Loading...
HomeMy WebLinkAboutBID SHEET - WILLIAM E RAMSEY City of Waterloo Property Bid Sheet Property to be bid upon: 2554-2556 Edqemont Avenue Name in which property would be transferred: Name of bidder: Di 1 n I CL cf f rurri Address of bidder: (3(p�,3 cic.L,b _Q,t P Phone & Fax number of bidder:3 S- . 35-1 a a.tt5 70..x‘. 3 (q_a35-03 C My offer for property be bid upon: \ ((-C, .5(o 0 $1,000.00 earnest fee: (Note this amount is refundable for unsuccessful bidders. The fee will not be refunded for successful bidders who withdraw their offer.) Brief ascription of intended Improvements: PLO s Q L a < Furthermore, I understand the zoning designation of the property and building code requirements that I am bound by this designation for my use of property. Note: The successful bidder will be required to sign a Development Agreement binding them to the specified completion deadline of twelve (12) Months. $011, Signature • pplican .'.de Date *Please place this page at the front of your bid proposal when submitting to the City Clerks Office. September 8, 2009 Chris Western Planner II City of Waterloo, Iowa 715 Mulberry Street Waterloo, IA Re: 2554-2556 Edgemont Dear Mr. Western Attached please find our bid for the above mentioned property. I will describe further in this letter our intent for the property. Proposed Use: We are proposing that the property will continue to be utilized as a two family dwelling, with one unit being owner occupied. Site Development: It is our intent to start on the outside of the property immediately upon successful bid. The trees and brush around the foundation will be removed;the grade at the foundation will be raised to provide a positive grade away from the foundation. New gutters, with guards will be installed around the house, to provide positive drainage from foundation. The patio between the front doors will be removed and replaced with no maintenance decking material. The basement wall that is bowing will be repaired and secured at this time. The exterior frame siding will be replaced with vinyl siding, and 28 new windows will be installed. The driveway will be finished with concrete and a double detached garage built to the rear of the lot. In the spring, when Financial Capacity: Please see our letter of financial capacity from Community National Bank, in Waterloo. Project Team: Bill Ramsey Donna Hoffman 2623 Falls Avenue 2623 Falls Avenue Waterloo, IA 50701 Waterloo, IA 5o7oi • 31 9-235-6205 31 9-23o-5036 Bill Ramsey has been involved in buying and selling real estate for 4o+ years in the metro area. He has been instrumental in development of several subdivisions throughout the community. Mr. Ramsey has over the years purchased many homes that were in need of repair in order to be habitable, and turned these structures into homes for families. The most recent of these projects was at 132 Block Street in Waterloo. Donna Hoffman has been property manager for 48 units for the past 2 years. She has been responsible for maintaining and updating the units, designing the work and materials to be used, developing the budget to complete the projects and working to maintain the budget and timeline to insure the projects were done in a timely fashion. Ms Hoffman has been involved in the properties that have been in need of repair to assure the projects are completed within the proposed timeline and on budget. Timeline: For the exterior work, we intend to utilize outside contractors to expedite the process and will allow us to do interior work that needs to be done. We do not plan to do landscaping around the foundation until spring, allowing for the ground to settle and to give new plantings a full season prior to winter temperatures. Month 1: • Removed trees, shrubs and overgrowth from perimeter of foundation. Remove dead branches from trees in rear yard. • Install dirt around foundation to provide a positive grade. • Remove patio. • Repair basement wall that is bowing. • Interior: remove furniture and debris from both units. • Interior: paint interior of both units • Install permanent decking at front doors • Begin double detached garage • Interior: Design decision on kitchens. The current plan is that new cabinets, counters and sinks will be installed, to better utilize the kitchen space and allow for dishwashers in each unit. Appliances and flooring will be installed. • Interior: refinish hardwood floors where possible. Month 2: • Install concrete driveway • Replace windows throughout structure, with higher energy efficient windows. • Remove siding, insulate exterior walls and install vinyl siding. Windows will be wrapped in contrasting color. • Interior: General clean up and move in Regards William E. Ramsey 4.COMMUNITY NATIONAL f t BANK P.O. Box 1288 •Waterloo,IA 50704-1288 P.O. Box 851 •Mason City,IA 50402-0851 September 8, 2009 William E. and Margaret T. Ramsey 4 Silver Lake Drive Waterloo IA 50702 To Whom It May Concern: William and Margaret Ramsey have been customers with Community National Bank since 1999. They have an excellent credit history with our Bank. Based upon a recent review of their credit file, it appears that William aid Margaret Ramsey would be qualified to obtain additional financing as needed. The property would need to go through normal underwriting procedures before a formal loan commitment can be issued. Should you have any further questions, please contact me directly at 3' 9/291- 2000. Sincerely, khAi .1c1±11A--/414) Rhonda Hinton AVP-Commercial Lending Offices In: Waterloo,IA Cedar Falls,IA Mason City,IA