HomeMy WebLinkAboutAIA DOCUMENT 704 - 2000 //-JD- o? R& Rio. 1 oo� - ,00 1 A IA Document G704TM - 2000 Certificate of Substantial Completion PROJECT: PROJECT NUMBER:07079/ OWNER:❑ (Name and address): CONTRACT FOR:General Construction 2007 Riverfront Stadium East CONTRACT DATE:November 15,2007 ARCHITECT:❑ Concession Renovations,Waterloo CONTRACTOR:❑ Leisure Services Waterloo,IA. FIELD:El TO OWNER: TO CONTRACTOR: OTHER:❑ (Name and address): (Name and address): City of Waterloo,Iowa Prairie Construction Co.,Inc. 715 Mulberry Street P.O.Box 626 Waterloo,IA 50703 Waterloo,IA 50704 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: The Work performed under this Contract has been reviewed and found,to the Architect's best knowledge,information and belief, to be substantially complete.Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate,which is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below: Warranty Date of Commencement v StruXture Architects PLC August 20,2008 ARCHITECT B DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective:$0.00 The Contractor will complete or correct the Work on the list of items attached hereto within Thirty(30)days from the above date of Substantial Completion. Prairie Construction Co.,Inc. 4. CONTRACTOR BY O/Z 3/a DATE l The Owner accepts the Work or designated portion as substantially complete and will assume full possession at 12:01 A.M.(time) on May 19,2008(date). City of Waterloo,Iowa OWNER DATE /d'b The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note:Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) The Owner shall be responsible for maintenance,heat,utilities insurance and damage caused by the Onwer's personnel. AIA Document G704TM—2000.Copyright ©1963,1978,1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING:This AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:03:59 on 08/20/2008 under Order No.1000367524_1 which expires on 8/21/2010,and is not for resale. User Notes: (2173474884) STR,U TUBE May 19, 2008 ,, ARCHITECTS TO: Brian Tenge- Prairie Construction Company, Inc. Re: Riverfront Stadium East Concession Stand Renovations- Waterloo, IA Substantial Completion Punch List review- May 19, 2008 Upon review of the Riverfront Stadium East Concession Stand Renovations on May 19, 2008, the following deficiencies were observed in need of correction, modification or completion prior to final acceptance of this portion of the project. EXTERIOR 1) Fill mortar joints in block head and bed joints that are not full and tooled. 2) Caulk all joints of exterior blue metal panels 3) Door 07- do not install floor door stop. Do install threshold, weatherstripping and kickplate. 4) Paint exterior concrete block, H.M. Doors and frames and overhead door. 5) Install concrete flatwork and retaining walls. CORRIDOR 010 1) Patch back cold asphalt infills to be level with adjacent floors. 2) Fill mortar joints in block work with mortar that are not full and tooled 3) Repair some of the multi-scored block faces that are chipped or broken and rub/grind down some of the patched chips that have been done. HALL 008 1) Door #11- painter shall touch-up scrapes on door. 2) Paint Overhead door #01 both sides- the specification for the O.H. door calls for this door to be painted. CONCESSIONS 002 1) Openings #14 and #15- rout out top 3A" tol" of floor expansion joint and caulk with traffic bearing caulking for foot traffic. 2) Serving windows #02 and 04- install weatherstripping in track of rolling shutters at openings 02 & 04. Please correct the above items as soon as possible. The first home game is n 9 days. STRUXTURE ARCHITECTS Dale R. Port, AIA xc- Rick Curran, Waterloo Leisure Services Owner's Rep. 314 E.4th Street Wate-loo, IA 50703-4704 • +.1. g i o"rz.i !AI[A Document G701TM — 2001 Change Order PROJECT(Name and address): CHANGE ORDER NUMBER:001 OWNER: ❑ 2007 Riverfront Stadium East DATE:July 22,2008 ARCHITECT: ❑Concession Renovations,Waterloo Leisure Services CONTRACTOR: ❑ Waterloo,IA. TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER:07079 FIELD: ❑ Prairie Construction Co.,Inc. CONTRACT DATE:November 15,2007 OTHER: ❑ P.O.Box 626 CONTRACT FOR:General Construction Waterloo;IA 50704 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable,any undisputed amount attributable to previously executed Construction Change Directives) See attached detailed list for items A-G. A. NO PRICE CHANGE B. ADD $ 614.00 C. ADD $ 516.00 D. NO PRICE CHANGE E. ADD $ 1,500.00 F. DEDUCT($ 75.00) G. ADD $ 292.00 TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$2,847.00 The original Contract Sum was $ 112,800.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 112,800.00 The Contract Sum will be increased by this Change Order in the amount of $ 2,847.00 The new Contract Sum including this Change Order will be $ 115,647.00 The Contract Time will be unchanged by Zero(0)days. The date of Substantial Completion as of the date of this Change Order therefore is April 15,2008 NOTE:This Change Order does not include changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects PLC Prairie Construction Co..Inc. City of Waterloo,Iowa ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Finn name) 314 East Fourth Street, P.O.Box 626, 715 M .terry t Waterloo,IA 50703 Waterloo,IA 50704 Water so.IA 50 Al ADDS At�DRES j� `I 74..... ADD BY(Signature) BY(Signature) BY(Signature) Dale R.Port Michael L.Christiason .34;,� SGhM e 4� (Typed n me) (Typed name) (Typed Tame) Macy 0 P Pro --rk r.}N Zdr e9 7/23/08 a.- 9 @ —0 8 DATE DATE DATE AIA Document G701 TM-2001.Copyright ©1979,1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING:This AEA' Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this Ale Document,or any portion of it.may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law, This document was produced by AIA software at 11:23:03 on 07r22/2008 under Order No.1000313499 1 which expires on 8/22/2008.and is not for resale. User Notes: (389570720) RIVERFRONT STADIUM EAST CONCESSIONS RENOVATIONS WATERLOO, IOWA GENERAL CHANGE ORDER#G1 a) To furnish and install a mortise style cylinder for exterior overhead door#1 (an "add" amount of $120.00) and credit the contract to delete the hand crank on door #1 and instead provide the door as a manual door for this opening (a "deduct" amount of $120.00), there is a net no price change for this item. NO PRICE CHANGE b) To add one course of concrete block above the 7'-4" high walls and remove and repair the existing 3 ft wall between openings #15 & 16, add the amount of$614.00 to the contract sum. ADD $ 614.00 c) To provide additional framing per revised framing plan Detail A/A310 to make necessary clearance for the roll-up hood for overhead door #1, add the amount of $516.00 to the contract sum. ADD $ 516.00 d) To install ceiling grid only in rooms 001, 002, 003, 004, 005 and 008 in lieu of patching back suspended ceilings in Corridor 009 and 010, there is no price change. NO PRICE CHANGE e) To install 2" concrete topping slab in Corridor 010 in lieu of installing cold patch asphalt extending from the east side of opening #09 down to the column where corridor 011 begins (approximately 612 sq ft) and install cold patch asphalt along the new wall of Corridor 009 and 011 flush with the floor surfaces as drawn and specified, add the net amount of $1,500.00 to the contract sum. ADD $ 1,500.00 f) To delete the steel lintel and installation at opening #013, deduct the amount of $75.00 from the contract sum. DEDUCT $ 75.00 g) To provide material and labor to fix the existing east steel column, add the amount of $292.00 to the contract sum. ADD $ 292.00 TOTAL CHANGE ORDER #G1 (a thru g) ADD $ 2,847.00