Loading...
HomeMy WebLinkAboutFORM OF BID OR PROPOSAL OF'BID OR PROPOSAL ENT PROJECT MAINE TRAINING CENTER g"T TERRAININ CENTER �M,T FIRE j)S MATERIALS i TE RLp�'IOW A HA HAZARDW ATE Center a ous Materials Training w HazarNewell Sheet the laws°f the state of 1925 a 50"103 existing underwith the existing a Corporation. (itself) documents listed Waterloo,IOC' ed being ° partners: (themselves)( tract The undersign o f the following P zedmselfl d with all the contract g and 1. consisting familiarized th worn Wayne Claassen Enc rater,Waterloo, slisted Partnership having the cost of the machinery, as prepare Materials Training materials,project area affecting if any) Hazardous inateri rewired to the re n Addenda e H el,labor, services conditions hereby Contents and file in the office of the personnel, transportation �the Table�C are n supervision, utility� S"W?,TER MAIN t prices for rag furnish all super ices,including LATER the ice Surveying, proposes toand services, WING CENTER and for Iowa,hereby p sHequipment, T F TRAINING appurtenances, N1A above- tools,app complete this H ce with the construct and all in accordan d quantities: TOTAL EXTENSION project., f ollowing items an work in place UNIT PRICE EST' U ICE SIT QTY. G ITEM DESCRIPTION L F 590 .. NO. lass 52 Dip �-� op g»Dia.,C Each 1 001. Water Main, g,�Dia•, � �� � I 'a-A------C-2- 4:221416_,C9• Tapping V alve�Sleeve and Box, � ��. 002. '52- Tapp Each 1 complete Complete E g»Dia.,Comp � Gate Valve,With Box, CJv��., 003. C7a ' Bury and Assembly, Each 1 Fire Hydrant,6.5 004• fete Comp Each 1rae.,_,__.6...--177- Gn t Remove and Re-Install, 005. Fire Hydrant, Complete Each 2 _ 4.. 0_t____)C2 Come to Existing � p06 Water Main,8"Dia. Tie-in �- 5 Degree Ductile Iron, Each 1 Bend g„Dia.,2 Thrust Restraint 00�• M 7 with�' PAGE I OF 3 WATER-MAIN-MAINEXT _MAT FIRE TR�'��G CENTER 8"WATER FOB OF BID 008. Bend, 8"Dia., 90 Degrees,Ductile Iron M.J.,with Trust Restraint Each 1 09. Seeding Fertilizing&Mulching. (Urban Mix)Acres 0.7 1 X)Lc i'D ) 017. Traffic Control L.S. 1CCO 018. Maintenance Bond, Two (2)Year L.S. 1 OC) -> TOTAL BID 2. It is understood that the quantities set forth are approximate only and subject to variation and that the unit bid price for the work done shall govern in the actual payment to Contractor. 3. In submitting this bid,the bidder understands that the right is reserved by the Hazardous Materials Training Center to reject any or all bids. If written notice of the acceptance of this bid is mailed, telegraphed, or delivered to the undersigned within thirty(30)days after the opening thereof, or at any time thereafter before this bid is withdrawn,the undersigned agrees to execute and deliver an agreement in the prescribed form and furnish the required bond and certificate of the insurance within ten(10)days after the agreement is presented to him for signature, and start work within ten(10) days after "Notice to Proceed" is issued.4. Security in the sum of \S`/e, CF 6416 131 n Dollars ($ )in the form of 6t , is submitted herewith in accordance with the INSTRUCTIONS TO BIDDERS. 5. The bidder is prepared to submit a financial and experience statement upon request. 6. The bidder has received the following Addendum or Addenda: Addendum No. Date 7. The bidder has filled in all blanks on this proposal. 8. The bidder has attached all applicable forms. 9. The Owner reserves the right to select alternates, delete line items, and/or to reduce quantities prior to the award of a contract due to budgetary limitations. FORM OF BID HAZ-MAT FIRE TRAINING CENTER 8"WATER MAIN EXT PAGE 2 OF 3 1.-t) / ` fre ��Lci le- l7 g \ Tame of Bidder) (Date) BY: � Title ' StJ ) Official Address: (Including Zip Code): Q a. v (ice/ ofvf-t-i/L/._no(tom✓ I.R.S.No. L/ O[1 / o FORM OF BID HAZ-MAT FIRE TRAINING CENTER 8"WATER MAIN EXT PAGE 3 OF 3