HomeMy WebLinkAboutRESOLUTION 2009-748 (2) : 7- .1-o' •'kv, 2069 7 ' Y ! AIA Document G704' - 2000 Certificate of Substantial Completion PROJECT: PROJECT NUMBER:07043-stone/ OWNER:❑ (Name and address): CONTRACT FOR:General Construction 2008 Stone Replacement for the CONTRACT DATE:August 26,2008 ARCHITECT:❑ Waterloo Public Library,Waterloo,IA. CONTRACTOR:❑ TO OWNER: TO CONTRACTOR: FIELD:❑ (Name and address): (Name and address): OTHER:❑ City of Waterloo Failor Hurley Construction 715 Mulberry Street PO Box 446 Waterloo,IA 50703 Hudson,IA 50643 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: The Work performed under this Contract has been reviewed and found,to the Architect's best knowledge,information and belief, to be substantially complete.Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate,which is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below: Warranty Date of Commencement StruXture Architects July 7,2009 ARCHITECT -''E��� 9A1-'--:)� DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective:$0.00 The Contractor will complete or correct the Work on the list of items attached h eto within Thirty(30)days from the above date of Substantial Completion. Failor Hurley Construction 7 J C�/o�} Z / ! / CONTRACTOR B DATE The Owner accepts the Work or designated portion as substantially complete and will assume full possession at 12:01 a.m.(time) on June 1,2009(date). City of Waterloo � -� - '7'0 5 OWNER BY DATE The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note:Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) The Owner shall be responsible for maintenance,heat,utilities,insurance and damage caused by the Owner's personnel. AIA Document G704T"'—2000.Copyright©1963,1978,1992 and 2000 by The American Institute of Architects.All rights reserved.WARNING:This AlA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 16:45:52 on 07/07/2009 under Order No.1000367524_1 which expires on 08/21/2010,and is not for resale. User Notes: (1380271727) i - lf, '''\ Im Document G701TM — 2001 to ,s,:Change Order `, PROJECT(Name and address): CHANGE ORDER NUMBER:003 OWNER.Cl 2008 Stone Replacement for the DATE:June 9,2009 TECT:❑ Waterloo Public Library Waterloo,IA. CONTRACTOR❑ TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER:07043-stone FIELD:❑ Failor Hurley Construction CONTRACT DATE:August 26,2208 :❑ PO Box 446 CONTRACT FOR:General Construction Hudson,IA 50643 THE CONTRACT IS CHANGED AS,FOLLOWS: (Include,where applicable any undisputed amount attributable to previously executed Construction Change Directives) A.Option No.2-Cut down existing damaged granite panels. ADD$5,753.00 B.To sod north side in lieu of Hydro Seeding. ADD$ 418.00 TOTAL ADD$6,171.00 TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$6,171.00 The original Contract Sum was $ 55,300.00 The net change by previously authorized Change Orders $ 5,204.00 The Contract Sum prior to this Change Order was $ 60,504.00 The Contract Sum will be increased by this Change Order in the amount of $ 6,171.00 The new Contract Sum including this Change Order will be $ 66,675.00 The Contract Time will be unchanged by Zero(0)days. The date of Substantial Completion as of the date of this Change Order therefore is June 1,2009 NOTE:This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects Failor Hurley Construction City of Waterloo ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Firm name) 314 E.4th Street PO Box 446 715 Mulberry Street Waterloo,IA 50703 , Hudson,IA 50643 Waterloo,IA 50703 ■I:ESS / XSlture) 4' 4. B (Signature) Timothy K.Jones William W.Failor ! Vn0. O Y' (Typed name) �+`� yurl2y y (Typed name) (Typed name) ` '27' q 611/0? 1'( -OG) DATE DATE DATE AIA Document G701 TM-2001.Copyright©1979,1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA®Document,or any 1 portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 17:15:20 on 06/09/2009 under Order No.1000365686_1 which expires on 08/22/2009,and is not for resale. User Notes: (930638897) A.. AI Document G7OITM — 2001 Change Order PROJECT(Name and address): CHANGE ORDER NUMBER:002 OWNER:0 2008 Stone Replacement for the DATE:June 3,2009 ARCHITECT: I Waterloo Public Library Waterloo,IA. CONTRACTOR:0 TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER:07043-stone FIELD:El Failor Hurley Construction CONTRACT DATE:August 26,2208 :❑ PO Box 446 CONTRACT FOR:General Construction Hudson,IA 50643 THE CONTRACT IS CHANGED AS FOLLOWS: (Include,where applicable,any undisputed amount attributable to previously executed Construction Change Directives) A.)Cost to remove approximately 140 l.f of 2'footing along the edge of the existing concrete sidewalk. ADD 4570.00 TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$470.00 The original Contract Sum was $ 55,300.00 The net change by previously authorized Change Orders $ 4,734.00 The Contract Sum prior to this Change Order was $ 60,034.00 The Contract Sum will be increased by this Change Order in the amount of $ 470.00 The new Contract Sum including this Change Order will be $ 60,504.00 The Contract Time will be unchanged by Zero(0)days. The date of Substantial Completion as of the date of this Change Order therefore is June 1,2009 NOTE:This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects Failor Hurley Construction City of Waterloo ARCHITECT(Finn name) CONTRACTOR(Firm name) OWNER(Firm name) 314 E.4th Street PO Box 446 715 Mulberry Street Waterloo,IA 50703 Hudson,IA 50643 Waterloo,IA 50703 ADDRESS ADDR 'j ADDRESS BY(Signature) BY(Signature) B (Signature Timothy K.Jones William W.Failor I-e .( (Typed name) (Typed name) - /( (Typed name) DATE DATE /�/ / DATE - a —O AIA Document G701 TM—2001.Copyright©1979,1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AlAe Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIAa Document.or any 1 portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 16:34:43 on 06/03/2009 under Order No.1000365686_1 which expires on 08/22/2009,and is not for resale. User Notes: (1144538480) -... L - O5 ! ALLV TM Document G701 — 2001 Change Order PROJECT(Name and address): CHANGE ORDER NUMBER:003 OWNER:❑ 2008 Stone Replacement for the DATE:June 9,2009 ARCHITECT:❑ Waterloo Public Library Waterloo,IA. CONTRACTOR:❑ TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER:07043-stone FIELD:❑ Failor Hurley Construction CONTRACT DATE:August 26,2208 :0 PO Box 446 CONTRACT FOR:General Construction Hudson,IA 50643 THE CONTRACT IS CHANGED AS FOLLOWS: (Include,where applicable,any undisputed amount attributable to previously executed Construction Change Directives) A.Option No.2-Cut down existing damaged granite panels. ADD$5,753.00 B.To sod north side in lieu of Hydro Seeding. ADD$ 418.00 TOTAL ADD$6,171.00 TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$6,171.00 The original Contract Sum was $ 55,300.00 The net change by previously authorized Change Orders $ 5,204.00 The Contract Sum prior to this Change Order was $ 60,504.00 The Contract Sum will be increased by this Change Order in the amount of $ 6,171.00 The new Contract Sum including this Change Order will be $ 66,675.00 The Contract Time will be unchanged by Zero(0)days. The date of Substantial Completion as of the date of this Change Order therefore is June 1,2009 NOTE:This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects Failor Hurley Construction City of Waterloo ARCHITECT(Firm name) CONTRACTOR(Finn name) OWNER(Finn name) 314 E.4th Street PO Box 446 715 Mulberry Street Waterloo,IA 50703 Hudson,IA 643 Waterloo,IA 50703 ADDRESS ADD S ADDRESS 1/nyr i —z. BY(Signature) BY( gnature) BY(Signature) Timothy K.Jones William W.Failor / , U r I2 y r c.y o f (Typed name) (Typed name) (Typed name) 4'////4)7 7- c, - 09 DATE DATE DATE AIA Document G701 TM-2001.Copyright©1979,1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AlA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA; Document,or any 1 portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 17.15:20 on 06/09/2009 under Order No.1000365686_1 which expires on 08/22/2009,and is not for resale. User Notes: (930638897) - a7- © g ! AIEA �=AIA Document G701 - 2001 Change Order PROJECT(Name and address): CHANGE ORDER NUMBER:001 OWNER: ❑ 2008 Stone Replacement for the DATE:October 10,2008 ARCHITECT:❑ Waterloo Public Library Waterloo,IA. CONTRACTOR: ❑ TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER:07043-stone FIELD: El Failor Hurley Construction CONTRACT DATE:August 26,2008 OTHER: ❑ PO Box 446 CONTRACT FOR:General Construction Hudson,IA 50643 THE CONTRACT IS CHANGED AS FOLLOWS: (Include,where applicable,any undisputed amount attributable to previously executed Construction Change Directives) A.Cost to complete additional pavement/sidewalk removal,install additional sidewalk,and complete additional stone panel work associated with the dimension discrepancy. ADD$4,734.00 TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$4,734.00 The original Contract Sum was $ 55,300.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 55,300.00 The Contract Sum will be increased by this Change Order in the amount of $ 4,734.00 The new Contract Sum including this Change Order will be $ 60,034.00 The Contract Time will be unchanged by Zero(0)days. The date of Substantial Completion as of the date of this Change Order therefore is June 01,2009 NOTE:This Change Order does not include changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects Failor Hurley Construction City of Waterloo ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Firm name) 314 E.4th Street PO Box 446 715 Mulberry Street Waterloo,IA 50703 Hudson,IA 50643 Waterloo,IA 50703 ADDRESS ADD ESS'/ • ADDRESS -- 4.‘ BY(Signature) BY(Signature) (Signature) Timothy K.Jones William W.Failor II al /Lr1-e yI VYl,ct r0 Y- (Typed name) (Typed name) (Typed name) DATE DATE DATE AIA Document G701 TM-2001.Copyright©1979,1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AlA Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA5 Document,or any .I portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 10:12:40 on 10/10/2008 under Order No.1000365686_1 which expires on 8/22/2009,and is not for resale. User Notes: (3462247181)