HomeMy WebLinkAboutMEMO TO COUNCIL RESOLUTION 2008-640/641 j,.y CITY OF WATERLOO ,
IOWA
��,i;��rf�i
WATERLOO BUILDING INSPECTIONS DEPARTMENT
715 Mulberry St. • Waterloo, IA 50703 • (319) 291-4319 Fax (319) 291-4262
°Iterioo NO LOUIS CUTWRIGHT,JR. • Building Official/Maintenance Administrator
MEMORANDUMMayor g
TIMOTHY J. 4 y/
HURLEY
TO: Mayor Tim Hurley and City Council
COUNCIL
MEMBERS FROM: Louis Cutwright, Jr.
Building Official/Maintenance Adminis r
REG IN ALD A.
SCHMITT DATE: July 23, 2008
Ward I
RE: 2008 SWIMMING POOL RENOVATION
CAROLYN GATES AND BYRNES POOLS
COLE
Ward
HAROLD I would like to set the date of hearing for Gates Swimming Pool Filter Replacement;
GETTY the painting of Gates and Byrnes Swimming Pools and the installation of ADA
Ward 3 approved handrails in the zero-depth entrance to both pools. That date of hearing
QUENTIN NI
and bid opening is set for August 18, 2008.
HART
Ward 4 This pool project is the ongoing upgrade and maintenance to our city pools. Last
year we installed new filters at Bymes. The installation has had a positive affect on
RON maintenance at Byrnes Pool. The filter replacement at both pools is driven by the
WELBER
Wand 5 DNR classifying the filter product we are now using, Diatomaceous Earth (D.E.), as
a hazardous material.
BOB
GREENWOOD Gates still has a D.E. system, and this year's pool project will change that system to
At-Largc
a sand filter system. The existing paint job is six (6) years old and shows signs of
SIEVE extreme wear. A new ADA requirement shows the need for handrails to be placed
SCHMITT in specific locations for the safety of those entering the pool at the zero-depth
At-Lame
locations.
I would like to set the date of hearing so we might be able to complete the project
before the snow flies.
Thank you for considering this request.
ja
Attachments
CITY WEBSITE: www.ci.waterloo.ia.us
WE'RE WORKING FOR YOU!
An Equal Opportunity/Affirmative Action Employer