HomeMy WebLinkAboutMEMO TO COUNCIL lA� ko-�,
/_r.,NIy CITY OF WAT =;' y I ` A--
WATERLOO BUILDING INSPECTIONS DEPARTMENT
715 Mulberry St. • Waterloo, IA 50703 • (319) 291-4319 Fax (319) 291-4262
Orloo '° LOUIS CUTWRIGHT,JR. • Building Official/Maintenance Administrator
MEMORANDUM
Mayor
TIMOTHY J.
HURLEY
TO: Mayor Tim Hurley and City Council
COUNCIL
MEMBERS FROM: Louis Cutwright, Jr.
Building Official/Maintenance Adminis r
REGINALD A.
SCHMITT DATE: July 23, 2008
Ward 1
RE: 2008 SWIMMING POOL RENOVATION
CAROLYN GATES AND BYRNES POOLS
con
Wad
HAROLD I would like to set the date of hearing for Gates Swimming Pool Filter Replacement;
GETTY the painting of Gates and Byrnes Swimming Pools and the installation of ADA
approved handrails in the zero-depth entrance to both pools. That date of hearing
QUENTIN NI.
and bid opening is set for August 18, 2008.
HART
Ward 4 This pool project is the ongoing upgrade and maintenance to our city pools. Last
year we installed new filters at Byrnes. The installation has had a positive affect on
RON maintenance at Byrnes Pool. The filter replacement at both pools is driven by the
WELPER
Iy„ 5 DNR classifying the filter product we are now using, Diatomaceous Earth (D.E.), as
a hazardous material.
BOB
GREENWOOD
f Gates still has a D.E. system, and this years pool project will change that system to
a sand filter system. The existing paint job is six (6) years old and shows signs of
STEVE extreme wear. A new ADA requirement shows the need for handrails to be placed
SCHMITT in specific locations for the safety of those entering the pool at the zero-depth
it La', locations.
I would like to set the date of hearing so we might be able to complete the project
before the snow flies.
Thank you for considering this request.
ja
Attachments
CITY WEBSITE: www.ci.waterloo.ia.us
WE'RE WORKING FOR YOU!
An Equal Opportunity/Affirmative Action Employer