HomeMy WebLinkAboutPAYMENT BOND THE AMERICAN INSTITUTE OF ARCHITECTS
w •
Bond No. IAC54702
AlA Document A3 I2
Payment Bond
Any singular reference to Contractor,Surety,Owner or other party shall be considered plural where applicable.
CONTRACTOR(Name and Address): SURETY(Name and Principal Place of Business):
Air Systems Heating and Cooling, Inc. Merchants BondingCompany
- P Y (Mutual)
915 Center St.
2100 Fleur Drive
Cedar Falls, IA 50613 Des Moines, IA 50321-1158
OWNER(Name and Address):
City Of Waterloo
715 Mulberry St.
Waterloo, IA 50703
CONTSTRUCTION CONTRACT
Date: May 19, 2008
•
Amount: $19,730.00
Description(Name and Location): 2008 Riverfront Stadium Kitchen Hood & Exhaust Fan Renovation
BOND
Date(Not earlier than Construction Contract Date): May 19, 2008
Amount: $19,730.00
Modifications to this Bond: ® None
See Page 6
CONTRACTOR AS PRINCIPAL SURETY
Company: (Corporate Seal) Company:Y: (Corporate Seal)
Air Systems Heating and Cooling, Inc. Merchants Bonding Company (Mutual)
Signature: Ikk`E71.0e441 �.� Signature: �lO.4,N��
Name and Title: Name and Title: Janet Willard, Attorney—In—Fact
(Any additional signatures appear on page 6)
(FOR INFORMATION ONLY—Name,Address and Telephone)
AGENT or BROKER: OWNER'S REPRESENTATIVE(Architect, Engineer or other
Pedersen Dowie Clabby McCausland Insurance party): Gilmor & Doyle, Lrd.
P.O. Box 2597 214 E. 4th St.
Waterloo, IA 50704 Waterloo, IA 50703
AlA DOCUMENT A312 • PERFOR.,0A,NCE BONO AND P.X ' ENT SONO • CECEM8ER 1984 ED. •Ai.i
T E AmERICAN INSTITUTE OF ARCHTEC'T5. 1735 NEW YORK .VE.. ,N.W.. WASHNOTON. D.C. 2CCO6 2_1
•
1 The Contractor and the Surety,jointly and severally,bind 6 When the Claimant has satisfied the conditions of Para-
themselves, their-heirs, executors, administrators, succes- graph 4,the Surety shall promptly and at the Surety's expense
sors and assigns to the Owner to pay for labor, materials and take the following actions:
equipment furnished for use in the performance of the -
- 6.7 Send an answer to the Claimant with a copy to the
Construction Contract, which is incorporated herein by
reference. Owner,within 45 days after receipt of the claim,stating the
amounts that are undisputed and the basis for challenging
2 With respect to the Owner, a this obligation shall be null any amounts that are disputed.
and void if the Contractor:
- 6.2 Pay or arrange for payment of any undisputed
2.1 Promptly makes payment, directly or indirectly, for amounts.
all sums due Claimants,and _ - -
•
7 The Surety's total obligation shall not exceed the amount
2.2 Defends,indemnifies and holds harmless the Owner of this Bond, and the amount of this Bond shall be credited
from all claims, demands, liens or suits-by any person or for any payments made in good faith by the Surety.
entity who furnished labor,materials or equipment for use
in the performance of the Construction Contract, pro- 8 Amounts owed by the Owner to the Contractor under the
vided the Owner has promptly notified the Contractor and _ Construction Contract shall be used for the performance of
the Surety (at the address described in Paragraph 12) of the Construction Contract and to satisfy claims,if-any,under
any claims,demands, liens or suits and tendered defense any Construction Performance Bond. By the Contractor
of such claims, demands, liens or suits to the Contractor furnishing and the Owner accepting this Bond, they agree
and the Surety,and provided there is no Owner Default.
that all funds earned by the Contractor in the performance of
3 With respect to Claimants,this obligation shalLbe null and the Construction Contract are dedicated to satisfy obligations
void if the Contractor promptly makes payment, directly or of the Contractor and the Surety under this Bond,s completion of
indirectly.for all sums due. the Owner's priority to use the funds for the of
the work.
4 The Surety shall have no obligation to Claimants under
this Bond until: 9 The Surety shall not be liable to the Owner, Claimants or
others for obligations of the Contractor that are unrelated to
4.1 Claimants who are employed by or have a direct the Construction Contract.The Owner shall not be liable for
contract with the Contractor have given notice to the payment of any costs or expenses of any Claimant under this
• Surety(at the address described in Paragraph 12)and sent Bond,and shall have under this Bond no obligations to make
a copy,or notice thereof,to the Owner,stating that a claim- -- -- payments-to,-gi3!e notices on.behalf of,-or otherwise have is being made under this Bond and, with substantial obligations to Claimants under this Bond.
accuracy,the amount of the claim.
10 The Surety hereby waives notice of any change, inciud-
4.2 Claimants who do not have a direct contract with the
Contractor: ing changes of time, to the Construction Contract or to
related subcontracts,purchase orders and other obligations.
.1 Have furnished written notice to the Contractor
and sent a copy, or notice thereof, to the Owner, 11 No suit or action shall be commenced by a Claimant
within 90 days after having last performed labor or under this Bond other than in a court of competent jurisdic-
last furnished materials or equipment included in tion in the location in which the work or part of the work is
the claim stating, with substantial accuracy, the located or after the expiration of one year from the date(1)on
amount of the claim and the name of the party to which the Claimant gave the notice required by Subpara-
whom the materials were furnished or supplied or graph 4.1 or Clause 4.2(iii), or(2) on which the last labor or
for whom the labor was done or performed; and service was performed by anyone or the last materials or
.2 Have either received a rejection in whole or in part equipment were furnished by anyone under the Construe
tion Contract, whichever of (1) or (2) first occurs. If the
from the Contractor,or not received within 30 days
provisions of this Paragraph are void or prohibited bylaw,the
of furnishing the above notice any communication
minimum period of limitation available to sureties as a
from the Contractor by which the Contractor has
defense in the jurisdiction of the suit shall be applicable.
indicated the claim will be paid directly or indirect-
ly; and
3 Not having been paid within the above 30 days, 12 Notice to the Surety, the Owner or the Contractor shall
be mailed or delivered to the address shown on the signature
have sent a written notice to the Surety (at the
Page. Actual receipt of notice by Surety, the Owner or the address described in Paragraph 12)and sent a copy,
or notice thereof,to the Owner,stating that a claim Contractor, however accomplished, shall be sufficient com-
ic being made under this Bond and enclosing a signate as of the date received at the address shown on the
copy of the previous written notice furnished to signature page.
the Contractor.
13 When this Bond has been furnished to comply with a
S If a notice required by Paragraph 4 is given by the Owner statutory or other legal requirement in the location where the
to the Contractor or to the Surety, that is sufficient compli- construction was to be performed,any provision in this Bond
ante. conflicting with said statutory or legal requirement shall be
ALA DOCUMENT A312 • PERFORMANCE 30N0 ANO PAY,mE.Nr SCNO • DECEMBER I98-I ED. • -VA 81
"HE AMERICAN INSTITUTE OF ARCHITECTS. :7 35 NEW YORX AVE.. N.w., WASHINGTON, D.C. 2CC06 A312-1984 5
•
deemed deleted herefrom and provisions conforming to "labor, materials or equipment" that part of water, gas,
such statutory or other legal requirement shall be deemed power, light, heat, oil,—gasoline, telephone service or
incorporated herein. The intent is that this Bond shall be rental equipment used in the Construction Contract,
construed as a statutory bond and not as a common law architectural and engineering services required for perfor-
bond. mance of the work of the Contractor anel the Contractor's
subcontractors,and all other items for which a mechanic's
14 Upon request by any person or entity appearing to be a lien may be asserted in the jurisdiction where the labor,
potential beneficiary of this Bond, the Contractor shall materials or equipment were furnished.
promptly furnish a copy of this Bond or shall permit a copy to -
be made. 15.2 Construction Contract: The agreement between
the Owner and the Contractor identified on the signature
15 DEFINITIONS page, including all Contract Documents and changes
thereto. _ .
15.1 Claimant: An individual or entity having a direct 15.3 Owner Default: Failure of the Owner, which has
contract with the Contractor orwith a subcontractor of the
Contractor to furnish labor, materials or equipment for neither been remedied nor waived,to pay the Contractor
use in the performance of the Contract.The intent of this asn required by ort comply Construction with the Contract or to perform
Bond shall be to include without limitation in the terms and complete with other terms thereof.
MODIFICATIONS TO THIS BOND ARE AS FOLLOWS:
•
•
(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.)
CONTRACTOR AS PRINCIPAL SURETY •
Company: (Corporate Seal) Company: Corporate Seal)
Air Systems Heating and Cooling, Inc.
�` Merchants Bonding Company (Mutual) --
Signature: UTA� — Signature:
Name and Tide: Name and Title: Janet Willard, Attorney=In-Fact
Address: 915 Center St. Address: Pedersen Dowie Clabby McCausland Insurance
Cedar Falls, IA 50613 3927 University Ave. , Waterloo. TA 50704
ALA 00CUMENT A31'_ • PERFORmANC- 30No ANO PAY.ME"+T 30No • OECE.MBER 1984 EC. •AIA a
r l?-1984 6
71-1E AmER:CAN INSTITUTE OF ARC]-IIrECTS, 1,-35 NEW YORK AVE., N.W., wAS+-tINCTON, O.C. ZCOC6