-of-way matters Expenditure Required Source of Funds Policy Issue Alternative Background Information: Iowa Clean Air Attainment Grant Hammond &Ridgeway Improvements • Enclosed: 1- One page Project Information(This Page) 2- Slide Handouts (Two Sheets) 3- Slide 42 notes 4- Improvement Concept Plan as Submitted to the DOT 5- Letter to Council Asking for Approval to Apply for the Grant The intersection experiences sever congestion during the daily peak hours particularly the afternoon peak hour. City Hired Snyder & Associates to study Hammond and Ridgeway and prepare grant application. Consultant showed that emissions could be reduced by reducing congestion through intersection improvement. ITE\I Factor CO* v OC(HC)* NOx* CALCULATIONS Before Protect Existing delay PM peak hour(hr)= 48.1 'emission Factor(EF g,1hr) 94.4 30.6 8.0 Peak hour Emissions=peak delay x EF(g) 4543 1474 383 Daily Emissions=peak`9% 50_478 16378 4256 Afro.P?oiecr New delay PM peak hour(hr)= 6.9 Fmission Factor (EF g hr) 94.4 30.6 8_C Peak hour Fin;ssions=peak delay x EF(g) 652 211 -' Dail;-Emissions=peak'9°b(g day) 7244 2.344 611 E\IISSIO\REDUCTIONS Dail-Emission Reduction(!day) 43.233 14.033 3.644 Annual Reduction=daily x 365 day(ke!yr) 15.780 5.122 1_33% Date Event 2006 Council approved hiring a consultant to study the location. Consultant's study showed there was a big problem. Their study concluded adding lanes and traffic signal will alleviate the problem. Air quality problems caused by sever congestion could be eliminated by improvements. A grant application for Clean Air Attainment Program funds was developed. Sept 14, INRCOG approved the proposed improvements of adding lanes and traffic 2006 signals, concluding that the proposed improvements to the intersection of Ridgeway Avenue and Hammond Avenue in the City of Waterloo conformed to the 2025 Long Range Transportation Plan. Oct 2, 2006 Waterloo City Council approved application for funds for the improvements and committed to it. Dec 10, Waterloo City Council approved hiring the consultant to design the project. 2007 (Council was reminded that it was not the final approval for construction of the project and there will be a public hearing on the final plans.) Jan 8, 2008 Preliminary design was ready. Public meeting was held. As of April Plans are finalized. To set a letting date DOT needs certification that right of 2, 2009 way is available. OVERVIEW • REDUCE CONGESTION -Cleaner Air IOWA CLEAN AIR -Save Fuel ATTAINMENT GRANT -Save Travel Time -Pedestrian Movements INTERSECTION OF HAMMOND • PAVEMENT & SEWER IMPROVEMENTS AND RIDGEWAY • SAVE CITY FUNDS • NO WIDENING HAMMOND IN SHORT TERM PROBLEM AND SOLUTION PROBLEM NEW DEVELOPMENTS • FLOW: delays , pollution • NEW AIR QUALITY STANDARDS • SAFETY -waterloo Non-Attainable? -will Have to Reduce Traffic SOLUTION Pollution • NEW RIDGEWAY & LAPORTE •ADD LANES INTERSECTION •ADD SIGNAL -More Traffic Through the Intersecti on? PUBLIC BENEFITS MODELING AND • IMPROVED CONDITIONS FOR SIMULATION THE PUBLIC • CONSULTANT -Drivers -SYNCHRO + SIMTRAFFIC -Pedestrians • CITY -Area Streets -VISSIM -City Funds Saved • INRCOG MPO -Construction Jobs Z LOSSES TO AVOID • DIRECT COSTS -Already$70,000 -City Reconstruction -Possible More City Costs •ADD LANES: NEAR FUTURE •ADD SIGNALS: FUTURE • MAINTENANCE COSTS MORE LOSSES TO AVOID • NON-DIRECT COSTS • USER COSTS:Fuel , Etc. • NON-QUANTIFIABLE COSTS -Speeding Side Streets -Lung Disease -Public/Driver Annoyance -Pedestrian/Handicap Safety -Future ICAAP Grants? 2 PROBLEM AND SOLUTION PROBLEM • FLOW : delays , pollution • SAFETY SOLUTION •ADD LANES •ADD SIGNAL FLOW •Intersection experiences sever congestion every day during the peak hours particularly the afternoon peak hour. •The intersection does not have enough capacity to handle the volume. -Congestion means extra fuel consumed, pollutants dispersed into the air, peoples times wasted, and driver frustration. -Stop and go situation typical of long lines behind a 4 way stop sign disperses a lot of pollution into the air. SAFETY -Pedestrian and handicap have problem crossing -Average six or more accidents per year which is high SOLUTION: EXTENSIVE SIMULATION AND MODELING -Increase capacity by adding lanes, reduce congestion and provide for orderly flow by installing traffic signals -Add pedestrian signals for pedestrian, handicap, and school children 2 i tiftl-"!'%'11:-.-:t,-, 1 . \ <, 1 , --- 4*....' 7-----. --'-; --- -- ''' ''''.-7:44.''4w ''111 -'- E z F 3 F F - \. t. -. t l i t t L t L 1 1 k i t 4 t E. Ridgeway Ave.,ts.„•: t R.C. ' i t • i. y t t S - q 3 , i t, t Ft F t t V' , 0 F r 1 I F i F at 0 i ' k I 75 37.5 0 75 FT September 25, 2006 Honorable Mayor Tim Hurley and Council Members City Hall 715 Mulberry Street Waterloo, Iowa 50703 RE: Iowa's Clean Air Attainment Program(ICAAP) Ridgeway & Hammond Dear Mayor Hurley and Council Members We are in the process of applying for a Clean Air grant. The application requires that City commit to the following: Upon the completion of the project the City will (1) properly maintain and operate the proposed project for public use during the project's useful life and (2) commit the necessary local matching funds to implement the project. I would like to ask for a resolution confirming the requirement. The estimated cost of improvements is $509,000. This includes engineering and construction costs. The City's matching share is 20% or approximately $102,000. The project includes adding turn lanes, adding traffic signals, and some right of way at the southwest corner of the intersection. This item will be on the October 2, 2006 Council Agenda. Sincerely Sandie Greco Traffic Operations Superintendent