Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DESIGN PHASE
, . U.S.Highway 63 From U.S.218 to Donald Street Initial Design Phase-Modifications to Original Scope Waterloo,Iowa Staff Hour Estimate-AECOM Portion Description of Work Senior Project Staff CADD GADD Project Eng/Prof , Eng/Prof Eng/Prof Opt.II Opt.I Tech, Admin Total Scope Revisions From Initial Design Phase (Refer To Original Scope For Task Numbering) ___ Deleted Or Modified Tasks -............._.........._..............____ _....10 Develop VISSIM Traffic Model,or Alternative(Deleted Ta.s9 (10) (30) (329) _ _....._ _______.........___C369./.._ 21 Drainage Problem at Railroad Underpass(Modified Task) ..(12)_ ..(12). .(12) .....32 Roadway_Enhancement Concapts(Modified Task) C.Ritland _38 b. Plan and Profile Des)gn,U.S.218 Interchange Modifications(Modifiec (6)_ 13_2)___ .(32). 1241_ __C?..1.1 .._0291. .....44 Soils Design_(Modified Task) Terracon 72 Traffic Signal Details,Westfield Ave,Connection(Deteted Tags)._ (_41 Ora (24), _0.111_ _..... Subtotal Deleted Or Modified Tasks (34) (134) (352) (60), (24) 0 0 (604) _. Added lasksilVotin Original SppEe)_ 1 ROI-of-Way Plats and Descriptions 4 96 282 382 2 Plot Plans and Summary Sheets 4 16 188 208 3 Design Cross Sections 2 48 24 24 98 _4 Right7pf-Way Laygut Sheets 20 20 40 80 Subtotal Modified Tasks 10 112 68 514 64 0 0 768 TOTAL HOURS (24) (22) (284) 454 40 0 0 164 • I..,1work\ADMIN 1 STAFFHRS\[Wet 63 Initial Design Scope Modifications Apr 2009 XLSN.S,63 Scope Modifications I