Loading...
HomeMy WebLinkAboutEMAIL RYAN COMPANIES US,INC. 625 First Street SE,Suite 460 lityA WWW.RYANCOMPANIES.COM Cedar Rapids,IA 52401-2032 BUILDING LASTING RELATIONSHIPS 319-731-2800 tel 319-731-2900 fax November 30,2007 Dennis Gentz Assistant City Engineer Waterloo Engineering Department 715 Mulberry,St. Waterloo,IA 50703 RE: Isle of Capri (IOC) Subject:Offsite Improvements—Acceptance Dennis, Ryan Companies,US,Inc.was the general contractor and Stanley Consultants,Inc.was the Civil Engineer for referenced project. Terracon Consulting Engineers&Scientists provided construction testing and observation on behalf of the IOC. We are submitting the As-built drawings as prepared by Stanley Engineers and a copy of the on site testing and observation reports. Stanley Engineering did provide any on site observation or inspections. Ryan Companies,US,Inc. certifies that construction of the offsite improvements were completed per the plans and specifications as prepared by Stanley Consults,Inc. Gee Grading completed the sanitary sewer, Aspro Inc completed the PCC paving at East Shaulis/IOC Blvd and Peterson Contractors Inc completed the East Shaulis/US 218 offsite improvements. The traffic signals at both locations were included in the scope of work completed by PCI. Ryan Companies,US,Inc. on behalf of the Isle of Capri is submitting the following documentation for acceptance of the subject public improvements by the City of Waterloo: • As-built drawings • Terracon field test& observation report • PCC and ACC material certificates • Sanitary sewer piping submittals • Two year maintenance bonds • Final construction cost breakdown Please feel free to call with any questions regarding this submittal. AZ LICENSE ROC195813 CLASS 8-01 COM.ROC212330 CLASS 13-01 RES.,CA LICENSE 842487,FL LICENSE CGC1506553,CGCI511473,CGCI506271,CHICAGO,IL LICENSE GC04631A,OR LICENSE 161162,WA LICENSE RYANCU1966KK YAH® WWW.RYANCOMPANIES.COM BUILDING LASTING RELATIONSHIPS 11110 ' spec Wr Ii►,•_ ' a Companies,US,Inc. J.h Windolf Sr. 'roject Manager End: As-built drawings Terracon field test&observation report PCC and ACC material certificates Sanitary sewer piping submittals Two year maintenance bonds Final construction cost breakdown Cc: Tony Calise Dick Meister Robert Wehner Clayton Cubbage Marc Gullickson Sandy Greco