Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ESTIMATED COST OF CONSTRUCTION
RIDGEWAY AVENUE AND HAMMOND AVENUE INTERSECTION IMPROVEMENTS ESTIMATED COST OF CONSTRUCTION CITY OF WATERLOO Iowa DOT PROJECT NUMBER-STP-A-8155(700)--86-07 SBA PROJECT#-107.1032.08 8/5/2010 ITEM NO. ITEM CODE ITEM EST.QTY. UNIT UNIT PRICE EXTENDED AMOUNT 1 2102-2710070 EXCAVATION,CLASS 10,ROADWAY AND BORROW 611 CY $ 6.00 $ 3,666.00 2 2105-8425015 TOPSOIL,STRIP,SALVAGE,AND SPREAD 1,310 CY S 5.00 $ 6,550.00 3 2115-0100000 MODIFIED SUBBASE 1,200 CY $ 28.00 $ 33,600.00 4 2123-7450020 SHOULDER FINISHING,EARTH 26.83 STA $ 200.00 $ 5,366.00 5 2213-7100400 RELOCATION OF MAIL BOXES 4 _EACH $ 400.00 $ 1,600.00 6 2301-1033090 STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT,CLASS C,CLASS 3 DURABILITY.9.0" 6,606.2 SY $ 41.00 $ 270,854.20 7 2301-6911722 PORTLAND CEMENT CONCRETE PAVEMENT SAMPLES 1 LS $ 1,250.00 $ 1,250.00 8 2502-8212036 SUBDRAIN,LONGITUDINAL,6 IN.DIA. 2,623.3 LF $ 9.00 $ 23,609.70 9 2502-8220193 SUBDRAIN OUTLET,RF-19C 21 EACH $ 300.00 $ 6,300.00 10 2503-4470400 INTAKE,RA-40 2 EACH $ 3,250.00 $ 6,500.00 11 2503-4470410 INTAKE,RA-41 3 EACH $ 3,750.00 $ 11,250.00 12 2503-4470415 INTAKE,RA-41,MODIFIED 1 EACH $ 4,500.00 $ 4,500.00 13 2503-4470420 INTAKE EXTENSION UNIT,RA-42 3 EACH $ 2,500.00 $ 7,500.00 14 2503-4470430 INTAKE,RA-43 5 EACH $ 4,250.00 $ 21,250.00 15 2503-4480490 UTILITY ACCESS,RA-49 7 EACH $ 3,500.00 $ 24,500.00 16 2503-7181036 REMOVE STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN. 94.0 LF $ 12.00 $ 1,128.00 17 2503-7325012 SEWER PIPE,2000D STORM,12 IN.DIA. 20.6 LF $ 38.00 $ 782.80 18 2503-7325015 SEWER PIPE,2000D STORM,15 IN.DIA. 106.9 LF $ 38.00 $ 4,062.20 19 2503-7375012 SEWER PIPE,3000D STORM,12 IN.DIA. 89.4 LF $ 42.00 $ 3,754.80 20 2504-4650007 UTILITY ACCESS,REBUILD SANITARY SEWER,TOP ONLY 3 EACH $ 1,000.00 $ 3,000.00 21 2510-6745850 REMOVAL OF PAVEMENT 5,506.0 SY $ 6.00 $ 33,036.00 22 2510-6750600 REMOVAL OF INTAKES AND UTILITY ACCESSES 15 EACH $ 500.00 $ 7,500.00 23 2515-2475006 DRIVEWAY,P.C.CONCRETE,6 IN. 671.9 SY $ 36.00 $ 24,188.40 24 2515-6745600 REMOVAL OF PAVED DRIVEWAY 762.0 SY $ 6.00 $ 4,572.00 25 2518-6910000 SAFETY CLOSURE 4 EACH $ 400.00 $ 1,600.00 26 2525-0000100 TRAFFIC SIGNALIZATION 1 LS $ 172,000.00 $ 172,000.00 27 2525-0000120 REMOVAL OF EXISTING TRAFFIC SIGNALIZATION 1 LS $ 1,000.00 $ 1,000.00 28 2526-8285000 CONSTRUCTION SURVEY 1 LS $ 10,000.00 $ 10,000.00 29 2527-9263109 PAINTED PAVEMENT MARKING,WATERBORNE OR SOLVENT-BASED 71.4 STA $ 55.00 $ 3,925.35 30 2527-9263137 PAINTED SYMBOLS AND LEGENDS,WATERBORNE OR SOLVENT-BASED 15 EACH $ 150.00 $ 2,250.00 31 2528-8445110 TRAFFIC CONTROL 1 LS $ 9,000.00 $ 9,000.00 32 2533-4980005 MOBILIZATION 1 LS $ 28,000.00 $ 28,000.00 33 2599-9999005 SUBDRAIN CLEANOUT 2 EACH $ 750.00 $ 1,500.00 34 2599-9999010 EROSION CONTROL 1 LS $ 5,500.00 $ 5,500.00 35 2601-2636044 SEEDING AND FERTILIZING(URBAN) 0.71 ACRE $ 3,000.00 $ 2,130.00 36 2601-2634105 MULCHING,BONDED FIBER MATRIX 0.71 ACRE $ 2,000.00 $ 1,420.00 TOTAL $ 748 645.45