HomeMy WebLinkAboutMEMO TO MAYOR { � � .TAILOR HIlRLEril 11! CONSTRUCTION October 7, 2008 Struxture Architects 314 E. 4th Street Waterloo, IA 50703 Attn: Mr. Tim Jones Subj: 2008 Stone Replacement for the Waterloo Public Library Tim, In the process of checking the stone shop drawings for the subject project, an error was discovered in the project plans. On the west elevation(along parking lot) the portion of wall north of the double doors is shown on the plans being a length of approximately 30'-8", and when field measured it was found to be actually 40'-8". In addition, the actual panel sizes are taller than shown. See attached letter from Carl Schuler Masonry Construction for further explanation. For these reasons, we are submitting the following change request. We propose to furnish all material, labor, and equipment required to complete additional pavement/sidewalk removal, install additional sidewalk, and complete additional stone panel work associated with the dimension discrepancy noted above for the sum of$4,734.00. Breakdown Pavement/sidewalk removal $ 116.00 Sidewalk 322.00 Stone panels 3,800.00 Bond 66.00 Contractor's fee 430.00 Total add: $4,734.00 Please feel free to contact us if you have any questions or need any additional information. Sincerely, FAILOR HURLEY CONSTRUCTION z: � <11: William W. Failor President P.0. Box 446,Hudson,IA 50643 I Office 319-230-3475 I Fax 319.988.9804 I FailorHurley,com