HomeMy WebLinkAboutSUBCONSULTANT SERVICES - RDG IA INC D/B/A RDG PLANNING & DESIGN EarthTech 501 Sycamore Street P 319.232.6531
Suite 222 F 319.232.0271
A tgca International Ltd.Company Waterloo, IA 50703 earthtech.com
SUBCONSULTANT SERVICES AGREEMENT
PROJECT NAME: U.S. Highway 63 Improvements
U.S. 218 to Donald Street('Project")
Waterloo, Iowa
This Agreement is by and between
Subconsultant
RDG IA Inc d/b/a RDG Planning&Design("Subconsultant")
301 Grand Avenue
Des Moines, Iowa 50309
and,
Earth Tech, Inc.
501 Sycamore, Suite 222
P.O. Box 1497
Waterloo, Iowa 50704-1497
Who agree as follows:
Earth Tech hereby engages Subconsultant to perform the services set forth in Part I("Services")and Subconsultant
agrees to perform the Services for the compensation set forth in Part III. Subconsultant and Earth Tech agree that this
signature page,together with Parts I-IV and attachments referred to therein,and the Prime Agreement,constitute the
entire agreement between them relating to the Project("Agreement").
APPROV D OR BCONSULTANT APPROVED F H TECH
By By \i(2eZ
Title P/'/nGra( Title Vice President
Date c3 "c5/-a Date March 29, 2006
PART I
SUBCONSULTANT'S RESPONSIBILITIES
A. SCOPE
Earth Tech has submitted an Agreement for Professional Services to the City of Waterloo,Iowa,("Client"),
which is the Prime Agreement. The services to be provided by Subconsultant to Earth Tech are a portion of
the services required under this agreement.
The services to be provided shall include preparation of gateway development concepts which will be
coordinated with the overall corridor enhancement, master plan and the enhancement plans for the City's
riverfront development project and other downtown enhancement plans. The Subconsultant shall provide the
services in accordance with the project schedule developed by Earth Tech's project manager for the Project.
The services are further defined in the Prime Agreement and Attachment A.
PART II
EARTH TECH'S RESPONSIBILITIES
Earth Tech shall, at its expense,do the following:
A. INFORMATION/REPORTS
Provide reports, studies and similar information provided to Earth Tech by Client relating to the Services.
B. REPRESENTATIVE
Designate a representative who shall have the authority to transmit instructions,receive information,interpret
and define Earth Tech's requirements and make decisions with respect to the Services.
C. DECISIONS
Provide criteria and information as to Earth Tech's requirements for the Services,attend meetings and make
decisions on matters relating to the Services.
D. MEETINGS
Advise the Subconsultant of review meetings with the Client and needed submittals for these meetings.
-2-
PART III
SUBCONSULTANT COMPENSATION,BILLING,AND PAYMENT
A. COMPENSATION
Compensation for the Services shall be on a unit price basis in accordance with the following hourly rates:
Landscape Architect V $98.50
Landscape Architect II 59.00
Landscape Architect III 50.00
Lead Artist 93.50
PC I 43.50
PA I 84.00
Maximum Amount Payable is the total cost of Fifty-Five Thousand Six Hundred Dollars($55,600.00),which
shall not be exceeded without written approval of Earth Tech and concurrence by the Client. The Maximum
Amount Payable is estimated in Attachment B.
A contingency amount of Four Thousand Dollars($4,000.00)has been established for this agreement and is
included in the Maximum Amount Payable. Written requests by the subconsultant indicating cause of cost
overruns and written approval by Earth Tech and Client is needed prior to usage of the contingency amount.
B. BILLING AND PAYMENT
1. Timing/Format
Subconsultant shall bill Earth Tech monthly for Services completed at the time of billing. Such bills
shall be prepared in a form and supported by documentation as Earth Tech may reasonably require,
and as may be required by Client. Earth Tech shall pay Subconsultant within 10 days of payment to
Earth Tech by Client, which payment shall be a condition precedent for payment under this
Agreement,less any retainage by Client or otherwise specified in this Agreement.
2. Billing Records
Subconsultant shall maintain accounting records of its costs in accordance with generally accepted
accounting practices and, if required by the Prime Agreement, in compliance with Federal
Acquisition Regulations. Access to such records will be provided during normal business hours with
reasonable notice during the term of this Agreement and for 3 years after Iowa DOT audit of project
costs. All invoices shall indicate Earth Tech project number and representative.
L:\work\ADMIN\AGREE\SUB\RDGUS63Impr.doc
-3-
PART IV
SUBCONSULTANT STANDARD TERMS AND CONDITIONS
1. STANDARD OF CARE. Services shall be performed in accordance with(a)the upon receipt of such certificates. Annual renewal certificates shall be provided during
standard of professional practice ordinarily exercised by the applicable profession at the the term of this Agreement evidencing no reduction in required coverages.
time and within the locality where the Services are performed,and(b)applicable laws
and regulations,including,but not limited to,laws and regulations for the protection of 8. INDEMNIFICATION.The Subconsultant agrees,to the fullest extent permitted
the environment Subconsultant will,upon notice by Earth Tech,timely re-perform any by law, to indemnify and hold harmless Earth Tech, its officers, directors and
non-conforming services without additional compensation. If deficiencies are not employees(collectively,Earth Tech)against all damages,liabilities or costs,including
corrected in a timely manner,Earth Tech may cause the same to be corrected and reasonable attorneys' fees and defense costs, to the extent caused by the
deduct costs incurred by reason of such deficiency from Subconsultant's compensation, Subconsultant's negligent erformance ofprofessional services under this Agreement
p
and,if Subconsultant's remaining compensation is not sufficient to reimburse Earth and that of its subconsultants or anyone for whom the Subconsultant is legally liable.
Tech for such costs,recover the same from Subconsultant. The Subconsultant shall not be obligated to indemnify Earth Tech in any manner
whatsoever for Earth Tech's own negligence.
2.CHANGE OF SCOPE.The scope of Services set forth in this Agreement is based
on facts known at the time of execution of this Agreement.For some projects involving Earth Tech agrees,to the fullest extent permitted by law,to inderrmify and hold
conceptual or process development services,scope may not be filly definable during harmless Subconsultant, its officers, directors and employees (collectively,
initial phases. As the Project progresses,facts discovered may indicate that scope Subconsultant)against all damages,liabilities or costs,including reasonable attorneys'
should be redefined. Subconsultant will promptly inform Earth Tech in writing of such fees and defense costs,to the extent caused by Earth Tech's negligent performance of
situations, and if the facts discovered constitute a material change in Project professional services under this Agreement and that of its subconsultants or anyone for
assumptions,the parties shall renegotiate this Agreement as necessary.No payment for whom Earth Tech is legally liable. Earth Tech shall not be obligated to indemnify
services beyond those described in the original scope will be authorized without a Subconsultant in any manner whatsoever for Subconsultanfs own negligence.
written amendment to this Agreement.
9.PROPRIETARY INFORMATION.Information relating to the Project,unless in
3.SAFETY.Subconsultant shall establish and maintain programs and procedures for the public domain,shall be kept confidential by Subconsultant and shall not be made
the safety of its employees. Subconsultant shall also comply with safety programs and available to third parties without written consent of Earth Tech.
procedures governing the Project site. Unless specifically set forth in this Agreement,
Earth Tech specifically disclaims any authority or responsibility for general job site 10.INDEPENDENT CONTRACTOR.Subconsultant is an independent Contractor
safety and safety of persons other than Earth Tech employees. and will maintain complete control of and responsibility for its employees,agents,
methods, and operations. Nothing contained in this Agreement will create any
4.DELAYS.If events beyond the control of Subconsultant,including,but not limited contractual relationship between Client and Subconsultant
to,fire,flood,explosion,riot,strike,war,process shutdown,act of God or the public
enemy,and act or regulation of any government agency,result in delay to any schedule 11.AMENDMENT.This Agreement,upon execution by both parties hereto,can be
established in this Agreement,such schedule shall be extended for a period equal to the amended only by a written instrument signed by both parties.
delay.
12. ASSIGNMENT/SUBCONTRACTING.Except for assignments(a)to entities
5. TERMINATION/SUSPENSION. Either party may terminate this Agreement which control,or are controlled by,the parties hereto or(b)resulting from operation of
upon 30 days written notice to the other party. Earth Tech shall pay Subconsultant for law,the rights and obligations of this Agreement cannot be assigned or subcontracted
all Services, including profit relating thereto, performed in accordance with the by either party without written permission of the other party.This Agreement shall be
requirements of this Agreement prior to termination. binding upon and inure to the benefit of any permitted assigns or subcontractors.
In the event either party defaults in its obligations under this Agreement(including 13. DISPUTE RESOLUTION.Parties shall attempt to settle disputes arising under
Earth Tech's obligation to make the payments required hereunder),the non-defaulting this agreement by discussion between the parties senior representatives of management
party may,after 7 days written notice stating its intention to suspend performance under If any dispute can not be resolved in this manner,within a reasonable length of time,
the Agreement if cure of such default is not commenced and diligently continued,and parties agree to attempt non-binding mediation or any other method of alternative
failure of the defaulting party to commence cure within such time limit and diligently dispute resolution prior to filing any legal proceedings. In the event any actions are
continue,suspend performance under this Agreement brought to enforce this Agreement,the prevailing party shall be entitled to collect its
litigation costs from the other party.
Subconsultant will,upon written notice from Earth Tech,suspend performance under
this Agreement. In such event,Subconsultant will resume performance upon written 14. NO WAIVER.No waiver by either party of any default by the other party in the
notice from Earth Tech and an appropriate extension of time will be mutually agreed performance of any particular section of this Agreement shall invalidate any other
upon and added to Subconsultant's time of performance. section of this Agreement or operate as a waiver of any future default,whether like or
different in character.
6. COORDINATION WITH OTHER CONTRACTORS. Subconsultant
understands that other contractors may be engaged by Client or Earth Tech to perform 15. NO THIRD-PARTY BENEFICIARY. Nothing contained in this Agreement,
services for the Project. Subconsultant shall perform Services in manner,sequence and nor the performance of the parties hereunder,is intended to benefit,nor shall inure to
timing to coordinate with services provided by such other contractors. the benefit of,any third party,including Client's contractors,if any.
7.INSURANCE.Subconsultant shall maintain insurance coverages and performance 16.SEVERABILITY.The various terms,provisions and covenants herein contained
and payment bonds of the same type and with the same limits as required under the shall be deemed to be separate and severable,and the invalidity or unenforceability of
Prime Agreement. Minimum insurance requirements shall be as follows: any of them shall not affect or impair the validity or enforceability of the remainder.
Comprehensive General Liability $1,000,000 17. AUTHORITY. The persons signing this Agreement warrant that they have the
occurrence/aggregate authority to sign as,or on behalf of,the party for whom they are signing.
Automobile Liability $1,000,000
occurrence/aggregate 18. NOTICES. Any notice required hereunder shall be sent to the business address
Worker's Compensation Employers Liability Statutory designated on the signature page of this Agreement and shall be deemed served if sent
Professional Liability $1,000,000 by registered or certified mail or hand-delivered to an officer or authorized
occurrence/aggregate representative of the party to whom the notice is directed.
Umbrella Liability $2,000,000
occurrence/aggregate 19. INCORPORATION OF PRIME AGREEMENT.Subconsultant agrees to be
bound by the Prime Agreement or selected portions thereof which is/are attached to this
Earth Tech shall be named as an additional insured on the first two policies referred to Agreement and incorporated by reference herein. Specifically,and without limitation,
above. Certificates evidencing such coverage will be provided to Earth Tech with the for projects subject to the Federal Acquisition Regulations(FARs),Subconsultant
executed copy of this Agreement providing for 30 days written notice to Earth Tech agrees to comply with all applicable sections of the FARs.
prior to cancellation or modification. Payment to Subconsultant will be contingent m.:\woaKwomImncneesAvesUecoNsurVanc.m o„o
ATTACHMENT A
RDg••
PLANNING•DESIGN
•
12-5-05
PROFESSIONAL SERVICES PROPOSAL
PROJECT NAME
U.S. Highway 63 Improvements
U.S. 218 To Donald Street
Waterloo, Iowa
PROJECT ENGINEER/CLIENT
Earth Tech Transportation Services (ET)
501 Sycamore Street, Suite 222
PO Box 1497
Waterloo, IA 50704
LANDSCAPE ARCHITECT
RDG Planning & Design (RDG)
301 Grand Avenue
Des Moines, IA 50309
Project Principal: Richard E, Gardner, ASLA
Project Manager: Jesse W. Lewis. ASLA
Project Landscape Architect: Laura A. Hawks, ASLA
Lead Project Artist: David B. Dahlquist
LANDSCAPE ARCHITECT SCOPE OF SERVICES
PART I: GENERAL DESCRIPTION
A. GATEWAY DEVELOPMENT CONCEPTS FOR THE U.S. HIGHWAY 63 ENHANCEMENT
MASTER PLAN
RDG will prepare two (1) gateway development concepts which will
include public art concepts for each gateway. The conceptual design
of the gateways will be will be coordinated with the overall
corridor Enhancement Master Plan and the enhancement plans for the
. city's riverfront development project and other downtown enhancement
plans.
B. GATEWAY DEVELOPMENT CONCEPTS will be based upon the following:
1. Conceptual design improvements as described in the: HIGHWAY 63
Planning Study Report (February 2005) ; "Turn Roadway to
Opportunity Highway 63 Corridor Plan" (October 2004) ; the "Cedar
Valley River Renaissance Preliminary Design Report"; and other
reports prepared by or for the City for adjacent downtown areas.
2. Contract Period: 12 months.
3. Contract Scope: As described in Part II
RDG Planning&Design
301 Grand Avenue Tel 515.288.3141
Des Moines,Iowa 50309 Fax 515.288.8631 www.rdgusa.com RDG IA Inc
U.S. Highway 63 Improvements
U.S. 218 To Donald Street
Waterloo, Iowa
page 2
4. Coordination of services and deliverables with Earth Tech and
Craig Ritland Landscape Architects (CRLA) .
PART II: PHASE 1 SCOPE OF SERVICES:
Task 1. Survey and Base Mapping.
.1 Review survey and base map information to ensure that
pertinent data is provided in order to generate master plan,
gateway and railroad underpass landscape enhancements. Review
proposed Right of Way areas at gateways to ensure sufficient
space for Gateway Elements.
.2 Project coordination and communications with Earth Tech
Task 2. Traffic and Operational Analysis
.1 Review traffic and operational analysis design requirements to
accommodate projected traffic in relation to gateway sites.
.2 Project coordination and communications with Earth Tech
Task 3. Evaluation of Design Alternatives.
.1 Review final recommendations for intersection/interchange
layouts, turning lane requirements and lengths, typical cross
sections, roadway centerline locations, pedestrian and bicycle
way accommodations, traffic control requirements, and other
design details.
.2 Project coordination and communications with Earth Tech
Task 4. Environmental Documentation.
.1 Review all environmental documentation and studies as they
pertain to gateways and underpass enhancements. - Not Included
.2 Project coordination and communications with Earth Tech - Not
Included
•
Task 5. GATEWAY DEVELOPMENT CONCEPTS / ENHANCEMENT MASTER PLAN.
.1 Grading Enhancements:
.1 Coordinate and where appropriate incorporate master plan
grading concepts with gateway development concepts.
.2 Retaining Wall Enhancements / RR Bridge Abutment Enhancement
Concept
.1 Site reconnaissances
.2 Project meetings included under Tasks 8, 9 and 10
.3 Prepare base map and coordinate drawings
.4 Develop theme and conceptual design.
.5 Develop drawing elevations, perspective sketch, and plan
view
.6 Prepare cost opinion.
.7 Present plans
.8 Revise plans per Client's comments
.9 Final presentation
RDG Planning&Design
301 Grand Avenue Tel 515.288.3141
Des Moines,Iowa 50309 Fax 515.288.8631 www.rdgusa.cor RDG IA Inc 'S410
U.S. Highway 63 Improvements
U.S. 218 To Donald Street
Waterloo, Iowa
page 3
.3 Decorative Paving Details
.1 Coordinate master plan ideas and where appropriate
incorporate master plan concepts with development concepts
for the gateways.
.4 Pedestrian and Bikeway Amenities
.1 Coordinate master plan ideas and where appropriate
incorporate master plan concepts with development concepts
for the gateways.
.5 Lighting
.1 Coordinate master plan ideas and where appropriate
incorporate master plan concepts with development concepts
for the gateways.
.6 Signing and Wayfinding
.1 Coordinate master plan ideas and where appropriate
incorporate master plan concepts with development concepts
for the gateways.
.7 Landscaping and Irrigation Concepts
.1 Coordinate master plan ideas and where appropriate
incorporate master plan concepts with development concepts
for the gateways.
.8 Gateway Concepts for One (1) Site (Hwy 218/63 Interchange
.1 Site reconnaissances
.2. Project meetings included under Tasks 8, 9 and 10
.3 Prepare base map and coordinate drawings
.4 Develop theme and conceptual design.
.5 Develop drawing elevations, perspective sketch, and plan
view
.6 Prepare cost opinion.
.7 Present plans
.8 Revise plans per Client's comments
.9 Final presentation
.9 Artistic Design Concepts for One (1) Site (Hwy 218/63
Interchange)
.1 Site reconnaissances
.2 Project meetings included under tasks 8, 9 and10.
.3 Consultant team design charrette.
.4 Design.
.5 Cost opinion
.6 Presentation graphics
.7 Final presentation
RDG Planning&Design
301 Grand Avenue Tel 515.288,3141
Des Moines,Iowa 50309 Fax 515.288.8631 www.rdgusa.com RDG IA Inc
U.S. Highway 63 Improvements
U.S. 218 To Donald Street
Waterloo, Iowa
page 4
Task 6. Preliminary and Final Design.
.1 Preliminary Design: not included
.2 Final Design: not included
.3 Bid Period Services: not included
.4 Contract Administration Services: not included.
.5 Construction Period Services: not included.
Task 7. Planning Activities
.1 Review planning work pertinent to project scope, and prior to
beginning "Enhancement Plans"
.2 Coordinate with Earth Tech and Vandewalle regarding
recommendations.
Task 8. Public Involvement Activities.
.1 Prepare for and attend General Task Force Meetings (3)
.3 Prepare for attend and participate in a design charrette
conducted by CRLA (1)
Task 9. Project Coordination
.1 Initial project meeting (1) to be included during charrette
.2 Attend project coordination and design review meetings (8)
Task 10. Project Administration and Meetings
.1 Coordination and design meetings - Internal (24)
.2 Project administrations
PART III: DELIVERABLES:
1. Nine (9) Trips to Waterloo (5 meetings with consultant team, 3 meetings
with task force, 1 charrette)
2. Conceptual Plan View (Presentation Graphic Quality) for one Gateway
Site
3. Illustrative Perspective for one Gateway site.
4. Conceptual Plan View for Railroad Overpass Enhancements
5. Illustrative Perspective of Railroad Overpass Enhancements
6. Deliverables 2, 3, 4, and 5 to be presented along with CRLA master
plan work as one "Highway 63 Enhancement Master Plan" package.
Graphics will be provided to the client in a digital file format for
client public relations and marketing purposes.
PROJECT ENGINEER/CLIENT RESPONSIBILITIES:
1. Furnish all historical data; existing conditions mapping, topographic
and boundary survey mapping, and all other site data and mapping
required for the preparation of PRELIMINARY DESIGN documents.
2. Furnish topographic and boundary mapping for the preparation of
PRELIMINARY DESIGN.
RDG Planning&Design
301 Grand Avenue Tel 515.288.3141
Des Moines,Iowa 50309 Fax 515.288.8631 www.rdgusa.com RDG IA Inc •
U.S. Highway 63 Improvements
U.S. 218 To Donald Street
Waterloo, Iowa
page 5
3. Furnish the services of special consultants (civil, structural,
electrical, soils, hydraulic, platting, etc.) , if required beyond the
Scope of Services proposed herein.
4. Furnish the services of a soil engineer when such services are deemed
necessary.
5. Furnish interpretation of all historical, archaeological and wetland
survey data.
6. Furnish interpretations of all required structural, mechanical,
chemical, and other tests, inspections, and reports.
7. Furnish legal, accounting, and insurance counseling services as may be
necessary for the project.
8. Assemble, prepare and publish all final PRELIMINARY DESIGN documents
and all required submittal documentation to include site data mapping,
base mapping, meeting notes and meeting minutes, construction plans,
specification and opinions of probable cost.
9. Furnish project administration services and execute all necessary
services contracts.
End of Scope
253.48_100405_Scope.doc
JWL/LAH/jwl
RDG Planning&Design
301 Grand Avenue Tel 515.288.3141
Des Moines,Iowa 50309 Fax 515.288.8631 www.rdgusa.corn RDG IA Inc '4040
Attachment B
U.S. Highway 63 Improvements
U.S. 218 to Donald Street
Waterloo, Iowa
Initial Design Phase
Cost Analysis
RDG Planning & Design
I. Labor Costs
Category Hours Rate/Hour Amount
Landscape Architect V 99 $98.50 $9,751.50
Landscape Architect II 169 $59.00 $9,971.00
Landscape Architect III 112 $50.00 $5,600.00
Lead Artist 220 $93.50 $20,570.00
PC I 24 $43.50 $1,044.00
PA I 24 $84.00 $2,016.00
Subtotal Labor 648 $48,952.50
II. Expense Costs
Category Units Rate/Unit Amount
Mileage 2360 $0.445 $1,050.20
Meals 16 $10.00 $160.00
Phone & Fax $480.00
Printing $140.00
Presentation Materials $860.00
Subtotal Expenses $2,690.20
III. Total Estimated Costs $51,642.70
Rounded $51,600.00
IV. Contingency $4,000.00
V. Maximum Amount Payable $55,600.00