HomeMy WebLinkAboutBID PROPOSAL - WCA ART COLLECTION STORAGE City of Waterloo August 19, 2011
Waterloo Center for the Arts
225 Commercial Street
Waterloo, IA 50701
Subject: Bid Proposal For WCA Art Collection Storage
We thank you for the opportunity to submit our proposal. Our proposal is based upon
our, on site detailed examination of the application and space allocation for storage.
We are providing a mobile mechanical assist base bid with optional upgrade choices for
your consideration. All pricing includes complete delivery and installation.
BASE BID
Our base bid for $139,246.00 meets and exceeds specifications of the bid request and
includes the following with optional considerations as noted:
Room la & lb Base Bid
Base bid per drawings (top view, elevation view, 3 dimensional view) attached:
The base bid includes:
All rails, ramp and decking for the entire room made of museum grade non off
gassing Medex materials.
Carriages, shelving and art supports as noted on drawing marked "BASE BID".
The base bid provides for:
*520 to 1,040, 2D art pieces 16" x 20" x 2" or less
524, 2D art pieces 24" x 36" x 2" or less
533, 2D art pieces 30" x 40" x 2" or less
326, 2D art pieces 36" x 48" x 2" or less
* This capacity is based on the flexibility to use the equipment as either single
sided or double sided equipment (for smaller sizes increasing the storage
capacity). Each piece of art has its own vertical art supports.
Storage system design provides rigid support for each piece of art and permits
adjustability of shelves vertically without the use of tools. Horizontal spacing can
be easily adjusted for future requirements. In addition all shelving can be easily
converted for 3D art storage in the future, without the need for parts.
Wall Hung Framed Art, Room 1 a & 1 b:
Per the requested specifications and attached drawings we are providing
Spacesaver wall mounted art rack that totals 83' wide x 8' high to meet the bid
specification requirements. The Spacesaver wall mounted art rack is constructed
of expanded metal (featuring thickest gage screen for maximum durability and
Specialists In Storage and Retrieval
1615 Second Avenue E-Mail: info@OSDI.COM Phone: (515) 244-1911
Des Moines, Iowa 50314-3602 Fax: (515) 244-2107
diamond mesh which is flattened and de burred. Included are 200 art hooks with
185 lb capacity.
Installation:
OSDI-Spacesaver only installs equipment with factory certified installers to
comply with manufacturer's warranty. Base bid includes 1 preventative
maintenance service (inspection, adjustment, lubrication) to the equipment every
12 months for a 5 year period.
Room la & lb BASE BID OPTIONS:
The following options are available for addition to the base bid as noted. See
drawings marked "Room la & lb Base Bid Options".
Option #1:
Addition of one carriage, shelving, art supports as noted on the "Base Bid"
,drawing as "optional". Cost for this additional option would be $11.093.00
to be added to "Base Bid Price". This provides for an additional 436 to
872 pieces of art 24"x36".
Option #2:
Deduct cost for Medex decking, and using a standard decking that can be
coated by the user to eliminate off gassing. Deduction amount = (-
$2,334.00) to be deducted from "Base Bid Price".
Option #3:
Upgrade base bid and option #1 to Electronic Operation of the mobile
system. (See drawings (top view, elevation view, 3 dimensional view
noted "Powered") attached, with electronic controls and photo sweep
safety system.
Cost = $6,611.00 to be added to the "Base Bid Price plus Option #1".
Bid includes 1 preventative maintenance service (inspection, adjustment,
lubrication) to the equipment every 6 months for a 5 year period.
Storage Room 2:
Base bid per drawings (top view, elevation view, 3 dimensional view) attached:
The base bid includes:
All rails and decking for the entire room.
Carriage, textile rack, as noted on drawing marked "Base Bid".
The base bid provides for:
325 Linear feet of Textile storage per attached drawings. Textile storage, see
technical drawing. The proposed textile storage is very heavy duty equipment
and can be used as a either a single depth or double depth roll storage. The
I "
components are easily moved horizontally or vertically without the use of tools.
Future components can be acquired to increase capacity to 650 by using double
depth per the drawing attached.
Storage Room 2 BASE BID OPTIONS:
Option #1:
Addition of four (4) mechanical assist carriages, shelving, art supports as
noted on the "Option" drawing. Cost for this additional option would be
$32,966.00 to be added to "Base Bid Price". This will provide growth for
2D and 3D art storage. Depending upon the specific size of art to be
stored the quantity of art to be stored would vary from 1,452 pieces
16"x20"x2" or less, to a lesser amount of larger art pieces. In addition
there will be growth for 3D art and depending upon size we conservatively
state you will have 204 sq. ft of shelf space for large 3D art that is 65"
high. With the addition of 2 more levels of shelves in the future this could
be increased to 612 sq. ft. of shelf space for 3D art that is 20" high.
Option #2:
Deduct cost for Medex decking, and using a standard decking that can be
coated by the user to eliminate off gassing. Deduction amount = (-
$2,007.00) to be deducted from "Base Bid Price".
Option #3:
Upgrade base bid and option #1 to Electronic Operation of the mobile
system. (See drawings (top view, elevation view, 3 dimensional view
noted "Powered") attached, with electronic controls and photo sweep
safety system.
Cost = $3,061.00 to be added to the "Base Bid Price plus Option #1".
Bid includes 1 preventative maintenance service (inspection, adjustment,
lubrication) to the equipment every 6 months for a 5 year period.
nPORTANT NOTE:
Based on the potential of loading carriages to the maximum, Storage room
1 a & 1 b could weigh a total of 203,000 Ibs, or 29,000 lbs per carriage.
Storage room 2 could weigh a total of 147,200 lbs or an average of 29,440
lbs per carriage. We strongly recommend that consideration be given to
making both of the mobile systems powered in order to provide users with
ease of carriage movement and to control the movement of all the
collections, which will protect the integrity of the collection.
ill Ili
II
IIII
I
'II
I '
is
The Powered systems have aisle safety features by use of a infrared
photo safety system. In addition the system can be secured for controlled
access. There are optional functions that can be added at any time such
as priority aisle, fire park, system auto cycle, system ventilation park and
system closed park. The system is equipped with "soft start / soft stop"
electronic motor control, to provide smooth movement of the carriages. {,
A rechargeable battery pack is provided in the event of a power outage so
that the system can still be utilized during a building power outage.
RFID / Bar Code System: 1.
Our base bid includes and meets /exceeds specifications of the bid request and
includes the following with optional considerations as noted:
1. Asset Management Solutions software (windows version).
2. RFID / Bar Code Scanner
3. 4,000 RFID / bar code passive labels
Optional:
We are providing a bar code solution, that will accomplish the primary objective
of managing the collection as follows:
Cost deduction of$ 4,485.00 which eliminates use of RFID but provides the
following:
1. Asset Management Solutions software (windows version).
2. Scanner (includes cables, gun / handle, cradle, Wifi and 1-D bar code reader.
3. 4,000 polyester bar code labels.
4. Full day of on site training = $1,600.00.
To completely deduct the RFID / Bar Code System included with the Base Bid,
you may deduct $9,275.00
ROOM 2 - ADDITIONAL TEXTILE
STORAGE
Future Textile Component Cost to Increase Capacity to 650 Square Feet--
TOTAL ADD-ON COST- $9,635.00
I ,I
SUMMARY:
Jpon your approval and award to us for this project, we are prepared to accept full
esponsibility of all project management responsibilities and to coordinate all activities to
(our complete satisfaction. Our Team thanks you for the opportunity to provide
(\taterloo Center for the Arts, a high quality and professional installation.
11
Project Team
)SDI Spacesaver
3rent Neubauer -- Senior Project Mgr. Quinn Markgraf— Contractor Support
)ean Sandstoe -- President Cheryl Stacey -- Region Business Mgr.
Jlike Marsh -- Technical Services Mgr Mike Lawrence — Field Support Mgr.
)anielle Rosauer—Technical Design
4
I ,
i
i
i 2
i :1
Project Detail Summary
Base Bid .$ 139,246.00
Addition for Room 1 Option#1 (additional shelving) .11,093.00
Addition for Room 1 Option#3 (upgrade to electronic operation)....6,611.00
Addition for Room 2 Option#1 (additional shelving) .32,966.00
Addition for Room 2 Option#3 (upgrade to electronic operation)....3,061.00
Addition for additional textile storage capacity .9,635.00
Addition for 200 additional "S"hooks 304.00
Deduct for standard art rack option - 2,175.16
Deduct for RFID/Bar Code option - 9,275.00
TOTAL $ 191,465.84