HomeMy WebLinkAboutREQUEST FOR PROPOSAL CITY OF WATERLOO , IOWA
N70o �o
Request for Proposal
June 2011
ASBESTOS SURVEY AND ABATEMENT
MONITORING SERVICES GROUP 2
FOR DEMOLITION ACTIVITIES OF THE HAZARD
MITIGATION GRANT PROGRAM (HMGP) PROPERTY
ACQUISITION PROJECT
City of Waterloo, Iowa
Prepared by
City of Waterloo
Planning and Zoning Department
SECTION I
NOTICE OF REQUEST FOR PROPOSALS
1.0 Receipt and Opening of Proposals
1.0.1 All proposals must be received in a sealed envelope in City Hall (date and time stamped)
by Monday, July 11, 2011 at 4:00 p.m. (our clock), Central Time, in order to be considered.
City Hall is located at 715 Mulberry St, Waterloo, Iowa. Proposals sent electronically or via
facsimile will not be accepted. The mailing container or envelope shall be plainly marked on
the outside with the notation 'SEALED RFP FOR ASBESTOS SURVEY AND MONITORING
SERVICES GROUP 2', and the name of the company submitting the proposal.
1.1 RFP Timeline
Name of the Proposal: ASBESTOS SURVEY AND MONITORING SERVICES GROUP 2
Date of Issuance: Monday, June 27, 2011
Deadline for Questions: Tuesday, July 5, 2011 at 4:00 p.m., Central Time
Deadline for Proposal Submittal: Monday, July 11, 2011 at 4:00 p.m., Central Time
Submit Sealed Proposal to: SEALED RFP FOR ASBESTOS SURVEY AND MONITORING
SERVICES GROUP 2
Address exactly as stated—* -* City Hall
City Clerk's Office
715 Mulberry Street
Waterloo, IA 50703
Method of Submittal: Mail or Overnight Delivery, In Person (No Electronic or Fax Submittals)
Contact Person, Title: Aric Schroeder, City Planner/Project Manager
E-mail Address: aric.schroeder(c�waterloo-ia.orq
Phone/ Fax Numbers: Phone: 319-291-4366 Fax: 319-291-4262
1.2 The City reserves the right to accept or reject any or all proposals and to waive any
informalities or irregularities in proposals if such waiver does not substantially change the offer
or provide a competitive advantage to any Proposer.
1.3 The City is not responsible for delays occasioned by the U.S. Postal Service, the internal mail
delivery system of the City, or any other means of delivery employed by the Proposer.
Similarly, the City is not responsible for, and will not open, any proposal responses that are
received later than the date and time stated above. Late proposals will be retained in the RFP
file, unopened. No responsibility will be attached to any person for premature opening of a
proposal not properly identified.
1.4 Proposals will be opened on Monday, July 11, 2011, at 5:30 pm (our clock) Central Time in
City Hall, 715 Mulberry Street, Waterloo. The main purpose of this opening is to reveal the
name(s) of the Proposer(s), not to serve as a forum for determining the awarded proposal(s).
1.5 Proposals will be evaluated promptly after opening. After an award is made, a proposal
summary will be sent to all companies who submitted a proposal. Proposal results will not be
given over the telephone. Proposals may be withdrawn anytime prior to the scheduled closing
time for receipt of proposals; no proposal may be modified or withdrawn for a period of sixty
(60) calendar days thereafter.
RFP FOR ASBESTOS SURVEY AND ABATEMENT MONITORING SERVICES GROUP 2—2011 Page 2 of 11
1.6 This project is totally or partially funded by the Federal Emergency Management
Administration (FEMA). FEMA site monitor(s) may be present to observe and monitor
asbestos survey procedures at the worksite.
SECTION II
INSTRUCTIONS TO PROPOSERS
2.0 The Proposal shall include the attached Exhibit "D" signature page and Exhibit "E° bid
tabulation pages, properly completed. A company representative who is authorized to bind the
company will sign on behalf of the company to indicate to the City that you have read all
provisions of the RFP and agree to all terms and conditions, except as provided in paragraph
2.4 below. The City of Waterloo reserves the right to reject any or all proposals, and to accept
in whole or in part, the proposal, which, in the judgment of the proposal evaluators, is the most
responsive and responsible proposal.
2.1 The Proposer must provide a certificate of professional liability (errors and omissions)
insurance coverage in a minimum amount of$250,000 per claim and $1,000,000 aggregate,
and the successful Proposer shall adhere to all insurance coverage specified in Exhibit "F"
attached hereto, and must maintain such coverage in force at all times during the term of the
service agreement.
2.2 A bid guarantee from each Proposer equivalent to five percent (5%) of the bid price is
required. The bid guarantee shall consist of a firm commitment such as a bid bond, certified
check, or other negotiable instrument acceptable to the City, as assurance that the Proposer
will, upon acceptance of its bid, execute such contractual documents as may be required
within the time specified.
2.3 This Request for Proposal does not commit the City to make an award, nor will the City pay
any costs incurred in the preparation and submission of proposals, or costs incurred in making
necessary studies for the preparation of proposals.
2.4 Important Exceptions to Contract Documents -The Proposer shall clearly state in the
submitted proposal any exceptions to, or deviations from, the minimum proposal requirements,
and any exceptions to the terms and conditions of this RFP. Such exceptions or deviations will
be considered in evaluating the proposals. Any exceptions should be noted on the Signature
Page. Companies are cautioned that exceptions taken to this RFP may cause their proposal to
be rejected. No additional exceptions shall be allowed after submittal of a proposal.
2.5 Incomplete Information - Failure to complete or provide any of the information requested in this
RFP, including references, and/or additional information as indicated, may result in
disqualification by reason of"non responsiveness".
SECTION III
SPECIAL TERMS AND CONDITIONS
3.0 Term of Contract
3.0.1 The initial term of the Contract shall be for three (3) months, anticipated to be (August
1, 2011) to (October 31, 2011).
3.0.2 The City and the Contractor may renew the original Contract for six (6) month time
periods by mutual agreement. Either party may give ten (10) days' notice before the
end of the Contract term to renew the Contract for additional increments.
RFP FOR ASBESTOS SURVEY AND ABATEMENT MONITORING SERVICES GROUP 2—2011 Page 3 of 11
3.0.3 A Contract, approved by the City Council and signed by the Mayor, shall become the
document that authorizes the Contract to begin, assuming the insurance requirements
have been met. Each section contained herein, any addenda and the response
(Proposal) from the successful bidder shall also be incorporated by reference into the
resulting Contract.
3.0.4 No price escalation will be allowed during the initial term of the Contract. If it is mutually
decided to renew beyond the initial period and the Contractor requests a price
increase, the Contractor shall provide documentation on the requested increase. The
City reserves the right to accept or reject price increases, to negotiate more favorable
terms, or to terminate (or allow to expire) without cost, the future performance of the
Contract.
3.0.5 The total actual expenses shall not exceed the amount allowed by the project Contract,
including any renewal extensions thereof, unless amended by written agreement.
3.1 Agreement Forms
3.1.1 After award, the Proposer will be required to enter into a written contract with the City
that is substantially in the form attached hereto as Exhibit "A".
3.1.2 Government Mandated Contract Provisions — Because the project activity is funded by
the federal government, federal law requires that the City's contracts relating to the
project include certain provisions. It is possible that some of the provisions set forth in
this Section do not apply to Contractor or the services to be provided hereunder, but
the provisions are nonetheless set forth to cause the Contract to comply with federal
law. City makes no representation about whether any particular requirement is
applicable to this Contract. Parenthetical comments in the following paragraphs are
taken from 44 CFR § 13.36(i).
3.1.2.1 Termination for Cause. In the event that Contractor defaults in the performance
or observance of any covenant, agreement or obligation set forth in the Contract,
and if such default remains uncured for a period of seven (7) days after notice
thereof shall have been given by City to Contractor(or for a period of fourteen (14)
days after such notice if such default is curable but requires acts to be done or
conditions to be remedied which, by their nature, cannot be done or remedied
within such 14-day period and thereafter Contractor fails to diligently and
continuously prosecute the same to completion within such 14-day period), then
City may declare that Contractor is in default under the Contractor
3.1.2.2 Termination for Convenience. The Contract may be terminated at any time, in
whole or in part, upon the mutual written agreement of the parties. City may
also choose to terminate the Contract at any time by delivering to Contractor
10-days' advance written notice of intent to terminate.
3.1.2.3 Remedies. If Contractor is in default of the Contract and has not cured said
default as set forth in Section 3.1.2.1 above, the City may take any one or more of
the following steps, at its option:
3.1.2.3.1 by mandamus or other suit, action or proceeding at law or in equity,
require Contractor to perform its obligations and covenants under the
Contract, or enjoin any acts or things which may be unlawful or in
violation of the rights of the City under the Contract, or obtain damages
caused to the City by any such default;
3.1.2.3.2 have access to and inspect, examine and make copies of all books
and records of Contractor which pertain to the project;
3.1.2.3.3 declare a default of the Contract, make no further disbursements, and
demand immediate repayment from Contractor of any funds previously
disbursed under the Contract;
RFP FOR ASBESTOS SURVEY AND ABATEMENT MONITORING SERVICES GROUP 2—2011 Page 4 of 11
3.1.2.3.4 terminate the Contract by delivering to Contractor a written notice of
termination; and/or
3.1.2.3.5 take whatever other action at law or in equity may be necessary or
desirable to enforce the obligations and covenants of Contractor under
the Contract, including but not limited to the recovery of funds.
3.1.2.3.6 No delay in enforcing the provisions hereof as to any breach or
violation shall impair, damage or waive the right of City to enforce the
same or to obtain relief against or recover for the continuation or
repetition of such breach or violation or any similar breach or violation
thereof at any later time or times. In the event that City prevails
against Contractor in a suit or other enforcement action under the
Contract, Contractor agrees to pay the reasonable attorneys'fees and
expenses incurred by City.
3.1.2.4 Contractor shall comply with Executive Order 11246 of September 24, 1965,
entitled "Equal Employment Opportunity," as amended by Executive Order
11375 of October 13, 1967, and as supplemented in Department of Labor
regulations (41 CFR Chapter 60). (applies to all construction contracts
awarded in excess of$10,000 by grantees and their contractors or
subgrantees)
3.1.2.5 Contractor shall comply with the Copeland "Anti-Kickback"Act (18 U.S.C. 874)
as supplemented in Department of Labor regulations (29 CFR Part 3). (applies
to all contracts and subcontracts for construction or repair)
3.1.2.6 Contractor shall comply with the Davis-Bacon Act (40 U.S.C. 276a to 276A-7)
as supplemented by Department of Labor regulations (29 CFR Part 5). (applies
to construction contracts in excess of$2,000 awarded by grantees and
subgrantees when required by federal grant program legislation, but does not
apply to projects paid for with disaster funding)
3.1.2.7 Contractor shall comply with Sections 103 and 107 of the Contract Work Hours
and Safety Standards Act (40 U.S.C. 327-330) as supplemented by Department
of Labor regulations (29 CFR Part 5). (applies to construction contracts
awarded by grantees and subgrantees in excess of$2,000, and in excess of
$2,500 for other contracts which involve the employment of mechanics or
laborers)
3.1.2.8 City's Reporting Regulations and Requirements. Contractor shall exercise best
efforts to maintain communication with City personnel whose involvement in the
project is necessary for successful and timely completion of the work of the
project, including by not limited to the closing of specific transactions.
Communications between the parties shall be verbal or in writing, as requested
by the parties or as dictated by the subject matter to be addressed. Contractor
shall maintain all project records for a minimum period of three (3) years after
the date of final payment for services rendered under the Contract. During the
term of the Contract and for the ensuing record-retention period, Contractor
shall make any or all project records available upon reasonable request, and in
any event within two (2) business days of request, to City, Iowa Homeland
Security and Emergency Management Division (HSEMD), the Federal
Emergency Management Agency (FEMA), the Comptroller General of the
United States, and any other agency of state or federal government, or the duly
authorized representatives of any of the foregoing, that has provided funding or
oversight for the HMGP property acquisition project, for the purpose of making
audit, examination, excerpts and/or transcriptions. For purposes of this section,
"records" means any and all books, documents, papers and records of any type
or nature that are directly pertinent to the Contract. Contractor agrees to
RFP FOR ASBESTOS SURVEY AND ABATEMENT MONITORING SERVICES GROUP 2—2011 Page 5 of 11
furnish, upon termination of the Contract and upon demand by the City, copies
of all basic notes and sketches, charts, computations, and any other data
prepared or obtained by the Contractor pursuant to the Contract, without cost
and without restrictions or limitation as to the use relative to specific projects
covered under the Contract. In such event, the Contractor shall not be liable for
the City's use of such documents on other projects.
3.1.2.9 Patent Rights and Copyrights. With respect to any discovery or invention which
arises or is developed in the course of or under the Contract, the Contractor is
responsible for complying with requirements pertaining to patent rights, as
defined by the awarding agency. With respect to any publication, documents,
or data that arises or is developed in the course of or under the Contract, the
Contractor is responsible for complying with requirements pertaining to
copyright, as defined by the awarding agency.
3.1.2.10 Access to Documents. See Section 3.1.2.8 above.
3.1.2.11 Retention of Documents. See Section 3.1.2.8 above.
3.1.2.12 Contractor shall comply with all applicable standards, orders, or requirements
issued under Section 306 of the Clean Air Act (42 U.S.C. 1857(h)), Section 508
of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and
Environmental Protection Agency regulations (40 CFR Part 15). (applies to
contracts, subcontracts, and subgrants of amounts in excess of$100,000)
3.1.2.13 Energy Efficiency Standards. Contractor shall comply with mandatory
standards and policies relating to energy efficiency that are contained in the
State Energy Conservation Plan issued pursuant to the Energy Policy and
Conservation Act (Pub. L. 94-163, 89 Stat. 871). [53 FR 8078, 8087, Mar. 11,
1988, as amended at 60 FR 19639, 19645, Apr. 19, 1995].
3.2 Terms of Payment
3.2.1 Invoices for services authorized under this Contract shall be submitted on a monthly
basis and will be paid within forty-five (45) days after receipt of an original invoice and
after services are delivered and have been accepted.
3.2.2 For accounting purposes, all invoices shall contain a sufficient level of detail regarding
all services provided and allowable expenses incurred.
3.2.3 All invoices and supporting documentation shall be submitted at the intervals as agreed
upon via US mail to: City of Waterloo Planning and Zoning Department, attn: HMGP
Structural Acquisition Project, 715 Mulberry Street, Waterloo, IA 50703.
3.2.4 City has the right, at its discretion, to deny payment for any work by any Contractor if
the total actual expenses exceed the amount allowed by the project Contract, including
any renewal extensions thereof. The Contractor is not obligated to continue
performance of services under this Agreement or otherwise incur costs in excess of the
total actual expense allowed unless an amendment to the Contract is approved, and
the City notifies the Contractor, in a written amendment, of the City's acceptance of the
revised total actual expense allowed.
3.2.5 The City may withhold payment for reasons including, but not limited to, the following:
unsatisfactory job performance or progress, defective work, disputed work, failure to
comply with material provisions of the Contract, third party claims filed or reasonable
evidence that a claim will be filed or other reasonable cause.
RFP FOR ASBESTOS SURVEY AND ABATEMENT MONITORING SERVICES GROUP 2—2011 Page 6 of 11
SECTION IV
SERVICE REQUIREMENTS
4.0 Background
The City of Waterloo, Iowa, is seeking proposals for asbestos survey (testing) and abatement
monitoring services (group 2) in connection with the acquisition of properties under the Hazard
Mitigation Grant Program (HMGP) Property Acquisition Project. The HMGP project involves
the purchase and demolition of properties significantly affected by the flood event of June
2008. The Iowa Homeland Security and Emergency Management Division (HSEMD) and the
Federal Emergency Management Agency (FEMA) have approved the City of Waterloo's
acquisition project to acquire properties in the Sans Souci, Riverside and Sherwood Park area.
These properties include a mix of residential structures, garages, and other ancillary
structures. There are no commercial or industrial properties. The City of Waterloo's approved
Hazard Mitigation Grant Program (HMGP) Property Acquisition Project Application is on file in
the office of the Planning and Zoning Department, 715 Mulberry Street, Waterloo, Iowa, and
may be inspected by any Proposer prior to submittal of a proposal. The application includes
detailed information, including maps and pictures, of the properties included. A list of
addresses, including adjoining lots, is included as Exhibit "B", and an overview map is included
as Exhibit "C". If Proposer requires access to view any structures in connection with
formulating a bid, please contact the City's Project Manager to arrange for access.
4.1 Scope of Work
The City of Waterloo is seeking a qualified asbestos surveyor to complete a pre-demolition
asbestos survey of the properties acquired and to provide monitoring (inspection) of asbestos
abatement activities for all properties that will require monitoring based on the results of the
asbestos survey. The Contractor shall furnish all tools, labor and materials for the proposed
asbestos surveying and monitoring of abatement in accordance with all applicable plans,
specifications, codes and ordinances of the City of Waterloo, Iowa, asbestos Statutes and Rules
(published by the Iowa Division of Labor), 40 CFR Parts 61 and 763, NESHAP, and any other
Federal Regulations, as well as all applicable State Regulations of the Iowa DNR.
The services to be performed under this Contract shall consist of the following:
4.1.1 Locating and identifying asbestos containing materials (ACM) in each structure located
at the address(es) listed in Exhibit "B". Contractor shall test all suspect materials,
including sub-surface layers and hard-to-get-to areas. A visual, cursory process only is
not acceptable. Testing shall involve exploratory demolition activities in multiple
random areas in each structure to access potential hidden ACM, and may involve
destructive investigations to identify and test suspect materials in sub-surface layers or
hard-to-reach areas.
4.1.2 Taking an adequate number of samples to identify ACM.
4.1.3 Suspect materials will be sampled and analyzed in an accredited lab.
4.1.4 Provide a written report for each property location on the samples taken, room location
and room area (square footage), the type of ACM, the percentage and quantity, and
other pertinent information for the requirements of an asbestos survey. The report
must be exceedingly clear on the location and extent of asbestos. If the Contractor
fails to provide information adequate for the abatement contractor to know with
certainty the location and amount/extent of the asbestos material to be removed, then
the Contractor shall perform a walk through with the Abatement Monitor to clarify the
needed abatement.
4.1.5 Provide written specifications for required asbestos abatement procedures.
RFP FOR ASBESTOS SURVEY AND ABATEMENT MONITORING SERVICES GROUP 2—2011
Page 7 of 11
4.1.6 Monitoring of asbestos abatement activities for any properties identified in the asbestos
survey as having findings requiring asbestos abatement monitoring, verifying through
inspection the removal of ACM as outlined in your survey report, and providing
clearance reports following completion.
4.1.7 Coordinate all asbestos abatement monitoring services with asbestos abatement
contractors and relevant City staff.
4.1.8 Ensure all activities requiring asbestos abatement monitoring take place in conformity
with all Federal Emergency Management Agency (FEMA) and State Historic
Preservation Office (SHPO) requirements as related to asbestos abatement.
4.1.9 At the request of the City given with reasonable advance notice, attend meetings of the
City relative to the work set forth in this Agreement.
4.1.10 Provide other services as requested by the City as may be necessary to implement the
HMGP Structural Acquisition Project.
4.1.11 Provide the above-described monitoring services on an as-needed basis, without
assurance of regularity in the frequency of transactions, the number of transactions
that may be handled concurrently, or the total number of transactions.
4.2 Silence of Specifications — Commercially accepted practices shall apply to any detail not
covered in this specification and to any omission of this specification. Any omission or
question of interpretation of the specification that affects the performance or integrity of the
service being offered shall be addressed in writing and submitted with the Proposal.
4.3 The Contractor conducting asbestos surveys and monitoring of abatement shall not be
eligible to perform asbestos abatement on those same properties.
4.4 The Contractor shall complete the Project in an expeditious manner and shall commence
work within seven (7) days after being notified by the City with a Notice to Proceed on any
given property or properties. It is anticipated that the City will issue a Notice to Proceed
approximately concurrently for all properties identified on Exhibit "B". All work shall be
completed and reports and necessary documentation provided within thirty (30) days of the
issuance of Notice to Proceed. If Contractor is prevented from timely completing the work
because of circumstances beyond the Contractor's reasonable control as determined by the
City, the time for completion of the work will be tolled for a period of time equivalent to the
stoppage resulting from such circumstances. The Contractor does hereby expressly
acknowledge and agree that time is of the essence of this Contract, and, thus, failure by the
Contractor to timely render and perform services hereunder shall constitute a material breach
of the Contract. A separate Notice to Proceed will be issued for surveying work and for
monitoring of abatement work. The Contractor shall complete inspection work or re-
inspection work within seven (7) days after being notified by the City with a Notice to Proceed
for monitoring of abatement work on any given property or properties, and shall provide the
required clearance reports or reports indicating failure to clear within ten (10) days.
SECTION V
METHOD OF EVALUATION
5.0 Contract Award -Any Contract award(s) made by the City of Waterloo is subject to prior
approval by the City of Waterloo City Council.
5.0.1 Award of Contract shall be made to the most responsible and responsive proposal from
a Company whose proposal offers the greatest value to the City with regard to the
criteria detailed and the specifications set forth herein. The City may select a Proposer
RFP FOR ASBESTOS SURVEY AND ABATEMENT MONITORING SERVICES GROUP 2—2011 Page 8 of 11
based on an "all or none" proposal, on individual responses, or as is otherwise deemed
to be in the best interest of the City.
5.1 Proposal Evaluation Criteria - In general, the proposals will be evaluated based on, but not
limited to, the general evaluation criteria stated below and the completeness, clarity and
content of the proposal. The following is a partial list of the criteria that may be used in our
determination of company responsibility and responsiveness:
5.1.1 Qualifications and Experience
5.1.1.1 Years of Experience of Key Personnel
5.1.1.2 Feedback from References
5.1.1.3 Knowledge and experience with asbestos survey and abatement monitoring
activities involved with federal and state grants.
5.1.2 Cost Effectiveness
5.1.3 Company Responsiveness to RFP
5.1.3.1 Total scope of services offered
5.1.3.2 Responses to overall proposal and compliance with submission guidelines
5.1.3.3 Proposal presentation (completeness, organization, appearance, etc.)
5.2 Financial terms will not be the sole determining factor in the award. To determine the award
the City will use a proposal evaluation method that will enable the City to award a Contract to
the Proposer offering services and experience that represents the best overall value to the
City.
5.3 Proposal Evaluation Procedures - Proposals will be evaluated by a Proposal Evaluation
Selection Committee (hereinafter referred to as the Committee) using the "Proposal Evaluation
Criteria" as listed above.
5.3.1 Committee members will evaluate each proposal based on their experience and
judgment of how well the proposal addresses the City's requirements. Each
prospective company is assured that any proposal submitted will be evaluated using
the best available information and without any forgone conclusions.
5.3.2 Consideration will also be given to solicited written clarification provided during the
evaluation process and input from staff or other persons judged to have useful
expertise that should be considered in a responsible, fair assessment of the relative
merits of each proposal.
5.3.3 The Committee may arrange interviews and/or conference calls with representatives of
the companies whose proposals are deemed to be within the "competitive range." The
purpose shall be the clarification of any aspect of the proposal that is deemed to have
a material bearing on arriving at a fair determination of which proposal offers the best
overall value. In addition, each Proposer deemed to be within the competitive range
may be invited to submit a "best and final offer" if such seems appropriate under the
clarifications issued to the provisions and specifications of this solicitation.
5.4 A Proposer's submission of a proposal constitutes its acceptance of this evaluation technique
and its recognition and acceptance that subjective judgments will be used by the evaluators in
the evaluation.
5.5 Following the evaluation process, the award process is as follows:
5.5.1 The evaluation team shall determine which proposer has submitted the best proposal
using the criteria set forth above, and make its recommendation to the City Council.
5.5.2 The City Council considers a resolution awarding the Contract and authorizing the
Mayor to execute the Contract on behalf of the City. Note, no Contract shall be
deemed to be created and exist unless and until the City Council adopts a resolution
awarding the Contract and authorizes the Mayor to sign the Contract.
RFP FOR ASBESTOS SURVEY AND ABATEMENT MONITORING SERVICES GROUP 2—2011 Page 9 of 11
5.5.3 The Mayor executes the Contract.
SECTION VI
FINANCIAL AND NON-FINANCIAL PROPOSAL
6.0 Financial Proposal: This portion of the Company's proposal shall include ONLY the proposed
cost.
6.1 Pricing shall be submitted in the bid tabulation format required by the City (Exhibit "E") and
shall be inclusive of all expenses of any type or nature.
6.2 Non-Financial Proposal: This portion of the proposal may be organized in a format determined
by the Proposer, but should include all materials of the proposal relating to the service
proposed, specifications, requirements, warranty, detailed service plan/timeline, experience,
qualifications of key proposed personnel and other information of a non-financial nature.
Provide a list of each proposed staff member with name, title, and description of work they
would perform.
6.3 The Proposer shall list by name the principal or project manager in your company who will
have direct and continued responsibility for the services provided to the City. This person will
serve as the company's first point-of-contact on all matters dealing with services and the
handling of day-to-day activities through the planning and implementation process. Interested
companies should provide background and qualifications, highlighting experience with similar
projects and demonstrating ways the company provides a high quality of customer service.
6.4 Proposer shall not make use of any subcontractors for the project unless such subcontractor
has been approved in advance by the City, in the exercise of the City's sole discretion.
Proposer shall submit such information about any proposed subcontractor as the City may
reasonably request.
6.5 Interested companies should provide an outline for project management and task
implementation. Please note that timely completion of this project is critical.
SECTION VII
GENERAL TERMS AND CONDITIONS
1. LANGUAGE,WORDS USED INTERCHANGEABLY-
The word CITY refers to the CITY OF WATERLOO, Reque the proposed supply/service as described in this
IOWA throughout these Instructions and Terms and Request for Proposal.
Conditions. Similarly, PROPOSER refers to the person 3. SPECIFICATION DEVIATIONS BY THE PROPOSER/
or company submitting an offer to sell its goods or OFFEROR-Any deviation from this specification MUST
services to the,CITY, and CONTRACTOR refers to the be noted in detail, and submitted in writing in the
successful bidder. Proposal. Completed specifications should be attached
2. PROPOSER QUALIFICATIONS - No Proposal shall be for any substitutions offered, or when amplifications are
p desirable or necessary. The absence of the specification
accepted from, and no Contract will be awarded to, any deviation statement and accompanying specifications
person, firm or corporation that is in arrears to the City will hold the Proposer strictly accountable to the
upon debt or Contract, that is a defaulter, as surety or specifications as written herein. Failure to submit this
otherwise, upon any obligation to the City, or that is document of specification deviation, if applicable, shall
deemed irresponsible or unreliable by the City. If be grounds for rejection of the item when offered for
requested, Proposers shall be required to submit
satisfactory evidence that theyhave a delivery. If specifications or descriptive papers are
knowledge of the particular supply/service ro osal and submitted with Proposals,ac the Proposer s name should
resources
P be clearly shown on each document.
that they have the necessary financial r to
RFP FOR ASBESTOS SURVEY AND ABATEMENT MONITORING SERVICES GROUP 2—2011
Page 10 of 11
4. COLLUSIVE PROPOSAL - The Proposer certifies that and shall be acknowledged and dated on the signature
the proposal submitted by said Proposer is done so page.
without any previous understanding, agreement or
connection with any person, firm, or corporation making 12. LAWS AND REGULATIONS - All applicable State of
a proposal for the same Contract, without prior Iowa and federal laws, ordinances, licenses and
knowledge of competitive prices, and it is, in all regulations of a governmental body having jurisdiction
respects, fair, without outside control, collusion, fraud or shall apply to the award throughout as the case may be,
otherwise illegal action. and are incorporated here by reference.
5. SPECIFICATION CHANGES, ADDITIONS AND 13. SUBCONTRACTING - No portion of this Proposal may
DELETIONS -All changes in Proposal documents shall be subcontracted without the prior written approval by
be through written addendum. Verbal information the City.
obtained otherwise will NOT be considered in awarding
of Proposals. 14. ELECTRONIC SUBMITTAL - Telegraphic and/or
proposal offers sent by electronic devices (e.g. facsimile
6. PROPOSAL CHANGES - Proposals, amendments machines) are not acceptable and will be rejected upon
thereto, or withdrawal requests received after the time receipt. Proposing firms will be expected to allow
advertised for Proposal opening, will be void regardless adequate time for delivery of their proposal either by
of when they were mailed. airfreight, postal service, or other means.
7. HOLD HARMLESS AGREEMENT - The Contractor 15. CANCELLATION-Either party may cancel the award in
agrees to protect, defend, indemnify and hold harmless the event that a petition, either voluntary or involuntary,
the City of Waterloo, its officers and employees, the US is filed to declare the other party bankrupt or insolvent or
Government, FEMA, State of Iowa, their agencies and in the event that such party makes an assignment for
agents, from any and all claims and damages of every the benefit of creditors.
kind and nature made, rendered or incurred by or in
16. ASSIGNMENT- Proposer shall not assign this order or
behalf of every person or corporation whatsoever,
including the parties hereto and their employees that any monies to become due hereunder without the prior
may arise, occur, or grow out of any acts, actions, work written consent of the City. Any assignment or attempt
or other activity done by the Contractor, its employees, at assignment made without such consent of the City
subcontractors or any independent contractors working shall be void.
under the direction of either the Contractor or 17. EQUAL OPPORTUNITY - The successful firm agrees
subcontractor in the performance of this Contract.
not to refuse to hire, discharge, promote, demote, or to
8. PROPOSAL REJECTION OR PARTIAL otherwise discriminate in matters of compensation
ACCEPTANCE - The City reserves the right to reject against any person otherwise qualified solely because
any or all Proposals. The City further reserves the right of age, race, color, religion, sex, sexual orientation,
to waive technicalities and formalities in Proposals, as gender identity, marital status, national origin,
well as to accept in whole or in part such Proposals citizenship status, disability, or veteran status.
where it is deemed advisable in protection of the best
interests of the City. 18. TAXES -The City of Waterloo is exempt from sales tax
and certain other use taxes.Any charges for taxes from
9. PROPOSAL CURRENCY/LANGUAGE - All proposal which the City is exempt will be deducted from invoices
prices shall be shown in US Dollars ($). All prices must before payment is made.
remain firm for the duration of the Contract regardless of
the exchange rate. All proposal responses must be 19. PROPOSAL INFORMATION IS PUBLIC — All
submitted in English. documents submitted with any proposal and the
proposal shall become public documents and subject to
10. PAYMENTS - Payments will be made for all Iowa Code Chapter 22,which is otherwise known as the
goods/services delivered, inspected and accepted within "Iowa Open Records Law". By submitting any document
45 days and on receipt of an original invoice. to the City of Waterloo in connection with a proposal,
te submit
party recognized this an waives any
11. MODIFICATION, ADDENDA & INTERPRETATIONS - claim gainstgthe City of Waterloo and anyoits officers
Any apparent inconsistencies, or any matter requiring and employees relating to the release of any document
explanation or interpretation, must be inquired into by or information submitted.
the Proposer in writing at least 72 hours (excluding
weekends and holidays) prior to the time set for the Each submitting party shall hold the City of Waterloo
Proposal opening. Any and all such interpretations or and its officers and employees harmless from any
modifications will be in the form of written addenda. All claims arising from the release of any document or
addenda shall become part of the Contract documents information made available to the City of Waterloo
arising from any proposal opportunity.
RFP FOR ASBESTOS SURVEY AND ABATEMENT MONITORING SERVICES GROUP 2—2011
Page 11 of 11
EXHIBIT"A"
CONTRACT FOR ASBESTOS SURVEY AND ABATEMENT
MONITORING SERVICES GROUP 2
This Contract for Asbestos Survey and Abatement Monitoring Services Group 2 (the
"Agreement") is entered into as of , 2011, by and between the City of
Waterloo, Iowa("City") and ("Contractor").
In consideration of the mutual promises exchanged herein, the parties agree as follows:
1. Term and Services. For a period of three (3)months after the date of this
Agreement, subject to extension upon the mutual written agreement of the parties, the Contractor
agrees to furnish all tools, labor and materials, and perform and substantially complete all work
within the time period stated in the specifications after receipt of Notice to Proceed with respect
to a given property or set of properties. Work to be performed includes all work described in the
Contract Documents (defined below).
Contractor shall provide the above services at the cost set forth in the Contractor's RFP response.
Contractor will be paid separately for each property at which services are performed.
Contractor's request for payment for services authorized under this Agreement shall be
submitted on a monthly basis and will be paid within forty-five (45) days after receipt of an
original invoice and after such services are delivered and accepted. Contractor will be paid for
all items satisfactorily completed. Such payment will be full compensation for asbestos
surveying and monitoring of abatement, for all permits, licenses, inspections, sampling, lab
analysis, for complying with all laws, rules, regulations and ordinances, including safety, and for
furnishing all materials, equipment, and labor to complete the work in accordance with these
plans and specifications.
2. Contract Documents. The following documents (collectively, the "Contract
Documents") are hereby incorporated by reference as though set forth herein in full:
a. Request for Proposal and all exhibits thereto
b. Addenda
c. Response (Proposal) from the Contractor
In the event of conflict between the provisions of the Contract Documents and this Agreement,
the provisions of this Agreement shall prevail.
2.1 Contract Limits. Total actual expenses allowed by the project Agreement,
including any renewal extensions of the Agreement, shall not exceed $ as provided in the
Bid Tabulation that is part of the Contractor's RFP Response referenced in Section 2.c above,
except by written amendment as provided herein.
3. Approval; Timing of Work. Contractor shall not begin work on any surveying or
monitoring until after the Agreement has been approved by the City Council and a completely
executed copy has been returned to Contractor with Notice to Proceed. The work shall
commence within seven (7) days after the City has issued a Notice to Proceed with respect to any
particular property or set of properties, and asbestos surveys shall be completed and delivered
within thirty (30) days after issuance of the Notice to Proceed. A separate Notice to Proceed will
be issued for surveying work and for monitoring of abatement work. The Contractor shall
complete inspection work or re-inspection work within seven(7) days after being notified by the
City with a Notice to Proceed for monitoring of abatement work on any given property or
properties, and shall provide the required clearance reports or reports indicating failure to clear
within ten(10) days.
4. Performance Bond. Contractor shall furnish a bond in an amount equal to One
Hundred percent(100%) of the contract price and shall be issued by a responsible surety
acceptable to the City. The bond shall guarantee the faithful performance of the contract and the
terms and conditions therein contained, shall guarantee the prompt payment of all materials and
labor and protect and shall save harmless the City from claims and damages of any kind arising
out of the performance of this Agreement.
4.1 Payment Bond. Contractor will be required to furnish a payment bond in an
amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a
responsible surety approved by the city council and shall guarantee the faithful payment as
required by law of all persons supplying labor and material in the execution of the work provided
for in the Agreement.
5. Reporting; Records. Contractor shall exercise best efforts to maintain
communication with City personnel whose involvement in the project is necessary or advisable
for successful and timely completion of the work of the project. Communications between the
parties shall be verbal or in writing, as requested by the parties or as dictated by the subject
matter to be addressed. Contractor shall maintain all project records for a minimum period of
three (3) years after the date of final payment for services rendered under this Agreement.
During the term of this Agreement and for the ensuing record-retention period, Contractor shall
make any or all project records available upon reasonable request, and in any event within two
(2) business days of request, to City, Iowa Homeland Security and Emergency Management
Division (HSEMD), the Federal Emergency Management Agency(FEMA), the Comptroller
General of the United States, and any other agency of state or federal government, or the duly
authorized representatives of any of the foregoing, that has provided funding or oversight for the
HMGP property acquisition project, for the purpose of making audit, examination, excerpts
and/or transcriptions. For purposes of this section, "records"means any and all books,
documents, papers and records of any type or nature that are directly pertinent to this Agreement.
Contractor agrees to furnish, upon termination of this Agreement and upon demand by the City,
copies of all basic notes and sketches, charts, computations, and any other data prepared or
obtained by the Contractor pursuant to this Agreement, without cost and without restrictions or
limitation as to the use relative to specific projects covered under this Agreement. In such event,
the Contractor shall not be liable for the City's use of such documents on other projects.
6. Government-Mandated Provisions. Because the project activity is funded by the
federal government, federal law requires that the City's contracts relating to the project include
certain provisions. It is possible that some of the provisions set forth in this Section do not apply
to Contractor or the services to be provided hereunder, but the provisions are nonetheless set
forth to cause this Agreement to comply with federal law. City makes no representation about
whether any particular requirement is applicable to this Agreement. Parenthetical comments in
the following paragraphs are taken from 44 CFR § 13.36(i).
2
A. Remedies. See Section 7 below.
B. Termination for Cause and for Convenience. See Sections 7 and 8 below.
C. Contractor shall comply with Executive Order 11246 of September 24,
1965, entitled "Equal Employment Opportunity," as amended by Executive Order 11375 of
October 13, 1967, and as supplemented in Department of Labor regulations (41 CFR Chapter
60). (applies to all construction contracts awarded in excess of$10,000 by grantees and their
contractors or subgrantees)
D. Contractor shall comply with the Copeland"Anti-Kickback"Act(18
U.S.C. 874) as supplemented in Department of Labor regulations (29 CFR Part 3). (applies to all
contracts and subcontracts for construction or repair)
E. Contractor shall comply with the Davis-Bacon Act(40 U.S.C. 276a to
276A-7) as supplemented by Department of Labor regulations (29 CFR Part 5). (applies to
construction contracts in excess of$2,000 awarded by grantees and subgrantees when required
by federal grant program legislation, but does not apply to projects paid for with disaster
funding)
F. Contractor shall comply with Sections 103 and 107 of the Contract Work
Hours and Safety Standards Act(40 U.S.C. 327-330) as supplemented by Department of Labor
regulations (29 CFR Part 5). (applies to construction contracts awarded by grantees and
subgrantees in excess of$2,000,and in excess of$2,500 for other contracts which involve the
employment of mechanics or laborers)
G. City's Reporting Regulations and Requirements. See Section 4 above.
H. Patent Rights and Copyrights. With respect to any discovery or invention
which arises or is developed in the course of or under this Agreement, the Archaeological
Company is responsible for complying with requirements pertaining to patent rights, as defined
by the awarding agency. With respect to any publication, documents, or data that arises or is
developed in the course of or under this Agreement,the Archaeological Company is responsible
for complying with requirements pertaining to copyright, as defined by the awarding agency.
I. Access to Documents. See Section 4 above.
J. Retention of Documents. See Section 4 above.
K. Contractor shall comply with all applicable standards, orders, or
requirements issued under Section 306 of the Clean Air Act(42 U.S.C. 1857(h)), Section 508 of
the Clean Water Act(33 U.S.C. 1368), Executive Order 11738, and Environmental Protection
Agency regulations (40 CFR Part 15). (applies to contracts, subcontracts, and subgrants of
amounts in excess of$100,000)
L. Energy Efficiency Standards. Contractor shall comply with mandatory
standards and policies relating to energy efficiency that are contained in the State Energy
Conservation Plan issued pursuant to the Energy Policy and Conservation Act(Pub. L. 94-163,
3
89 Stat. 871). [53 FR 8078, 8087, Mar. 11, 1988, as amended at 60 FR 19639, 19645, Apr. 19,
1995j.
7. Indemnity. Except as to any negligence of City, its officials, officers, employees
or agents, in the performance of any duty under this Agreement, and to the extent not covered by
insurance maintained by Contractor, Contractor agrees to defend and indemnify City, its
officials, officers, employees and agents, and to hold same harmless, from and against any and
all claims, demands, causes of action, losses,costs, or liabilities whatsoever, including but
limited to reasonable attorneys' fees and expenses, arising from or in connection with the acts or
omissions of Contractor in providing the services contemplated by this Agreement.
8. Default Termination for Cause. In the event that Contractor defaults in the
performance or observance of any covenant, agreement or obligation set forth in this Agreement,
and if such default remains uncured for a period of seven (7) days after notice thereof shall have
been given by City to Contractor(or for a period of fourteen (14) days after such notice if such
default is curable but requires acts to be done or conditions to be remedied which, by their
nature, cannot be done or remedied within such 14-day period and thereafter Contractor fails to
diligently and continuously prosecute the same to completion within such 14-day period),then
City may declare that Contractor is in default hereunder and may take any one or more of the
following steps, at its option:
a. by mandamus or other suit, action or proceeding at law or in equity, require
Contractor to perform its obligations and covenants hereunder, or enjoin any
acts or things which may be unlawful or in violation of the rights of the City
hereunder, or obtain damages caused to the City by any such default;
b. have access to and inspect, examine and make copies of all books and
records of Contractor which pertain to the project;
c. declare a default of this Agreement,make no further disbursements, and
demand immediate repayment from Contractor of any funds previously
disbursed under this Agreement;
d. terminate this Agreement by delivery to Contractor a written notice of
termination; and/or
e. take whatever other action at law or in equity may be necessary or desirable
to enforce the obligations and covenants of Contractor hereunder, including
but not limited to the recovery of funds.
No delay in enforcing the provisions hereof as to any breach or violation shall impair, damage or
waive the right of City to enforce the same or to obtain relief against or recover for the
continuation or repetition of such breach or violation or any similar breach or violation thereof at
any later time or times. In the event that City prevails against Contractor in a suit or other
enforcement action hereunder, Contractor agrees to pay the reasonable attorneys' fees and
expenses incurred by City.
9. Termination for Convenience. This Agreement may be terminated at any time, in
whole or in part, upon the mutual written agreement of the parties. City may also choose to
4
terminate this Agreement at any time by delivering to Contractor 10-days' advance written
notice of intent to terminate.
10. Non-Assignable Duties. Contractor may not assign its duties hereunder without
the prior written consent of City.
11. Independent Contractor. Contractor is an independent contractor and is not an
employee, servant, agent,partner, or joint venturer of City. Contractor has no power or authority
to enter into contracts or agreements on behalf of City. City shall determine the work to be done
by Contractor, but Contractor shall determine the legal means by which it performs the work
specified by City. City is not responsible for withholding, and shall not withhold, FICA or taxes
of any kind from any payments which it owes Contractor. Neither Contractor nor its employees,
if any, shall be entitled to receive any benefits which employees of City are entitled to receive
and shall not be entitled to workers' compensation, unemployment compensation, medical
insurance, life insurance, pension, or any benefits of any type or nature whatsoever on account of
their work for City. Contractor shall be solely responsible for compensating its employees, if
any.
12. Severability. In the event any provision of this Agreement, together with the
Contract Documents, is held invalid, illegal, or unenforceable, whether in whole or in part, the
remaining provisions of this Agreement shall not be affected thereby and shall continue in full
force and effect. If, for any reason, a court finds that any provision of this Agreement is invalid,
illegal, or unenforceable as written, but that by limiting such provision it would become valid,
legal, and enforceable, then such provision shall be deemed to be written and shall be construed
and enforced as so limited.
13. General Terms. This Agreement, together with the Contract Documents,
constitutes the entire agreement between the parties pertaining to the subject matter hereof. This
Agreement may not be modified or amended except pursuant to the mutual written agreement of
the parties. This Agreement is binding on the parties and the heirs,personal representatives,
successor and assigns of each. Time is of the essence in the performance of the terms hereof.
IN WITNESS WHEREOF, the parties have executed this Agreement for Asbestos
Survey and Abatement Monitoring Services Group 2 as of the date first set forth above.
CITY OF WATERLOO, IOWA
By:
Ernest G. Clark, Mayor [Contractor]
Attest:
Suzy Schares, City Clerk
5
Exhibit "B" Property Data Sheet
# 'PIN Property Address Year Built Main Base SF Stories Basement Other Buildings/Notes
1 891315376003 180 SANS SOUCI DR 1914 1010 2 Full
2 891315377002 LOT 22-31 SANS 1990-2007 13168 1 None Six garage buildings and one picnic
SOUCI-GARAGES (combined total) shelter for a total of 13,168 square feet
3 891316451021, 114 BLACKWOOD AV 1941 864 1 Full (above 20x40 steel utility building
891316451026, ground)
891316451027,
891316451028,
891316451029,
891316451014, -
891316451015,
891316451016
4 891316327007, 159 GREENWOOD 1941 580
891316327008 AV 1 Full(above 24x24 garage that was pushed off
ground) foundation by flood and now sits
adjacent to 151 Greenwood
5 891316326014 160 GREENWOOD 1920, 1920 2778(combined 1 Full (above Three dwellings on one property
AV(160A, 160B& & 1930 total) ground)
6 891316401006, 128 GREENWOOD 1920 1360 1 Full(above
891316401008, AV ground)
891316401009
7 891316326029 162 GREENWOOD 1934 504 1 Full(above
AV
ground)
8 - 891316326025, 148 GREENWOOD 1928 632
891316326021, AV 1 Full(above 20x21+8x9 foundation (block walls)for
891316327009 ground) second dwelling located behind the
Some
9 891316301006 108 CASTLEWOOD 1947 1128
LN 1 None Small shed located northeast of
10 891316327011 151 GREENWOOD 1920 532 dwelling
AV 1 Full(above
ground)
Information about property characteristics is provided as a convenience to bidders. It is believed, but not
guaranteed, to be accurate, and bidders assume all risk of relying on such information. The City has not
undertaken a thorough inspection to verify all data presented. Each bidder is advised to examine the properties
itself to verify all information relevant to its bid and to project completion.